ML15258A024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15258A024
| number = ML15258A024
| issue date = 09/11/2015
| issue date = 09/11/2015
| title = D.C. Cook, Units 1 and 2 - Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval
| title = Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval
| author name = Gebbie J P
| author name = Gebbie J
| author affiliation = Indiana Michigan Power Co
| author affiliation = Indiana Michigan Power Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:INDIANEA Indiana Michigan PowerMICHIGAN Cook Nuclear PlantOne Cook PlaceA unit of American Electric Power Indiagnaihgn, PowercomSeptember 11, 2015 AEP-NRC-201 5-9110 CFR 50.55aDocket Nos.: 50-31550-316U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D. C. 20555-0001Donald C. Cook Nuclear Plant Units 1 and 2Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year InserviceTesting Interval
{{#Wiki_filter:INDIANEA                                                                             Indiana Michigan Power MICHIGAN                                                                              Cook Nuclear Plant Ipf*VER                                                                            One Cook Place A unit ofAmerican Electric Power                                                       Indiagnaihgn,   Powercom September 11, 2015                                                               AEP-NRC-201 5-91 10 CFR 50.55a Docket Nos.:         50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval


==References:==
==References:==
: 1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear RegulatoryCommission (NRC), "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.55a RequestsAssociated with the Fifth Ten-Year Inservice Testing Interval," AEP-NRC-2015-31, datedJuly 31, 2015, Agencywide Documents Access and Management System AccessionNo. ML15216A121.2. Letter from A. W. Dietrich, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1and 2 -Supplemental Information Needed for Acceptance of Requested Licensing Action Re:Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)," dated September 2, 2015.By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook NuclearPlant (CNP) Units 1 and 2, requested U. S. Nuclear Regulatory Commission (NRC) authorizationfor approval of the 10 CFR 50.55a relief requests associated with the Fifth Inservice Testing Intervalfor CNP. The NRC staff provided a request for supplemental information (Reference 2) to completethe review of Reference 1.This letter is being submitted as a supplement to Reference 1 to correct an incorrect reference tothe applicable 10 CER 50.55a paragraph in Relief Request REL-PPI. I&M's initial submittal.(Reference 1) identified Relief Request REL-PP1 as being requested under the provisions of 10CFR 50.55a(z)(1), which was incorrect. Relief Request REL-PP1 is being requested under theprovisions of 10 CFR 50.55a(z)(2).Additionally, Enclosure 2 of Reference 1 incorrectly identified Agencywide Documents Access andManagement System (ADAMS) Accession No. ML061730715 as a precedent for REL-PPI. Thecorrect ADAMS No. is ML061730175.I&M requests approval of the relief requests prior to the start of the Fifth 10-Year Test Interval,which will begin July 1, 2016.4QO47 U. S. Nuclear Regulatory Commission AEP-NRC-201 5-91Page 2This letter contains no new commitments. Should you have any questions, please contactMr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely,Joel P. GebbieSite Vice PresidentJMT/amsc: A. W. Dietrich, NRC Washington, D.C.J. T. King, MPSCMDEQ -RMD/RPSNRC Resident InspectorC. D. Pederson, NRC Region IllA. J. Williamson, AEP Ft. Wayne, w/o enclosures Ito AEP-NRC-2015-91AFFI RMATI ONI, Joel P. Gebbie, being duly sworn, state that I am the Site Vice President of Indiana MichiganPower Company (I&M), that I am authorized to sign and file this request with the U. S. NuclearRegulatory Commission on behalf of I&M, and that the statements made and the matters setforth herein pertaining to I&M are true and correct to the best of my knowledge, information, andbelief.Indiana Michigan Power CompanyJoel P. GebbieSite Vice PresidentSWORN TO AND SUBSCRIBED BEFORE METHIS Uf DAY OFS ,,c', 2015Notary PublicANNE M. PALMANotary Public, State of Michigan.County of BerrienMy Commission Expires 10-).,6-2017Acting in the Countyof .My Commission ExpiresIn-/#-&o/7-}}
: 1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC), "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval," AEP-NRC-2015-31, dated July 31, 2015, Agencywide Documents Access and Management System Accession No. ML15216A121.
: 2. Letter from A. W. Dietrich, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2   - Supplemental Information Needed for Acceptance of Requested Licensing Action Re:
Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)," dated September 2, 2015.
By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, requested U. S. Nuclear Regulatory Commission (NRC) authorization for approval of the 10 CFR 50.55a relief requests associated with the Fifth Inservice Testing Interval for CNP. The NRC staff provided a request for supplemental information (Reference 2) to complete the review of Reference 1.
This letter is being submitted as a supplement to Reference 1 to correct an incorrect reference to the applicable 10 CER 50.55a paragraph in Relief Request REL-PPI. I&M's initial submittal.
(Reference 1) identified Relief Request REL-PP1 as being requested under the provisions of 10 CFR 50.55a(z)(1), which was incorrect. Relief Request REL-PP1 is being requested under the provisions of 10 CFR 50.55a(z)(2).
Additionally, Enclosure 2 of Reference 1 incorrectly identified Agencywide Documents Access and Management System (ADAMS) Accession No. ML061730715 as a precedent for REL-PPI. The correct ADAMS No. is ML061730175.
I&M requests approval of the relief requests prior to the start of the Fifth 10-Year Test Interval, which will begin July 1, 2016.
4QO47
 
U. S. Nuclear Regulatory Commission                                     AEP-NRC-201 5-91 Page 2 This letter contains no new commitments. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
Sincerely, Joel P. Gebbie Site Vice President JMT/ams c:     A. W. Dietrich, NRC Washington, D.C.
J. T. King, MPSC MDEQ    - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region Ill A. J. Williamson, AEP Ft. Wayne, w/o enclosures
 
Enclosure 1Ito AEP-NRC-2015-91 AFFI RMATI ON I, Joel P. Gebbie, being duly sworn, state that I am the Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS    Uf   DAY OFS   ,,c',             2015 ANNE State Notary Public, M. PALMA of Michigan.
County of Berrien Notary Public                                  My Commission Expires 10-).,6-2017 Acting in the Countyof .           *_~i*f~f My Commission Expires          In-/#-&o/7-}}

Latest revision as of 06:44, 31 October 2019

Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval
ML15258A024
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/11/2015
From: Gebbie J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-201 5-91
Download: ML15258A024 (3)


Text

INDIANEA Indiana Michigan Power MICHIGAN Cook Nuclear Plant Ipf*VER One Cook Place A unit ofAmerican Electric Power Indiagnaihgn, Powercom September 11, 2015 AEP-NRC-201 5-91 10 CFR 50.55a Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval

References:

1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC), "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval," AEP-NRC-2015-31, dated July 31, 2015, Agencywide Documents Access and Management System Accession No. ML15216A121.
2. Letter from A. W. Dietrich, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Re:

Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)," dated September 2, 2015.

By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, requested U. S. Nuclear Regulatory Commission (NRC) authorization for approval of the 10 CFR 50.55a relief requests associated with the Fifth Inservice Testing Interval for CNP. The NRC staff provided a request for supplemental information (Reference 2) to complete the review of Reference 1.

This letter is being submitted as a supplement to Reference 1 to correct an incorrect reference to the applicable 10 CER 50.55a paragraph in Relief Request REL-PPI. I&M's initial submittal.

(Reference 1) identified Relief Request REL-PP1 as being requested under the provisions of 10 CFR 50.55a(z)(1), which was incorrect. Relief Request REL-PP1 is being requested under the provisions of 10 CFR 50.55a(z)(2).

Additionally, Enclosure 2 of Reference 1 incorrectly identified Agencywide Documents Access and Management System (ADAMS) Accession No. ML061730715 as a precedent for REL-PPI. The correct ADAMS No. is ML061730175.

I&M requests approval of the relief requests prior to the start of the Fifth 10-Year Test Interval, which will begin July 1, 2016.

4QO47

U. S. Nuclear Regulatory Commission AEP-NRC-201 5-91 Page 2 This letter contains no new commitments. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.

Sincerely, Joel P. Gebbie Site Vice President JMT/ams c: A. W. Dietrich, NRC Washington, D.C.

J. T. King, MPSC MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region Ill A. J. Williamson, AEP Ft. Wayne, w/o enclosures

Enclosure 1Ito AEP-NRC-2015-91 AFFI RMATI ON I, Joel P. Gebbie, being duly sworn, state that I am the Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.

Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS Uf DAY OFS ,,c', 2015 ANNE State Notary Public, M. PALMA of Michigan.

County of Berrien Notary Public My Commission Expires 10-).,6-2017 Acting in the Countyof . *_~i*f~f My Commission Expires In-/#-&o/7-