ML14225A621: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training)
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Pressurize the Main Steam Lines JPM Number: 2014 ILT NRC JPM c Revision Number: 00 Date: __10/15/2013___
Page 1 of 13 Exelon Nuclear Job Performance Measure Pressurize the Main Steam Lines JPM Number: 2014 ILT NRC JPM c Revision Number: 00 Date: __10/15/2013___
Developed By:
Developed By:
Instructor Date  
Instructor         Date Validated By:
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 13


Validated By:
2014 ILT NRC JPM c - Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date
 
2014 ILT NRC JPM c - Rev 00 Page 2 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initia l validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included. ________ 3. Performance location specified. (in-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified. ________ 5. Initiating cue (and terminating cue if required) are properly identified. ________ 6. Task standards identifi ed and verified by SME review. ________ 7. Critical steps meet the criteria for critical step s and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contai ns criteria for successful completion. ________ 9. Verify the procedure(s) referenced by this JPM re flects the current revision:
________   1. Task description and number, JPM description and number are identified.
Procedure QCOP 0250-01 Rev: 12 Procedure Rev:   Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict. ________ 11. Verify performance time is accurate
________   2. Knowledge and Abilities (K/A) references are included.
________ 12. If the JPM cannot be performed as written wit h proper responses, then revise the JPM. ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________   3. Performance location specified. (in-plant, control room, simulator, or other)
SME / Instructor Date  
________   4. Initial setup conditions are identified.
 
________   5. Initiating cue (and terminating cue if required) are properly identified.
SME / Instructor Date  
________   6. Task standards identified and verified by SME review.
 
________   7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
SME / Instructor Date  
________   8. If an alternate path is used, the task standard contains criteria for successful completion.
________   9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure QCOP 0250-01           Rev: 12 Procedure                       Rev:
Procedure                       Rev:
________   10. Verify cues both verbal and visual are free of conflict.
________   11. Verify performance time is accurate
________   12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________   13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date Page 2 of 13


2014 ILT NRC JPM c - Rev 00 Page 3 of 13 Revision Record (Summary)
2014 ILT NRC JPM c - Rev 00 Revision Record (Summary)
Revision 00, Renamed 2014 ILT NRC JPM c. Restarted numbering accordingly.  
Revision 00, Renamed 2014 ILT NRC JPM c. Restarted numbering accordingly.
 
Previous changes were:
Previous changes were:  
This JPM is developed IAW guidelines established in NUREG 1021 Rev 9 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 "Control Room Systems," for RO/SRO candidates.
 
This JPM is developed IAW guidelines established in NUREG 1021 Rev 9 ES-301 and Appendix C. This JPM meets th e criteria of Category B.1 "Control Room Systems," for RO/SRO candidates.
Bank JPM LS-009-II Rev. 11 was used as the basis for this JPM, which was revised to reflect procedure and JPM template changes for the 2009 ILT NRC licensing exam.
Bank JPM LS-009-II Rev. 11 was used as the basis for this JPM, which was revised to reflect procedure and JPM template changes for the 2009 ILT NRC licensing exam.
This JPM was also revised to start at a lowe r power, and more stable, initial condition to facilitate the performance of t he other JPMs in the set.
This JPM was also revised to start at a lower power, and more stable, initial condition to facilitate the performance of the other JPMs in the set.
2014 ILT NRC JPM c - Rev 00 Page 4 of 13 SIMULATOR SETUP INSTRUCTIONS 1. Reset the simulator to IC 18. 2. Go to run
Page 3 of 13


NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and ot her JPMs that are scheduled to be run concurrently.
2014 ILT NRC JPM c - Rev 00 SIMULATOR SETUP INSTRUCTIONS
Setup Instructions - Enter/perfo rm the following commands and actions
: 1. Reset the simulator to IC 18.
: 3. Malfunctions and remote functions: (contained in caep file "C caep.cae")
: 2. Go to run NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
Setup Instructions - Enter/perform the following commands and actions
: 3. Malfunctions and remote functions: (contained in caep file C caep.cae)
Cause a group 1(2 commands)l00:00:00l01 imf rp05al00:00:02l02 imf rp05bl00:00:04l03 Remove Group 1 signalsl00:00:00l04 dmf rp05al00:00:06l05 dmf rp05bl00:00:08l06 Override 901-3 A-16 offl00:00:00l07 imf ser0717 offl00:00:10l08 delete DW pneu air leakagel00:00:00l09 irf ia13r 0l00:00:12l10
Cause a group 1(2 commands)l00:00:00l01 imf rp05al00:00:02l02 imf rp05bl00:00:04l03 Remove Group 1 signalsl00:00:00l04 dmf rp05al00:00:06l05 dmf rp05bl00:00:08l06 Override 901-3 A-16 offl00:00:00l07 imf ser0717 offl00:00:10l08 delete DW pneu air leakagel00:00:00l09 irf ia13r 0l00:00:12l10
* Do NOT reset the Group 1 Isolation during QCGP 2-3 actions.
* Do NOT reset the Group 1 Isolation during QCGP 2-3 actions.
Line 55: Line 61:
* Monitor RPV Level and Pressure throughout:
* Monitor RPV Level and Pressure throughout:
* RPV pressure will rise very slowly at approximately 2 psig / minute.
* RPV pressure will rise very slowly at approximately 2 psig / minute.
* RPV Level will rise slowly due to heating up the post-scram water. This results in the RFPs tripping several minutes into t he JPM (and possibly again when the MSIVs are reopened).
* RPV Level will rise slowly due to heating up the post-scram water. This results in the RFPs tripping several minutes into the JPM (and possibly again when the MSIVs are reopened).
* When the Feed Pump trips, restart the Feed Pump.
* When the Feed Pump trips, restart the Feed Pump.
: 4. Remotes/Overrides:
: 4. Remotes/Overrides:
* Override the following panels' acknowledge buttons to the "acknowledge" position using the Sim Op computer to sele ct the button and override the position to "ACK" (expert commands not available to perform this function) o 901-3 o 901-4 o 901-6 o 901-53 o 901-54 5. Verify the following control panel lineups:
* Override the following panels acknowledge buttons to the acknowledge position using the Sim Op computer to select the button and override the position to ACK (expert commands not available to perform this function) o 901-3 o 901-4 o 901-6 o 901-53 o 901-54
2014 ILT NRC JPM c - Rev 00 Page 5 of 13
: 5. Verify the following control panel lineups:
Page 4 of 13
 
2014 ILT NRC JPM c - Rev 00
* The Main Steam Line Drain Valves are CLOSED.
* The Main Steam Line Drain Valves are CLOSED.
* All Turbine Bypass Valves are CLOSED.
* All Turbine Bypass Valves are CLOSED.
* On the <CONTROL> <RX COOLDOWN> screen, verify REACTOR COOLDOWN is OFF. 6. Verify that a blank current revision of QCOP 0250-01 "PRESSURIZING THE MAIN STEAM LINES", is available 7. Snap the setup to Zero when all other conditions for concurrently run JPMs are established. 8. Place AO 1-4723 in "Man Open" (901-4 panel) 9. This completes the setup for this JPM.JPM C QCOP 0250-01, Rev 012, P RF:\2014 ILT NRC Exam\JPMs\Systems J
* On the <CONTROL> <RX COOLDOWN> screen, verify REACTOR COOLDOWN is OFF.
2014 ILT NRC JPM c - Rev 00 Page 6 of 13 INITIAL CONDITIONS - You are the Unit 1 ANSO. - A spurious Group I Isolation occurred approximately 30 minutes ago. - Reactor water level ha s been maintained <100
: 6. Verify that a blank current revision of QCOP 0250-01 PRESSURIZING THE MAIN STEAM LINES, is available
" by Feed/C ondensate. - An extra reactor operator will control pressure between 800 and 1000 psig with relief valves. - A Shift Supervisor is standing by to provide the necessary verifications. - Group 1 isolation signals do NOT need to be bypassed. - This JPM is NOT time critical.
: 7. Snap the setup to Zero when all other conditions for concurrently run JPMs are established.
: 8. Place AO 1-4723 in Man Open (901-4 panel)
JPM C QCOP         F:\2014 ILT NRC 0250-01, Rev 012, PRExam\JPMs\Systems J
: 9. This completes the setup for this JPM.
Page 5 of 13


INITIATING CUE Pressurize the Main Steam lines and re-open the MSIV's per QCOP 0250-01 "PRESSURIZING THE MAIN STEAM LINES". Notify the Unit Superviso r when the MSIVs are open. {When candidate acknowledges the cue, provide the candidate with the procedure QCOP 0250-01}
2014 ILT NRC JPM c - Rev 00 INITIAL CONDITIONS
-        You are the Unit 1 ANSO.
-        A spurious Group I Isolation occurred approximately 30 minutes ago.
-        Reactor water level has been maintained <100 by Feed/Condensate.
-        An extra reactor operator will control pressure between 800 and 1000 psig with relief valves.
-        A Shift Supervisor is standing by to provide the necessary verifications.
-        Group 1 isolation signals do NOT need to be bypassed.
-        This JPM is NOT time critical.
INITIATING CUE Pressurize the Main Steam lines and re-open the MSIV's per QCOP 0250-01 PRESSURIZING THE MAIN STEAM LINES.
Notify the Unit Supervisor when the MSIVs are open.
{When candidate acknowledges the cue, provide the candidate with the procedure QCOP 0250-01}
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elemen ts of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Nu mber" column on the following pages. Then annotate that comment in the "C omments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marg inal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment i ssues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Some operations that are perform ed from outside of the contro l room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to per form groups of procedure steps instead of calling for each individual item to be performed.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
2014 ILT NRC JPM c - Rev 00 Page 7 of 13 JPM Start Time:
Page 6 of 13
STEP ELEMENT STANDARD SAT UNSAT Comment Number *F.1. *Place MN STM ISOL RESET to INBD.
* Places MN STM ISOL RESET switch on the 901-5


panel to INBD position. ___ ______
2014 ILT NRC JPM c - Rev 00 JPM Start Time:
*F.2. *Place MN STM ISOL RESET to OUTBD.
Comment SAT  UNSAT STEP              ELEMENT                          STANDARD Number
* Places MN STM ISOL RESET switch on the 901-5 panel to OUTBD position. ___ ______
*F.1.    *Place MN STM ISOL RESET to      Places MN STM ISOL              ___  ___    ___
*F.3 *At the DEHC Operator's Workstation, on the  
INBD.
<CONTROL> <PRESSURE  
* RESET switch on the 901-5 panel to INBD position.
 
*F.2.   *Place MN STM ISOL RESET to       Places MN STM ISOL              ___  ___    ___
CONTROL> screen, adjust DEHC Pressure Set 200 psig above reactor pressure OR as high as possible.
OUTBD.
* Pressure Set adjusted to at least 200 psig above reactor
* RESET switch on the 901-5 panel to OUTBD position.
 
*F.3     *At the DEHC Operators          Pressure Set adjusted to at      ___  ___    ___
pressure.
Workstation, on the               least 200 psig above reactor
* Select STPT/RAMP
        <CONTROL> <PRESSURE               pressure.
* Enter desired value for Set Point and a desired value for  
CONTROL> screen, adjust
 
* Select STPT/RAMP DEHC Pressure Set 200 psig above reactor pressure OR as
Ramp. Select OK to  
* Enter desired value for high as possible.
 
* Set Point and a desired value for Ramp. Select OK to enter values.
enter values.
* Select OK to confirm values or CANCEL to abort changes EVALUATOR NOTE: In steps F.4 and F.5, the candidate may open two valves simultaneously.
* Select OK to confirm values or CANCEL to abort changes ___ ______EVALUATOR NOTE: In steps F.4 and F.5, the candidate may open two valves simultaneously. The student may also perform F.5 prior to F.4 (allowed by procedure)  
The student may also perform F.5 prior to F.4 (allowed by procedure)
*F.4. *Open Outboard MSIVs:
*F.4.   *Open Outboard MSIVs:
* On Panel 901-3 , C/S for: AO 1-203-2A taken to OPEN; Valve indicates OPEN. AO 1-203-2B taken to OPEN; Valve indicates OPEN.
* On Panel 901-3 , C/S for:       ___  ___    ___
AO 1-203-2A taken to OPEN; Valve indicates OPEN.
AO 1-203-2B taken to OPEN; Valve indicates OPEN.
AO 1-203-2C taken to OPEN; Valve indicates OPEN.
AO 1-203-2C taken to OPEN; Valve indicates OPEN.
AO 1-203-2D taken to OPEN; Valve indicates OPEN. ___ ______
AO 1-203-2D taken to OPEN; Valve indicates OPEN.
2014 ILT NRC JPM c - Rev 00 Page 8 of 13 STEP ELEMENT STANDARD SAT UNSAT Comment Number *F.5. *Open Steam Line drain valves:
Page 7 of 13
* On Panel 901-3 , C/S for: MO 1-220-90A taken to OPEN; Valve indicates open MO 1-220-90B taken to OPEN; Valve indicates open MO 1-220-90C taken to OPEN; Valve indicates open MO 1-220-90D taken to OPEN; Valve indicates open ___ ______
*F.6. *Equalize pressure across MSIVs* On Panel 901-3 , C/S for:
 
MO 1-220-1 taken to OPEN; Valve indicates open.


MO 1-220-2 taken to OPEN; Valve indicates open.  
2014 ILT NRC JPM c - Rev 00 Comment SAT  UNSAT STEP              ELEMENT                          STANDARD Number
*F.5.  *Open Steam Line drain valves:
* On Panel 901-3 , C/S for:            ___  ___    ___
MO 1-220-90A taken to OPEN; Valve indicates open MO 1-220-90B taken to OPEN; Valve indicates open MO 1-220-90C taken to OPEN; Valve indicates open MO 1-220-90D taken to OPEN; Valve indicates open
*F.6.  *Equalize pressure across          On Panel 901-3 , C/S for:          ___  ___    ___
MSIVs*
MO 1-220-1 taken to OPEN; Valve indicates open.
MO 1-220-2 taken to OPEN; Valve indicates open.
MO 1-220-3 throttled OPEN; Valve indicates open or mid position F.7. Monitor differential pressure      Verifies Differential Pressure is  ___  ___    ___
across the MSIVs.                  decreasing using:
: a. Reactor Pressure
: b. PI 1-3040-10, TURB THROT PRESS (at panel 901-7)
EVALUATORS : Steps F.7.a (1), (2), and (3) are applicable only if the THROTTLE PRESS MED (XMITTER X) FAILED LOW alarm was received.
F.7.a  Checks DEHC for diagnostic        DEHC checked for Diagnostic        ___  ___    ___
Alarm: THROTTLE PRESS            Alarms MED (XMITTER X) FAILED LOW Page 8 of 13


MO 1-220-3 throttled OPEN; Valve indicates open or mid position ___ ______
2014 ILT NRC JPM c - Rev 00 Comment SAT  UNSAT STEP                  ELEMENT                          STANDARD Number F.7.a(1)  Verify each Throttle Pressure      From the <AUX> <XMITTER          ___  ___    ___
F.7. Monitor differential pressure across the MSIVs. Verifies Differential Pressure is decreasing using: a. Reactor Pressure
Transmitter indicates an          RESET> SCREEN:
: b. PI 1-3040-10, TURB THROT PRESS (at panel 901-7) ___ ______EVALUATORS : Steps F.7.a (1), (2), and (3) are applicable only if the THROTTLE PRESS MED (XMITTER X) FAILED LOW alarm was received. F.7.a Checks DEHC for diagnostic Alarm: "THROTTLE PRESS
increasing trend                  Increasing trends on Throttle Pressure Transmitters verified.
F.7.a(2)  If necessary, RESET                From the <AUX> <XMITTER          ___  ___    ___
THROTTLE #X for each Throttle      RESET> SCREEN:
Pressure transmitter that          Selects RESET for each indicates FAILED.                 failed transmitter and selects OK to confirm each reset.
F.7.a(3)   Verify each Throttle Pressure      From the ALARMS screen,          ___   ___    ___
transmitter alarm indicates a      verifies each Throttle NORMAL state and clear alarms      Pressure alarm indicates a by selecting ACK ALL              NORMAL state and clears all alarms by selecting ACK ALL.
EVALUATORS : Steps F.7.a (4)&(5) are not applicable because all transmitter alarms will reset.
EVALUATORS : Step F.8. is not applicable because the differential pressure across the MSIVs will decrease to <200 psig.
CUE:       If asked, grant permission to open the Inboard MSIVs.
Page 9 of 13


MED (XMITTER X) FAILED
2014 ILT NRC JPM c - Rev 00 Comment SAT  UNSAT STEP              ELEMENT                        STANDARD Number EVALUATOR NOTE: The candidate may open two valves simultaneously to avoid a possible Group I isolation on high Main Steam Line flow rates.
*F.9.  *WHEN diff. press. across the    On Panel 901-3, C/S for:      ___    ___    ___
MSIVs is <200 psid, OR has stopped decreasing and Unit      AO 1-203-1A taken to OPEN; Supervisor has given permission  Valve indicates OPEN.
to proceed, THEN open inboard MSIVs:
* AO 1-203-1B taken to OPEN; Valve indicates OPEN.
AO 1-203-1C taken to OPEN; Valve indicates OPEN.
AO 1-203-1D taken to OPEN; Valve indicates OPEN.
EVALUATOR NOTE: The candidate should inform you that the MSIVs are open.
CUE:    Another NSO will complete the remaining procedure steps.
JPM Stop Time:
Page 10 of 13


LOW"  DEHC checked for Diagnostic Alarms ___ ______
2014 ILT NRC JPM c - Rev 00 JPM  
2014 ILT NRC JPM c - Rev 00 Page 9 of 13 STEP ELEMENT STANDARD SAT UNSAT Comment Number F.7.a(1) Verify each Throttle Pressure Transmitter indicates an
 
increasing trend From the <AUX> <XMITTER RESET> SCREEN:
Increasing trends on Throttle Pressure Transmitters
 
verified.
___ ______
F.7.a(2) If necessary, RESET THROTTLE #X for each Throttle
 
Pressure transmitter that
 
indicates FAILED.
From the <AUX> <XMITTER RESET> SCREEN:
Selects RESET for each failed transmitter and selects OK to confirm each reset.
___ ______
F.7.a(3) Verify each Throttle Pressure transmitter alarm indicates a
 
NORMAL state and clear alarms by selecting ACK ALL From the ALARMS screen, verifies each Throttle
 
Pressure alarm indicates a
 
"NORMAL" state and clears
 
all alarms by selecting ACK
 
ALL. ___ ______EVALUATORS :  Steps F.7.a (4)&(5) are not applicable because all transmitter alarms will reset.
EVALUATORS :  Step F.8. is not applicable because the di fferential pressure across the MSIVs will decrease to <200 psig. CUE:  If asked, grant permission to open the Inboard MSIVs.
2014 ILT NRC JPM c - Rev 00 Page 10 of 13 STEP ELEMENT STANDARD SAT UNSAT Comment Number EVALUATOR NOTE:  The candidate may open two valves simultaneously to avoid a possible Group I isolation on high Main Steam Line flow rates.
*F.9. *WHEN diff. press. across the MSIVs is <2 00 psid, OR has stopped decreasing and Unit Supervisor has given permission to proceed, THEN open inboard MSIVs:
* On Panel 901-3, C/S for:
AO 1-203-1A taken to OPEN; Valve indicates OPEN.
 
AO 1-203-1B taken to OPEN; Valve indicates OPEN. 
 
AO 1-203-1C taken to OPEN; Valve indicates OPEN. 
 
AO 1-203-1D taken to OPEN; Valve indicates OPEN. ___ ______EVALUATOR NOTE:  The candidate should inform you that the MSIV's are open.
CUE:  Another NSO will comp lete the rema ining procedure steps. JPM Stop Time: 
 
2014 ILT NRC JPM c - Rev 00 Page 11 of 13 JPM  


==SUMMARY==
==SUMMARY==
Operator's Name
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Pressurize The Main Steam Lines JPM Number: 2014 ILT NRC JPM c  Revision Number: 00 Task Number and Title: Pressurize the Main Steam Lines SR-0250-P01 (Freq: LIC=B) Given a r eactor plant at power when an inadvertent Group 1 isolation occurs, det ermine the cause, reset the Group 1 and re-open the MSIVs in accordance with QCOP 0250-01.
K/A Number and Importance:
K/A:  239001 A4.01 Rating:  4.2/4.0 Ability to manually operate and/or monitor in the control room:
MSIV's  Suggested Testing Environment: Simulator


Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 0250-01, Rev. 12, PRESSURIZING THE MAIN STEAM LINES Actual Testing Environment:
Operators Name:                                                              Job Title:          EO          RO        SRO            FS STA/IA                SRO Cert JPM Title:                Pressurize The Main Steam Lines JPM Number:                2014 ILT NRC JPM c                                                Revision Number: 00 Task Number and Title:                      Pressurize the Main Steam Lines SR-0250-P01 (Freq: LIC=B) Given a reactor plant at power when an inadvertent Group 1 isolation occurs, determine the cause, reset the Group 1 and re-open the MSIVs in accordance with QCOP 0250-01.
Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 17 minutes Actual Time Used:
K/A Number and Importance:                      K/A: 239001 A4.01 Rating: 4.2/4.0 Ability to manually operate and/or monitor in the control room: MSIV's Suggested Testing Environment: Simulator Alternate Path:             Yes         No       SRO Only:             Yes         No         Time Critical:           Yes         No Reference(s): QCOP 0250-01, Rev. 12, PRESSURIZING THE MAIN STEAM LINES Actual Testing Environment:                         Simulator               Control Room                   In-Plant           Other Testing Method:                   Simulate               Perform Estimated Time to Complete: 17 minutes                                       Actual Time Used:                       minutes EVALUATION  
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily? Yes No The operator's performance wa s evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?                                         Yes                     No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                                         Satisfactory           Unsatisfactory Comments:
Evaluator's Name
Evaluators Name:                                                                                 (Print)
:   (Print) Evaluator's Signature
Evaluators Signature:                                                                           Date:
:   Date:   [If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]  
[If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]
 
Page 11 of 13
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS - You are the Unit 1 ANSO. - A spurious Group I Isolation occurred approximately 30 minutes ago. - Reactor water level ha s been maintained <100
" by Feed/C ondensate. - An extra reactor operator will control pressure between 800 and 1000 psig with relief valves. - A Shift Supervisor is standing by to provide the necessary verifications. - Group 1 isolation signals do NOT need to be bypassed. - This JPM is NOT time critical.


INITIATING CUE Pressurize the Main Steam lines and re-open the MSIV's per QCOP 0250-01 "PRESSURIZING THE MAIN STEAM LINES". Notify the Unit Superviso r when the MSIVs are open.}}
INITIAL CONDITIONS
-      You are the Unit 1 ANSO.
-      A spurious Group I Isolation occurred approximately 30 minutes ago.
-      Reactor water level has been maintained <100 by Feed/Condensate.
-      An extra reactor operator will control pressure between 800 and 1000 psig with relief valves.
-      A Shift Supervisor is standing by to provide the necessary verifications.
-      Group 1 isolation signals do NOT need to be bypassed.
-      This JPM is NOT time critical.
INITIATING CUE Pressurize the Main Steam lines and re-open the MSIV's per QCOP 0250-01 PRESSURIZING THE MAIN STEAM LINES.
Notify the Unit Supervisor when the MSIVs are open.
SRRS: 3D.105 (when utilized for operator initial or continuing training)}}

Revision as of 01:27, 4 November 2019

Systems JPM C Mod
ML14225A621
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/27/2013
From:
NRC/RGN-III
To:
Exelon Generation Co
Bruce Palagi
Shared Package
ML13093A388 List:
References
Download: ML14225A621 (13)


Text

Exelon Nuclear Job Performance Measure Pressurize the Main Steam Lines JPM Number: 2014 ILT NRC JPM c Revision Number: 00 Date: __10/15/2013___

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 13

2014 ILT NRC JPM c - Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure QCOP 0250-01 Rev: 12 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13

2014 ILT NRC JPM c - Rev 00 Revision Record (Summary)

Revision 00, Renamed 2014 ILT NRC JPM c. Restarted numbering accordingly.

Previous changes were:

This JPM is developed IAW guidelines established in NUREG 1021 Rev 9 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 "Control Room Systems," for RO/SRO candidates.

Bank JPM LS-009-II Rev. 11 was used as the basis for this JPM, which was revised to reflect procedure and JPM template changes for the 2009 ILT NRC licensing exam.

This JPM was also revised to start at a lower power, and more stable, initial condition to facilitate the performance of the other JPMs in the set.

Page 3 of 13

2014 ILT NRC JPM c - Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 18.
2. Go to run NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

Setup Instructions - Enter/perform the following commands and actions

3. Malfunctions and remote functions: (contained in caep file C caep.cae)

Cause a group 1(2 commands)l00:00:00l01 imf rp05al00:00:02l02 imf rp05bl00:00:04l03 Remove Group 1 signalsl00:00:00l04 dmf rp05al00:00:06l05 dmf rp05bl00:00:08l06 Override 901-3 A-16 offl00:00:00l07 imf ser0717 offl00:00:10l08 delete DW pneu air leakagel00:00:00l09 irf ia13r 0l00:00:12l10

  • Do NOT reset the Group 1 Isolation during QCGP 2-3 actions.
  • Manually Scram the reactor and perform scram actions IAW QCGP 2-3 as necessary to stabilize the plant.
  • Monitor RPV Level and Pressure throughout:
  • RPV pressure will rise very slowly at approximately 2 psig / minute.
  • RPV Level will rise slowly due to heating up the post-scram water. This results in the RFPs tripping several minutes into the JPM (and possibly again when the MSIVs are reopened).
  • When the Feed Pump trips, restart the Feed Pump.
4. Remotes/Overrides:
  • Override the following panels acknowledge buttons to the acknowledge position using the Sim Op computer to select the button and override the position to ACK (expert commands not available to perform this function) o 901-3 o 901-4 o 901-6 o 901-53 o 901-54
5. Verify the following control panel lineups:

Page 4 of 13

2014 ILT NRC JPM c - Rev 00

  • On the <CONTROL> <RX COOLDOWN> screen, verify REACTOR COOLDOWN is OFF.
6. Verify that a blank current revision of QCOP 0250-01 PRESSURIZING THE MAIN STEAM LINES, is available
7. Snap the setup to Zero when all other conditions for concurrently run JPMs are established.
8. Place AO 1-4723 in Man Open (901-4 panel)

JPM C QCOP F:\2014 ILT NRC 0250-01, Rev 012, PRExam\JPMs\Systems J

9. This completes the setup for this JPM.

Page 5 of 13

2014 ILT NRC JPM c - Rev 00 INITIAL CONDITIONS

- You are the Unit 1 ANSO.

- A spurious Group I Isolation occurred approximately 30 minutes ago.

- Reactor water level has been maintained <100 by Feed/Condensate.

- An extra reactor operator will control pressure between 800 and 1000 psig with relief valves.

- A Shift Supervisor is standing by to provide the necessary verifications.

- Group 1 isolation signals do NOT need to be bypassed.

- This JPM is NOT time critical.

INITIATING CUE Pressurize the Main Steam lines and re-open the MSIV's per QCOP 0250-01 PRESSURIZING THE MAIN STEAM LINES.

Notify the Unit Supervisor when the MSIVs are open.

{When candidate acknowledges the cue, provide the candidate with the procedure QCOP 0250-01}

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Page 6 of 13

2014 ILT NRC JPM c - Rev 00 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • F.1. *Place MN STM ISOL RESET to Places MN STM ISOL ___ ___ ___

INBD.

  • RESET switch on the 901-5 panel to INBD position.
  • F.2. *Place MN STM ISOL RESET to Places MN STM ISOL ___ ___ ___

OUTBD.

  • RESET switch on the 901-5 panel to OUTBD position.
  • F.3 *At the DEHC Operators Pressure Set adjusted to at ___ ___ ___

Workstation, on the least 200 psig above reactor

<CONTROL> <PRESSURE pressure.

CONTROL> screen, adjust

  • Select STPT/RAMP DEHC Pressure Set 200 psig above reactor pressure OR as
  • Enter desired value for high as possible.
  • Set Point and a desired value for Ramp. Select OK to enter values.
  • Select OK to confirm values or CANCEL to abort changes EVALUATOR NOTE: In steps F.4 and F.5, the candidate may open two valves simultaneously.

The student may also perform F.5 prior to F.4 (allowed by procedure)

  • F.4. *Open Outboard MSIVs:
  • On Panel 901-3 , C/S for: ___ ___ ___

AO 1-203-2A taken to OPEN; Valve indicates OPEN.

AO 1-203-2B taken to OPEN; Valve indicates OPEN.

AO 1-203-2C taken to OPEN; Valve indicates OPEN.

AO 1-203-2D taken to OPEN; Valve indicates OPEN.

Page 7 of 13

2014 ILT NRC JPM c - Rev 00 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • F.5. *Open Steam Line drain valves:
  • On Panel 901-3 , C/S for: ___ ___ ___

MO 1-220-90A taken to OPEN; Valve indicates open MO 1-220-90B taken to OPEN; Valve indicates open MO 1-220-90C taken to OPEN; Valve indicates open MO 1-220-90D taken to OPEN; Valve indicates open

  • F.6. *Equalize pressure across On Panel 901-3 , C/S for: ___ ___ ___

MSIVs*

MO 1-220-1 taken to OPEN; Valve indicates open.

MO 1-220-2 taken to OPEN; Valve indicates open.

MO 1-220-3 throttled OPEN; Valve indicates open or mid position F.7. Monitor differential pressure Verifies Differential Pressure is ___ ___ ___

across the MSIVs. decreasing using:

a. Reactor Pressure
b. PI 1-3040-10, TURB THROT PRESS (at panel 901-7)

EVALUATORS : Steps F.7.a (1), (2), and (3) are applicable only if the THROTTLE PRESS MED (XMITTER X) FAILED LOW alarm was received.

F.7.a Checks DEHC for diagnostic DEHC checked for Diagnostic ___ ___ ___

Alarm: THROTTLE PRESS Alarms MED (XMITTER X) FAILED LOW Page 8 of 13

2014 ILT NRC JPM c - Rev 00 Comment SAT UNSAT STEP ELEMENT STANDARD Number F.7.a(1) Verify each Throttle Pressure From the <AUX> <XMITTER ___ ___ ___

Transmitter indicates an RESET> SCREEN:

increasing trend Increasing trends on Throttle Pressure Transmitters verified.

F.7.a(2) If necessary, RESET From the <AUX> <XMITTER ___ ___ ___

THROTTLE #X for each Throttle RESET> SCREEN:

Pressure transmitter that Selects RESET for each indicates FAILED. failed transmitter and selects OK to confirm each reset.

F.7.a(3) Verify each Throttle Pressure From the ALARMS screen, ___ ___ ___

transmitter alarm indicates a verifies each Throttle NORMAL state and clear alarms Pressure alarm indicates a by selecting ACK ALL NORMAL state and clears all alarms by selecting ACK ALL.

EVALUATORS : Steps F.7.a (4)&(5) are not applicable because all transmitter alarms will reset.

EVALUATORS : Step F.8. is not applicable because the differential pressure across the MSIVs will decrease to <200 psig.

CUE: If asked, grant permission to open the Inboard MSIVs.

Page 9 of 13

2014 ILT NRC JPM c - Rev 00 Comment SAT UNSAT STEP ELEMENT STANDARD Number EVALUATOR NOTE: The candidate may open two valves simultaneously to avoid a possible Group I isolation on high Main Steam Line flow rates.

  • F.9. *WHEN diff. press. across the On Panel 901-3, C/S for: ___ ___ ___

MSIVs is <200 psid, OR has stopped decreasing and Unit AO 1-203-1A taken to OPEN; Supervisor has given permission Valve indicates OPEN.

to proceed, THEN open inboard MSIVs:

  • AO 1-203-1B taken to OPEN; Valve indicates OPEN.

AO 1-203-1C taken to OPEN; Valve indicates OPEN.

AO 1-203-1D taken to OPEN; Valve indicates OPEN.

EVALUATOR NOTE: The candidate should inform you that the MSIVs are open.

CUE: Another NSO will complete the remaining procedure steps.

JPM Stop Time:

Page 10 of 13

2014 ILT NRC JPM c - Rev 00 JPM

SUMMARY

Operators Name: Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: Pressurize The Main Steam Lines JPM Number: 2014 ILT NRC JPM c Revision Number: 00 Task Number and Title: Pressurize the Main Steam Lines SR-0250-P01 (Freq: LIC=B) Given a reactor plant at power when an inadvertent Group 1 isolation occurs, determine the cause, reset the Group 1 and re-open the MSIVs in accordance with QCOP 0250-01.

K/A Number and Importance: K/A: 239001 A4.01 Rating: 4.2/4.0 Ability to manually operate and/or monitor in the control room: MSIV's Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 0250-01, Rev. 12, PRESSURIZING THE MAIN STEAM LINES Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 17 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

[If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]

Page 11 of 13

INITIAL CONDITIONS

- You are the Unit 1 ANSO.

- A spurious Group I Isolation occurred approximately 30 minutes ago.

- Reactor water level has been maintained <100 by Feed/Condensate.

- An extra reactor operator will control pressure between 800 and 1000 psig with relief valves.

- A Shift Supervisor is standing by to provide the necessary verifications.

- Group 1 isolation signals do NOT need to be bypassed.

- This JPM is NOT time critical.

INITIATING CUE Pressurize the Main Steam lines and re-open the MSIV's per QCOP 0250-01 PRESSURIZING THE MAIN STEAM LINES.

Notify the Unit Supervisor when the MSIVs are open.

SRRS: 3D.105 (when utilized for operator initial or continuing training)