Provides Rev to 970612 Request for License Amend to Revise TS 6.0, Administrative Controls, Based on Recent Discussion W/Nrc.Proposed New TS 6.2.2.f Which Used Term Operations Middle Manager Removed.Revised TS Pages Encl
ML18016A536
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/27/1998
From: Scarola J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A537 List:
References
HNP-98-087, HNP-98-87, NUDOCS 9809020004
Download: ML18016A536 (6)


Text

CATEGORY j.

REGULA RY XNFORMATXON DXSTRIBUTXO SYSTEM (RIDS)

ACCESSION NBR:9809020004 DOC.DATE: 98/08/27 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME . s AUTHOR AFFILXATXON SCAROLA,J.v Carolina Power &. Light Co.

RECIP.NAMh RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Provides rev to 970612 request for license amend to revise TS 6.0, "Administrative Controls," based on recent discussion w/NRC.Proposed new TS 6.2.2.f which used term "Operations middle manager" removed. Revised TS pages encl.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution 1 ENCL J SIZE:

NOTES:Application for permit renewal filed. 05000400 G

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL: At"RS 1 1 FILE CENTE 1 1 NRR/DE/ECGB/A 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS'R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

s 1

Carolina Power 8 Ught Company James Scarola PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant SERIAL: HNP-98-087 AUG 27 1998 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISED REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICALSPECIFICATION 6.0, ADMINISTRATIVECONTROLS

Dear Sir or Madam:

By letter dated June 12, 1997, Carolina Power & Light Company (CP&L) submitted a Request for License Amendment for the Harris Nuclear Plant (HNP). The proposed amendment revises Technical Specification (TS) 6.0, "Administrative Controls." Specifically, the proposed amendment included a revision to TS section 6.2, Organization, which deleted the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold a Senior Reactor Operator (SRO) license, and added a new TS 6.2.2.f which states that "Ifthe Manager - Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." Based on recent discussions with the NRC staff, CP&L is submitting a revision to the June 12, 1997 submittal.

The proposed new TS 6.2.2.f which used the term "Operations middle manager" is removed and ]

an addition to TS 6.2.2.e is provided which better defines the intent of the proposed change. The proposed wording change to TS 6.2.2.e states, "If the Manager - Operations does not hold a Senior Reactor Operator License, an off-shift Operations superintendent who reports directly to the Manager - Operations and holds a Senior Reactor Operator License shall be designated to supervise shift work and licensed activities." CP&L requests that the previously proposed TS Page 6-1a, containing TS 6.2.2.e, be replaced with the enclosed Page 6-la. The remaining proposed TS pages included in CP&L's June 12, 1997 letter are unaffected.

Enclosure 1 provides the revised proposed Technical Specification Page 6-la.

A II ~ t" -~ ~

These changes do not affect the conclusions of either the.,10.,CFR 50.92 Evaluation orsthe Environmental Considerations submitted as part of CP&L's June 12, 1997 letter.

9809020004 980827 PDR ADOCK 0500040'0 P PDR I 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095

V 1

iV Cg t

l'

'1 4 I 1

'ocument Control Desk e

HNP-98-087/Page 2 Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 362-2646.

Sincerely, MGW

Enclosure:

1. Technical Specification Pages James Scarola, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are employees, contractors, and agents of Carolina Power & Light Company.

Notary (Sea )

Mycommissionexpires: @-7 M~ egal. Rgp yO>Ay 4 Oy~

V+

>sue Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. M. Fry, Acting Director N.C. DEHNR COU~P.

Mr. S. C. Flanders (NRR Project Manager, HNP)

Mr. L. A. Reyes, NRC Regional Administrator

/

h, hf ~ g

~',<,'0' )

P

,v l~

E OSURE 1 to HNP-98-087 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISED REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICALSPECIFICATION 6.0, ADMINISTRATIVECONTROLS TECHNICALSPECIFICATION PAGES