|
|
(5 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15258A024 | | | number = ML15258A024 |
| | issue date = 09/11/2015 | | | issue date = 09/11/2015 |
| | title = D.C. Cook, Units 1 and 2 - Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval | | | title = Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval |
| | author name = Gebbie J P | | | author name = Gebbie J |
| | author affiliation = Indiana Michigan Power Co | | | author affiliation = Indiana Michigan Power Co |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:INDIANEA Indiana Michigan PowerMICHIGAN Cook Nuclear PlantOne Cook PlaceA unit of American Electric Power Indiagnaihgn, PowercomSeptember 11, 2015 AEP-NRC-201 5-9110 CFR 50.55aDocket Nos.: 50-31550-316U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D. C. 20555-0001Donald C. Cook Nuclear Plant Units 1 and 2Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year InserviceTesting Interval | | {{#Wiki_filter:INDIANEA Indiana Michigan Power MICHIGAN Cook Nuclear Plant Ipf*VER One Cook Place A unit ofAmerican Electric Power Indiagnaihgn, Powercom September 11, 2015 AEP-NRC-201 5-91 10 CFR 50.55a Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval |
|
| |
|
| ==References:== | | ==References:== |
| : 1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear RegulatoryCommission (NRC), "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.55a RequestsAssociated with the Fifth Ten-Year Inservice Testing Interval," AEP-NRC-2015-31, datedJuly 31, 2015, Agencywide Documents Access and Management System AccessionNo. ML15216A121.2. Letter from A. W. Dietrich, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1and 2 -Supplemental Information Needed for Acceptance of Requested Licensing Action Re:Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)," dated September 2, 2015.By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook NuclearPlant (CNP) Units 1 and 2, requested U. S. Nuclear Regulatory Commission (NRC) authorizationfor approval of the 10 CFR 50.55a relief requests associated with the Fifth Inservice Testing Intervalfor CNP. The NRC staff provided a request for supplemental information (Reference 2) to completethe review of Reference 1.This letter is being submitted as a supplement to Reference 1 to correct an incorrect reference tothe applicable 10 CER 50.55a paragraph in Relief Request REL-PPI. I&M's initial submittal.(Reference 1) identified Relief Request REL-PP1 as being requested under the provisions of 10CFR 50.55a(z)(1), which was incorrect. Relief Request REL-PP1 is being requested under theprovisions of 10 CFR 50.55a(z)(2).Additionally, Enclosure 2 of Reference 1 incorrectly identified Agencywide Documents Access andManagement System (ADAMS) Accession No. ML061730715 as a precedent for REL-PPI. Thecorrect ADAMS No. is ML061730175.I&M requests approval of the relief requests prior to the start of the Fifth 10-Year Test Interval,which will begin July 1, 2016.4QO47 U. S. Nuclear Regulatory Commission AEP-NRC-201 5-91Page 2This letter contains no new commitments. Should you have any questions, please contactMr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely,Joel P. GebbieSite Vice PresidentJMT/amsc: A. W. Dietrich, NRC Washington, D.C.J. T. King, MPSCMDEQ -RMD/RPSNRC Resident InspectorC. D. Pederson, NRC Region IllA. J. Williamson, AEP Ft. Wayne, w/o enclosures Ito AEP-NRC-2015-91AFFI RMATI ONI, Joel P. Gebbie, being duly sworn, state that I am the Site Vice President of Indiana MichiganPower Company (I&M), that I am authorized to sign and file this request with the U. S. NuclearRegulatory Commission on behalf of I&M, and that the statements made and the matters setforth herein pertaining to I&M are true and correct to the best of my knowledge, information, andbelief.Indiana Michigan Power CompanyJoel P. GebbieSite Vice PresidentSWORN TO AND SUBSCRIBED BEFORE METHIS Uf DAY OFS ,,c', 2015Notary PublicANNE M. PALMANotary Public, State of Michigan.County of BerrienMy Commission Expires 10-).,6-2017Acting in the Countyof .My Commission ExpiresIn-/#-&o/7-}} | | : 1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC), "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval," AEP-NRC-2015-31, dated July 31, 2015, Agencywide Documents Access and Management System Accession No. ML15216A121. |
| | : 2. Letter from A. W. Dietrich, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Re: |
| | Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)," dated September 2, 2015. |
| | By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, requested U. S. Nuclear Regulatory Commission (NRC) authorization for approval of the 10 CFR 50.55a relief requests associated with the Fifth Inservice Testing Interval for CNP. The NRC staff provided a request for supplemental information (Reference 2) to complete the review of Reference 1. |
| | This letter is being submitted as a supplement to Reference 1 to correct an incorrect reference to the applicable 10 CER 50.55a paragraph in Relief Request REL-PPI. I&M's initial submittal. |
| | (Reference 1) identified Relief Request REL-PP1 as being requested under the provisions of 10 CFR 50.55a(z)(1), which was incorrect. Relief Request REL-PP1 is being requested under the provisions of 10 CFR 50.55a(z)(2). |
| | Additionally, Enclosure 2 of Reference 1 incorrectly identified Agencywide Documents Access and Management System (ADAMS) Accession No. ML061730715 as a precedent for REL-PPI. The correct ADAMS No. is ML061730175. |
| | I&M requests approval of the relief requests prior to the start of the Fifth 10-Year Test Interval, which will begin July 1, 2016. |
| | 4QO47 |
| | |
| | U. S. Nuclear Regulatory Commission AEP-NRC-201 5-91 Page 2 This letter contains no new commitments. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649. |
| | Sincerely, Joel P. Gebbie Site Vice President JMT/ams c: A. W. Dietrich, NRC Washington, D.C. |
| | J. T. King, MPSC MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region Ill A. J. Williamson, AEP Ft. Wayne, w/o enclosures |
| | |
| | Enclosure 1Ito AEP-NRC-2015-91 AFFI RMATI ON I, Joel P. Gebbie, being duly sworn, state that I am the Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief. |
| | Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS Uf DAY OFS ,,c', 2015 ANNE State Notary Public, M. PALMA of Michigan. |
| | County of Berrien Notary Public My Commission Expires 10-).,6-2017 Acting in the Countyof . *_~i*f~f My Commission Expires In-/#-&o/7-}} |
Letter Sequence Request |
---|
|
|
MONTHYEARML15258A0242015-09-11011 September 2015 Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval Project stage: Request ML16032A0312016-02-0404 February 2016 Request for Use of Alternative REL-PP1 Associated with Pump Inservice Testing (CAC Nos. MF6548 and MF6549) Project stage: Other 2015-09-11
[Table View] |
Similar Documents at Cook |
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2021-35, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-052021-05-0404 May 2021 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-05 AEP-NRC-2021-01, Form OAR-1, Owner'S Activity Report2021-01-14014 January 2021 Form OAR-1, Owner'S Activity Report AEP-NRC-2020-51, CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval2020-10-0505 October 2020 CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2020-08, Form OAR-1, Owner'S Activity Report2020-01-29029 January 2020 Form OAR-1, Owner'S Activity Report AEP-NRC-2019-35, Form OAR-1, Owner'S Activity Report2019-08-0101 August 2019 Form OAR-1, Owner'S Activity Report AEP-NRC-2018-47, Submittal of Form OAR-1, Owner'S Activity Report2018-07-31031 July 2018 Submittal of Form OAR-1, Owner'S Activity Report AEP-NRC-2018-19, Submittal of 2017 Steam Generator Tube Inspection Report2018-05-22022 May 2018 Submittal of 2017 Steam Generator Tube Inspection Report AEP-NRC-2018-14, Form OAR-1, Owner'S Activity Report2018-03-23023 March 2018 Form OAR-1, Owner'S Activity Report AEP-NRC-2017-13, Transmittal of 2016 Steam Generator Tube Inspection Report2017-05-24024 May 2017 Transmittal of 2016 Steam Generator Tube Inspection Report AEP-NRC-2016-35, Fifth 10-Year Interval Pump and Valve Inservice Testing Program2016-06-30030 June 2016 Fifth 10-Year Interval Pump and Valve Inservice Testing Program ML15258A0242015-09-11011 September 2015 Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2015-65, Form OAR-1, Owner'S Activity Report2015-07-21021 July 2015 Form OAR-1, Owner'S Activity Report AEP-NRC-2015-01, Steam Generator Tube Inspection Report2015-04-13013 April 2015 Steam Generator Tube Inspection Report AEP-NRC-2015-06, Form OAR-1, Owner'S Activity Report2015-01-21021 January 2015 Form OAR-1, Owner'S Activity Report AEP-NRC-2014-13, Form OAR-1 Owner'S Activity Report2014-02-0707 February 2014 Form OAR-1 Owner'S Activity Report AEP-NRC-2013-54, Submittal of Form OAR-1, Owner'S Activity Report2013-08-14014 August 2013 Submittal of Form OAR-1, Owner'S Activity Report AEP-NRC-2012-63, 2012 Steam Generator Tube Inspection Report2012-10-0202 October 2012 2012 Steam Generator Tube Inspection Report ML12053A2622012-01-20020 January 2012 Form OAR-1 Owner'S Activity Report ML1106704232011-02-28028 February 2011 Form OAR-1 Owner'S Activity Report AEP-NRC-2010-56, Submittal of Owner'S Activity Report for Inservice Inspection Activities2010-07-0101 July 2010 Submittal of Owner'S Activity Report for Inservice Inspection Activities AEP-NRC-2010-19, Fourth Ten-Year Interval Inservice Testing Program Relief Request REL-0042010-02-0505 February 2010 Fourth Ten-Year Interval Inservice Testing Program Relief Request REL-004 ML1007506762009-10-23023 October 2009 Enclosure to AEP-NRC-2010-21, Donald C. Cook, Units 1 & 2 - ISI Program Plan Fourth Ten-Year Inspection Interval AEP-NRC-2009-51, Inservice Inspection Summary Report, Cycle 18, 2009 Refueling Outage2009-07-29029 July 2009 Inservice Inspection Summary Report, Cycle 18, 2009 Refueling Outage ML0904304002009-01-14014 January 2009 Request to Extend Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License Amendment for Submittal of ISI Information and Analyses - Response to Request for Additional Information AEP-NRC-2008-41, Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License - Amendment for Submittal of ISI Information and Analyses2008-10-0909 October 2008 Request for Relief to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination and Request for License - Amendment for Submittal of ISI Information and Analyses ML0822702052008-08-0505 August 2008 Relief Requests for Inservice Pressure Testing AEP-NRC-2008-12, Inservice Inspection Summary Report for Period of 11/14/2006 Through 04/29/20082008-07-24024 July 2008 Inservice Inspection Summary Report for Period of 11/14/2006 Through 04/29/2008 ML0804605022008-02-0404 February 2008 Inservice Inspection Summary Report for the Period of May 5, 2006 to November 6, 2007 ML0705206452007-02-0909 February 2007 Inservice Inspection Summary Report ML0631304122006-10-31031 October 2006 Steam Generator Tube Inservice Inspection Report ML0622804742006-08-0404 August 2006 Inservice Inspection Summary Report ML0600601102005-12-28028 December 2005 Fourth 10-Year Interval Pump and Valve Inservice Testing Program ML0521404632005-07-21021 July 2005 Inservice Inspection Summary Report ML0511601762005-04-15015 April 2005 Proposed Alternative to the ASME Code, Section XI, Repair Requirements ML0503903572005-01-31031 January 2005 Inservice Inspection Summary Report ML0430904912004-10-28028 October 2004 Steam Generator Tube Inservice Inspection Report ML0405600602004-02-19019 February 2004 Inservice Inspection Summary Report ML0326706222003-09-18018 September 2003 Inservice Inspection Summary Report ML0225301462002-09-0606 September 2002 NIS-1 Report for Inservice Inspection (ISI) Activities for Cycle 18 Refueling Outage (April 22, 2002 to June 9, 2002) ML0216804782002-06-13013 June 2002 Addendum to 1998 NIS-1 Report for Inservice Inspection Activities ML0215603962002-06-0303 June 2002 Steam Generator Tube Inservice Inspection Report ML0213700502002-05-15015 May 2002 NIS-1 Report for Inservice Inspection (ISI) Activities 2024-07-30
[Table view] Category:Letter
MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance 2024-09-09
[Table view] |
Text
INDIANEA Indiana Michigan Power MICHIGAN Cook Nuclear Plant Ipf*VER One Cook Place A unit ofAmerican Electric Power Indiagnaihgn, Powercom September 11, 2015 AEP-NRC-201 5-91 10 CFR 50.55a Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval
References:
- 1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC), "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval," AEP-NRC-2015-31, dated July 31, 2015, Agencywide Documents Access and Management System Accession No. ML15216A121.
- 2. Letter from A. W. Dietrich, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Re:
Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)," dated September 2, 2015.
By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, requested U. S. Nuclear Regulatory Commission (NRC) authorization for approval of the 10 CFR 50.55a relief requests associated with the Fifth Inservice Testing Interval for CNP. The NRC staff provided a request for supplemental information (Reference 2) to complete the review of Reference 1.
This letter is being submitted as a supplement to Reference 1 to correct an incorrect reference to the applicable 10 CER 50.55a paragraph in Relief Request REL-PPI. I&M's initial submittal.
(Reference 1) identified Relief Request REL-PP1 as being requested under the provisions of 10 CFR 50.55a(z)(1), which was incorrect. Relief Request REL-PP1 is being requested under the provisions of 10 CFR 50.55a(z)(2).
Additionally, Enclosure 2 of Reference 1 incorrectly identified Agencywide Documents Access and Management System (ADAMS) Accession No. ML061730715 as a precedent for REL-PPI. The correct ADAMS No. is ML061730175.
I&M requests approval of the relief requests prior to the start of the Fifth 10-Year Test Interval, which will begin July 1, 2016.
4QO47
U. S. Nuclear Regulatory Commission AEP-NRC-201 5-91 Page 2 This letter contains no new commitments. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
Sincerely, Joel P. Gebbie Site Vice President JMT/ams c: A. W. Dietrich, NRC Washington, D.C.
J. T. King, MPSC MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region Ill A. J. Williamson, AEP Ft. Wayne, w/o enclosures
Enclosure 1Ito AEP-NRC-2015-91 AFFI RMATI ON I, Joel P. Gebbie, being duly sworn, state that I am the Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS Uf DAY OFS ,,c', 2015 ANNE State Notary Public, M. PALMA of Michigan.
County of Berrien Notary Public My Commission Expires 10-).,6-2017 Acting in the Countyof . *_~i*f~f My Commission Expires In-/#-&o/7-