ML17291A800: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/1995
| issue date = 04/30/1995
| title = Monthly Operating Rept for Apr 1995 for WNP-2. W/950510 Ltr
| title = Monthly Operating Rept for Apr 1995 for WNP-2. W/950510 Ltr
| author name = EMBREE D G, PARRISH J V
| author name = Embree D, Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:I~RIORITY CELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)ACCESSXON NBR:9505180272 DOC.DATE: 95/04/30 NOTARIZED:
{{#Wiki_filter:I ~
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
RIORITY CELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
Washington Public Power Supply System PARRISH,J.V.
ACCESSXON     NBR:9505180272               DOC.DATE: 95/04/30             NOTARIZED: NO       DOCKET FACIL:50-397     WPPSS     Nuclear Project, Unit 2, Washington Public                   Powe 05000397 AUTH. NAME               AUTHOR AFFILIATION EMBREE,D.G.             Washington Public Power Supply System PARRISH,J.V.             Washington .Public Power Supply System RECIP.NAME               RECIPIENT AFFILIATION
Washington.Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Apr 1995 for WNP-2.W/950510 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR lENCL TITLE: Monthly Operating Report (per Tech Specs)NOTES SIZE: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: AC ,F LE CENTER RRQ DOPS/OECS EXTERNAL LI TCO BRYCE I J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DIS P/PIPB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 YOTE TO ALL"RIDS" RECIPIEYTS:
Monthly operating rept               for   Apr 1995     for   WNP-2.
PLEASE HELP VS TO REDUCE O'KSTE!CONTACT I'HE DOCL'ifE4TCONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELl nfl.'PATE YOUR N'Aif E I'ROif DISTRIBUTIOY LIS'I'S I:OR DOCL'5 IEN'I'S YOL'Oi'"I'LTI'.D!
W/950510     ltr.
TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 May 10, 1995 G02-95-092 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
DISTRIBUTION CODE: IE24D               COPIES RECEIVED:LTR               lENCL     SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT                 COPIES                RECIPIENT          COPIES ID CODE/NAME               LTTR ENCL            ID  CODE/NAME      LTTR ENCL PD4-2 PD                       1        1      CLIFFORD,J               1   1 INTERNAL: AC                                10     10       AEOD/SPD/RRAB           1    1
            ,F LE CENTER                    1        1      NRR/DIS P/PIPB           1    1 RRQ DOPS/OECS                  1         1     RGN4                    1   1 EXTERNAL      LITCO BRYCE I J H              1         1     NOAC                    1   1 NRC PDR                        1         1 YOTE TO ALL"RIDS" RECIPIEYTS:
PLEASE HELP VS TO REDUCE O'KSTE! CONTACT I'HE DOCL'ifE4TCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELl nfl.'PATE YOUR N'AifE I'ROif DISTRIBUTIOYLIS'I'S I:OR DOCL'5 IEN'I'S YOL'Oi'"I'LTI'.D!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                         20   ENCL     20
 
vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968         ~ 3000 George Washington Way ~ Richland, Washington 99352 May 10, 1995 G02-95-092 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT APRIL 1995 Transmitted herewith is the Monthly Operating Report for the month of April, 1995 as required by Technical Specification 6.9.1.6.Sincerely, J..Parrish (Mai Drop 1023)ice-President, Nuclear Operations JVP:DGE CC: LJ Callen, NRC RIV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA-(399)!9505180272 950430'DR ADQCK'05000397 R'"'"'PDR REPORT PERIOD: APRIL 1995 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1995 COMPLETED BY: D.G.Embree TELEPHONE:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL 1995 Transmitted herewith is the Monthly Operating Report for the month                   of April, 1995 as required by Technical Specification 6.9.1.6.
(509)3774448~,~g'o.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-04 4/5/95 F 152.4 A 95-006 HA INSTRU Relay failure caused turbine trip and automatic scram during monthly surveillance testing.Relay replaced.95-05 4/22/95 S 206.0 C N/A RC FUELXX Plant entered annual refueling and maintenance outage (R-10)on April 22.
Sincerely, J.. Parrish     (Mai Drop 1023) ice-President, Nuclear Operations JVP:DGE CC:     LJ Callen, NRC RIV NRC Sr. Resident Inspector (927N)
INPO ANI Library Utility Data Institute BPA- (399)
    !   9505180272 ADQCK '05000397 950430'DR R         '               " '"'PDR
 
UNIT SHUTDOWNS AND POWER REDUCTIONS
                                                                                                                                                        ~, ~
DOCKET NO.:         50-397 UNIT NAME:         WNP-2 DATE:     May 1, 1995 COMPLETED BY:           D.G. Embree           g'o.
TELEPHONE:         (509) 3774448 REPORT PERIOD:      APRIL 1995 Date   Type     Hours     Reason     Method   LER Number       System Component     Cause and Corrective Action To Prevent Recurrence 95-04       4/5/95     F       152.4       A                     95-006         HA     INSTRU       Relay failure caused turbine trip and automatic scram during monthly surveillance testing. Relay replaced.
95-05     4/22/95     S     206.0       C                     N/A           RC   FUELXX       Plant entered annual refueling and maintenance outage (R-10) on April 22.


==SUMMARY==
==SUMMARY==
: At the beginning of the month the plant was operating at full power.Qn April 5, the plant experienced an automatic scram resulting in about'6 days of forced outage.Following the forced outage, the plant restarted and operated an additional 11 days then plant shutdown for the annual refueling outage on April 22.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG%161 Exhibits F&H AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: APRIL 1995 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
:               At the beginning of the month the plant was operating at full power. Qn April 5, the plant experienced an automatic scram resulting in about'6 days of forced outage. Following the forced outage, the plant restarted and operated an additional 11 days then plant shutdown for the annual refueling outage on April 22.
50-397 WNP-2 May 1, 1995 D.G.Embree (509)377-8448 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe), 7 10 12 13 14 15 1079 1108 1107 1101 453-16-13-13-13 13 396 1031 960 1100 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1097 1092 1094 1095 1093 942 57-14-14-16-16-14-13*-12-12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.  
TYPE                     REASON                                                          METHOD                    SYSTEM & COMPONENT F - Forced               A - Equipment Failure             E - Operator Training &       1 - Manual                NUREG%161 Exhibits F & H S - Scheduled            B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration            3 - Auto Scram D - Regulatory Restriction          -
~" r t.4  
G Operational Error            4 - Continued H - Other                      5 - Reduced Load 9 - Other
~4'I PERATING STATUS REPOR for WNP-2 Date: May 1, 1995 2.3.4.5.6.7.8.9.3323 1200.9 1120 1132 1086 N/A Docket: 50-397 Reporting Period: APRIL 1995 Outage+On-Line Hours: 719.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons: 10.Power to which restricted, if any (Net MW,): None 11.Reasons for restrictions, if any: 12.Report Period Hours 13.Hours Reactor Critical 14.Rx Reserve Shutdown Hours 15.Hours Generator On-Line 16.Unit Reserve Shutdown Hours 17.Gross Thermal Energy (MWH)18.Gross Electrical Energy (MWH)19.Net Electrical Energy (MWH)20.Unit Service Factor 21.Unit Availability Factor 22.Unit Capacity Factor (MDC Net)23.Unit Capacity Factor (DER Net)24.Unit Forced Outage Rate 25.Forced Outage Hours MONTH 719.0 392.9 0,0 360.7 0.0 1,086,196 368,200 350,163 50.2%50.2%44.8%43.5%29.7%152.4 YEAR 2,879.0 2,404.3 0.0 2,324.5 0.0 7,404,028 2,553,980 2,451,795 80.7%80.7%78.4%76.0%13.0%348.6 CUMULATIVE 90,967.2 65,104.9 340,4 62,892.1 381.7 186,666,868 62,907,480 60,276,929 69.1%69.6%60.7%60.0%11.7%8,319.7 27.If currently shutdown, estimated startup date: 26.Shutdowns scheduled over the next 6 months (type, date, duration):
 
Refueling, April 22, 1995, 42 days.May 31, 1995 Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.}}
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:       50-397 UNIT:    WNP-2 DATE:    May 1, 1995 COMPLETED BY:          D. G. Embree TELEPHONE:        (509) 377-8448 REPORT PERIOD:              APRIL 1995 AVERAGE DAILYPOWER LEVEL                                        AVERAGE DAILYPOWER LEVEL DAY                  (Net MWe)                                 DAY                 (Net MWe) 1079                                   16                    1097 1108                                   17                    1092 1107                                   18                    1094 1101                                   19                    1095 453                                   20                    1093
                              -16                                   21                      942
  ,  7                                                              22                      57
                              -13                                   23                      -14
                              -13                                   24                     -14 10                        -13                                  25                      -16 13                                  26                      -16 12                        396                                  27                      -14 13                      1031                                  28                      -13 14                        960                                  29                      -12 15                      1100                                  30                      -12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
  ~"
r t.
4
 
PERATING STATUS REPOR
~ 4 'I for WNP-2 Date:   May 1, 1995 Docket: 50-397
: 2. Reporting Period: APRIL 1995                               Outage   + On-Line Hours:     719.0
: 3. Utility
 
==Contact:==
David G. Embree (509) 377-8448
: 4. Licensed Thermal Power (MW, ):                                                           3323
: 5. Nameplate Rating (Gross MW, ):                                                         1200.9
: 6. Design Electrical Rating (Net MW,):                                                       1120
: 7. Maximum Dependable Capacity (Gross MW,):                                                 1132
: 8. Maximum Dependable Capacity (Net MW, ):                                                   1086
: 9. If changes occur above since last report, give reasons:                                    N/A
: 10. Power to which restricted,     if any (Net MW,):                                         None
: 11. Reasons   for restrictions, if any:
MONTH                YEAR          CUMULATIVE
: 12. Report Period Hours                               719.0              2,879.0            90,967.2
: 13. Hours Reactor Critical                           392.9              2,404.3            65,104.9
: 14. Rx Reserve Shutdown Hours                           0,0                  0.0              340,4
: 15. Hours Generator On-Line                           360.7              2,324.5            62,892.1
: 16. Unit Reserve Shutdown Hours                         0.0                  0.0              381.7
: 17. Gross Thermal Energy (MWH)                   1,086,196            7,404,028        186,666,868
: 18. Gross Electrical Energy (MWH)                 368,200            2,553,980          62,907,480
: 19. Net Electrical Energy (MWH)                   350,163            2,451,795          60,276,929
: 20. Unit Service Factor                             50.2%                80.7%              69.1%
: 21. Unit Availability Factor                         50.2%                80.7%              69.6%
: 22. Unit Capacity Factor (MDC Net)                   44.8%                78.4%              60.7%
: 23. Unit Capacity Factor (DER Net)                   43.5%                76.0%              60.0%
: 24. Unit Forced Outage Rate                          29.7%               13.0%              11.7%
: 25. Forced Outage Hours                              152.4               348.6             8,319.7
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):                 Refueling, April 22, 1995, 42 days.
: 27. Ifcurrently  shutdown, estimated startup date:                                    May 31, 1995 Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.}}

Latest revision as of 07:10, 4 February 2020

Monthly Operating Rept for Apr 1995 for WNP-2. W/950510 Ltr
ML17291A800
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1995
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-092, GO2-95-92, NUDOCS 9505180272
Download: ML17291A800 (6)


Text

I ~

RIORITY CELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSXON NBR:9505180272 DOC.DATE: 95/04/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington .Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1995 for WNP-2.

W/950510 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR lENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: AC 10 10 AEOD/SPD/RRAB 1 1

,F LE CENTER 1 1 NRR/DIS P/PIPB 1 1 RRQ DOPS/OECS 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE I J H 1 1 NOAC 1 1 NRC PDR 1 1 YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP VS TO REDUCE O'KSTE! CONTACT I'HE DOCL'ifE4TCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELl nfl.'PATE YOUR N'AifE I'ROif DISTRIBUTIOYLIS'I'S I:OR DOCL'5 IEN'I'S YOL'Oi'"I'LTI'.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 May 10, 1995 G02-95-092 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL 1995 Transmitted herewith is the Monthly Operating Report for the month of April, 1995 as required by Technical Specification 6.9.1.6.

Sincerely, J.. Parrish (Mai Drop 1023) ice-President, Nuclear Operations JVP:DGE CC: LJ Callen, NRC RIV NRC Sr. Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA- (399)

! 9505180272 ADQCK '05000397 950430'DR R ' " '"'PDR

UNIT SHUTDOWNS AND POWER REDUCTIONS

~, ~

DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1995 COMPLETED BY: D.G. Embree g'o.

TELEPHONE: (509) 3774448 REPORT PERIOD: APRIL 1995 Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-04 4/5/95 F 152.4 A 95-006 HA INSTRU Relay failure caused turbine trip and automatic scram during monthly surveillance testing. Relay replaced.

95-05 4/22/95 S 206.0 C N/A RC FUELXX Plant entered annual refueling and maintenance outage (R-10) on April 22.

SUMMARY

At the beginning of the month the plant was operating at full power. Qn April 5, the plant experienced an automatic scram resulting in about'6 days of forced outage. Following the forced outage, the plant restarted and operated an additional 11 days then plant shutdown for the annual refueling outage on April 22.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG%161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: May 1, 1995 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: APRIL 1995 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1079 16 1097 1108 17 1092 1107 18 1094 1101 19 1095 453 20 1093

-16 21 942

, 7 22 57

-13 23 -14

-13 24 -14 10 -13 25 -16 13 26 -16 12 396 27 -14 13 1031 28 -13 14 960 29 -12 15 1100 30 -12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~"

r t.

4

PERATING STATUS REPOR

~ 4 'I for WNP-2 Date: May 1, 1995 Docket: 50-397

2. Reporting Period: APRIL 1995 Outage + On-Line Hours: 719.0
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1132
8. Maximum Dependable Capacity (Net MW, ): 1086
9. If changes occur above since last report, give reasons: N/A
10. Power to which restricted, if any (Net MW,): None
11. Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 719.0 2,879.0 90,967.2
13. Hours Reactor Critical 392.9 2,404.3 65,104.9
14. Rx Reserve Shutdown Hours 0,0 0.0 340,4
15. Hours Generator On-Line 360.7 2,324.5 62,892.1
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MWH) 1,086,196 7,404,028 186,666,868
18. Gross Electrical Energy (MWH) 368,200 2,553,980 62,907,480
19. Net Electrical Energy (MWH) 350,163 2,451,795 60,276,929
20. Unit Service Factor 50.2% 80.7% 69.1%
21. Unit Availability Factor 50.2% 80.7% 69.6%
22. Unit Capacity Factor (MDC Net) 44.8% 78.4% 60.7%
23. Unit Capacity Factor (DER Net) 43.5% 76.0% 60.0%
24. Unit Forced Outage Rate 29.7% 13.0% 11.7%
25. Forced Outage Hours 152.4 348.6 8,319.7
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, April 22, 1995, 42 days.
27. Ifcurrently shutdown, estimated startup date: May 31, 1995 Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.