ML18139B364: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,.r :. ~.; -' ' -~
{{#Wiki_filter:' ' -~
* VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINJA 23261 May 29, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINJA 23261
Serial No. 333 NO/DWL:ms Docket Nos. 50-280, 50-281 50-338, 50-339 License Nos. DPR-32, DPR-37 NPF-4, NPF-7 NUREG-0737 POST-TMI REQUIREMENTS CLARIFICATION OF ITEM II.F.1 EXCEPTIONS In our letter of December 15, 1980 (Serial No. 985), Vepco stated that some design information regarding the gaseous effluent monitoring systems required by NUREG-0737, Item II .F .1 (Parts 1 and 2) would not be available by the required date of January 1, 1981. It was also stated that the final mentation date of January 1, 1982 would be met and that the missing design information would be provided prior to this implementation date. This letter will provide additional clarification of our position regarding this schedule exception.
* May 29, 1981 Mr. Harold R. Denton, Director                               Serial No. 333 Office of Nuclear Reactor Regulation                         NO/DWL:ms Attn: Mr. Darrell G. Eisenhut, Director                     Docket Nos. 50-280, 50-281 Division of Licensing                                              50-338, 50-339 U. S. Nuclear Regulatory Commission                          License Nos. DPR-32, DPR-37 Washington, D. C. 20555                                                      NPF-4, NPF-7 Gentlemen:
The design information which was not provided in our December 15, 1980 submittal was omitted due to the lack of vendor supplied specific design and operating information.
NUREG-0737 POST-TMI REQUIREMENTS CLARIFICATION OF ITEM II.F.1 EXCEPTIONS In our letter of December 15, 1980 (Serial No. 985), Vepco stated that some design information regarding the gaseous effluent monitoring systems required by NUREG-0737, Item II .F .1 (Parts 1 and 2) would not be available by the required date of January 1, 1981. It was also stated that the final imple-mentation date of January 1, 1982 would be met and that the missing design information would be provided prior to this implementation date. This letter will provide additional clarification of our position regarding this schedule exception.
Accordingly, a final design description and as-built system drawings were not available.
The design information which was not provided in our December 15, 1980 submittal was omitted due to the lack of vendor supplied specific design and operating information. Accordingly, a final design description and as-built system drawings were not available. This vendor information is being received by Vepco in time to meet the implementation date of January 1, 1982. It is our intention to have available for review all final design information including final system drawings by November 1, 1981. Final station procedures to calibrate and operate these systems would not be available by November 1, 1981 but would, however, be available prior to the scheduled illlplementation date. The basis for these.procedures is part of the vendor supplied informa-tion. These vendor supplied "operating instructions" could be provided as a preliminary description of the final operating procedures, if necessary.
This vendor information is being received by Vepco in time to meet the implementation date of January 1, 1982. It is our intention to have available for review all final design information including final system drawings by November 1, 1981. Final station procedures to calibrate and operate these systems would not be available by November 1, 1981 but would, however, be available prior to the scheduled illlplementation date. The basis for these.procedures is part of the vendor supplied tion. These vendor supplied "operating instructions" could be provided as a preliminary description of the final operating procedures, if necessary.
If the;re are any questions or concerns regarding this information, please contact this office.
If the;re are any questions or concerns regarding this information, please contact this office. cc: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. Robert A. Clark, .J:hief Operating Reactors Branch No. 3 Divisiqn of Licensing I Very truly yours, -;z-) /V/. ~;,J f ' B. R. Sylvia J Manager -Nuclear Operations and Maintenance
Very truly yours,
.-'!}}
                                                                  -;z-) /V/. ~;,J
                                                              ~ B. R. Sylvia f'
J Manager - Nuclear Operations and Maintenance
,.r
~.;
:.
      -
cc:   Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. Robert A. Clark, .J:hief Operating Reactors Branch No. 3 Divisiqn of Licensing I
                                                                                        .-'!}}

Revision as of 03:12, 21 October 2019

Provides Addl Clarification of Licensee Position Re post-TMI Requirements of NUREG-0737,Item II.F.1,Parts 1 & 2,re Gaseous Effluent Monitoring Sys Design Info.Final Design Info & Sys Drawings Will Be Provided by 811101
ML18139B364
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 05/29/1981
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Eisenhut D
Office of Nuclear Reactor Regulation
References
TASK-2.F.1, TASK-TM 333, NUDOCS 8106030318
Download: ML18139B364 (1)


Text

' ' -~

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINJA 23261

  • May 29, 1981 Mr. Harold R. Denton, Director Serial No. 333 Office of Nuclear Reactor Regulation NO/DWL:ms Attn: Mr. Darrell G. Eisenhut, Director Docket Nos. 50-280, 50-281 Division of Licensing 50-338, 50-339 U. S. Nuclear Regulatory Commission License Nos. DPR-32, DPR-37 Washington, D. C. 20555 NPF-4, NPF-7 Gentlemen:

NUREG-0737 POST-TMI REQUIREMENTS CLARIFICATION OF ITEM II.F.1 EXCEPTIONS In our letter of December 15, 1980 (Serial No. 985), Vepco stated that some design information regarding the gaseous effluent monitoring systems required by NUREG-0737, Item II .F .1 (Parts 1 and 2) would not be available by the required date of January 1, 1981. It was also stated that the final imple-mentation date of January 1, 1982 would be met and that the missing design information would be provided prior to this implementation date. This letter will provide additional clarification of our position regarding this schedule exception.

The design information which was not provided in our December 15, 1980 submittal was omitted due to the lack of vendor supplied specific design and operating information. Accordingly, a final design description and as-built system drawings were not available. This vendor information is being received by Vepco in time to meet the implementation date of January 1, 1982. It is our intention to have available for review all final design information including final system drawings by November 1, 1981. Final station procedures to calibrate and operate these systems would not be available by November 1, 1981 but would, however, be available prior to the scheduled illlplementation date. The basis for these.procedures is part of the vendor supplied informa-tion. These vendor supplied "operating instructions" could be provided as a preliminary description of the final operating procedures, if necessary.

If the;re are any questions or concerns regarding this information, please contact this office.

Very truly yours,

-;z-) /V/. ~;,J

~ B. R. Sylvia f'

J Manager - Nuclear Operations and Maintenance

,.r

~.;

.

-

cc: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. Robert A. Clark, .J:hief Operating Reactors Branch No. 3 Divisiqn of Licensing I

.-'!