ML13339A335: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:DETROIT EDISON -FERMI 2AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST11/21/13PAGE 1WASHINGTON, DC 20555Media: 8 1/2 X 11Number Cnt IssueDTC Doc. Serial Number Page Rev Copies Lvl Date Sec StatusTMTRM TRM VOL I 105 1 IR 11/21/13 AFCPlease destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
{{#Wiki_filter:DETROIT EDISON -   FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 11/21/13 PAGE    1 WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC      Doc. Serial Number             Page   Rev Copies Lvl Date     Sec Status TMTRM    TRM VOL I                             105   1   IR 11/21/13       AFC Please destroy or mark all   revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway,Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Detroit Edison EF2,   C/O Info Mgmt 140 NOC,   6400 North Dixie Highway, Newport MI 48166.   (734) 586-4338 OR (734)   586-4061 for questions or concerns.
Ref: cb14614oo/
Ref: cb1461 4oo/
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL -VOL IRevision 105 dated 11/21/13Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
 
Destroy the removed pages. Be sure that Revision 104 has been inserted prior to inserting thesepages.SECTIONREMOVE and DESTROYINSERTIn Front of TRM ManualImmediately following Title PageTitle Page Rev 104 03/16/13List of Effective PagesLEP-1 through LEP-4 Rev 104 03/16/13Title Page Rev 105 11/21/13List of Effective PagesLEP-1 through LEP-4 Rev 105 11/21/13Table of Contents5.0 Administrative ControlsTRM-iii Rev 99 09/10TRM 5.0-a Rev 99 09/10TRM 5.0-1 Rev 99 09/10TRM 5.0-2 thru TRM 5.0-7 Rev 99 09/10TRM 5.0-8 Rev 99 09/10TRM-iii Rev 105 11/13TRM 5.0-a Rev 105 11/13TRM 5.0-1 Rev 105 11/13N/ATRM 5.0-2 Rev 105 11/13END Fermi2Technical Requirements ManualVolume IDTEEnergyARMS -INFORMATION DTC: TMTRM [File: 1754 I DSN: TRM VOL I I Rev:105Date 11/21/2013 Recipient q.6S FERMI 2 -TECHNICAL REQUIREMENTS MANUALVOL ILIST OF EFFECTIVE PAGESPage Revision Page RevisionTRM i Revision 76 TRM 3.3-31 Revision 31TRM ii Revision 73 TRM 3.3-32 Revision 31TRM iii Revision 105 TRM 3.3-33 Revision 31TRM iv Revision 76 TRM 3.3-34 Revision 31TRM v Revision 79 TRM 3.3-35 Revision 60TRM vi Revision 31 TRM 3.3-36 Revision 104TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31TRM 3.3-c Revision 31 TRM 3.4-a Revision 31TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87TRM 3.3-18 Revision 100 TRM 3.6-6 Revision 33TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31TRM Vol. ILEP-IREV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESPage Revision Page RevisionTRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31TRm 3.6-32 Revision 70 TRM 3.11-a Revision 31TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 102TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31TRM 3.7-15 Revision 98 TRM 3.12-18 Revision 75TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75TRM 3.8-3 Revision 96 TRM 3.12-27 Revision 31TRM 3.8-4 Revision 96 TRM 3.12-28 Revision 31TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31TRM 3.8-8 Revision 50 TRM 5.0-a Revision 105TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 105TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 105TRM 3.8-11 Revision 50TRM 3.8-12 Revision 31TRM Vol. ILE P- 2REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESPageTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMB1.0-1B2.0-1B3.0-1B3.0-2B3.0-2aB3.0-2bB3.0-2cB3.0-3B3.0-4B3.0-5B3.0-6B3.0-7B3.1-1B3.2-1B3.3. 1-1B3.3.1-2B3.3.2-1B3.3.2-2B3.3.3-1B3.3.4-1B3.3.4-2B3.3.5-1B3.3.5-2B3.3.6-1B3.3.6-2B3.3.6-3B3.3.6-4B3.3.6-5B3.3.6-6B3.3.7-1B3.3.7-2B3.3.8-1B3.3.9-1B3.3.10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1B3.4.1-2B3.4.1-3B3.4.1-4B3.4.1-5B3.4.2-1B3.4.3-1B3.4.4-1B3.4.5-1B3.4.6-1B3.4.7-1B3.5-1B3.6.1-1B3.6.2-1RevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionPage31316363727272313154727231313131313167318431313131313176763131313156456231313171717171313131313131313167TRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMTRMB3.6.3-1B3.6.4-1B3.6.5-1B3.6.6-1B3.6.7-1B3.6.8-1B3.7.1-1B3.7.2-1B3.7.3-1B3.7.4-1B3.7.4-2B3.7.5-1B3.7.6-1B3.7.7-1B3.7.8-1B3.7.9-1B3.8.1-1B3.8.2-1B3.8.3-1B3.8.4-1B3.8.5-1B3. 8. 6-1B3.9.1-1B3.9.2-1B3.9.3-1B3.9.4-1B3.10-1B3.11.1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 RevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevisionRevision873131703131313173313131319931793131963131433165313131313144313131313131TRM Vol. ILEP-3REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ILIST OF EFFECTIVE PAGESCORE OPERATING LIMITS REPORTCOLR 16, Revision 1Page RevisionNotation Page1 12 13 14 15 16 17 18 19 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 1TRM Vol. ILEP-4REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL ITable of Contents (Cont'd)Section andTR 3.9TR 3.9.1TR 3.9.2TR 3.9.3TR 3.9.4TitleREFUELING OPERATIONS Communications
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 105 dated 11/21/13 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
...................................
Destroy the removed pages. Be sure that Revision 104 has been inserted prior to inserting these pages.
Refueling Platform
SECTION                    REMOVE and DESTROY                          INSERT In Front of TRM Manual    Title Page Rev 104 03/16/13                  Title Page Rev 105 11/21/13 Immediately following      List of Effective Pages                      List of Effective Pages Title Page                LEP-1 through LEP-4 Rev 104 03/16/13        LEP-1 through LEP-4 Rev 105 11/21/13 Table of Contents          TRM-iii Rev 99 09/10                        TRM-iii Rev 105 11/13 5.0 Administrative Controls                  TRM 5.0-a Rev 99 09/10                      TRM 5.0-a Rev 105 11/13 TRM 5.0-1 Rev 99 09/10                      TRM 5.0-1 Rev 105 11/13 TRM 5.0-2 thru TRM 5.0-7 Rev 99 09/10        N/A TRM 5.0-8 Rev 99 09/10                      TRM 5.0-2 Rev 105 11/13 END
...............................
 
Crane Travel -Spent Fuel Storage Pool ...........
Fermi 2 Technical Requirements Manual Volume I DTE Energy ARMS - INFORMATION DTC: TMTRM     [File: 1754           I DSN: TRM VOL I I Rev:105 Date 11/21/2013                         Recipient q.6S
Reactor Pressure Vessel Water Level -Refueling
 
..PageTRMTRMTRMTRM3.9-13.9-23.9-43.9-5TR 3.10TRTR3.113.11.1TR 3.12TRTRTRTRTRTRTRTRTRTR3.12.13.12.23 .12 .3.12.33.12.43.12.53.12.63.12.73 .12.84.05.0TR 5.1TR 5.1.1TR 5.2TR 5.2.1SPECIAL OPERATIONS (Blank) ..........................
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page        Revision                   Page           Revision TRM  i       Revision 76                 TRM 3.3-31   Revision 31 TRM  ii     Revision 73                 TRM 3.3-32   Revision 31 TRM  iii     Revision 105               TRM 3.3-33   Revision 31 TRM  iv     Revision 76                 TRM 3.3-34   Revision 31 TRM  v       Revision 79                 TRM 3.3-35   Revision 60 TRM  vi     Revision 31                 TRM 3.3-36   Revision 104 TRM  1.0-a   Revision 31                 TRM 3.3-37   Revision 72 TRM  1.0-1   Revision 31                 TRM 3.3-38   Revision 31 TRM  2.0-1   Revision 31                 TRM 3.3-39   Revision 31 TRM  3.0-a   Revision 31                 TRM 3.3-40   Revision 56 TRM  3.0-1   Revision 63                 TRM 3.3-41   Revision 56 TRM  3.0-2   Revision 72                 TRM 3.3-42   Revision 45 TRM  3.0-3   Revision 54                 TRM 3.3-43   Revision 62 TRM  3.0-4   Revision 72                 TRM 3.3-44   Revision 72 TRM  3.1-a   Revision 31                 TRM 3.3-45   Revision 31 TRM  3.1-1   Revision 31                 TRM 3.3-46   Revision 31 TRM  3.2-1   Revision 31                 TRM 3.3-47   Revision 31 TRM  3.3-a   Revision 31                 TRM 3.3-48   Revision 31 TRM  3.3-b   Revision 31                 TRM 3.3-49   Revision 31 TRM  3.3-c   Revision 31                 TRM 3.4-a   Revision 31 TRM  3.3-d   Revision 31                 TRM 3.4-1   Revision 36 TRM  3.3-1   Revision 34                 TRM 3.4-la   Revision 71 TRM  3.3-2   Revision 59                 TRM 3.4-lb   Revision 71 TRM  3.3-3   Revision 31                 TRM 3.4-2   Revision 31 TRM  3.3-4   Revision 31                 TRM 3.4-3   Revision 31 TRM  3.3-5   Revision 31                 TRM 3.4-4   Revision 31 TRM  3.3-6   Revision 31                 TRM 3.4-5   Revision 31 TRM  3.3-7   Revision 31                 TRM 3.4-6   Revision 31 TRM  3.3-8   Revision 31                 TRM 3.4-7   Revision 31 TRM  3.3-9   Revision 31                 TRM 3.4-8   Revision 31 TRM  3.3-10 Revision 31                 TRM 3.4-9   Revision 31 TRM  3.3-11 Revision 31                 TRM 3.4-10   Revision 31 TRM  3.3-12 Revision 67                 TRM 3.5-1   Revision 31 TRM  3.3-13 Revision 74                 TRM 3.6-a   Revision 70 TRM  3.3-13a Revision 67                 TRM 3.6-1   Revision 60 TRM  3.3-14 Revision 67                 TRM 3.6-2   Revision 67 TRM  3.3-15 Revision 31                 TRM 3.6-3   Revision 31 TRM  3.3-16 Revision 31                 TRM 3.6-4   Revision 55 TRM  3.3-17 Revision 31                 TRM 3.6-5   Revision 87 TRM  3.3-18 Revision 100               TRM 3.6-6   Revision 33 TRM  3.3-19 Revision 31                 TRM 3.6-7   Revision 31 TRM  3.3-20 Revision 31                 TRM 3.6-8   Revision 31 TRM  3.3-21 Revision 59                 TRM 3.6-9   Revision 85 TRM  3.3-22 Revision 31                 TRM 3.6-10   Revision 31 TRM  3.3-23 Revision 31                 TRM 3.6-11   Revision 31 TRM  3.3-24 Revision 31                 TRM 3.6-12   Revision 31 TRM  3.3-25 Revision 31                 TRM 3.6-13   Revision 71 TRM  3.3-26 Revision 31                 TRM 3.6-14   Revision 31 TRM  3.3-27 Revision 31                 TRM 3.6-15   Revision 31 TRM  3.3-28 Revision 76                 TRM 3.6-16   Revision 31 TRM  3.3-29 Revision 76                 TRM 3.6-17   Revision 31 TRM  3.3-30 Revision 31                 TRM 3.6-18   Revision 31 TRM Vol. I                      LEP-I              REV 105   11/21/13
RADIOACTIVE EFFLUENTS Temporary Outdoor Storage Tank Radioactivity
 
.....FIRE PROTECTION Fire Detection Instrumentation
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page        Revision                     Page           Revision TRM  3.6-19 Revision 31                   TRM 3.8-13   Revision 61 TRM  3.6-20 Revision 31                   TRM 3.8-14   Revision 46 TRM  3.6-21 Revision 31                   TRM 3.8-15   Revision 31 TRM  3.6-22 Revision 31                   TRM 3.8-16   Revision 31 TRM  3.6-23 Revision 31                   TRM 3.8-17   Revision 43 TRM  3.6-24 Revision 58                   TRM 3.8-18   Revision 33 TRM  3.6-25 Revision 31                   TRM 3.9-a   Revision 31 TRM  3.6-26 Revision 31                   TRM 3.9-1   Revision 31 TRM  3.6-27 Revision 31                   TRM 3.9-2   Revision 65 TRM  3.6-28 Revision 31                   TRM 3.9-3   Revision 80 TRM  3.6-29 Revision 31                   TRM 3.9-4   Revision 88 TRM  3.6-30 Revision 31                   TRM 3.9-5   Revision 31 TRM  3.6-31 Revision 31                   TRM 3.10-1   Revision 31 TRm  3.6-32 Revision 70                   TRM 3.11-a   Revision 31 TRM  3.6-33 Revision 31                   TRM 3.11-1   Revision 31 TRM  3.6-34 Revision 31                   TRM 3.12-a   Revision 31 TRM  3.6-35 Revision 31                   TRM 3.12-1   Revision 75 TRM  3.7-a Revision 73                   TRM 3.12-2   Revision 31 TRM  3.7-b Revision 31                   TRM 3.12-3   Revision 31 TRM  3.7-1 Revision 60                   TRM 3.12-4   Revision 102 TRM  3.7-2 Revision 70                   TRM 3.12-5   Revision 53 TRM  3.7-3 Revision 70                   TRM 3.12-6   Revision 53 TRM  3.7-4 Revision 73                   TRM 3.12-7   Revision 31 TRM  3.7-5 Revision 31                   TRM 3.12-8   Revision 57 TRM  3.7-6 Revision 31                   TRM 3.12-9   Revision 40 TRM  3.7-7 Revision 31                   TRM 3.12-10 Revision 31 TRM  3.7-8 Revision 31                   TRM 3.12-11 Revision 49 TRM  3.7-9 Revision 31                   TRM 3.12-12 Revision 31 TRM  3.7-10 Revision 44                   TRM 3.12-13 Revision 75 TRM  3.7-11 Revision 31                   TRM 3.12-14 Revision 31 TRM  3.7-12 Revision 72                   TRM 3.12-15 Revision 31 TRM  3.7-13 Revision 31                   TRM 3.12-16 Revision 75 TRM  3.7-14 Revision 31                   TRM 3.12-17 Revision 31 TRM  3.7-15 Revision 98                   TRM 3.12-18 Revision 75 TRM  3.7-16 Revision 31                   TRM 3.12-19 Revision 31 TRM  3.7-17 Revision 31                   TRM 3.12-20 Revision 75 TRM  3.7-18 Revision 77                   TRM 3.12-21 Revision 31 TRM  3.7-19 Revision 31                   TRM 3.12-22 Revision 31 TRM  3.7-20 Revision 79                   TRM 3.12-23 Revision 31 TRM  3.8-a Revision 31                   TRM 3.12-24 Revision 31 TRM  3.8-1 Revision 31                   TRM 3.12-25 Revision 31 TRM  3.8-2 Revision 31                   TRM 3.12-26 Revision 75 TRM  3.8-3 Revision 96                   TRM 3.12-27 Revision 31 TRM  3.8-4 Revision 96                   TRM 3.12-28 Revision 31 TRM  3.8-5 Revision 31                   TRM 3.12-29 Revision 78 TRM  3.8-6 Revision 50                   TRM 3.12-30 Revision 31 TRM  3.8-7 Revision 50                   TRM 4.0-1   Revision 31 TRM  3.8-8 Revision 50                   TRM 5.0-a   Revision 105 TRM  3.8-9 Revision 50                   TRM 5.0-1   Revision 105 TRM  3.8-10 Revision 50                   TRM 5.0-2   Revision 105 TRM  3.8-11 Revision 50 TRM  3.8-12 Revision 31 TRM Vol. I                        LE P- 2              REV 105   11/21/13
...................
 
Fire Suppression Water System ....................
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page          Revision                  Page            Revision TRMB1.0-1    Revision 31                TRMB3.6.3-1    Revision  87 TRM B2.0-1    Revision 31                TRMB3.6.4-1    Revision  31 TRMB3.0-1    Revision 63                TRMB3.6.5-1    Revision  31 TRM B3.0-2    Revision 63                TRMB3.6.6-1    Revision  70 TRM B3.0-2a  Revision 72                TRMB3.6.7-1   Revision  31 TRMB3.0-2b    Revision 72                TRMB3.6.8-1   Revision  31 TRM B3.0-2c  Revision 72                TRMB3.7.1-1    Revision  31 TRMB3.0-3     Revision 31                TRMB3.7.2-1    Revision  31 TRM B3.0-4    Revision 31                TRMB3.7.3-1    Revision  73 TRMB3.0-5    Revision 54                TRMB3.7.4-1    Revision  31 TRM B3.0-6    Revision 72                TRMB3.7.4-2    Revision  31 TRM B3.0-7    Revision 72                TRMB3.7.5-1    Revision  31 TRM B3.1-1    Revision 31                TRMB3.7.6-1    Revision  31 TRM B3.2-1    Revision 31                TRMB3.7.7-1    Revision  99 TRM B3.3. 1-1 Revision 31                TRM B3.7.8-1  Revision  31 TRM B3.3.1-2  Revision 31                TRMB3.7.9-1    Revision  79 TRMB3.3.2-1   Revision 31                TRMB3.8.1-1   Revision  31 TRM B3.3.2-2  Revision 31                TRMB3.8.2-1   Revision  31 TRMB3.3.3-1   Revision 67                TRMB3.8.3-1   Revision  96 TRM B3.3.4-1  Revision 31                TRMB3.8.4-1   Revision  31 TRM B3.3.4-2 Revision 84                TRMB3.8.5-1    Revision  31 TRM B3.3.5-1  Revision 31                TRMB3. 8. 6-1  Revision  43 TRM B3.3.5-2  Revision 31                TRM B3.9.1-1  Revision  31 TRM B3.3.6-1  Revision 31                TRM B3.9.2-1  Revision  65 TRM B3.3.6-2  Revision 31                TRMB3.9.3-1    Revision  31 TRMB3.3.6-3  Revision 31                TRMB3.9.4-1    Revision  31 TRM B3.3.6-4  Revision 31                TRMB3.10-1    Revision  31 TRMB3.3.6-5  Revision 76                TRMB3.11.1-1  Revision  31 TRM B3.3.6-6  Revision 76                TRMB3.12.1-1  Revision  31 TRM B3.3.7-1  Revision 31                TRMB3.12.2-1  Revision  44 TRM B3.3.7-2  Revision 31                TRMB3.12.3-1   Revision  31 TRMB3.3.8-1  Revision 31                TRM B3.12.4-1  Revision  31 TRM B3.3.9-1 Revision 31                TRMB3.12.5-1  Revision  31 TRMB3.3.10-1 Revision 56                TRM B3.12.6-1 Revision  31 TRMB3.3.11-1 Revision 45                TRMB3.12.7-1   Revision  31 TRMB3.3.12-1 Revision 62                TRMB3.12.8-1   Revision  31 TRMB3.3.13-1 Revision 31 TRMB3.3.14-1 Revision 31 TRMB3.4.1-1   Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3  Revision 71 TRM B3.4.1-4  Revision 71 TRM B3.4.1-5  Revision 71 TRM B3.4.2-1  Revision 31 TRMB3.4.3-1  Revision 31 TRMB3.4.4-1  Revision 31 TRMB3.4.5-1  Revision 31 TRMB3.4.6-1  Revision 31 TRM B3.4.7-1  Revision 31 TRM B3.5-1    Revision 31 TRM B3.6.1-1  Revision 31 TRM B3.6.2-1  Revision 67 TRM Vol. I                        LEP-3              REV 105  11/21/13
Spray and Sprinkler Systems ......................
 
C02  Systems .......................................
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 16, Revision 1 Page                  Revision Notation Page 1                        1 2                        1 3                        1 4                        1 5                        1 6                        1 7                        1 8                        1 9                         1 10                        1 11                        1 12                        1 13                       1 14                        1 15                        1 16                        1 17                        1 18                        1 19                        1 20                        1 21                        1 22                        1 23                       1 24                        1 TRM Vol. I                            LEP-4              REV 105 11/21/13
Halon Systems ....................................
 
Fire Hose Stations
FERMI 2  -  TECHNICAL REQUIREMENTS                                      MANUAL VOL I Table of Contents                            (Cont'd)
...............................
Section and Title                                                                                              Page TR 3.9         REFUELING OPERATIONS TR 3.9.1          Communications ...................................                                       TRM  3.9-1 TR 3.9.2          Refueling Platform ...............................                                       TRM  3.9-2 TR 3.9.3          Crane Travel - Spent Fuel Storage Pool ...........                                       TRM  3.9-4 TR 3.9.4          Reactor Pressure Vessel Water Level - Refueling ..                                       TRM  3.9-5 TR 3.10        SPECIAL OPERATIONS            (Blank)              ..........................               TRM 3.10-1 TR 3.11        RADIOACTIVE EFFLUENTS TR 3.11.1          Temporary Outdoor Storage Tank Radioactivity .....                                       TRM 3.11-1 TR 3.12        FIRE PROTECTION TR 3.12.1          Fire Detection Instrumentation ...................                                       TRM  3.12-1 TR 3.12.2 3 .12 .         Fire Suppression Water System ....................                                       TRM  3 .12-8 TR 3.12.3          Spray and Sprinkler Systems ......................                                       TRM  3.12-13 TR 3.12.4          C0 2 Systems .......................................                                     TRM  3.12-16 TR 3.12.5          Halon Systems ....................................                                       TRM  3.12-18 TR 3.12.6          Fire Hose Stations ...............................                                       TRM  3.12-20 TR 3.12.7          Yard Fire Hydrants and Hydrant Hose Houses .......                                       TRM  3.12-26 TR 3  .12.8        Fire Rated Assemblies ............................                                       TRM  3.12-29 TR 4.0      DESIGN FEATURES    (Blank) .................................                                   TRiM 4.0-1 TR 5.0      ADMINISTRATIVE CONTROLS TR 5.1          Programs TR 5.1.1        Inservice Inspection and Testing Program for Snubbers                                      TRM 5.0-1 TR 5.2          Reports TR 5.2.1        Startup Reports .....................................                                       TRM 5.0-2 BASES TR B1. 0        USE AND APPLICATION TR B1 . 1          Definitions (Blank)                 .............................                     TRM B1.0-1 TR B2. 0       SAFETY LIMITS    (SLs)          (Blank)              ........................           TRM B2.0-1 TR B3 . 0      Limiting Condition for Operation (TRLCO)
Yard Fire Hydrants and Hydrant Hose Houses .......Fire Rated Assemblies
Applicability ......................................                                     TRM B3.0-1 TR B3 . 0      Surveillance Requirement (TRSR) Applicability ......                                     TRM B3.0-3 TR B3 . 1      REACTIVITY CONTROL SYSTEMS TR B3 . 1.1        Control Rod Drive Housing Support ...............                                     TRM B3. 1-1 TR B3 .2        POWER DISTRIBUTION LIMITS                        (Blank)              .................. TRM B3.2-1 (continued)
............................
TRM VOL I                                             TRM-iii                                            REV 105 11/13 1
DESIGN FEATURES (Blank) .................................
 
ADMINISTRATIVE CONTROLSProgramsInservice Inspection and Testing Program for SnubbersReportsStartup Reports .....................................
SECTION 5.0 DETAILED INDEX OF SECTION Page TR 5.1.1   Inservice Inspection and Testing Program for Snubbers ..........................................      TRM 5.0-1 TR 5.2.1   Startup Reports ...................................     TRM 5.0-2 (Reporting Requirements)
BASESUSE AND APPLICATION Definitions (Blank) .............................
TRM 5.0-a REV. 105  11/13 I TI~ Vol.
SAFETY LIMITS (SLs) (Blank) ........................
TRM Vol. I I                              TRM 5. 0-a             REV. 105  11/13 1
Limiting Condition for Operation (TRLCO)Applicability
 
......................................
Programs TR 5.1 TR 5.0      ADMINISTRATIVE CONTROLS TR 5.1      Programs TR 5.1.1    Inservice  Inspection and Testing Program for Snubbers The Snubber Program specified in ISI-NDE Program, Part C implements the requirements of the ASME OM Code, Subsection ISTA and ISTD, 2004 Edition, as allowed by 10CFR50.55a(b)(3)(v) in lieu of ASME Section XI, IWF-5200(a) and (b) and IWF-5300(a) and (b), which applies to preservice and inservice examination and testing requirements for snubbers.
Surveillance Requirement (TRSR) Applicability
REV 105 11/13 TRI'I 5.0-1 TRM Vol. II TRN Vol.                             TRM 5. 0-1                    REV 105 11/13 1
......REACTIVITY CONTROL SYSTEMSControl Rod Drive Housing Support ...............
 
POWER DISTRIBUTION LIMITS (Blank) ..................
Reports TR 5.2 TR 5.0      ADMINISTRATIVE CONTROLS TR 5.2      Reports In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the Regional Administrator of the Regional Office of the NRC unless otherwise noted.
TRM 3.10-1TRM 3.11-1TRMTRMTRMTRMTRMTRMTRMTRMTRiMTRMTRM3.12-13 .12-83.12-133.12-163.12-183.12-203.12-263.12-294.0-15.0-15.0-2TRTRTRTRTRTRTRTRB1. 0B1 .1B2. 0B3 .0B3 .0B3 .1B3 .1. 1B3 .2TRM B1.0-1TRM B2.0-1TRM B3.0-1TRM B3.0-3TRM B3. 1-1TRM B3.2-1(continued)
TR 5.2.1    Startup Report
TRM VOL ITRM-iiiREV 105 11/13 1 SECTION 5.0DETAILED INDEX OF SECTIONPageTR 5.1.1 Inservice Inspection and Testing Program forSnubbers
: a. A summary report of plant startup and power escalation testing shall be submitted following:
..........................................
: 1. Receipt of an Operating License;
TRM 5.0-1TR 5.2.1 Startup Reports ...................................
: 2. Amendment to the license involving a planned increase in power level;
TRM 5.0-2(Reporting Requirements)
: 3. Installation of fuel that has a different design or has been manufactured by a different fuel supplier; and
TI~ Vol. I TRM 5.0-a REV. 105 11/13 ITRM Vol. ITRM 5. 0-aREV. 105 11/13 1 ProgramsTR 5.1TR 5.0 ADMINISTRATIVE CONTROLSTR 5.1 ProgramsTR 5.1.1 Inservice Inspection and Testing Program for SnubbersThe Snubber Program specified in ISI-NDE Program, Part C implements the requirements of the ASME OM Code, Subsection ISTA and ISTD, 2004Edition, as allowed by 10CFR50.55a(b)(3)(v) in lieu of ASME SectionXI, IWF-5200(a) and (b) and IWF-5300(a) and (b), which applies topreservice and inservice examination and testing requirements forsnubbers.
: 4. Modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the unit.
TRN Vol. I TRI'I 5.0-1 REV 105 11/13TRM Vol. ITRM 5. 0-1REV 105 11/13 1 ReportsTR 5.2TR 5.0 ADMINISTRATIVE CONTROLSTR 5.2 ReportsIn addition to the applicable reporting requirements of Title 10, Code of FederalRegulations, the following reports shall be submitted to the RegionalAdministrator of the Regional Office of the NRC unless otherwise noted.TR 5.2.1 Startup Reporta. A summary report of plant startup and power escalation testingshall be submitted following:
: b. The startup report shall address each of the tests identified in Subsection 14.1.4.8 of the Final Safety Analysis Report and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report.
: 1. Receipt of an Operating License;2. Amendment to the license involving a planned increase inpower level;3. Installation of fuel that has a different design or has beenmanufactured by a different fuel supplier; and4. Modifications that may have significantly altered thenuclear,
: c. Startup reports shall be submitted within:
: thermal, or hydraulic performance of the unit.b. The startup report shall address each of the tests identified inSubsection 14.1.4.8 of the Final Safety Analysis Report andshall include a description of the measured values of theoperating conditions or characteristics obtained during the testprogram and a comparison of these values with design predictions and specifications.
: 1. 90 days following completion of the startup test program;
Any corrective actions that were requiredto obtain satisfactory operation shall also be described.
: 2. 90 days following resumption or commencement of commercial power operation; or
Anyadditional specific details required in license conditions basedon other commitments shall be included in this report.c. Startup reports shall be submitted within:1. 90 days following completion of the startup test program;2. 90 days following resumption or commencement of commercial power operation; or3. 9 months following initial criticality, whichever isearliest.
: 3. 9 months following initial  criticality, whichever is earliest.
If the startup report does not cover all three events (i.e.,initial criticality, completion of startup test program, andresumption or commencement of commercial operation) supplementary reports shall be submitted at least every 3 monthsuntil all three events have been completed.
If the startup report does not cover all three events (i.e.,
TRM Vol. I TRM 5.0-2 REV 105 11/13 ITRM Vol. ITRM 5. 0-2REV 105 11/13 1}}
initial criticality, completion of startup test program, and resumption or commencement of commercial operation) supplementary reports shall be submitted at least every 3 months until all three events have been completed.
TRM  5.0-2                    REV 105  11/13 I Vol. I TRM Vol. I                           TRM 5. 0-2                   REV 105   11/13 1}}

Latest revision as of 11:41, 4 November 2019

Licensing Document Transmittal Fermi 2 Technical Requirements Manual - Vol I
ML13339A335
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/21/2013
From:
DTE Energy
To:
Office of Nuclear Reactor Regulation
References
00935, cb1461
Download: ML13339A335 (11)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 11/21/13 PAGE 1 WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 105 1 IR 11/21/13 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb1461 4oo/

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 105 dated 11/21/13 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 104 has been inserted prior to inserting these pages.

SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Page Rev 104 03/16/13 Title Page Rev 105 11/21/13 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 104 03/16/13 LEP-1 through LEP-4 Rev 105 11/21/13 Table of Contents TRM-iii Rev 99 09/10 TRM-iii Rev 105 11/13 5.0 Administrative Controls TRM 5.0-a Rev 99 09/10 TRM 5.0-a Rev 105 11/13 TRM 5.0-1 Rev 99 09/10 TRM 5.0-1 Rev 105 11/13 TRM 5.0-2 thru TRM 5.0-7 Rev 99 09/10 N/A TRM 5.0-8 Rev 99 09/10 TRM 5.0-2 Rev 105 11/13 END

Fermi 2 Technical Requirements Manual Volume I DTE Energy ARMS - INFORMATION DTC: TMTRM [File: 1754 I DSN: TRM VOL I I Rev:105 Date 11/21/2013 Recipient q.6S

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 105 TRM 3.3-33 Revision 31 TRM iv Revision 76 TRM 3.3-34 Revision 31 TRM v Revision 79 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 104 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRM 3.3-18 Revision 100 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-I REV 105 11/21/13

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRm 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 102 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 98 TRM 3.12-18 Revision 75 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75 TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TRM 3.8-3 Revision 96 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 96 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 105 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 105 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 105 TRM 3.8-11 Revision 50 TRM 3.8-12 Revision 31 TRM Vol. I LE P- 2 REV 105 11/21/13

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRMB1.0-1 Revision 31 TRMB3.6.3-1 Revision 87 TRM B2.0-1 Revision 31 TRMB3.6.4-1 Revision 31 TRMB3.0-1 Revision 63 TRMB3.6.5-1 Revision 31 TRM B3.0-2 Revision 63 TRMB3.6.6-1 Revision 70 TRM B3.0-2a Revision 72 TRMB3.6.7-1 Revision 31 TRMB3.0-2b Revision 72 TRMB3.6.8-1 Revision 31 TRM B3.0-2c Revision 72 TRMB3.7.1-1 Revision 31 TRMB3.0-3 Revision 31 TRMB3.7.2-1 Revision 31 TRM B3.0-4 Revision 31 TRMB3.7.3-1 Revision 73 TRMB3.0-5 Revision 54 TRMB3.7.4-1 Revision 31 TRM B3.0-6 Revision 72 TRMB3.7.4-2 Revision 31 TRM B3.0-7 Revision 72 TRMB3.7.5-1 Revision 31 TRM B3.1-1 Revision 31 TRMB3.7.6-1 Revision 31 TRM B3.2-1 Revision 31 TRMB3.7.7-1 Revision 99 TRM B3.3. 1-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.1-2 Revision 31 TRMB3.7.9-1 Revision 79 TRMB3.3.2-1 Revision 31 TRMB3.8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRMB3.8.2-1 Revision 31 TRMB3.3.3-1 Revision 67 TRMB3.8.3-1 Revision 96 TRM B3.3.4-1 Revision 31 TRMB3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 84 TRMB3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRMB3. 8. 6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-2 Revision 31 TRMB3.9.3-1 Revision 31 TRMB3.3.6-3 Revision 31 TRMB3.9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRMB3.10-1 Revision 31 TRMB3.3.6-5 Revision 76 TRMB3.11.1-1 Revision 31 TRM B3.3.6-6 Revision 76 TRMB3.12.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRMB3.12.2-1 Revision 44 TRM B3.3.7-2 Revision 31 TRMB3.12.3-1 Revision 31 TRMB3.3.8-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.9-1 Revision 31 TRMB3.12.5-1 Revision 31 TRMB3.3.10-1 Revision 56 TRM B3.12.6-1 Revision 31 TRMB3.3.11-1 Revision 45 TRMB3.12.7-1 Revision 31 TRMB3.3.12-1 Revision 62 TRMB3.12.8-1 Revision 31 TRMB3.3.13-1 Revision 31 TRMB3.3.14-1 Revision 31 TRMB3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRMB3.4.3-1 Revision 31 TRMB3.4.4-1 Revision 31 TRMB3.4.5-1 Revision 31 TRMB3.4.6-1 Revision 31 TRM B3.4.7-1 Revision 31 TRM B3.5-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B3.6.2-1 Revision 67 TRM Vol. I LEP-3 REV 105 11/21/13

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 16, Revision 1 Page Revision Notation Page 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 1 24 1 TRM Vol. I LEP-4 REV 105 11/21/13

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I Table of Contents (Cont'd)

Section and Title Page TR 3.9 REFUELING OPERATIONS TR 3.9.1 Communications ................................... TRM 3.9-1 TR 3.9.2 Refueling Platform ............................... TRM 3.9-2 TR 3.9.3 Crane Travel - Spent Fuel Storage Pool ........... TRM 3.9-4 TR 3.9.4 Reactor Pressure Vessel Water Level - Refueling .. TRM 3.9-5 TR 3.10 SPECIAL OPERATIONS (Blank) .......................... TRM 3.10-1 TR 3.11 RADIOACTIVE EFFLUENTS TR 3.11.1 Temporary Outdoor Storage Tank Radioactivity ..... TRM 3.11-1 TR 3.12 FIRE PROTECTION TR 3.12.1 Fire Detection Instrumentation ................... TRM 3.12-1 TR 3.12.2 3 .12 . Fire Suppression Water System .................... TRM 3 .12-8 TR 3.12.3 Spray and Sprinkler Systems ...................... TRM 3.12-13 TR 3.12.4 C0 2 Systems ....................................... TRM 3.12-16 TR 3.12.5 Halon Systems .................................... TRM 3.12-18 TR 3.12.6 Fire Hose Stations ............................... TRM 3.12-20 TR 3.12.7 Yard Fire Hydrants and Hydrant Hose Houses ....... TRM 3.12-26 TR 3 .12.8 Fire Rated Assemblies ............................ TRM 3.12-29 TR 4.0 DESIGN FEATURES (Blank) ................................. TRiM 4.0-1 TR 5.0 ADMINISTRATIVE CONTROLS TR 5.1 Programs TR 5.1.1 Inservice Inspection and Testing Program for Snubbers TRM 5.0-1 TR 5.2 Reports TR 5.2.1 Startup Reports ..................................... TRM 5.0-2 BASES TR B1. 0 USE AND APPLICATION TR B1 . 1 Definitions (Blank) ............................. TRM B1.0-1 TR B2. 0 SAFETY LIMITS (SLs) (Blank) ........................ TRM B2.0-1 TR B3 . 0 Limiting Condition for Operation (TRLCO)

Applicability ...................................... TRM B3.0-1 TR B3 . 0 Surveillance Requirement (TRSR) Applicability ...... TRM B3.0-3 TR B3 . 1 REACTIVITY CONTROL SYSTEMS TR B3 . 1.1 Control Rod Drive Housing Support ............... TRM B3. 1-1 TR B3 .2 POWER DISTRIBUTION LIMITS (Blank) .................. TRM B3.2-1 (continued)

TRM VOL I TRM-iii REV 105 11/13 1

SECTION 5.0 DETAILED INDEX OF SECTION Page TR 5.1.1 Inservice Inspection and Testing Program for Snubbers .......................................... TRM 5.0-1 TR 5.2.1 Startup Reports ................................... TRM 5.0-2 (Reporting Requirements)

TRM 5.0-a REV. 105 11/13 I TI~ Vol.

TRM Vol. I I TRM 5. 0-a REV. 105 11/13 1

Programs TR 5.1 TR 5.0 ADMINISTRATIVE CONTROLS TR 5.1 Programs TR 5.1.1 Inservice Inspection and Testing Program for Snubbers The Snubber Program specified in ISI-NDE Program, Part C implements the requirements of the ASME OM Code, Subsection ISTA and ISTD, 2004 Edition, as allowed by 10CFR50.55a(b)(3)(v) in lieu of ASME Section XI, IWF-5200(a) and (b) and IWF-5300(a) and (b), which applies to preservice and inservice examination and testing requirements for snubbers.

REV 105 11/13 TRI'I 5.0-1 TRM Vol. II TRN Vol. TRM 5. 0-1 REV 105 11/13 1

Reports TR 5.2 TR 5.0 ADMINISTRATIVE CONTROLS TR 5.2 Reports In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the Regional Administrator of the Regional Office of the NRC unless otherwise noted.

TR 5.2.1 Startup Report

a. A summary report of plant startup and power escalation testing shall be submitted following:
1. Receipt of an Operating License;
2. Amendment to the license involving a planned increase in power level;
3. Installation of fuel that has a different design or has been manufactured by a different fuel supplier; and
4. Modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the unit.
b. The startup report shall address each of the tests identified in Subsection 14.1.4.8 of the Final Safety Analysis Report and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report.
c. Startup reports shall be submitted within:
1. 90 days following completion of the startup test program;
2. 90 days following resumption or commencement of commercial power operation; or
3. 9 months following initial criticality, whichever is earliest.

If the startup report does not cover all three events (i.e.,

initial criticality, completion of startup test program, and resumption or commencement of commercial operation) supplementary reports shall be submitted at least every 3 months until all three events have been completed.

TRM 5.0-2 REV 105 11/13 I Vol. I TRM Vol. I TRM 5. 0-2 REV 105 11/13 1