ML17256A627: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/29/1983
| issue date = 03/29/1983
| title = Forwards Revised A-103:4.2 Operator Requalification Program. Program Forms Basis for 1983 Annual Exam
| title = Forwards Revised A-103:4.2 Operator Requalification Program. Program Forms Basis for 1983 Annual Exam
| author name = MAIER J E
| author name = Maier J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = THOMPSON H
| addressee name = Thompson H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATORY ORMATIONDISTRIBUTION SY.M(RIDS)AQCBSSION NBR;8304130156 DOC~DATE:
{{#Wiki_filter:REGULATORY       ORMATION DISTRIBUTION SY     .M (RIDS)
83/03/28NOTARIZED:
AQCBSSION NBR;8304130156           DOC~DATE:   83/03/28    NOTARIZED:   NO         'DOCKET FACIL:50 BYNAME 244 Robert Emmet  Ginna Nuclear AUTHOR AF F ILI ATION Planti Unit    ii Rochester    G  05000244 AUTH MAIERg J ~ E ~       Rochester Gas L Elect> ic Corp, RECIP,llAME           RECIPIENT AFFILIATION THOMPSONiH ~           Division of Human Factors Safety
NO'DOCKETFACIL:50244RobertEmmetGinnaNuclearPlantiUnitiiRochester G05000244AUTHBYNAMEAUTHORAFFILIATIONMAIERgJ~E~Rochester GasLElect>icCorp,RECIP,llAME RECIPIENT AFFILIATION THOMPSONiH
~DivisionofHumanFactorsSafety


==SUBJECT:==
==SUBJECT:==
ForwardsrevisedA"103>4:2 operatorrequalification program,Programformsbasisfor1983annualexam,DISTRIBUTION CODE'003S COPIESRECEIVED:LTR"
Forwards revised A"103>4:2 operator        requalification    program, Program forms basis for 1983 annual        exam, DISTRIBUTION CODE'003S         COPIES RECEIVED:LTR"       -ENCL      SIZE      +
-ENCLSIZE+TITLE.':OperatorRequalification ProgramNOTES:NRR/OL/SEP icy.05000244RECIPIENT IDCODE/NAME NRROR85BCINTERNALS NRR/DHFS/OLB 01,RGN1COPIESLTTRENCL11221RECIPIENTIDCODE/NAME DICKINGREGFILE04COPIESLTTRENCL1111EXTERNAL:
TITLE.': Operator Requalification Program NOTES:NRR/OL/SEP       icy.                                                         05000244 RECIPIENT        COPIES            RECIP IENT          COPIES ID CODE/NAME      LTTR ENCL        ID CODE/NAME         LTTR ENCL NRR OR85  BC            1    1    DICKING                  1    1 INTERNALS NRR/DHFS/OLB       01,     2    2    REG  FILE        04      1    1 RGN1                          1 EXTERNAL: ACRS                      10    10    INPQrJeSTARNES LPOR            03      1    1    NRC  POR        02      1 NOTES'8      NSTC            05      1 1
ACRSLPORNSTCNOTES'810100311051111INPQrJeSTARNES NRCPOR021NTIS1TOTALNUMBEROFCOPIESREQUIRE,D:
1 1
LTTR2?ENCL,22 4('I"<"~1f'4g~,YW,lNll''~f'<<Jrq0I(ik,,U~illgillq,ffl'ltyli')Ithcjlg~Off>>w1~'~]ltNl[~ill~'>f)5>'"cKfPl'fted>>f,,>gl><l.]7-<0)(pfgjfy>,llll lg~g(~CArkfc~lip3)~i,><,F'1'I",sks,')434>
NTIS                    1 TOTAL NUMBER OF COPIES REQUIRE,D: LTTR          2?   ENCL,   22
I5",'fN0~~Ca',fVI'~.>flJ>>/(e'f>>>.i%lk'~t~'I$~/llew(]g)+$%g)ff/~)Iffffyglk%'gilg~(1')'A0<'~~4~<JLPh4'c,''<E>1i''4J>'(><>>~o$ll>llrRAr>
i>~%g'Ir~kV[~'~~<"i9~'~Vf'N,>~~lwl<,lllA'4pg~,gl~eirglipf4)3~g>>'pejlW~akl,gklrtll
<<~z'VI,Ipt'1gpI,'Jlf,Ig<~ggtg~fwgi'qs'13Ij5('lf'f4i,)pgff)~)))'I,>>'llewy~,giyI')il~HI"iX~IX)l>><ei"iIf~~iI)s'~<~itIlx,~<Lt<if',)
s,i'Jj,)g,i$,)l(K)$')lu'f4''4)))laJ)lJ')>>~"I,'~>'i+il~'IgX~vJa=II>(a>>iilKk"5Ilf~y,k'yq~'jaill<~vi(~J<i'kL,)IIIgf4l,gf<<,'
IIZIISIIII llllEi&#xc3;lbaaloetIeCiiliIllllllli 3Z.IIIIIIIIIII ROCHESTER GASANDELECTRICCORPORATION
~89EASTAVENUE,ROCHESTER, N.Y.14649rootsJOHNE.MAIERVloeProslttont
'tCI.CPHONE AttcacoOE7105462700GinnaNuclearPowerPlantMarch29,1983Mr.H.Thompson, DirectorDivisionofHumanFactorSafetyUnitedStatesNuclearRegulator Commission Washington, D.C.20555


==DearMr.Thompson:==
('    I "<"          ~ 1f'4 g~,Y                              W,l        N        ll                  ''  ~
f  '<<J        rq 4
0
                                                                                                              ] lt    Nl[ ~                      g~g        (~      C I(i k,,U ~ ill                                          gill      q,f  fl'lt y    l          ill ~'> f )5>'"c Ark f c~                                                                                        fl J>>
KfPl          lip    3  )~i                                                                                        /(
i') Ith              'f  ted>>f                        ,><,F'1 'I",s      ks,')434>                                                  'f>>    >.i%          lk'~t c  jl                                                                                                                    e
                                                                                            ,, >g l><l.]7 -<                            I 5",'fN                                                                    ~  'I$
g ~Off>>                w1~'~ 0 )(p f gjfy>,llll l                                    0 ~~  C a',  f V I'~.>
            ~  /llew(]g )+$    %g) f f/~) I f f f fyglk%      'g        ilg ~ ( 1')'A                        0  <'~
                                                                                                                        ~ 4~<    JL    Ph    4'c,''<E              >  1  i''      4J  >
                                                                                                                                                                                            '( ><>>      ~        o  $
ll>llrRAr> i >~%                      g      'Ir~k V[~'~              ~<      "      i9~'~          Vf'llew'N, >      ~      ~
lwl<,                lllA'4              pg  ~,    gl~eirg    lip  f )3 4          ~    g>> 'pe      jlW~ak      l,gklrtll <<~              z    'VI,  I p        t'1      g    p I,'J  lf,  I g  <~ g  g tg ~fwg i 'qs'1        3    Ij5('l f  'f 4 i,) p g f f )~ )))'              I, >>        y~,g i y  I  '
                                                                                                                                                                                                              )i l      ~    H I" iX    ~    IX      )    l>><ei" i I f      ~~i  I x,~ <Lt<if',) s,i                                                    u'f 4'' 4
                  )s'~    <~it    I                                              'Jj,                  $
                                                                                                                ')          )))      la l                                        ) g,i$ ,)      l( K)                    l                                                      J
                                                                ) lJ')            > >~"I                                                                        ,'    ~>'i+i      l~  'I gX        ~vJ          a =II>  (
a>>i    il K                    <~ vi(
k "5  I lf  ~ y, k'y q
                                                                            ~J<i'k
                                                                            ~'
jail l L                g f4
                                                                                                                                                      , )III l,g f<<,'
 
I                                                                                            baal oetIeC IZIISIIII      llllEi&#xc3;l roots ii    li    Illllllli IIIIIIIIIII                                                                3Z.
ROCHESTER GAS AND ELECTRIC CORPORATION              ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E. MAIER                                                                      'tCI.CPHONE Vloe Proslttont                                                          Attca coOE 710  546 2700 G inna Nuclear Power Plant March 29, 1983 Mr. H. Thompson,                    Director Division of                    Human  Factor Safety United States Nuclear Regulator Commission Washington, D.C.                      20555
 
==Dear Mr. Thompson:==
 
Enclosed            is the R. Z. Ginna Nuclear Power Plant Operator Requali-fication            Program.          The program has been revised to address the NRC changes in areas of emphasis.                      The topics covered and examined for our Annual Exam are those presently used by the NRC. The only changes in the program are the adjustments of topic titles.
This program was the basis                      for the 1983 Annual Exam and          the proposed schedule for 1983.
Should you have any questions concerning the program, please contact Mr. Richard Morrill, Training Manager, R. Z. Ginna Nuclear Power Plant at 315-524-4446 Zxt. 213.
Sincerely, Q~
J. Z.
                                                                        ~u.t Maier Vice President Electric  Zc Steam        Production JEM/cls Enclosure 8304t30i36 830389
 
ll I
  'Ir yU
 
1983 OPERATOR 'REQUALIFICATION SCHEDULE Jan    4    7  Annual  Exam Jan  11  14  Annual Exam Jan  18  21  Annual Exam Jan  25  28  Annual Exam Feb    1  4  Annual Exam                              I icense    Events Feb    8  11  Emergency  Procedures  Admin/Secu    License  Events  CPR Feb  15  18  Zmergency  Procedures  Admin/Secu      I icense    Events Feb  22  25  Emergency  Procedures  Admin/Secu    License  Events  CPR March  1  4  Emergency  Procedures  Admin/Secu    License  Events  CPR March  8  11  Emergency  Procedures  Admin/Secu                      CPR March 15  18  Plant Design Systems    Refueling March 22  25  Plant Design Systems    Refueling March 29    1 Simulator April  5    8  Plant Design Systems    Refueling April 12  15  Plant Design Systems    Refueling April 19  22  Simulator April 26  29  Heat Transfer/Fluid  Flow  Simulator May    3    6  Plant Design Systems    Refueling May  10  13  Heat Transfer/Fluid  Flow May  17  20  Simulator May  24  27  Heat Transfer/Fluid  Flow  Radiation Controls May  31                                  Radiation    Controls June  7  10  Heat Transfer/Fluid  Flow June  14  17                              Radiation    Controls June  21  24  Heat Transfer/Fluid  Flow June  28    1  Reactor Theory    Simulator July    5  8  Reactor Theory July  12  15                              Radiation    Controls July  19  22  Simulator July  26  29                              Radiation Controls Aug    2    5  Simulator  Instrumentation and Control Aug    9  12  Simulator  Instrumentation and Control Aug  16  19  Reactor Theory  Simulator Aug  23  26  Reactor Theory Aug  30    1 Reactor Theory Sept    6  9  Technical Specifications Sept  13  16  Technical Specifications    Simulator Sept  20      Simulator  Instrumentation and Control Sept Oct Oct 27 30 11 4  7 14 Simulator  - l~ >+t.u~~~~
Zmergency Procedures
                                            ~
Instrumentation and Control Gn.h-o I Oct  18  21  Emergency Procedures Oct  25  28  Technical Specifications Nov        4  Technical Specifications Nov    8  11  Technical Specifications Nov  15  18  Emergency Procedures Nov  22  25  Emergency Procedures Nov  29    2 Simulator Dec    6  9  Emergency Procedures Dec  13  16 Dec  20  23 Dec  27  30


EnclosedistheR.Z.GinnaNuclearPowerPlantOperatorRequali-ficationProgram.TheprogramhasbeenrevisedtoaddresstheNRCchangesinareasofemphasis.
ThetopicscoveredandexaminedforourAnnualExamarethosepresently usedbytheNRC.Theonlychangesintheprogramaretheadjustments oftopictitles.Thisprogramwasthebasisforthe1983AnnualExamandtheproposedschedulefor1983.Shouldyouhaveanyquestions concerning theprogram,pleasecontactMr.RichardMorrill,TrainingManager,R.Z.GinnaNuclearPowerPlantat315-524-4446 Zxt.213.Sincerely, Q~~u.tJ.Z.MaierVicePresident ElectricZcSteamProduction JEM/clsEnclosure 8304t30i36 830389 llI'IryU 1983OPERATOR'REQUALIFICATION SCHEDULEJanJanJanJanFebFebFebFebMarchMarchMarchMarchMarchAprilAprilAprilAprilMayMayMayMayMayJuneJuneJuneJuneJulyJulyJulyJulyAugAugAugAugAugSeptSeptSeptSeptOctOctOctOctNovNovNovNovNovDecDecDecDec411182518152218152229512192631017243171421285121926291623306132027-4-111825815222961320277142128411182541118251815222961320271017241815222951219261916307142128411182529162330AnnualExamAnnualExamAnnualExamAnnualExamAnnualExam-IicenseEventsEmergency Procedures
-Admin/Secu
-LicenseEvents-CPRZmergency Procedures
-Admin/Secu
-IicenseEventsEmergency Procedures
-Admin/Secu
-LicenseEvents-CPREmergency Procedures
-Admin/Secu
-LicenseEvents-CPREmergency Procedures
-Admin/Secu
-CPRPlantDesignSystems-Refueling PlantDesignSystems-Refueling Simulator PlantDesignSystems-Refueling PlantDesignSystems-Refueling Simulator HeatTransfer/Fluid Flow-Simulator PlantDesignSystems-Refueling HeatTransfer/Fluid FlowSimulator HeatTransfer/Fluid Flow-Radiation Controls-Radiation ControlsHeatTransfer/Fluid Flow-Radiation ControlsHeatTransfer/Fluid FlowReactorTheory-Simulator ReactorTheory-Radiation ControlsSimulator
-Radiation ControlsSimulator
-Instrumentation andControlSimulator
-Instrumentation andControlReactorTheory-Simulator ReactorTheoryReactorTheoryTechnical Specifications Technical Specifications
-Simulator Simulator
-Instrumentation andControl-Instrumentation andControlSimulator
-l~>+t.u~~~~
~Gn.h-oIZmergency Procedures Emergency Procedures Technical Specifications Technical Specifications Technical Specifications Emergency Procedures Emergency Procedures Simulator Emergency Procedures
~T}}
~T}}

Latest revision as of 19:36, 29 October 2019

Forwards Revised A-103:4.2 Operator Requalification Program. Program Forms Basis for 1983 Annual Exam
ML17256A627
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/29/1983
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Thompson H
Office of Nuclear Reactor Regulation
Shared Package
ML17256A628 List:
References
NUDOCS 8304130156
Download: ML17256A627 (6)


Text

REGULATORY ORMATION DISTRIBUTION SY .M (RIDS)

AQCBSSION NBR;8304130156 DOC~DATE: 83/03/28 NOTARIZED: NO 'DOCKET FACIL:50 BYNAME 244 Robert Emmet Ginna Nuclear AUTHOR AF F ILI ATION Planti Unit ii Rochester G 05000244 AUTH MAIERg J ~ E ~ Rochester Gas L Elect> ic Corp, RECIP,llAME RECIPIENT AFFILIATION THOMPSONiH ~ Division of Human Factors Safety

SUBJECT:

Forwards revised A"103>4:2 operator requalification program, Program forms basis for 1983 annual exam, DISTRIBUTION CODE'003S COPIES RECEIVED:LTR" -ENCL SIZE +

TITLE.': Operator Requalification Program NOTES:NRR/OL/SEP icy. 05000244 RECIPIENT COPIES RECIP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR OR85 BC 1 1 DICKING 1 1 INTERNALS NRR/DHFS/OLB 01, 2 2 REG FILE 04 1 1 RGN1 1 EXTERNAL: ACRS 10 10 INPQrJeSTARNES LPOR 03 1 1 NRC POR 02 1 NOTES'8 NSTC 05 1 1

1 1

NTIS 1 TOTAL NUMBER OF COPIES REQUIRE,D: LTTR 2? ENCL, 22

(' I "<" ~ 1f'4 g~,Y W,l N ll ~

f '<<J rq 4

0

] lt Nl[ ~ g~g (~ C I(i k,,U ~ ill gill q,f fl'lt y l ill ~'> f )5>'"c Ark f c~ fl J>>

KfPl lip 3 )~i /(

i') Ith 'f ted>>f ,><,F'1 'I",s ks,')434> 'f>> >.i% lk'~t c jl e

,, >g l><l.]7 -< I 5",'fN ~ 'I$

g ~Off>> w1~'~ 0 )(p f gjfy>,llll l 0 ~~ C a', f V I'~.>

~ /llew(]g )+$ %g) f f/~) I f f f fyglk% 'g ilg ~ ( 1')'A 0 <'~

~ 4~< JL Ph 4'c,<E > 1 i 4J >

'( ><>> ~ o $

ll>llrRAr> i >~% g 'Ir~k V[~'~ ~< " i9~'~ Vf'llew'N, > ~ ~

lwl<, lllA'4 pg ~, gl~eirg lip f )3 4 ~ g>> 'pe jlW~ak l,gklrtll <<~ z 'VI, I p t'1 g p I,'J lf, I g <~ g g tg ~fwg i 'qs'1 3 Ij5('l f 'f 4 i,) p g f f )~ )))' I, >> y~,g i y I '

)i l ~ H I" iX ~ IX ) l>><ei" i I f ~~i I x,~ <Lt<if',) s,i u'f 4 4

)s'~ <~it I 'Jj, $

') ))) la l ) g,i$ ,) l( K) l J

) lJ') > >~"I ,' ~>'i+i l~ 'I gX ~vJ a =II> (

a>>i il K <~ vi(

k "5 I lf ~ y, k'y q

~J<i'k

~'

jail l L g f4

, )III l,g f<<,'

I baal oetIeC IZIISIIII llllEiÃl roots ii li Illllllli IIIIIIIIIII 3Z.

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E. MAIER 'tCI.CPHONE Vloe Proslttont Attca coOE 710 546 2700 G inna Nuclear Power Plant March 29, 1983 Mr. H. Thompson, Director Division of Human Factor Safety United States Nuclear Regulator Commission Washington, D.C. 20555

Dear Mr. Thompson:

Enclosed is the R. Z. Ginna Nuclear Power Plant Operator Requali-fication Program. The program has been revised to address the NRC changes in areas of emphasis. The topics covered and examined for our Annual Exam are those presently used by the NRC. The only changes in the program are the adjustments of topic titles.

This program was the basis for the 1983 Annual Exam and the proposed schedule for 1983.

Should you have any questions concerning the program, please contact Mr. Richard Morrill, Training Manager, R. Z. Ginna Nuclear Power Plant at 315-524-4446 Zxt. 213.

Sincerely, Q~

J. Z.

~u.t Maier Vice President Electric Zc Steam Production JEM/cls Enclosure 8304t30i36 830389

ll I

'Ir yU

1983 OPERATOR 'REQUALIFICATION SCHEDULE Jan 4 7 Annual Exam Jan 11 14 Annual Exam Jan 18 21 Annual Exam Jan 25 28 Annual Exam Feb 1 4 Annual Exam I icense Events Feb 8 11 Emergency Procedures Admin/Secu License Events CPR Feb 15 18 Zmergency Procedures Admin/Secu I icense Events Feb 22 25 Emergency Procedures Admin/Secu License Events CPR March 1 4 Emergency Procedures Admin/Secu License Events CPR March 8 11 Emergency Procedures Admin/Secu CPR March 15 18 Plant Design Systems Refueling March 22 25 Plant Design Systems Refueling March 29 1 Simulator April 5 8 Plant Design Systems Refueling April 12 15 Plant Design Systems Refueling April 19 22 Simulator April 26 29 Heat Transfer/Fluid Flow Simulator May 3 6 Plant Design Systems Refueling May 10 13 Heat Transfer/Fluid Flow May 17 20 Simulator May 24 27 Heat Transfer/Fluid Flow Radiation Controls May 31 Radiation Controls June 7 10 Heat Transfer/Fluid Flow June 14 17 Radiation Controls June 21 24 Heat Transfer/Fluid Flow June 28 1 Reactor Theory Simulator July 5 8 Reactor Theory July 12 15 Radiation Controls July 19 22 Simulator July 26 29 Radiation Controls Aug 2 5 Simulator Instrumentation and Control Aug 9 12 Simulator Instrumentation and Control Aug 16 19 Reactor Theory Simulator Aug 23 26 Reactor Theory Aug 30 1 Reactor Theory Sept 6 9 Technical Specifications Sept 13 16 Technical Specifications Simulator Sept 20 Simulator Instrumentation and Control Sept Oct Oct 27 30 11 4 7 14 Simulator - l~ >+t.u~~~~

Zmergency Procedures

~

Instrumentation and Control Gn.h-o I Oct 18 21 Emergency Procedures Oct 25 28 Technical Specifications Nov 4 Technical Specifications Nov 8 11 Technical Specifications Nov 15 18 Emergency Procedures Nov 22 25 Emergency Procedures Nov 29 2 Simulator Dec 6 9 Emergency Procedures Dec 13 16 Dec 20 23 Dec 27 30

~T