{{#Wiki_filter:CATEGORY j.REGULA RY XNFORMATXON DXSTRIBUTXO SYSTEM (RIDS)ACCESSION NBR:9809020004 DOC.DATE: 98/08/27 NOTARIZED:
{{#Wiki_filter:CATEGORY j.
YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME.s AUTHOR AFFILXATXON SCAROLA,J.v Carolina Power&.Light Co.RECIP.NAMh RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
REGULA   RY XNFORMATXON DXSTRIBUTXO           SYSTEM (RIDS)
ACCESSION NBR:9809020004             DOC.DATE: 98/08/27 NOTARIZED: YES                   DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                         05000400 AUTH. NAME   . s     AUTHOR AFFILXATXON SCAROLA,J.v           Carolina Power       &. Light Co.
RECIP.NAMh             RECIPIENT AFFILIATION Records Management Branch (Document             Control Desk)


==SUBJECT:==
==SUBJECT:==
Provides rev to 970612 request for license amend to revise TS 6.0,"Administrative Controls," based on recent discussion w/NRC.Proposed new TS 6.2.2.f which used term"Operations middle manager" removed.Revised TS pages encl.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR 1 ENCL J SIZE: TITLE: OR Submittal:
Provides rev to 970612 request for license amend to revise TS 6.0, "Administrative Controls," based on recent discussion w/NRC.Proposed new TS 6.2.2.f which used term "Operations middle manager" removed. Revised TS pages encl.
General Distribution DOCKET 05000400 NOTES:Application for permit renewal filed.05000400 G RECIPIENT ID CODE/NAME PD2-1 LA FLANDERS,S COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 INTERNAL: At" RS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 1 1 1 1 1 1 1'1 0 FILE CENTE NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT 1 1 1 1 1 1 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: AOOID TITLE:  OR COPIES RECEIVED:LTR Submittal: General Distribution 1 ENCL   J   SIZE:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS'R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 s 1 Carolina Power 8 Ught Company PO Box 165 New Hill NC 27562 AUG 27 1998 James Scarola Vice President Harris Nuclear Plant SERIAL: HNP-98-087 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION:
NOTES:Application for permit renewal filed.                                               05000400 G
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 REVISED REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATION DESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVE CONTROLS
RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME         LTTR ENCL        ID  CODE/NAME        LTTR ENCL PD2-1 LA                   1       1     PD2-1 PD                 1    1 FLANDERS,S                1       1 INTERNAL: At"RS                       1        1    FILE  CENTE              1    1 NRR/DE/ECGB/A             1        1    NRR/DE/EMCB              1    1 NRR/DRCH/HICB             1        1    NRR/DSSA/SPLB            1     1
                                            '
NRR/DSSA/SRXB              1              NUDOCS-ABSTRACT           1     1 OGC/HDS2                  1       0 EXTERNAL: NOAC                         1       1     NRC PDR                   1     1 NOTE TO ALL   "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS'R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               14   ENCL     13
 
s 1
Carolina Power 8 Ught Company                                                   James Scarola PO Box 165                                                                     Vice President New Hill NC 27562                                                               Harris Nuclear Plant SERIAL: HNP-98-087 AUG    27    1998                                                                        10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISED REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICALSPECIFICATION 6.0, ADMINISTRATIVECONTROLS


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By letter dated June 12, 1997, Carolina Power&Light Company (CP&L)submitted a Request for License Amendment for the Harris Nuclear Plant (HNP).The proposed amendment revises Technical Specification (TS)6.0,"Administrative Controls." Specifically, the proposed amendment included a revision to TS section 6.2, Organization, which deleted the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold a Senior Reactor Operator (SRO)license, and added a new TS 6.2.2.f which states that"If the Manager-Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." Based on recent discussions with the NRC staff, CP&L is submitting a revision to the June 12, 1997 submittal.
 
The proposed new TS 6.2.2.f which used the term"Operations middle manager" is removed and]an addition to TS 6.2.2.e is provided which better defines the intent of the proposed change.The proposed wording change to TS 6.2.2.e states,"If the Manager-Operations does not hold a Senior Reactor Operator License, an off-shift Operations superintendent who reports directly to the Manager-Operations and holds a Senior Reactor Operator License shall be designated to supervise shift work and licensed activities." CP&L requests that the previously proposed TS Page 6-1a, containing TS 6.2.2.e, be replaced with the enclosed Page 6-la.The remaining proposed TS pages included in CP&L's June 12, 1997 letter are unaffected. provides the revised proposed Technical Specification Page 6-la.A II~t"-~~These changes do not affect the conclusions of either the.,10.,CFR 50.92 Evaluation orsthe Environmental Considerations submitted as part of CP&L's June 12, 1997 letter.9809020004 980827 PDR ADOCK 0500040'0 P PDR I 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095 1 V iV Cg t'1 4 1 l'I e'ocument Control Desk HNP-98-087/Page 2 Please refer any questions regarding this submittal to Mr.J.H.Eads at (919)362-2646.Sincerely, MGW  
By letter dated June 12, 1997, Carolina Power & Light Company (CP&L) submitted a Request for License Amendment for the Harris Nuclear Plant (HNP). The proposed amendment revises Technical Specification (TS) 6.0, "Administrative Controls."               Specifically, the proposed amendment included a revision to TS section 6.2, Organization, which deleted the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold a Senior Reactor Operator (SRO) license, and added a new TS 6.2.2.f which states that "Ifthe Manager - Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." Based on recent discussions with the NRC staff, CP&L is submitting a revision to the June 12, 1997 submittal.
The proposed new TS 6.2.2.f which used the term "Operations middle manager" is removed and                 ]
an addition to TS 6.2.2.e is provided which better defines the intent of the proposed change. The proposed wording change to TS 6.2.2.e states, "If the Manager - Operations does not hold a Senior Reactor Operator License, an off-shift Operations superintendent who reports directly to the Manager - Operations and holds a Senior Reactor Operator License shall be designated to supervise shift work and licensed activities." CP&L requests that the previously proposed TS Page 6-1a, containing TS 6.2.2.e, be replaced with the enclosed Page 6-la. The remaining proposed TS pages included in CP&L's June 12, 1997 letter are unaffected.
Enclosure    1  provides the revised proposed Technical Specification Page 6-la.
A II ~                   t"     -~ ~
These changes do not affect the conclusions of either the.,10.,CFR 50.92 Evaluation orsthe Environmental Considerations submitted as part of CP&L's June 12, 1997 letter.
9809020004 980827 PDR       ADOCK 0500040'0 P                         PDR                   I 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502   Fax 919 362-2095
 
V 1
iV Cg t
l'
  '1       4   I 1
 
'ocument     Control Desk e
HNP-98-087/Page 2 Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 362-2646.
Sincerely, MGW


==Enclosure:==
==Enclosure:==
: 1. Technical Specification Pages James Scarola, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are employees, contractors, and agents of Carolina Power & Light Company.
Notary (Sea )
Mycommissionexpires: @-7          M~                                                    egal. Rgp yO>Ay    4 Oy~
V+
                                                                                            >sue Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. M. Fry, Acting Director N.C. DEHNR                                          COU~P.
Mr. S. C. Flanders (NRR Project Manager, HNP)
Mr. L. A. Reyes, NRC Regional Administrator
/
h,    hf ~ g
        ~',<,'0' )
P
    ,v l~


1.Technical Specification Pages James Scarola, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are employees, contractors, and agents of Carolina Power&Light Company.Mycommissionexpires:
E     OSURE 1 to HNP-98-087 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISED REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICALSPECIFICATION 6.0, ADMINISTRATIVECONTROLS TECHNICALSPECIFICATION PAGES}}
@-7 M~Mr.J.B.Brady, NRC Sr.Resident Inspector Mr.M.Fry, Acting Director N.C.DEHNR Mr.S.C.Flanders (NRR Project Manager, HNP)Mr.L.A.Reyes, NRC Regional Administrator Notary (Sea)egal.Rgp yO>Ay 4 Oy~>sue V+COU~P.
/h, hf~g)P ,v~',<,'0'l~
E OSURE 1 to HNP-98-087 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400/LICENSE NO.NPF-63 REVISED REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATION DESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVE CONTROLS TECHNICAL SPECIFICATION PAGES}}

Revision as of 05:43, 22 October 2019

Provides Rev to 970612 Request for License Amend to Revise TS 6.0, Administrative Controls, Based on Recent Discussion W/Nrc.Proposed New TS 6.2.2.f Which Used Term Operations Middle Manager Removed.Revised TS Pages Encl
ML18016A536
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/27/1998
From: Scarola J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A537 List:
References
HNP-98-087, HNP-98-87, NUDOCS 9809020004
Download: ML18016A536 (6)


Text

CATEGORY j.

REGULA RY XNFORMATXON DXSTRIBUTXO SYSTEM (RIDS)

ACCESSION NBR:9809020004 DOC.DATE: 98/08/27 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME . s AUTHOR AFFILXATXON SCAROLA,J.v Carolina Power &. Light Co.

RECIP.NAMh RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Provides rev to 970612 request for license amend to revise TS 6.0, "Administrative Controls," based on recent discussion w/NRC.Proposed new TS 6.2.2.f which used term "Operations middle manager" removed. Revised TS pages encl.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution 1 ENCL J SIZE:

NOTES:Application for permit renewal filed. 05000400 G

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL: At"RS 1 1 FILE CENTE 1 1 NRR/DE/ECGB/A 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1

'

NRR/DSSA/SRXB 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS'R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

s 1

Carolina Power 8 Ught Company James Scarola PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant SERIAL: HNP-98-087 AUG 27 1998 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISED REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICALSPECIFICATION 6.0, ADMINISTRATIVECONTROLS

Dear Sir or Madam:

By letter dated June 12, 1997, Carolina Power & Light Company (CP&L) submitted a Request for License Amendment for the Harris Nuclear Plant (HNP). The proposed amendment revises Technical Specification (TS) 6.0, "Administrative Controls." Specifically, the proposed amendment included a revision to TS section 6.2, Organization, which deleted the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold a Senior Reactor Operator (SRO) license, and added a new TS 6.2.2.f which states that "Ifthe Manager - Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." Based on recent discussions with the NRC staff, CP&L is submitting a revision to the June 12, 1997 submittal.

The proposed new TS 6.2.2.f which used the term "Operations middle manager" is removed and ]

an addition to TS 6.2.2.e is provided which better defines the intent of the proposed change. The proposed wording change to TS 6.2.2.e states, "If the Manager - Operations does not hold a Senior Reactor Operator License, an off-shift Operations superintendent who reports directly to the Manager - Operations and holds a Senior Reactor Operator License shall be designated to supervise shift work and licensed activities." CP&L requests that the previously proposed TS Page 6-1a, containing TS 6.2.2.e, be replaced with the enclosed Page 6-la. The remaining proposed TS pages included in CP&L's June 12, 1997 letter are unaffected.

Enclosure 1 provides the revised proposed Technical Specification Page 6-la.

A II ~ t" -~ ~

These changes do not affect the conclusions of either the.,10.,CFR 50.92 Evaluation orsthe Environmental Considerations submitted as part of CP&L's June 12, 1997 letter.

9809020004 980827 PDR ADOCK 0500040'0 P PDR I 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095

V 1

iV Cg t

l'

'1 4 I 1

'ocument Control Desk e

HNP-98-087/Page 2 Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 362-2646.

Sincerely, MGW

Enclosure:

1. Technical Specification Pages James Scarola, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are employees, contractors, and agents of Carolina Power & Light Company.

Notary (Sea )

Mycommissionexpires: @-7 M~ egal. Rgp yO>Ay 4 Oy~

V+

>sue Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. M. Fry, Acting Director N.C. DEHNR COU~P.

Mr. S. C. Flanders (NRR Project Manager, HNP)

Mr. L. A. Reyes, NRC Regional Administrator

/

h, hf ~ g

~',<,'0' )

P

,v l~

E OSURE 1 to HNP-98-087 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISED REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICALSPECIFICATION 6.0, ADMINISTRATIVECONTROLS TECHNICALSPECIFICATION PAGES