Line 3: Line 3:
| issue date = 12/12/1980
| issue date = 12/12/1980
| title = Requests Evaluation of Deficiency Repts within 30 Days Re Weld Overstress Caused by Pulled Pipe Spools,Cable Tray Supports Not Meeting Drawing Requirements & Class IE Conductors Too Close to non-Class IE Conductors
| title = Requests Evaluation of Deficiency Repts within 30 Days Re Weld Overstress Caused by Pulled Pipe Spools,Cable Tray Supports Not Meeting Drawing Requirements & Class IE Conductors Too Close to non-Class IE Conductors
| author name = VAN BRUNT E E
| author name = Van Brunt E
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name = WILSON W H
| addressee name = Wilson W
| addressee affiliation = BECHTEL POWER CORP.
| addressee affiliation = BECHTEL POWER CORP.
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530

Revision as of 21:43, 18 June 2019

Requests Evaluation of Deficiency Repts within 30 Days Re Weld Overstress Caused by Pulled Pipe Spools,Cable Tray Supports Not Meeting Drawing Requirements & Class IE Conductors Too Close to non-Class IE Conductors
ML17296B146
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/12/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Wilson W
BECHTEL POWER CORP.
References
10CFR-050.55E, 10CFR-50.55E, ANPP-16886-BSK, NUDOCS 8012230496
Download: ML17296B146 (6)


Text

REGULATORY I'RMATION DISTRIBUTION SYST M (RIDS)ACCESSION NBR:8012230496 DOC~DATE: 80/12/12 NOTARIZE: NO FACIL:STN 50-528 Palo Verde Nuclear Stationi Unit ii Arizona Publi STN 50-529 Palo Verde Nuclear Stations Unit 2i Arizona Publi STN"50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi AUTH INANE AUTHOR AFF IL I ATION VAN BRUNTiE.ED Arizona Public Service Co, REC IP.NAME RECIPIEN1 AFF ILIATION NILSONi H~H~Bechtel Power Corp.(subs.of Bechtel Corp.)DOCKET¹05000528 05000529 05000530 S I ZE e2

SUBJECT:

Requests deficiency repts within 30 days re weld overstress caused by pulled pipe spoolsicable tray supports not meeting drawing requirements L class IE condctors too close to non-Class IE conductors.

DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR i ENCL TITLE: Construction Deficiency Report (10CFR50.55E)

NOTES:Standardized Plant.Standardized Plant.Standardized Plant.05000528 05000529 05000530 RFCIPIENT ID CODE/NAME CTI ON: A/D LICE,NSNG 04 LEEpJ~06 NTERNAL: AD/RCI/IE 1 1 ASLBP/J.HARD DIRg DIV OF LIC EQUIP QUAL BR11'LE 09 MPA 20 OELD 21 QA BR 14 RUTHERFORDiW IE COPIES LTTR ENCI RECIPIENT ID CODE/NAME MIRAGLIAg F.05 KERRIGAN J, 07 AEOD 18 D/DIR HUM FAC15 EDO 8 STAFF 19 HYD/GEO BR 22 LIC QUAL BR 12 NRC PDR 02 P REV 13 tG FILE 01 V 21 COPIES LTTR ENCL XTERHALe ACRS NSIC 16 08 16 1 1 LPDR 03 DE'c~glSea 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 40 ENCL 0

ARIZONA NUCLEAIZ POVIEll PAOJEGTII~,I<)IIII,'I:

tJiIr.2 l I'III)I,'Illx, AIIIOIIII 8.'>(UG ,~j'/i'ecember 12., 1980 ANPP-16886-BSK/JAR Nr.W.H.Wilson , Project Manager Bechtel Power Corporation

'11445 South Lakewood Boulevard Downey, California

Subject:

Potentially Reportable Deficiencies

-10CFR50.55(e)

File: 80-019-026; 0.4.33.2 Re: (1)ANPP-15525.-BSK/JAR, dated Nay 28, 1980

Dear Bill:

The NRC was notified yesterday of the following potentially reportable defi-"ciencies:

DER 80-38: Pipe spools pulled to facilitate installation of pi pe supports may overs tress wel ds C/7)ILK CD>CD CD~I<C,Q~i gtf$'hal,>'b~C DER 80-39: Item 3 Only-Cable tray supports do not meet drawling requirements DER 80-41: 'lass IE conductors come within six inche's (6")of non-class IE conductors on six (6)ITE Gould 480 Volt Load Center Isolation Relay Cabinets As noted in the referenced letter, inter'r final reports are required within thirty (30)days unless a deficiency is evaluated as Not Reportable, in wh'ich case, a written report is not required.You are requested to evaluate these DER's for reportabi lity and submit your recommendations along with the applicable wri tten reports to APS, in accor-.dance with the Reference (1), by January 5, 1981.Very truly yours, E.E.Van Brunt, Jr.APS Vice President, Nuclear Projects e~ANPP Project Director 0 I 0/~8830~g 0 J I f 0 Ilr.W.II.14,Llson Pro'Icct H lnaper ANPP-16886-BSK/.Ihl<

December 12, 1980 Page 2 cc: R.L.Robb D.B.Fasnacht J.A.Roedel J.H.Allen A.C.Rogers W.E.Ide A.C.Gehr J.A.Brand W.J.Stubblefield W.G.Bingham R.L.Patterson R.W.Welcher R.H.Grant D.R.Hawkinson lf I