ML17261B135: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 40: Line 40:
-1 and 2).Tendon/Rock Anchors The tendon consists of 90-1/4" high strength steel wires conforming to ASTM A421-59T, Type BA.The tendon system provides sufficient vertical prestress force so there are no net merid-ional membrane tensile forces in the concrete shell under appli-cation of design load combinations.
-1 and 2).Tendon/Rock Anchors The tendon consists of 90-1/4" high strength steel wires conforming to ASTM A421-59T, Type BA.The tendon system provides sufficient vertical prestress force so there are no net merid-ional membrane tensile forces in the concrete shell under appli-cation of design load combinations.
pJ fOv g>~(p~(<<l~p/0 eooszsotss eoosts PDR ADOCK 05000244 P PDC t~,r~g~t)~l oi Bellows The bellows are 6-inch diameter, stainless steel pipe bellows complying with requirements of ASA B31.1 Code for Pres-sure Piping.They provide movement capability for the rigid tendon conduit at the hinged joint in order to ensure a sealed tendon enclosure which retains the grease corrosion protection around the tendon and also seals against contaminants gaining access to the tendons.The bellows also provides essentially no resistance across the hinged joint to the movements.
pJ fOv g>~(p~(<<l~p/0 eooszsotss eoosts PDR ADOCK 05000244 P PDC t~,r~g~t)~l oi Bellows The bellows are 6-inch diameter, stainless steel pipe bellows complying with requirements of ASA B31.1 Code for Pres-sure Piping.They provide movement capability for the rigid tendon conduit at the hinged joint in order to ensure a sealed tendon enclosure which retains the grease corrosion protection around the tendon and also seals against contaminants gaining access to the tendons.The bellows also provides essentially no resistance across the hinged joint to the movements.
The inside diameter of the bellows is approximately
The inside diameter of the bellows is approximately 5.6 inches and the diameter of tne tendon bundle is approximately 3 inches.With 1.3 inches clearance and maximum predicted horizontal movement at design loads of 0.2 inch, margin is available to preclude con-tact.The neoprene pads used in the design were specified to conform to standard of the American Association of State Highway Officials.
 
===5.6 inches===
and the diameter of tne tendon bundle is approximately 3 inches.With 1.3 inches clearance and maximum predicted horizontal movement at design loads of 0.2 inch, margin is available to preclude con-tact.The neoprene pads used in the design were specified to conform to standard of the American Association of State Highway Officials.
This material is used extensively in U.S.and European bridge construction.
This material is used extensively in U.S.and European bridge construction.
The purpose of the pad was to prevent moments from being developed in the cylinder wall.Tension Bars The tension bar assemblies are approximately 20 feet long and consists of a 1 3/8 inch diameter bar with two anchor plates.The bar conforms to ASTM A322-64a and ASTM A29-64.The anchorages plates conform to AISI C-1040 and shall develop 100%of the bars ultimate strength.The assemblies are oriented radially at about 1 foot 1 inch centers tying the base of the cylindrical wall to the mat concrete.The bars were designed to transfer horizontal loads from the cylindrical containment shell into the base mat.They transfer loads from internal pressure and earthquake.
The purpose of the pad was to prevent moments from being developed in the cylinder wall.Tension Bars The tension bar assemblies are approximately 20 feet long and consists of a 1 3/8 inch diameter bar with two anchor plates.The bar conforms to ASTM A322-64a and ASTM A29-64.The anchorages plates conform to AISI C-1040 and shall develop 100%of the bars ultimate strength.The assemblies are oriented radially at about 1 foot 1 inch centers tying the base of the cylindrical wall to the mat concrete.The bars were designed to transfer horizontal loads from the cylindrical containment shell into the base mat.They transfer loads from internal pressure and earthquake.

Revision as of 08:46, 6 May 2019

Provides Info & Assessment on Integrity of Connection of Containment Bldg to Foundation,Per 900808 Telcon.Util Believes That Existing Condition Not Safety Concern & No Reason Exists to Suspect Joint Will Not Perform Function
ML17261B135
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/15/1990
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9008230155
Download: ML17261B135 (10)


Text

ACCELERATED DISTRIBUTION DH 4 REGULATORY INFORMATION DIS RIBUTION SYSTEM (RIDS)/15 NOTARIZED:

NO ant, Unit 1, Rochester G Corp.

SUBJECT:

Provides info&assessment re con 900808 telcon w/NRC.tainment integrity,per ACCESSION NBR: 9008230155 DOC.DATE: 90/0 FACIL:50-244 Robert Emmet Ginna Nuclear P AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-DOCKET g 05000244 DISTRIBUTION CODE: A001D COPIES RECEIVED: TITLE: OR Submittal:

General Distribution NOTES:License Exp date in accordance with LTR ENCL SIZE: 10CFR2,2.109(9/19/72).

D S 05000244/RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A COPIES LTTR ENCL 1 1 2 2 PD RECIPIENT D CODE/NAME-3 PD COPIES LTTR ENCL 1 1 D D INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC N/DOEA/OTSB11 NRC PDR 1, 1 1 1 1 1 1 1 NW/DST/SELB 8D 1 1 NRR/DST/SRXB 8E 1 1 OC/~1 0~RE Ol 1 1 1 1 1 1 1 1 1 0 1 1 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:

/A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR:NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 18, ENCL 16 K I e-i.a>L h t IIIIIIII IIIIIII A HO llllllt/g/j!II IIIIIIIIIIIII IIIIIIII IIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C MECREOY Vice Prerldent Cinna Nuclear Production TELEPHONE AREA CODE7tB 546 2700 August 15, 1990 U.S.Nuclear Regulatory Commission Attention:

Allen R.Johnson Project Directorate I-3 Document Control Desk Washington, D.C.20555

Subject:

Reference:

Containment Integrity R.E.Ginna Nuclear Power Plant Docket No.50-244 August 8, 1990 Conference Call RGGE with USNRC

Dear Mr.Johnson:

As a follow up to the August 8, 1990 telephone conference call, RGGE is providing the following information and engineering assessment on the integrity of the connection of the Containment Building to its foundation.

Since the July 9, 1990 NRC Request for Additional Infor-mation, RGGE has reviewed all currently available original design documents.

The review has provided a good understanding of the original design intent of all components of the joint.The following is a description of RGGE's findings of the design basis for each of the components in the connection (see Attachments

-1 and 2).Tendon/Rock Anchors The tendon consists of 90-1/4" high strength steel wires conforming to ASTM A421-59T, Type BA.The tendon system provides sufficient vertical prestress force so there are no net merid-ional membrane tensile forces in the concrete shell under appli-cation of design load combinations.

pJ fOv g>~(p~(<<l~p/0 eooszsotss eoosts PDR ADOCK 05000244 P PDC t~,r~g~t)~l oi Bellows The bellows are 6-inch diameter, stainless steel pipe bellows complying with requirements of ASA B31.1 Code for Pres-sure Piping.They provide movement capability for the rigid tendon conduit at the hinged joint in order to ensure a sealed tendon enclosure which retains the grease corrosion protection around the tendon and also seals against contaminants gaining access to the tendons.The bellows also provides essentially no resistance across the hinged joint to the movements.

The inside diameter of the bellows is approximately 5.6 inches and the diameter of tne tendon bundle is approximately 3 inches.With 1.3 inches clearance and maximum predicted horizontal movement at design loads of 0.2 inch, margin is available to preclude con-tact.The neoprene pads used in the design were specified to conform to standard of the American Association of State Highway Officials.

This material is used extensively in U.S.and European bridge construction.

The purpose of the pad was to prevent moments from being developed in the cylinder wall.Tension Bars The tension bar assemblies are approximately 20 feet long and consists of a 1 3/8 inch diameter bar with two anchor plates.The bar conforms to ASTM A322-64a and ASTM A29-64.The anchorages plates conform to AISI C-1040 and shall develop 100%of the bars ultimate strength.The assemblies are oriented radially at about 1 foot 1 inch centers tying the base of the cylindrical wall to the mat concrete.The bars were designed to transfer horizontal loads from the cylindrical containment shell into the base mat.They transfer loads from internal pressure and earthquake.

The design of the containment was based on an equivalent static seismic analysis.In conjunction with contain-ment design, a dynamic modal analysis was performed.

The modal analysis showed that the horizontal seismic loads were approxi-mately half those used in the design.In the design of these bars, the assumption was made that the total seismic load is transferred by only half of the total number, which is a conservative assumption.

Further, no credit was taken for the fact that the cylinder caps a two-foot thick mat and the true horizontal load transfer would be by a combin-ation of tensile and compressive loads.Additionally, at the vertical joint where the rod exists from the cylindrical section into the base slab, the bars are encased in the same grease as the tendons.In 1990, RG&E conducted the required tendon surveillance testing, which tests the tendon/rock anchor system.The results of the lift off tests have shown that the required prestress continues to meet all design requirements.

As part of the tendon testing program, a sacrificial tendon wire was extracted, examined and tested.That wire extended the full height of the Containment down to the tendon/rock anchor coupling.The wire showed no evidence of corrosion and tested out to its specified yield and ultimate strengths.

The grease which surrounds the tendon was also analyzed and showed no evidence of water or unacceptable levels of chlorides, nitrates or sulfides.RG&E performed chemical analysis of the water in the vicin-ity of the joint and found it to have a pH of 7.5, 125 PPM chlorides and 120 PPM sulfate, values well within acceptable limits.RG&E is performing a detailed finite element stress analysis of cylindrical wall to base mat connection to obtain a better understanding of the inherent conservatism'.

The work has begun and will be completed by mid-December, 1990.RG&E is in the process of making repairs and/or modifi-cations to the foundation area to assure that no standing ground-water will be in contact with this joint.'number of materials are being investigated.

At this time, a definitive schedule for completing the modifications/repair is dependent on these inves-tigations, but we are striving for a completion date of November 30, 1990.This period will permit a detailed investigation of potential materials'o ensure that the selected approach will be effective.

In light of the above discussion, RG&E believes that the existing condition is not a safety concern and that there is no reason to suspect that the joint will not perform'its designed function for the following reasons: o The results of the tendon lift-off tests confirm that the tendon/rock anchor system are performing as designed.It also confirms that the neoprene pads have not deteriorat'ed, otherwise tendon forces would be lower than required.

0 The ezamination of the sacrificial wire showed no signs of corrosion present.0 No moisture or unacceptable levels of chlorides, nitrates, or sulfides were found in the tendon grease.0 The chemistry of the groundwater is basic and contains low levels of chlorides and sulfates.0 There is no evidence of grease leaking from the joint, implying that the bellows are functioning as designed.0 The tension, bar system and the cylinder/base mat.con-figuration provide diverse load transferring mech-anisms.0 The materials of the critical components are not sus-ceptible to stress corrosion cracking.Based on a review of the design calculations, our best engineering judgement is that the system as a whole is substan-tially conservative.

Very truly yours;Robert C.M red LAS/154 zc: Mr.Allen R.Johnson (Mail Stop 14D1)Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector CONTAlNMENT VESSEL FOR R.E.GINNA PO'LVER PLANT ICSOOS ISCSOI soOS SIIIL 5 Illl~I~I lltls Ctst~5100 I'Itis ctsl sllo~5 51CCL~1 RIOICISC~1sc a 10 silt IILL ltsOO~~t~'$ttL LIstl 14ONOCS1 slits 5tC t<C ltl 105 COSIL ISO 10~III Iltl Istsol I<<I I51coso 51~CC Closr ICOIOCC I$504510s I I INII SIICC C~001 Fig.l.Cross section o1 containment vessel.ATTACHMENT 1

A 90-'g" OIA B,B,R.V.WIRE TENDONS--~(A 9P CL WALL It TEHDONS--.52'-6" RAD TO CL CONTAINMENT VESSEL 9"~~" LINER p Fl.EXIBLE FILLER (BOTH SIDES)6'gp'O.D.CQNOUI T'4" CEL'OTEX OR EQUAL 4)4 SPIRAL BARS-RIHG BEAM-NEOPRENE PAO BELLOWS-(SST)4 4 p OTTOMAITTC COATTITG GA OAA~4 L)(g" DIA x 2'-ll" SCH 40 PIPE SLY (FILL Wl GREASE)-CREASED BAR I~~D D CD I 13" DIA x 20'-0" TENSION BAR I 123<" CENTERS I r TOP LINER ((MA J EL 233'-8" ROCK ANCHOR COUPLIHG EHCLOSURE N4 SPIRAL BARS-gP+~<iP Py!~~~~iv p*1 GROUTED ROCK AHCHOR--ATTACHMENT 2

,g~1 4 I