(3 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 04/09/2018 | | | issue date = 04/09/2018 |
| | title = Response to Appeal of NRC Letter Upholding Disputed Violation Documented in Evaluation of Changes, Tests, and Experiments Baseline Inspection Report 05000454/2017009, 050000455/2017009 | | | title = Response to Appeal of NRC Letter Upholding Disputed Violation Documented in Evaluation of Changes, Tests, and Experiments Baseline Inspection Report 05000454/2017009, 050000455/2017009 |
| | author name = West K S | | | author name = West K |
| | author affiliation = NRC/RGN-III | | | author affiliation = NRC/RGN-III |
| | addressee name = Kanavos M E | | | addressee name = Kanavos M |
| | addressee affiliation = Exelon Generation Co, LLC | | | addressee affiliation = Exelon Generation Co, LLC |
| | docket = 05000454, 05000455 | | | docket = 05000454, 05000455 |
| | license number = NPF-037, NPF-066 | | | license number = NPF-037, NPF-066 |
| | contact person = Heck J K | | | contact person = Heck J |
| | case reference number = EA-17-138 | | | case reference number = EA-17-138 |
| | document report number = IR 2017009 | | | document report number = IR 2017009 |
Line 15: |
Line 15: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| See also: [[followed by::IR 05000454/2017009]] | | See also: [[see also::IR 05000454/2017009]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 April 9, 2018 EA-17-138 | | {{#Wiki_filter:UNITED STATES |
|
| | NUCLEAR REGULATORY COMMISSION |
| Mr. Mark Kanavos | | REGION III |
| Site VP, Byron Generating Station 4450 North German Church Rd Byron, IL 61010-9794 | | 2443 WARRENVILLE RD. SUITE 210 |
|
| | LISLE, ILLINOIS 60532-4352 |
|
| | April 9, 2018 |
| SUBJECT: RESPONSE TO APPEAL OF NRC LETTER UPHOLDING DISPUTED VIOLATION DOCUMENTED IN EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS BASELINE INSPECTION REPORT 05000454/2017009, 05000455/2017009 | | EA-17-138 |
| Dear Mr. Kanavos: | | Mr. Mark Kanavos |
|
| | Site VP, Byron Generating Station |
| In a letter dated February 8, 2018, to Anne T. Boland, Director of the U.S. Nuclear Regulatory Commission's (NRC) Office of Enforcement, you requested the NRC review a December 21, 2017, decision by Kenneth G. O'Brien, Acting Deputy Regional Administrator, Region III, to | | 4450 North German Church Rd |
| uphold Non-Cited Violation (NCV) 05000454/2017009-01; 05000455/2017009-01, which Exelon | | Byron, IL 61010-9794 |
| had disputed. After reviewing that decision, and your February 8, 2018, letter, and after | | SUBJECT: RESPONSE TO APPEAL OF NRC LETTER UPHOLDING DISPUTED VIOLATION |
| coordination with the Director of the Office of Enforcement, I have decided to accept your | | DOCUMENTED IN EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS |
| request for review. To be clear, our process does not provide for multiple appeals of the Region's determination. Rather, under the specific facts of this case, I interpret your request instead as Exelon's initial appeal of the specific and substantive modifications to the NCV | | BASELINE INSPECTION REPORT 05000454/2017009, 05000455/2017009 |
| reflected in Region III's December 21 decision. | | Dear Mr. Kanavos: |
|
| | In a letter dated February 8, 2018, to Anne T. Boland, Director of the U.S. Nuclear Regulatory |
| Consideration of this appeal is warranted in this case because the June 29, 2017, inspection report that documented the NCV (Byron Station Units 1 and 2-Evaluations of Changes Tests, and Experiments Baseline Inspection Report 05000454/2017009; 05000455/2017009) did not | | Commissions (NRC) Office of Enforcement, you requested the NRC review a December 21, |
| fully articulate the basis for the violation. Region III acknowledged this limitation in its | | 2017, decision by Kenneth G. OBrien, Acting Deputy Regional Administrator, Region III, to |
| December 21, 2017, letter, noting that the initially-documented NCV, "included an explanatory | | uphold Non-Cited Violation (NCV) 05000454/2017009-01; 05000455/2017009-01, which Exelon |
| statement that was open to interpretation," and provided additional information to justify the NCV. | | had disputed. After reviewing that decision, and your February 8, 2018, letter, and after |
| The additional information and analysis relied upon by Region III to uphold the NCV was not | | coordination with the Director of the Office of Enforcement, I have decided to accept your |
| previously provided to Exelon in writing. In turn, Exelon's February 8 appeal asserts detailed new arguments and information that Region III could not have reasonably expected Exelon to have raised earlier, given how the NCV was first documented. Accordingly, I have determined the unusual facts and circumstances of this particular case warrant consideration as an initial appeal of Region III's December 21 decision. Consistent with | | request for review. To be clear, our process does not provide for multiple appeals of the |
| that approach, the review will be conducted by an independent panel, which will consider all relevant information provided on this matter to date. The panel's final determination will rely in | | Regions determination. Rather, under the specific facts of this case, I interpret your request |
| M. Kanavos - 2 -
| | instead as Exelons initial appeal of the specific and substantive modifications to the NCV |
| part upon input from the Office of Nuclear Reactor Regulation regarding the proper application of the NRC-approved Surveillance Frequency Control Program at Byron Station.
| | reflected in Region IIIs December 21 decision. |
| This letter will be made available electronically for public inspection and copying from the Agencywide Documents Access and Management System (ADAMS) available at http://www.nrc.gov/reading-rm/adams.html and in the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."
| | Consideration of this appeal is warranted in this case because the June 29, 2017, inspection |
| Sincerely,
| | report that documented the NCV (Byron Station Units 1 and 2Evaluations of Changes Tests, |
|
| | and Experiments Baseline Inspection Report 05000454/2017009; 05000455/2017009) did not |
| /RA/
| | fully articulate the basis for the violation. Region III acknowledged this limitation in its |
| K. Steven West Regional Administrator Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSERV
| | December 21, 2017, letter, noting that the initially-documented NCV, included an explanatory |
| | statement that was open to interpretation, and provided additional information to justify the |
| | NCV. |
| | The additional information and analysis relied upon by Region III to uphold the NCV was not |
| | previously provided to Exelon in writing. In turn, Exelons February 8 appeal asserts detailed |
| | new arguments and information that Region III could not have reasonably expected Exelon to |
| | have raised earlier, given how the NCV was first documented. |
| | Accordingly, I have determined the unusual facts and circumstances of this particular case |
| | warrant consideration as an initial appeal of Region IIIs December 21 decision. Consistent with |
| | that approach, the review will be conducted by an independent panel, which will consider all |
| | relevant information provided on this matter to date. The panels final determination will rely in |
|
| |
|
| ML18100A222 OFC RIII/ORA OE OGC RIII/ORA NAME JHeck:jc ABoland1 Moulding2 KSWest DATE 4/2/18 04/05/18 4/2/18 04/09/18 | | M. Kanavos -2- |
| | part upon input from the Office of Nuclear Reactor Regulation regarding the proper application |
| | of the NRC-approved Surveillance Frequency Control Program at Byron Station. |
| | This letter will be made available electronically for public inspection and copying from the |
| | Agencywide Documents Access and Management System (ADAMS) available at |
| | http://www.nrc.gov/reading-rm/adams.html and in the NRC Public Document Room in |
| | accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, |
| | Exemptions, Requests for Withholding. |
| | Sincerely, |
| | /RA/ |
| | K. Steven West |
| | Regional Administrator |
| | Docket Nos. 50-454; 50-455 |
| | License Nos. NPF-37; NPF-66 |
| | cc: Distribution via LISTSERV |
| | |
| | |
| | ML18100A222 |
| | OFC RIII/ORA OE OGC RIII/ORA |
| | NAME JHeck:jc ABoland1 Moulding2 KSWest |
| | DATE 4/2/18 04/05/18 4/2/18 04/09/18 |
| }} | | }} |
Similar Documents at Byron |
---|
Category:Enforcement Action
MONTHYEARML18100A2222018-04-0909 April 2018 Response to Appeal of NRC Letter Upholding Disputed Violation Documented in Evaluation of Changes, Tests, and Experiments Baseline Inspection Report 05000454/2017009, 050000455/2017009 IR 05000454/20110042011-11-0303 November 2011 IR 05000454-11-004, 05000455-11-004, on 07/01/2011 - 09/30/2011, Byron Station, Units 1 & 2, Maintenance Risk Assessment and Emergent Work Control, Identification and Resolution of Problems; Other Activities IR 05000454/20105022011-07-21021 July 2011 IR 05000454-10-502(DRS), 05000455-10-502; Exelon Generation Company, LLC; on 06/16/2010 - 05/24/2011; Byron Station, Units 1 & 2, Results of NRC Emergency Action Level and Emergency Plan Changes Inspection and Follow-up of Unresolved Item IR 05000454/20070092008-04-0101 April 2008 EA-08-046, Byron Station - Final Significance Determination for a White Finding and Notice of Violation; NRC Inspection Report No. 05000454/2007009 (DRS) and 05000455/2007009 (DRS) ML0808700182008-03-27027 March 2008 RN-08-016 - Issuance of Orders Imposing Additional Requirement for Access Authorization and Physical Protection at Independent Sent Fuel Storage Installations 2018-04-09
[Table view] Category:Inspection Report
MONTHYEARIR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 IR 05000454/20230012023-05-0505 May 2023 Integrated Inspection Report 05000454/2023001 and 05000455/2023001 IR 05000454/20230102023-04-19019 April 2023 License Phase 1 Report 05000454/2023010 IR 05000454/20234012023-03-30030 March 2023 Baseline Security Inspection 05000454/2023401; and 05000455/2023401 IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 IR 05000454/20220062023-03-0101 March 2023 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2022006 and 05000454/2022006) IR 05000454/20220042023-02-0101 February 2023 Integrated Inspection Report 05000454/2022004 and 05000455/2022004 IR 05000454/20220102023-01-17017 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report Report 05000454/2022010 and 05000455/2022010 IR 05000454/20224032022-12-28028 December 2022 Cyber Security Inspection Report 05000454/2022403 and 05000455/2022403 IR 05000454/20224052022-12-0909 December 2022 Material Control and Accounting Program Inspection Report 05000454/2022405 and 05000455/2022405 IR 05000454/20220032022-11-0707 November 2022 Integrated Inspection Report 05000454/2022003 and 05000455/2022003 BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 IR 05000454/20220052022-08-24024 August 2022 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2022005; 05000455/2022005) IR 05000454/20224022022-08-0909 August 2022 Security Baseline Inspection Report 05000454/2022402 and 05000455/2022402 IR 05000454/20220022022-08-0808 August 2022 Integrated Inspection Report 05000454/2022002 and 05000455/2022002 IR 05000454/20220012022-05-0303 May 2022 Integrated Inspection Report 05000454/2022001 and 05000455/2022001 IR 05000454/20224012022-04-0404 April 2022 Security Baseline Inspection Report 05000454/2022401 and 05000455/2022401 IR 05000454/20210062022-03-0202 March 2022 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2021006 and 05000455/2021006) IR 05000454/20210042022-02-11011 February 2022 Integrated Inspection Report 05000454/2021004 and 05000455/2021004 IR 05000454/20210122022-01-0606 January 2022 Biennial Problem Identification and Resolution Inpsection Report 05000454/2021012 and 05000455/2021012 IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 IR 05000454/20214032021-11-22022 November 2021 Security Baseline Inspection Report 05000454/2021403 and 05000455/2021403 IR 05000454/20210032021-10-29029 October 2021 Integrated Inspection Report 05000454/2021003 and 05000455/2021003 and Exercise of Enforcement Discretion IR 05000454/20214022021-09-28028 September 2021 Security Baseline Inspection Report 05000454/2021402 and 05000455/2021402 IR 05000454/20210052021-09-0101 September 2021 Updated Inspection Plan for Byron Station Units 1 and 2 (05000454/2021005 and 05000455/2021005) IR 05000454/20210022021-08-0404 August 2021 Integrated Inspection Report 05000454/2021002; 05000455/2021002; and 07200068/2021001 IR 05000454/20210112021-05-14014 May 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000454/2021011 and 05000455/2021011 IR 05000454/20215012021-04-21021 April 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2021501 and 05000455/2021501 IR 05000454/20210012021-04-20020 April 2021 Integrated Inspection Report 05000454/2021001 and 05000455/2021001 IR 05000454/20214012021-03-24024 March 2021 Security Baseline Inspection Report 05000454/2021401 and 05000455/2021401 IR 05000454/20180102021-03-19019 March 2021 Closure of Auxiliary Feedwater System Unresolved Item 05000454/2018010-04 and 05000455/2018010-04 IR 05000454/20200062021-03-0404 March 2021 Annual Assessment Letter for Byron Station (Report 05000454/2020006 and 05000455/2020006) IR 05000454/20210102021-02-0909 February 2021 Triennial Fire Protection Inspection Report 05000454/2021010 and 05000455/2021010 IR 05000454/20200042021-01-27027 January 2021 Integrated Inspection Report 05000454/2020004 and 05000455/2020004 IR 05000454/20204032020-12-16016 December 2020 Security Baseline Inspection Report 05000454/2020403 and 05000455/2020403 2024-08-08
[Table view] Category:Letter
MONTHYEARML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion 2024-09-06
[Table view] |
See also: IR 05000454/2017009
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, ILLINOIS 60532-4352
April 9, 2018
EA-17-138
Mr. Mark Kanavos
Site VP, Byron Generating Station
4450 North German Church Rd
Byron, IL 61010-9794
SUBJECT: RESPONSE TO APPEAL OF NRC LETTER UPHOLDING DISPUTED VIOLATION
DOCUMENTED IN EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS
BASELINE INSPECTION REPORT 05000454/2017009, 05000455/2017009
Dear Mr. Kanavos:
In a letter dated February 8, 2018, to Anne T. Boland, Director of the U.S. Nuclear Regulatory
Commissions (NRC) Office of Enforcement, you requested the NRC review a December 21,
2017, decision by Kenneth G. OBrien, Acting Deputy Regional Administrator, Region III, to
uphold Non-Cited Violation (NCV)05000454/2017009-01; 05000455/2017009-01, which Exelon
had disputed. After reviewing that decision, and your February 8, 2018, letter, and after
coordination with the Director of the Office of Enforcement, I have decided to accept your
request for review. To be clear, our process does not provide for multiple appeals of the
Regions determination. Rather, under the specific facts of this case, I interpret your request
instead as Exelons initial appeal of the specific and substantive modifications to the NCV
reflected in Region IIIs December 21 decision.
Consideration of this appeal is warranted in this case because the June 29, 2017, inspection
report that documented the NCV (Byron Station Units 1 and 2Evaluations of Changes Tests,
and Experiments Baseline Inspection Report 05000454/2017009; 05000455/2017009) did not
fully articulate the basis for the violation. Region III acknowledged this limitation in its
December 21, 2017, letter, noting that the initially-documented NCV, included an explanatory
statement that was open to interpretation, and provided additional information to justify the
NCV.
The additional information and analysis relied upon by Region III to uphold the NCV was not
previously provided to Exelon in writing. In turn, Exelons February 8 appeal asserts detailed
new arguments and information that Region III could not have reasonably expected Exelon to
have raised earlier, given how the NCV was first documented.
Accordingly, I have determined the unusual facts and circumstances of this particular case
warrant consideration as an initial appeal of Region IIIs December 21 decision. Consistent with
that approach, the review will be conducted by an independent panel, which will consider all
relevant information provided on this matter to date. The panels final determination will rely in
M. Kanavos -2-
part upon input from the Office of Nuclear Reactor Regulation regarding the proper application
of the NRC-approved Surveillance Frequency Control Program at Byron Station.
This letter will be made available electronically for public inspection and copying from the
Agencywide Documents Access and Management System (ADAMS) available at
http://www.nrc.gov/reading-rm/adams.html and in the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
/RA/
K. Steven West
Regional Administrator
Docket Nos. 50-454; 50-455
License Nos. NPF-37; NPF-66
cc: Distribution via LISTSERV
ML18100A222
OFC RIII/ORA OE OGC RIII/ORA
NAME JHeck:jc ABoland1 Moulding2 KSWest
DATE 4/2/18 04/05/18 4/2/18 04/09/18