Requests Evaluation of Deficiency Repts within 30 Days Re Weld Overstress Caused by Pulled Pipe Spools,Cable Tray Supports Not Meeting Drawing Requirements & Class IE Conductors Too Close to non-Class IE Conductors
ML17296B146
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/12/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Wilson W
BECHTEL POWER CORP.
References
10CFR-050.55E, 10CFR-50.55E, ANPP-16886-BSK, NUDOCS 8012230496
Download: ML17296B146 (6)


Text

REGULATORY I'RMATION DISTRIBUTION SYST M (RIDS)

ACCESSION NBR:8012230496 DOC ~ DATE: 80/12/12 NOTARIZE: NO DOCKET ¹ FACIL:STN STN 50-528 50-529 Palo Palo Verde Verde Nuclear Nuclear Stationi Stations Unit Unit ii 2i Arizona Publi Arizona Publi 05000528 05000529 STN"50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi 05000530 AUTH INANE AUTHOR AFF IL I ATION VAN BRUNTiE.ED Arizona Public Service Co, REC IP. NAME RECIPIEN1 AFF ILIATION NILSONi H ~ H ~ Bechtel Power Corp. (subs. of Bechtel Corp.)

SUBJECT:

Requests deficiency repts within 30 days re weld overstress caused by pulled pipe spoolsicable tray supports not meeting drawing requirements L class IE condctors too close to non-Class IE conductors.

DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR i ENCL S I ZE 2 e

TITLE: Construction Deficiency Report (10CFR50.55E)

NOTES:Standardized Plant. 05000528 Standardized Plant. 05000529 Standardized Plant. 05000530 RFCIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCI ID CODE/NAME LTTR ENCL CTI ON: A/D LICE,NSNG 04 MIRAGLIAgF. 05 LEEpJ ~ 06 KERRIGAN J, 07 NTERNAL: AD/RCI/IE 1 1 AEOD 18 ASLBP/J.HARD D/DIR HUM FAC15 DIRg DIV OF LIC EDO 8 STAFF 19 EQUIP QUAL BR11 HYD/GEO BR 22

'LE 09 LIC QUAL BR 12 MPA 20 NRC PDR 02 OELD 21 P REV 13 QA BR 14 tG FILE 01 RUTHERFORDiW IE V 21 XTERHALe ACRS 16 16 1 LPDR 03 NSIC 08 1 DE'c ~g lSea 0

TOTAL NUMBER OF COPIES REQUIRED: LTTR 40 ENCL 0

ARIZONA NUCLEAIZ POVIEll PAOJEGT

II~,I <)IIII,'I: tJiIr. 2 l I'III)I,'Illx,AIIIOIIII8.'>(UG

~j'/i'ecember 12., 1980 ANPP-16886-BSK/JAR Nr. W. H. Wilson

, Project Manager Bechtel Power Corporation

'11445 South Lakewood Boulevard Downey, California

Subject:

Potentially Reportable Deficiencies - 10CFR50.55(e)

File: 80-019-026; 0.4. 33. 2 Re: (1) ANPP-15525.-BSK/JAR, dated Nay 28, 1980

Dear Bill:

The NRC was notified yesterday of the following potentially reportable defi-

"ciencies:

DER 80-38: Pipe spools pulled to facilitate installation of pi pe supports may overs tress wel ds DER 80-39: Item 3 Only - Cable tray supports do not meet drawling requirements DER 80-41: 'lass IE conductors come within six inche's (6") of non-class IE conductors on six (6) ITE Gould 480 Volt Load Center Isolation Relay Cabinets As noted in the referenced letter, thirty inter'r final reports are required within (30) days unless a deficiency is evaluated as Not Reportable, in wh'ich case, a written report is not required.

You are requested to evaluate these DER's for reportabi lity and submit your recommendations along with the applicable wri tten reports to APS, in accor-

. dance with the Reference ( 1), by January 5, 1981.

Very truly yours, C/7) E. E. Van Brunt, Jr.

~i ILK CD> APS Vice President, Nuclear Projects e~ ANPP Project Director gtf$

CD~

CD 0 I 0/

'hal,>'b I<

C,Q

~

C

~8830

~g

0 J

I f

Ilr. W. II. 14,Llson 0

Pro'Icct H lnaper ANPP-16886-BSK/.Ihl<

December 12, 1980 Page 2 cc: R. L. Robb D. B. Fasnacht J. A. Roedel J. H. Allen A. C. Rogers W. E. Ide A. C. Gehr J. A. Brand W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. H. Grant D. R. Hawkinson