ML17309A409: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/31/1988
| issue date = 10/31/1988
| title = Forwards Response to 880627 Ltr Requesting Addl Info Re Plant Procedures Generation Package & Background Info Explaining Present Sys of Controlling Emergency Operating Procedures
| title = Forwards Response to 880627 Ltr Requesting Addl Info Re Plant Procedures Generation Package & Background Info Explaining Present Sys of Controlling Emergency Operating Procedures
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = STAHLE C
| addressee name = Stahle C
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACCELERATEDDlUTIONDEMONSTRA.NSYSTEMI3.REGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)RECIPIENTIDCODE/NAMEPD1-3LASTAHLE,CCOPIESLTTRENCL1111ACCESSIONNBR:8811180128DOC.DATE:88/10/31NOTARIZED:NODOCKETFACIL:50-244RobertEmmetGinnaNuclearPlant,Unit1,RochesterG05000244"'UTH.NAME-AUTHORAFFILIATIONMECREDY,R.C.RochesterGas&ElectricCorp.5WRECIP.NAMERECIPIENTAFFILIATIONSTAHLE,C.DocumentControlBranch(DocumentControlDesk)
{{#Wiki_filter:AC CELE RATED          Dl                      UTI ON      DE M ON STRA.         N    SYSTEM I3.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8811180128                        DOC.DATE: 88/10/31        NOTARIZED: NO          DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant,                           Unit 1, Rochester    G  05000244 NAME        -  AUTHOR                AFFILIATION                                                    "'UTH.
MECREDY,R.C.         Rochester Gas                  & Electric    Corp.                       5W RECIP.NAME            RECIPIENT AFFILIATION STAHLE,C.                 Document Control Branch (Document                        Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwardsresponsetoaddiinforeutilproceduresgenerationpackage.IDISTRIBUTIONCODE:A003DCOPIESRECEIVED:LTR(ENCL(SIZE:5+7~9TITLE:OR/LicensingSubmittal:Suppl1toNUREG-0737(GenericLtr82-33)8NOTES:LicenseExpdateinaccordancewith10CFR2,2.109(9/19/72).05000244/RECIPIENTCOPIESIDCODE/NAMELTTRENCLPD1-3PD77INTERNAL:ARM/DAF/LFMBNUDOCS-ABSTRACTRES/DSIR/EIBEXTERNAL:LPDRNSIC1011111111NRR/DLPQ~~0~XKENRCPDR111111D,SRIhMIX'ZOALL"RIDS"RECIPIERIS'IEASEHELPUSTOREDUCEHASTE.'XRKACZ'LHEDOCUMEÃZCOFZEKLDESK,ROOMPl-37(EXT.20079)KOELOCUTEYOURNAMEFRYDISTRIKlTIGNLISTSFORDOCUMEXZSYOUDONiTNEEDtTOTALNUMBEROFCOPIESREQUIRED:LTTR17ENCL16I.
Forwards      response to addi                  info re    util  procedures generation I
t'ZZZZZZIgruzSZizgL4$0f41~~Iiiiti"'iiifiierrZZS8K.::::ROCHESTERGASANDELECTRICCORPORATIONo89EASTAVENUE,ROCHESTER,N.Y.14649-0001October31,1988TCLEPHONCAncecoosvie546-2700U.S.NuclearRegulatoryCommissionDocumentControlDeskAttn:Mr.CarlStahlePWRProjectDirectorateNo.1Washington,D.C.20555
package.
DISTRIBUTION CODE: A003D TITLE: OR/Licensing Submittal: Suppl 1 to COPIES RECEIVED:LTR       ( ENCL (     SIZE: 5+ 7~
NUREG-0737(Generic Ltr 82-33) 9 8
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).                                 05000244 RECIPIENT                          COPIES              RECIPIENT          COPIES
                                                                                                                  /
ID  CODE/NAME                        LTTR ENCL        ID  CODE/NAME        LTTR ENCL PD1-3 LA                                1      1      PD1-3 PD                7    7 STAHLE,C                                1      1 INTERNAL: ARM/DAF/LFMB NUDOCS-ABSTRACT 1
1 0
1 NRR/DLPQ
                                                                        ~XKE
                                                                                ~~     0     1 1
1 1
D RES/DSIR/EIB                            1      1                                                  ,S EXTERNAL: LPDR                                      1      1      NRC PDR                1    1 NSIC                                    1      1 R
I h
MIX 'ZO ALL "RIDS" RECIPIERIS'IEASE HELP US TO REDUCE                HASTE.'XRKACZ 'LHE DOCUMEÃZ COFZEKL DESK, ROOM  Pl-37 (EXT. 20079)               KO  ELOCUTE YOUR NAME FRY DISTRIKlTIGN LISTS FOR  DOCUMEXZS YOU DONiT NEEDt I.
TOTAL NUMBER OF COPIES REQUIRED: LTTR                            17  ENCL    16
 
~  ~
t 'ZZZZZZI      gruzSZiz Iiiiti"'iii fiierrZZS gL4$ 0 f41 8K.::::
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 October 31, 1988                    TCLEPHONC Ance coos vie 546-2700 U.S. Nuclear Regulatory Commission Document                    Control Desk Attn: Mr. Carl Stahle PWR Project Directorate        No. 1 Washington, D.C.                     20555


==Subject:==
==Subject:==
GinnaPlantProceduresGenerationPackage(PGP)RequestforAdditionalInformationR.E.GinnaNuclearPowerPlantDocketNo.50-244
Ginna Plant Procedures Generation Package          (PGP)
Request for Additional Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Stahle:==
 
Your letter to R. Kober, dated June 27, 1988 requested.
additional information regarding the Ginna Plant Procedures Generation Package (PGP). In response, please find attached the information you requested                              as  well as background information explaining our present system of controlling EOPs.
If you have any questions regarding the information provided or require additional information, please call Charles J. Mambretti (716) 724-8071.
Ro ert C. cred General Manager Nuclear Production Attachment ZC:          U.S. Nuclear Regulatory Commission Region I 475          Allendale Road    "
King of Prussia,            PA    19406 Ginna Senior Resident Inspector goo~
88iliSOiZS SSi03i PDR              ADOCK 05000244  "
PDC
 
RESPONSE TO CONCERNS REGARDING THE GINNA PROCEDURES GENERATION PACKAGE (PGP )
The Ginna    PGP was formulated based upon interpretation of NRC requirements and the guidance of NUREG-0899.            The PGP provided the guidelines required to generate the original EOPs which were implemented in December of 1985.              In addition, the package described the development of the EOPs and the manner in which they were implemented.
thereafter, It  is important to recognize that implementation and changes        to the EOPs were controlled in accordance with the guidance contained in the following Ginna Administrative procedures.
A-502.1    Emergency and Abnormal Procedure Writers Guide A-503.1    Emergency and Abnormal Procedures Users Guide A-601.6    Procedure Changes Control  Emergency and Abnormal Procedures These    documents    have    evolved  into the    "living"    governing documents (revised as        necessary)  for EOP maintenance    and. the original    PGP  is not    used    to control  Emergency    and  Abnormal Procedures.
The  controlling    documents  for the training  program have become procedures:
A-103.6    Operator Training Responsibilities TRC-5.1    Initial License Operator Training TRC-5.2    Operator Requalification Training As a  result of    an  internal EOP assessment completed in February 1988,  and  NRC    concerns  resulting from the Ginna PGP review transmitted to RG&E on June 27, 1988, RG&E has initiated an EOP upgrade program scheduled for completion in April 1989.                This program includes revision to the EOP governing        procedures.      Draft copies of these          revisions are attached for information.
Responses    to each of the NRC concerns are provided below including, where appropriate, references to sections of the draft procedures.
8811180128
 
I r"
 
CONCERNS AND RESPONSES Concern 1 The PGF  states that deviations from and additions to the generic technical guidelines (WOG "ERGs) will be documented, and will include technical justification supporting these additions and/or deviations.        The PGP      should also state that the safety significance of these differences will be identified and documented    in the  PGP.
~Res onse Procedure A-606.1 Section 3.3 and.. Appendix 2B, items 22 and 22A (attached) address the need. to assess the safety significance of deviations from the technical guidelines (WOG ERG) and documentation thereof.
Concern  2 Sections    4.5.3 or 5.2 should be revised to indicate a specific method    for highlighting notes (e.g., outlining/boxing) to differentiate them from cautions while drawing attention to their content.
~Res onse Procedure A-502.1 provides the following        instructions:
4.5.2        CAUTION STATEMENTS - text should be in a block format, as shown in Figure 3, in addition to the following formatting requirements:
4.5.2.1      Caution'tatements should.'e enclosed at the top and bottom by a continuous line of asterisks which should begin three lines below the preceding text.            This differentiates the    CAUTION and NOTE.
4.5.2.2      The  statement header CAUTION should be centered and placed two lines below he preceding line of asterisks.
4.5.2.3      Caution statement text. should begin two lines below the caution header and extend from margin to margin.
4.5.2.4      Caution statements    should be emphasized as described in section 5.2, Emphasis Techniques,      by using all upper case  capitalization.
4.5.2.5      Caution statements    which apply to the whole procedure shall  be stated    prior to  any operator action step and be shown on the    foldout page  if applicable.
 
~,
L-h
 
4.5.2.6    Caution statements      which apply to a      particular step shall  be stated prior to that step.
4.5.2.7    Caution statements        should be written to preclude confusion as to which step or evolution they refer.
4.5.3      NOTE STATEMENTS  t:ext should be in a block format as shown in Figure 3, in addition to the following formatting requirements:
4.5.3.1    The statement    header NOTE should be on the same line as the text but separated from the text by a colon.
4.5.3.2    Note statement text should begin two lines below the preceding text and extend from margin to margin.
4.5.3.3    Note statements should be preceded with a bullet (o) to also differentiate them from a CAUTION.
4.5.3.4    Note statements    which apply to  a  particular step shall be  stated prior to that step.
Concern  3 Sections    4.5.2 and 4.5.3 should state that cautions and notes will not    contain action steps, as is stated in Figure 4.2-2 of the  PGP.
R~es onse Procedure A-502.1 contains the following        instructions:
2.3.2      CAUTION    STATEMENTS      statements    denote  potential hazards    to personnel or equipment.          Cautions which apply to a particular action step should appear directly before that step.            Cautions which apply throughout a procedure, or a portion of it, should appear at the start of the procedure or at the point where they become applicable.      A caution statement will not contain a direct action.              A passive    action statement. may be appropriate.      An example would be the continuous monitoring of a parameter with an associated action  if  a prescribed, value is reached.
2.3.3      NOTE    STATEMENTS  statements        contain advisory or administrative information for subsequent action steps or for caution stat:ements.        The directions in step 2.3.2 for placement and action content should be applied to notes.          Where cautions    and notes are included together all caution statements should be listed before    any note statement.
 
5'Q 1
l
 
Concern 4 Section 5.12 addresses logic terms and conditional statements.
The  writer's guide should be expanded to included examples of acceptable    and. unacceptable    combinations.      See NUREG-0899, Appendix B,    for  additional  guidance.
R~es  onse Procedure A-502.1 This procedure has been expanded to include Appendix A (attached) which provides additional guidance on logic terms and conditional statements as well as examples illustrating this guidance.
Concern 5 Section 5e3 provides guidelines for referencing sections, subsections, and steps within a procedure and for referencing another procedure. However, criteria for writers,to it decide should also provide guidelines or when the steps of a referenced procedure are to be      included. in  the EOP, rather than referenced.
~Res  onse Procedure A-502.1 provides the following instructions=
5.12.4
  ~  ~      REFERENCING        referencing is used to denote a procedure    which  may provide    useful or necessary information to the operator during the execution of an EOP/AP. In general, those procedures referenced cover low probability occurrences or normal plant operations whose inclusion within an EOP/AP would cause excessive complication and reduce effectiveness of the procedure in effect. Referencing is denoted by the term REFER followed by the procedure designator and title as shown by;  REFER  TO  ER-AFW.1, ALTERNATE WATER SUPPLY TO    AFW PUMPS.
Concern    6 The format and. content of Critical        Safety Function Status Trees (CSFSTs) should be specified in the      writer's guide.
~Res  onse Procedure A-502.1 6.0          FORMAT OF  CRITICAL SAFETY FUNCTION STATUS TREES
 
I r
\
P I
h t
 
6.1        Critical Safety Function Status Trees (CSFSTs) are block format devices used in the evaluation of predefined safety concerns designated as Critical Safety Functions. (FIGURE 6  CSFST).
6.1.1
  ~  ~      The blocks are aligned so that the user will enter each tree on the left-hand side of its page and. move towards the right-hand side.
                          )
6.1.2      Each    block contains a question concerning current plant conditions. The question in each block may be dependent on previous blocks.
6.1s3      Each question is written to obtain a YES or NO response. The response dictates which branch of the status tree will be taken.
6.1.4      Questions should be written so that a        YES  response branch will move the user down the page.
Each  possible complete path through the tree ends in its  own end  point, or terminus. The last path segment and the associated terminus circle use a color-code and/or pattern-code as shown in FIGURE 7.
6.1.6      Terminals should be ordered so that the highest priority condition terminus is at the top of the page and the priority levels descend down the page.          The priority order for color-coding, in descending order, is RED"ORANGE-YELLOW-GREEN.
6.1.7      All terminals color-coded        other than GREEN will provide an applicable Functional Restoration procedure designator.
Concern 7 The    writer's guide addresses simple action steps. However, should also include verification steps, continuous or periodic it steps, alternative and equally acceptable steps, and steps which refer the operator to another subsection of the procedure. The content and, format of each type of action step needs to be described in the writer's guide.          See NUREG-0899, Subsections 5.7.2-5.7.8, for additional guidance.
~Res  onse Procedure A-502.1 provides the following      instructions:
5.12        BRANCHING  branching        encompasses  transitioning, either to another step in the same procedure or to another EOP/AP; and referencing another procedure for supplemental information or direction.      Transitioning in a series operation while referencing is a parallel operation.
 
f I QA 0
K
 
5.12.1  TRANSITION TO A LATER STEP                  WITHIN CURRENT    EOP/AP-shall be performed by using              the words  GO  TO as shown by;  GO TO  Step 20.
5.12.2  TRANSITION TO A PREVIOUS STEP WITHIN CURRENT EOP/AP-shall be performed by using the words RETURN TO as shown by; RETURN TO Step 20.
5.12.3  TRANSITION      TO    ANOTHER      EOP  (or  AP)    should    be performed by using the words GO                TO, followed by    the procedure designator, number, title, and the specific procedure step as shown by; GO TO ES-0.1, REACTOR TRIP RESPONSE, Step 20.
5.12.3.1 If  a  specific step is not shown it is to be assumed.
that    transition is to the beginning of the designated procedure.
5.12.3.2 Transition from        an  EOP. to  an AP should not be used.
5.12.3.3 Procedures      entered    for supplemental      guidance    or from CSFST    direction      may use      a RETURN TO    statement. This statement      should      contain      the  appropriate procedure designator,      title    and step number where        applicable. A procedure    with multiple entry conditions may use an open return statement as shown by; RETURN TO PROCEDURE AND STEP IN EFFECT.            This denotes a transition to the last previous      EOP  in use.
5.12.4  REFERENCING        -    referencing is used to denote a procedure      which may provide useful or necessary information to the operator during the execution of an EOP/AP.      In general, those procedures referenced cover low probability occurrences or normal plant operations whose inclusion within an EOP/AP would cause excessive complication and reduced effectiveness of the procedure in effect. Referencing is denoted by the term REFER followed by the procedu're designator and title as shown by; REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS.
5.12.4.1 Referencing a procedure does not constitute leaving the procedure in effect as additional information.
it  is providing only 5.12.4.2 Referencing          should      be    minimized    for procedure continuity.
5.12.5  The    referencing terms GO TO, RETURN TO and REFER TO and    the procedure designator and title shall be all capitalized. and the word Step shall be initially capitalized for emphasis.
 
va t~
P
 
Concern  8 Sections 4.1.9 and 5.6.5 should. be revised to indicate that page rotation and breaking of words are unacceptable at all times.
R~es onse Procedure A-502.1 contains the following      instructions:
4.1.8        TEXT 'CONTINUITY    the text of operator action steps; with applicable substeps, cautions, notes; should be wholly contained on the same page.          Where physical constraints preclude this the following guidelines apply.-
4.1.8.1      Cautions'nd/or      notes may be placed        alone  on  the immediately preceding page.
4.1.8.2      If a  step must be continued on to another page, then:
4.1.8.2.1    The initial page shall be annotated at the bottom of the action step field portion of the page to indicate that the step continues. (i.e., THIS STEP CONTINUED ON FOLLOWING PAGE.)
4.1.8.2.2    The  following page shall have the initial action step heading repeated and. be annotated to indicate that the step is being continued from a previous page.
ex.,Establish letdown THIS STEP CONTINUED    FROM PREVIOUS PAGE 4.1.9        PAGE    ROTATION necessary should be minimized but when to rotate a page for the sake of clarity and it  is readability (i.e., proper graph construction), the following rules are applicable; 4.1.9.1      The left hand edge of the normal page shall become the top of the rotated page.
4.1.9.2      Page margins, identification and. numbering shall n'ot rotate.
Concern 9 Because    the licensee has chosen check spaces          as  a  method  of placekeeping the writer's guide should state            that    all  action steps should have check-off spaces.
 
l
~Res  onse The    original intent      was  to use checkoff spaces, however, during the development        and  validation      of the EOPs, the value of checkoffs became questionable for placekeeping purposes.                As a result, the requirement was removed from                Procedure  A-502.1.
Alternatives for. placekeeping are contained in Procedure A-503.1 as follows:
3.7.3        Placekeeping is the responsibility of the EOP User; normally the Control Room Foreman. In order to ensure proper placekeeping, the EOP User may checkoff or annotate steps by using pen/pencil markings to the immediate right of the Action Step or Response Not Obtained (RNO) performed.          Also available to him,. are stick-on pads or note pads which may be affixed to pages where transition or looping are necessary.
Concern 10 Section    5.6e9    states that brackets are to be used. only in calculations.      The  writer's guide should describe how values for adverse containment conditions will be specified in the EOPs.
R~es  onse Procedure A-502.1 contains the following guidance:.
5.6.6
  ~  ~      .PARENTHESES          are used to provide the adverse containment    values for instrumentation readings in applicable steps.          They are used to provide valve number designations        and instrument designators when these are noted in addition to a word descriptor.
Parentheses may also be use to provide amplifying or useful information such as locations, breaker cubicle designations, and information which cannot be placed in a note prior to a step as substep condition.
it only applies to a specific Concern 11 Regarding      action statements,        the following concerns    should be specifically      addressed  in the writer's guide:
: a. Action steps should be structured so that they can be executed by the minimum shift staffing required by the Technical Specifications.
: b. Action steps should be structured to be consistent with the roles and responsibilities of the operators.
: c. Action steps should be structured so as to minimize the movement of personnel around the control room while carrying out procedural steps..
8
 
e
: d. Action steps    should  be  structured. to avoid unintentional duplication of tasks.
: e. Action steps should be structured to enable the control room supervisor to follow staff actions and monitor plant status.
~Res ense Procedure A-502.1 contains the following guidance:
2 '  ,
OPERATOR    ACTION STEPS      general requirements are that action    steps be structured so that they can be executed. by minimum shift staffing as required by Technical Specifications, and be consistent with the responsibilities of the shift positions. In addition, the action steps should minimize the movement of personnel in the Control Room and enable the effective supervisory overview to monitor plant status.
2.3.1      OPERATOR    ACTION STEPS      are short, precise statements presenting    exactly the task to be performed and the expected response or result of that task.          It is not necessary to state expected results of routine tasks.
Steps are assumed to be performed in sequence unless otherwise denoted.      Actions directed in a step should not be expected to be complete before the next step is begun. If a particular action must be completed before continuation,: this must be stated in that step or substep.      The action steps are presented in a dual column format and are identif ied as immediate or subsequent actions.
5.5        NARRATIVE STYLE        steps may be written as complete sentences, short phrases, or some combination of the two. Notes and cautions should be written as complete sentences.      Sentences, clauses and phrases should be short and precise utilizing 'normal American English word order where practical.            Operator action steps should:
5.5.1      Be  short, imperative statements which state the exact task that the operator is expected to perform.
5.5.2      Deal with only one idea. Complex evolutions should be broken down into a series of steps and substeps.
5.5.3      Be clear as to the objectives of operator actions.
5.5e4      Be written in sentence form in the right-hand. column.
 
tt J1
 
Concern 12 The PGP    should address the accessibility of EOPs and techniques to distinguish      them from other plant procedures.
~Res  ense Presently the EOPs are contained in volumes with red covered jackets.        The EOPs are the only control room procedures differentiated in this manner and are easily distinguishable.
Upon completion of the EOP update in April 1989, the EOPs will be stored in a bookcase separate from all other procedures.
Additionally, the EOPs will have a unique binder and format, as described below.
Procedure A-,503.1,provides the following instructions:
2.0          EOP/AP Section Or anization  in order to facilitate rapid location of specific sections and subsections of the EOP/AP, the control room copy is arranged per FIGURE    3  as  follows:
2.1          COVER    SHEET      which    is used for administrative purposes      and does not provide any active function in the EOP/AP to be used. The Cover Sheet of the control room copy is the      first  page seen in the binder.
2.2          PURPOSE    and ENTRY CONDITIONS/SYMPTOMS PAGE - in the control    room copy is immediately following the cover sheet.
2.2.1
  ~  ~        A  Purpose      Statement    which specifically describes the intent of the procedure.
2.2.2        Entry conditions and/or Symptoms sections which specify the conditions, transitions and/or symptoms which dictate or direct entry into the procedure.          The symptoms used should be unique to the procedure.
2.3          OPERATOR ACTION STEP PAGES  which may be subdivided into Immediate Operator Action pages, followed by subsequent operator action pages.        Operator action step pages may contain; 2.3.1        CAUTION STATEMENTS  which provide information about hazards to personnel or equipment and advice on actions or transitions which may become necessary depending on changes in plant conditions.
2.3.2        NOTE STATEMENTS  which provide              administrative or advisory information which supports operator actions.
10
 
I P
 
OPERATOR  ACTION STEPS    presented  in  a  two column format, direct the operator through specific step by step tasks, give the expected results from those tasks and provide contingency actions to be taken should an expected task method not be available or an expected result not be obtained.
ATTACHMENT PAGES    which may    be used to provide additional information to the operator. They provide information concerning a particular step or evolution addressed in the procedure. The information presented is of importance to the action or decision where referenced,  but is of a length or format which precludes  incorporation into the procedure step.
Similar information is contained in A-502.1 Section 3.5.
11
 
A-503.1:19 FIGURE 3 CONTROL ROOM EOP/AP BINDER AEGUQIGEMENT (TRI-FOLD BINDER)
EOP FOLD OVER PAGES II                          II ATTACHMENTS      II                          IIFOLD OUT PAGES II                          II II        EOP              II II                          II coversheet purpose/entry        II conditions/symptomsll immediate/
((    subsequent action ((
 
==SUMMARY==
II                          II ATTACHMENT B1  FOLD BINDER FOLD OVER PAGES II                        II Attachment            I I o        AP          o II II                        II II    coversheet          II II    purpose/entry        II II    conditions/symptom II    immediate/
II    subsequent actions (I II                        II I
12
 
0 Concern 13 The  quality of the reproduced copies of the        EOPs  should be addressed  in the PGP since all copies of the      EOPs  need to be legible and complete.
~Res onse Since EOPs/APs are considered Plant procedures, these procedures and any changes      to these procedures are governed by the provisions of A-601.2 (Procedure Control  Permanent Changes) and A-602 (Procedure Distribution).      These procedures provide for proofreading and distribution of EOPs/APs to address this concern.
Concern 14 Particular attention should be paid. to deviations from and additions to the generic technical guidelines that are of safety significance during the verification and validation programs.
The PGP should discuss how the deviations and additions will be verified and validated.
~Res onse Procedure A-601.6 provides the following    directions:
3.3.2      Verification Performance:
3.3.2.1    The verification process shall be performed by pre-
                          ~
      ~
identifying the knowledgeable individuals needed to
                                              ~
perform the reviews on
                            ~
ATTACHMENT  2.
                                                ~
3.3.2.2    Individuals performing the technical accuracy review should include operations,        STA,  training staff, operations    supervision,    technical staff, nuclear engineering, etc., as deemed'ecessary by the Technical Assistant to the Operations manager or designee.
3.3.2.3    The Technical Assistant to, the Operations Manager or designee shall perfo'rm the written accuracy review.
3.3.2.4    Deviation or changes to existing setpoints (footnotes) or new setpoints shall require review by technical staff and independent review by nuclear engineering.
Included with the review shall be a documented basis, to include calculations or analysis, as applicable.
3.3.2.5    Deviations from the WOG ERG guidance shall require review by knowledgeable licensed operations staff.
Included shall be a documented basis which assesses the safety significance of the deviation.
13


==DearMr.Stahle:==
S l
YourlettertoR.Kober,datedJune27,1988requested.additionalinformationregardingtheGinnaPlantProceduresGenerationPackage(PGP).Inresponse,pleasefindattachedtheinformationyourequestedaswellasbackgroundinformationexplainingourpresentsystemofcontrollingEOPs.Ifyouhaveanyquestionsregardingtheinformationprovidedorrequireadditionalinformation,pleasecallCharlesJ.Mambretti(716)724-8071.RoertC.credGeneralManagerNuclearProductionAttachmentZC:U.S.NuclearRegulatoryCommissionRegionI475AllendaleRoadKingofPrussia,PA"19406GinnaSeniorResidentInspectorgoo~88iliSOiZSSSi03iPDRADOCK05000244"PDC RESPONSETOCONCERNSREGARDINGTHEGINNAPROCEDURESGENERATIONPACKAGE(PGP)TheGinnaPGPwasformulatedbaseduponinterpretationofNRCrequirementsandtheguidanceofNUREG-0899.ThePGPprovidedtheguidelinesrequiredtogeneratetheoriginalEOPswhichwereimplementedinDecemberof1985.Inaddition,thepackagedescribedthedevelopmentoftheEOPsandthemannerinwhichtheywereimplemented.Itisimportanttorecognizethatthereafter,implementationandchangestotheEOPswerecontrolledinaccordancewiththeguidancecontainedinthefollowingGinnaAdministrativeprocedures.A-502.1A-503.1A-601.6EmergencyandAbnormalProcedureWritersGuideEmergencyandAbnormalProceduresUsersGuideProcedureChangesControl-EmergencyandAbnormalProceduresThesedocumentshaveevolvedintothe"living"governingdocuments(revisedasnecessary)forEOPmaintenanceand.theoriginalPGPisnotusedtocontrolEmergencyandAbnormalProcedures.Thecontrollingdocumentsforthetrainingprogramhavebecomeprocedures:A-103.6OperatorTrainingResponsibilitiesTRC-5.1InitialLicenseOperatorTrainingTRC-5.2OperatorRequalificationTrainingAsaresultofaninternalEOPassessmentcompletedinFebruary1988,andNRCconcernsresultingfromtheGinnaPGPreviewtransmittedtoRG&EonJune27,1988,RG&EhasinitiatedanEOPupgradeprogramscheduledforcompletioninApril1989.ThisprogramincludesrevisiontotheEOPgoverningprocedures.Draftcopiesoftheserevisionsareattachedforinformation.ResponsestoeachoftheNRCconcernsareprovidedbelowincluding,whereappropriate,referencestosectionsofthedraftprocedures.8811180128 Ir" CONCERNSANDRESPONSESConcern1ThePGFstatesthatdeviationsfromandadditionstothegenerictechnicalguidelines(WOG"ERGs)willbedocumented,andwillincludetechnicaljustificationsupportingtheseadditionsand/ordeviations.ThePGPshouldalsostatethatthesafetysignificanceofthesedifferenceswillbeidentifiedanddocumentedinthePGP.~ResonseProcedureA-606.1Section3.3and..Appendix2B,items22and22A(attached)addresstheneed.toassessthesafetysignificanceofdeviationsfromthetechnicalguidelines(WOGERG)anddocumentationthereof.Concern2Sections4.5.3or5.2shouldberevisedtoindicateaspecificmethodforhighlightingnotes(e.g.,outlining/boxing)todifferentiatethemfromcautionswhiledrawingattentiontotheircontent.~ResonseProcedureA-502.1providesthefollowinginstructions:4.5.2CAUTIONSTATEMENTS-textshouldbeinablockformat,asshowninFigure3,inadditiontothefollowingformattingrequirements:4.5.2.1Caution'tatementsshould.'eenclosedatthetopandbottombyacontinuouslineofasteriskswhichshouldbeginthreelinesbelowtheprecedingtext.ThisdifferentiatestheCAUTIONandNOTE.4.5.2.2ThestatementheaderCAUTIONshouldbecenteredandplacedtwolinesbelowheprecedinglineofasterisks.4.5.2.3Cautionstatementtext.shouldbegintwolinesbelowthecautionheaderandextendfrommargintomargin.4.5.2.4Cautionstatementsshouldbeemphasizedasdescribedinsection5.2,EmphasisTechniques,byusingalluppercasecapitalization.4.5.2.5Cautionstatementswhichapplytothewholeprocedureshallbestatedpriortoanyoperatoractionstepandbeshownonthefoldoutpageifapplicable.
~,L-h 4.5.2.6Cautionstatementswhichapplytoaparticularstepshallbestatedpriortothatstep.4.5.2.74.5.3Cautionstatementsshouldbewrittentoprecludeconfusionastowhichsteporevolutiontheyrefer.NOTESTATEMENTS-t:extshouldbeinablockformatasshowninFigure3,inadditiontothefollowingformattingrequirements:4.5.3.14.5.3.2ThestatementheaderNOTEshouldbeonthesamelineasthetextbutseparatedfromthetextbyacolon.Notestatementtextshouldbegintwolinesbelowtheprecedingtextandextendfrommargintomargin.4.5.3.3Notestatementsshouldbeprecededwithabullet(o)toalsodifferentiatethemfromaCAUTION.4.5.3.4Notestatementswhichapplytoaparticularstepshallbestatedpriortothatstep.Concern3SectionswillnotthePGP.4.5.2and4.5.3shouldstatethatcautionsandnotescontainactionsteps,asisstatedinFigure4.2-2ofR~esonseProcedureA-502.1containsthefollowinginstructions:2.3.2CAUTIONSTATEMENTS-statementsdenotepotentialhazardstopersonnelorequipment.Cautionswhichapplytoaparticularactionstepshouldappeardirectlybeforethatstep.Cautionswhichapplythroughoutaprocedure,oraportionofit,shouldappearatthestartoftheprocedureoratthepointwheretheybecomeapplicable.Acautionstatementwillnotcontainadirectaction.Apassiveactionstatement.maybeappropriate.Anexamplewouldbethecontinuousmonitoringofaparameterwithanassociatedactionifaprescribed,valueisreached.2.3.3NOTESTATEMENTS-statementscontainadvisoryoradministrativeinformationforsubsequentactionstepsorforcautionstat:ements.Thedirectionsinstep2.3.2forplacementandactioncontentshouldbeappliedtonotes.Wherecautionsandnotesareincludedtogetherallcautionstatementsshouldbelistedbeforeanynotestatement.
5'Q1l Concern4Section5.12addresseslogictermsandconditionalstatements.Thewriter'sguideshouldbeexpandedtoincludedexamplesofacceptableand.unacceptablecombinations.SeeNUREG-0899,AppendixB,foradditionalguidance.R~esonseProcedureA-502.1ThisprocedurehasbeenexpandedtoincludeAppendixA(attached)whichprovidesadditionalguidanceonlogictermsandconditionalstatementsaswellasexamplesillustratingthisguidance.Concern5Section5e3providesguidelinesforreferencingsections,subsections,andstepswithinaprocedureandforreferencinganotherprocedure.However,itshouldalsoprovideguidelinesorcriteriaforwriters,todecidewhenthestepsofareferencedprocedurearetobeincluded.intheEOP,ratherthanreferenced.~ResonseProcedureA-502.1providesthefollowinginstructions=5.12.4~~REFERENCING-referencingisusedtodenoteaprocedurewhichmayprovideusefulornecessaryinformationtotheoperatorduringtheexecutionofanEOP/AP.Ingeneral,thoseproceduresreferencedcoverlowprobabilityoccurrencesornormalplantoperationswhoseinclusionwithinanEOP/APwouldcauseexcessivecomplicationandreduceeffectivenessoftheprocedureineffect.ReferencingisdenotedbythetermREFERfollowedbytheproceduredesignatorandtitleasshownby;REFERTOER-AFW.1,ALTERNATEWATERSUPPLYTOAFWPUMPS.Concern6Theformatand.contentofCriticalSafetyFunctionStatusTrees(CSFSTs)shouldbespecifiedinthewriter'sguide.~ResonseProcedureA-502.16.0FORMATOFCRITICALSAFETYFUNCTIONSTATUSTREES Ir\PIht 6.1CriticalSafetyFunctionStatusTrees(CSFSTs)areblockformatdevicesusedintheevaluationofpredefinedsafetyconcernsdesignatedasCriticalSafetyFunctions.(FIGURE6-CSFST).6.1.1~~6.1.2Theblocksarealignedsothattheuserwillentereachtreeontheleft-handsideofitspageand.movetowardstheright-handside.)Eachblockcontainsaquestionconcerningcurrentplantconditions.Thequestionineachblockmaybedependentonpreviousblocks.6.1s3EachquestioniswrittentoobtainaYESorNOresponse.Theresponsedictateswhichbranchofthestatustreewillbetaken.6.1.4QuestionsshouldbewrittensothataYESresponsebranchwillmovetheuserdownthepage.Eachpossiblecompletepaththroughthetreeendsinitsownendpoint,orterminus.Thelastpathsegmentandtheassociatedterminuscircleuseacolor-codeand/orpattern-codeasshowninFIGURE7.6.1.6Terminalsshouldbeorderedsothatthehighestpriorityconditionterminusisatthetopofthepageandtheprioritylevelsdescenddownthepage.Thepriorityorderforcolor-coding,indescendingorder,isRED"ORANGE-YELLOW-GREEN.6.1.7Allterminalscolor-codedotherthanGREENwillprovideanapplicableFunctionalRestorationproceduredesignator.Concern7Thewriter'sguideaddressessimpleactionsteps.However,itshouldalsoincludeverificationsteps,continuousorperiodicsteps,alternativeandequallyacceptablesteps,andstepswhichrefertheoperatortoanothersubsectionoftheprocedure.Thecontentand,formatofeachtypeofactionstepneedstobedescribedinthewriter'sguide.SeeNUREG-0899,Subsections5.7.2-5.7.8,foradditionalguidance.~ResonseProcedureA-502.1providesthefollowinginstructions:5.12BRANCHING-branchingencompassestransitioning,eithertoanotherstepinthesameprocedureortoanotherEOP/AP;andreferencinganotherprocedureforsupplementalinformationordirection.Transitioninginaseriesoperationwhilereferencingisaparalleloperation.
fIQA0K 5.12.15.12.25.12.35.12.3.1TRANSITIONTOALATERSTEPWITHINCURRENTEOP/AP-shallbeperformedbyusingthewordsGOTOasshownby;GOTOStep20.TRANSITIONTOAPREVIOUSSTEPWITHINCURRENTEOP/AP-shallbeperformedbyusingthewordsRETURNTOasshownby;RETURNTOStep20.TRANSITIONTOANOTHEREOP(orAP)-shouldbeperformedbyusingthewordsGOTO,followedbytheproceduredesignator,number,title,andthespecificprocedurestepasshownby;GOTOES-0.1,REACTORTRIPRESPONSE,Step20.Ifaspecificstepisnotshownitistobeassumed.thattransitionistothebeginningofthedesignatedprocedure.5.12.3.2TransitionfromanEOP.toanAPshouldnotbeused.5.12.3.35.12.45.12.4.15.12.4.25.12.5ProceduresenteredforsupplementalguidanceorfromCSFSTdirectionmayuseaRETURNTOstatement.Thisstatementshouldcontaintheappropriateproceduredesignator,titleandstepnumberwhereapplicable.Aprocedurewithmultipleentryconditionsmayuseanopenreturnstatementasshownby;RETURNTOPROCEDUREANDSTEPINEFFECT.ThisdenotesatransitiontothelastpreviousEOPinuse.REFERENCING-referencingisusedtodenoteaprocedurewhichmayprovideusefulornecessaryinformationtotheoperatorduringtheexecutionofanEOP/AP.Ingeneral,thoseproceduresreferencedcoverlowprobabilityoccurrencesornormalplantoperationswhoseinclusionwithinanEOP/APwouldcauseexcessivecomplicationandreducedeffectivenessoftheprocedureineffect.ReferencingisdenotedbythetermREFERfollowedbytheprocedu'redesignatorandtitleasshownby;REFERTOER-AFW.1,ALTERNATEWATERSUPPLYTOAFWPUMPS.Referencingaproceduredoesnotconstituteleavingtheprocedureineffectasitisprovidingonlyadditionalinformation.Referencingshouldbeminimizedforprocedurecontinuity.ThereferencingtermsGOTO,RETURNTOandREFERTOandtheproceduredesignatorandtitleshallbeallcapitalized.andthewordStepshallbeinitiallycapitalizedforemphasis.
vat~P Concern8Sections4.1.9and5.6.5should.berevisedtoindicatethatpagerotationandbreakingofwordsareunacceptableatalltimes.R~esonseProcedureA-502.1containsthefollowinginstructions:4.1.84.1.8.1TEXT'CONTINUITY-thetextofoperatoractionsteps;withapplicablesubsteps,cautions,notes;shouldbewhollycontainedonthesamepage.Wherephysicalconstraintsprecludethisthefollowingguidelinesapply.-Cautions'nd/ornotesmaybeplacedaloneontheimmediatelyprecedingpage.4.1.8.24.1.8.2.1Ifastepmustbecontinuedontoanotherpage,then:Theinitialpageshallbeannotatedatthebottomoftheactionstepfieldportionofthepagetoindicatethatthestepcontinues.(i.e.,THISSTEPCONTINUEDONFOLLOWINGPAGE.)4.1.8.2.2Thefollowingpageshallhavetheinitialactionstepheadingrepeatedand.beannotatedtoindicatethatthestepisbeingcontinuedfromapreviouspage.ex.,Establishletdown-THISSTEPCONTINUEDFROMPREVIOUSPAGE4.1.9PAGEROTATION-shouldbeminimizedbutwhenitisnecessarytorotateapageforthesakeofclarityandreadability(i.e.,propergraphconstruction),thefollowingrulesareapplicable;4.1.9.1Thelefthandedgeofthenormalpageshallbecomethetopoftherotatedpage.4.1.9.2Pagemargins,identificationand.numberingshalln'otrotate.Concern9Becausethelicenseehaschosencheckspacesasamethodofplacekeepingthewriter'sguideshouldstatethatallactionstepsshouldhavecheck-offspaces.
l  
~ResonseTheoriginalintentwastousecheckoffspaces,however,duringthedevelopmentandvalidationoftheEOPs,thevalueofcheckoffsbecamequestionableforplacekeepingpurposes.Asaresult,therequirementwasremovedfromProcedureA-502.1.Alternativesfor.placekeepingarecontainedinProcedureA-503.1asfollows:3.7.3PlacekeepingistheresponsibilityoftheEOPUser;normallytheControlRoomForeman.Inordertoensureproperplacekeeping,theEOPUsermaycheckofforannotatestepsbyusingpen/pencilmarkingstotheimmediaterightoftheActionSteporResponseNotObtained(RNO)performed.Alsoavailabletohim,.arestick-onpadsornotepadswhichmaybeaffixedtopageswheretransitionorloopingarenecessary.Concern10Section5.6e9statesthatbracketsaretobeused.onlyincalculations.Thewriter'sguideshoulddescribehowvaluesforadversecontainmentconditionswillbespecifiedintheEOPs.R~esonseProcedureA-502.1containsthefollowingguidance:.5.6.6~~.PARENTHESES-areusedtoprovidetheadversecontainmentvaluesforinstrumentationreadingsinapplicablesteps.Theyareusedtoprovidevalvenumberdesignationsandinstrumentdesignatorswhenthesearenotedinadditiontoaworddescriptor.Parenthesesmayalsobeusetoprovideamplifyingorusefulinformationsuchaslocations,breakercubicledesignations,andinformationwhichcannotbeplacedinanotepriortoastepasitonlyappliestoaspecificsubstepcondition.Concern11Regardingactionstatements,thefollowingconcernsshouldbespecificallyaddressedinthewriter'sguide:a.ActionstepsshouldbestructuredsothattheycanbeexecutedbytheminimumshiftstaffingrequiredbytheTechnicalSpecifications.b.Actionstepsshouldbestructuredtobeconsistentwiththerolesandresponsibilitiesoftheoperators.c.Actionstepsshouldbestructuredsoastominimizethemovementofpersonnelaroundthecontrolroomwhilecarryingoutproceduralsteps..8 e
d.Actionstepsshouldbestructured.toavoidunintentionalduplicationoftasks.e.Actionstepsshouldbestructuredtoenablethecontrolroomsupervisortofollowstaffactionsandmonitorplantstatus.~ResenseProcedureA-502.1containsthefollowingguidance:2',2.3.1OPERATORACTIONSTEPS-generalrequirementsarethatactionstepsbestructuredsothattheycanbeexecuted.byminimumshiftstaffingasrequiredbyTechnicalSpecifications,andbeconsistentwiththeresponsibilitiesoftheshiftpositions.Inaddition,theactionstepsshouldminimizethemovementofpersonnelintheControlRoomandenabletheeffectivesupervisoryoverviewtomonitorplantstatus.OPERATORACTIONSTEPSareshort,precisestatementspresentingexactlythetasktobeperformedandtheexpectedresponseorresultofthattask.Itisnotnecessarytostateexpectedresultsofroutinetasks.Stepsareassumedtobeperformedinsequenceunlessotherwisedenoted.Actionsdirectedinastepshouldnotbeexpectedtobecompletebeforethenextstepisbegun.Ifaparticularactionmustbecompletedbeforecontinuation,:thismustbestatedinthatsteporsubstep.Theactionstepsarepresentedinadualcolumnformatandareidentifiedasimmediateorsubsequentactions.5.5NARRATIVESTYLE-stepsmaybewrittenascompletesentences,shortphrases,orsomecombinationofthetwo.Notesandcautionsshouldbewrittenascompletesentences.Sentences,clausesandphrasesshouldbeshortandpreciseutilizing'normalAmericanEnglishwordorderwherepractical.Operatoractionstepsshould:5.5.15.5.2Beshort,imperativestatementswhichstatetheexacttaskthattheoperatorisexpectedtoperform.Dealwithonlyoneidea.Complexevolutionsshouldbebrokendownintoaseriesofstepsandsubsteps.5.5.35.5e4Beclearastotheobjectivesofoperatoractions.Bewritteninsentenceformintheright-hand.column.
ttJ1 Concern12ThePGPshouldaddresstheaccessibilityofEOPsandtechniquestodistinguishthemfromotherplantprocedures.~ResensePresentlytheEOPsarecontainedinvolumeswithredcoveredjackets.TheEOPsaretheonlycontrolroomproceduresdifferentiatedinthismannerandareeasilydistinguishable.UponcompletionoftheEOPupdateinApril1989,theEOPswillbestoredinabookcaseseparatefromallotherprocedures.Additionally,theEOPswillhaveauniquebinderandformat,asdescribedbelow.ProcedureA-,503.1,providesthefollowinginstructions:2.0EOP/APSectionOranization-inordertofacilitaterapidlocationofspecificsectionsandsubsectionsoftheEOP/AP,thecontrolroomcopyisarrangedperFIGURE3asfollows:2.12.2COVERSHEET-whichisusedforadministrativepurposesanddoesnotprovideanyactivefunctionintheEOP/APtobeused.TheCoverSheetofthecontrolroomcopyisthefirstpageseeninthebinder.PURPOSEandENTRYCONDITIONS/SYMPTOMSPAGE-inthecontrolroomcopyisimmediatelyfollowingthecoversheet.2.2.1~~APurposeStatementwhichspecificallydescribestheintentoftheprocedure.2.2.2Entryconditionsand/orSymptomssectionswhichspecifytheconditions,transitionsand/orsymptomswhichdictateordirectentryintotheprocedure.Thesymptomsusedshouldbeuniquetotheprocedure.2.3OPERATORACTIONSTEPPAGES-whichmaybesubdividedintoImmediateOperatorActionpages,followedbysubsequentoperatoractionpages.Operatoractionsteppagesmaycontain;2.3.1CAUTIONSTATEMENTS-whichprovideinformationabouthazardstopersonnelorequipmentandadviceonactionsortransitionswhichmaybecomenecessarydependingonchangesinplantconditions.2.3.2NOTESTATEMENTS-whichprovideadministrativeoradvisoryinformationwhichsupportsoperatoractions.10 IP OPERATORACTIONSTEPS-presentedinatwocolumnformat,directtheoperatorthroughspecificstepbysteptasks,givetheexpectedresultsfromthosetasksandprovidecontingencyactionstobetakenshouldanexpectedtaskmethodnotbeavailableoranexpectedresultnotbeobtained.ATTACHMENTPAGES-whichmaybeusedtoprovideadditionalinformationtotheoperator.Theyprovideinformationconcerningaparticularsteporevolutionaddressedintheprocedure.Theinformationpresentedisofimportancetotheactionordecisionwherereferenced,butisofalengthorformatwhichprecludesincorporationintotheprocedurestep.SimilarinformationiscontainedinA-502.1Section3.5.11


A-503.1:19FIGURE3CONTROLROOMEOP/APBINDERAEGUQIGEMENT(TRI-FOLDBINDER)EOPFOLDOVERPAGESATTACHMENTSIIIIIIIIIIFOLDOUTPAGESIISUMMARYATTACHMENTIIEOPIIIIII-coversheet-purpose/entryIIconditions/symptomsll-immediate/((subsequentaction((IIIIB1-FOLDBINDERFOLDOVERPAGESAttachmentIIIIoIIIIIIIIIIIIIIIIAPoIIIIcoversheetIIpurpose/entryIIconditions/symptomimmediate/subsequentactions(IIII12 0
3.3.3       Verification Documentation:
Concern13ThequalityofthereproducedcopiesoftheEOPsshouldbeaddressedinthePGPsinceallcopiesoftheEOPsneedtobelegibleandcomplete.~ResonseSinceEOPs/APsareconsideredPlantprocedures,theseproceduresandanychangestotheseproceduresaregovernedbytheprovisionsofA-601.2(ProcedureControl-PermanentChanges)andA-602(ProcedureDistribution).TheseproceduresprovideforproofreadinganddistributionofEOPs/APstoaddressthisconcern.Concern14Particularattentionshouldbepaid.todeviationsfromandadditionstothegenerictechnicalguidelinesthatareofsafetysignificanceduringtheverificationandvalidationprograms.ThePGPshoulddiscusshowthedeviationsandadditionswillbeverifiedandvalidated.~ResonseProcedureA-601.6providesthefollowingdirections:3.3.2VerificationPerformance:~~~~~3.3.2.1Theverificationprocessshallbeperformedbypre-identifyingtheknowledgeableindividualsneededtoperformthereviewsonATTACHMENT2.3.3.2.2Individualsperformingthetechnicalaccuracyreviewshouldincludeoperations,STA,trainingstaff,operationssupervision,technicalstaff,nuclearengineering,etc.,asdeemed'ecessarybytheTechnicalAssistanttotheOperationsmanagerordesignee.3.3.2.3TheTechnicalAssistantto,theOperationsManagerordesigneeshallperfo'rmthewrittenaccuracyreview.3.3.2.4Deviationorchangestoexistingsetpoints(footnotes)ornewsetpointsshallrequirereviewbytechnicalstaffandindependentreviewbynuclearengineering.Includedwiththereviewshallbeadocumentedbasis,toincludecalculationsoranalysis,asapplicable.3.3.2.5DeviationsfromtheWOGERGguidanceshallrequirereviewbyknowledgeablelicensedoperationsstaff.Includedshallbeadocumentedbasiswhichassessesthesafetysignificanceofthedeviation.13 Sl 3.3.3VerificationDocumentation:3.3.3.1VerificationshallbecompletedbydocumentationonATTACHMENT2.3.3.3.2TheTechnicalAssistanttotheOperationManager(TAOM)~~~ordesigneeshallpre-identifytheindividualsneededtoperformthetechnicalreviewbynameandasterisksonATTACHMENT2.3.3.3.3TheTechnicalAssistanttotheOperationsManagerordesigneeshalldocumentanydeviationsfromtheWOG'ERGsorsetpointchangesonATTACHMENT2,addinganyadditionalpagesasnecessary.Includedwithanydeviationsshallbethejustificationand.the,.safety,significanceofthedifferencefromtheWOGERGs.NOTE:Allcommentsmustberesolvedbeforethevalidationprocessisstarted.IntheeventacommentcannotberesolvedtheEPCshallreviewtheproposedchangeandresolvethecomment.3.3.3.43.53.5.1Followingcompletionoftheverificationprocess,theTechnicalAssistanttotheOperationsManagerordesigneeshallresolveanycommentsandfollowupwithanyfurtherreviews,asnecessary,andindicateresolution/completionbysignatureonATTACHMENT2.FinalReviewandAroyal:Followingvalidationandverification,theTAOMshallinitiateaPCNfortheprocedurechangeornewprocedureandinitiatetherequired.10CFR50.59reviewcriteriaasrequiredbyReference2.2and2.3.Concern15Section5.2.A(page67)statesthatallEOPswillbeverified,butSection5.3.B(page93)statesthat"yellowpath"functionalrestorationproceduresmaynotbevalidated.ToassurecompletevalidationofalltheEOPstheprogramdescriptionshouldincludeanindicationthatthefullcomlementofEOPswillbevalidated.~ResenseWhiletheinitialsetofyellowpathFRprocedureshavenotbeenformallyvalidated,theyhavebeenusedsuccessfullyduringsimulatortraining.RG&Ehasahighconfidencelevelintheseprocedures.Futurerevisionstotheseprocedureswillreceivevalidation.14
3.3.3.1      Verification shall be completed          by documentation    on ATTACHMENT  2.
~~
3.3.3.2
Concern16ThevalidationprogramdescriptionshouldstatethatalloftheEOPswillbevalidatedonthedynamicsimulator,onceitiscompleted,usingtheproceduresandscenariosdescribedinthecurrentvalidationprogramdescription.ForthepartsoftheEOPsthatcannotbevalidatedonthesimulator,theexistingmethodofprocedurevalidationmaybereliedupon.RevisionstotheEOPsneedtobeverified,andvalidated.Theverificationandvalidationprogramdescriptionsshoulddiscussthecriteriaormethodsthatwillbeusedfordeterminingtheneedto'reverifyandrevalidateanychangesintheEOPs,.andhowtheverificationandvalidationprocessistobecarriedout.~ResenseProcedureA-601.6containsthefollowinginstructions:3.4VALIDATIONPROCESS:3.4.1Validationistheprocessbywhichtheuseabilityoftheprocedureisconfirmed.3.4.1.1Validationprovidesameansbywhichminimumoperatingshiftpersonneltesttheprocedureandproposedchangesinaplantspecificcontrolroomenvironmentunderscenariodriven,simulatedemergencyconditions.3.4.1.2Validationmaybeconductedbyoneoftwomethods;the~~~simulatormethodorthewalkthrough(tabletop)method.3.4.1.3hSimulatorvalidationswillbeutilizedtothemaximumextentpossibleonallprocedureswhichaffectactionconductedintheControlRoom.3.4.1.4Walkthroughvalidationswillbeutilizedforoperatoractionswhichareconductedoutsidethecontrolroomorwherethesimulatorlacksthecapabilitytoproperlyvalidatetheprocedureorchange.3.4.2ScenarioDeveloment:NOTE:Validationshallbeperformedonallmajorchangesornewprocedures.3.4.2.13.4.2.2TheTAOMordesigneeshalldevelopadetailedeventscenariousingthefinaldraftprocedureaftertheverificationprocess.iscompleted.ATTACHMENT3providesalistingofscenarios.Fornewproceduresthescenariomustcontainsufficientguidancetoplacetheplantinacoldshutdownorsafeconditiontoensurethatallnecessarytransitionsareaccomplished.15
  ~  ~  ~    The  Technical Assistant to the Operation Manager (TAOM) or designee shall pre-identify the individuals needed to perform the technical review by name and asterisks on ATTACHMENT 2.
'
3.3.3.3       The  Technical Assistant to the Operations Manager or designee  shall document any deviations from the WOG
Forchangestoexistingprocedures,thescenarioshallbedevelopedinsuchamannerthatthestep(s)changedarefullytestedincludingResponseNotObtained(RNO)actions.TheTAOMordesigneeshalldetailthescenarioandthevalidationmethodtobeusedontheValidationScenariosheet,ATTACHMENT3A.Forchangesmadeasaresultofsimulatortrainingfeedbackwhenusingtheprocedures,theTAOMordesigneeshallconsulttheappropriatesimulatorinstructorforscenariodetails.ValidationPerformance:NOTE:Forchangestoproceduresasaresultofsimulatortrainingfeedback,theTAOMordesigneeshallensurethat,thevalidationperformancehasbeenconductedand.documentedinaccordancewithsteps3.4.3.1through3.4.3.8.Forbothsimulatororwalkthroughmethods,thevalidationscenarioshallbeperformedbytheminimumcontrolroomcomplementof3licensedoperators,withatleastonebeinganSRO,andanSTA.TheValidationCoordinatorshallbeeitheraSROorasimulatorinstructorwithSROequivalentplantcertification.TheValidationCoordinatorisnormallytheTAOMordesignee.UsingtheValidationScenarioSheet,theValidationCoordinatorshallbriefthevalidationteaminallthenecessaryinitialconditions,systemsand/or,entryconditionstobeginthevalidation.Atnotimeshallthedetailsofthescenariobemadeknowntothevalidationteam.TheValidationCoordinatorshalldirecttheentirescenarioperformance,includinganyinformationnecessaryforoperatordecisionmaking.Included.shallbedeterminationwhenthescenariohasprogressedsufficientlytoeffecttermination.Thevalidationteamwillrespondtothedataavailabletothem(simulatororwalkthrough)andperformtheactionsoftheprocedure.TheValidationCoordinatorandsimulatorinstructorshallobservetheactionsofthecrewandassesstheirperformance.TheValidationCoordinatormayterminatethescenariowhenthescenarioobjectivehasbeenaccomplished.16 I4 3.4.3.73.4.3.8~~3.4'.=3.9Immediatelyfollowingconclusion.ofthescenario,theValidationCoordinatorshalldebriefthevalidationteamusing-theapplicableguidancecontainedinATTACHMENT3B,validationcriteria',.TheValidationCoordinatorshallcompleteaValidationPerformanceSheet,ATTACHMENT.3C',andrecordanycommentsforfurtherevaluation/resolution.TheTAOM''ordesigneeshallberesponsibleforresolutionofcommentspriortosubmittalofthechangeforfinalprocessing.Majorchangesasaresultofcommentsshallrequireverificationandrevalidation.eThewalkthrough(tabletop)validationmethodshallbeconductedinamannersimilarto'.;thesimulator(steps...3.4.3.1through..3.4.3."8)'exceptthatnoactualcontrolmanipulationwilltakeplace.,However,theprocessused,timerequiredaridanynecessarytoolsshallbefactoredintothe.task(s).required,forvalidity.Documentationshallbe'ompletedperATTACHMENT3C.DetailspertainingtoVerificationwerediscussed.inConcern14.toitsfcommitmeR~esenseUponcompletingthedevelopmentoftheEOPsin1985,alllicensedindividualsweregivenclassroomtrainingontheEOPs.Whentheinstallationofthenewplantspecificsimulatorwascompleted,thesimulatorwasutilizedtotrainalllicensed.personnelonallEOPs,."'inally,-ongoingEOPtrain'ingj.sprovidedintheRegual'ificationProgram.Asapart~of~the-Licensed.Operat;or"InitialTrainingProgram,eachlicensecandidatereceivestrainingoneveryEOP.Thisconsistsof'lassroomtiainingreinforcedbysimulatorexercises.rConcern17-YaItiscrucialthatalloperatorsbetrainedonallaspectsofe'achEOP.sothat.all-operators-arepreparedtoexecuteeachEOPullestextent.Thetrainingprogramshouldinclude.a-nttotrain,alloperatorsonallEOPsssConcern18TheEOPtrainingprogramdescriptionshouldincludeacommitmenttoformal,EOPtraining(,orretraining)onthesimulatorwhenthesimulator'isfinished,andplansforthistraining.Thisdescriptionshouldindicatethe,'useof:,,'widevarietyofscenarios;includingmultiplefailures,tofullyexercisetheEOPsonthesimulatorandthusexposetheoperatorstoawidevarietyofEOPuses.  
            'ERGs or setpoint changes on ATTACHMENT 2, adding any additional pages as necessary.           Included with any deviations shall be the justification and. the,. safety
~i R~esonseFormalEOPsimulatortrainingwasconductedforalllicensedindividualswhenthesimulatorwasreadyfortraining.1naddition,theoperatorsreceiveEOPtrainingonthesimulatoreachyearaspartoftheLicensedOperatorRequalificationProgram.ThistrainingincludesscenarioswhichexerciseallEOPs.Thelessonsarewrittentoallowtheinstructortheflexibilitytoexercisemanydifferentpathsthroughtheprocedures.Thistrainingalsoincludesscenarioswithmultiplefailures.Concern19TheEOPtrainingprogramshouldincludethemethodtobeusedtotrainoperatorsinareaswherethesimulatordoesnotreactliketheplantandinpartsoftheEOPsthatcannotberunonthesimulator.~ResenseAllEOPscanbefullyexercisedonthesimulator.TherearenodiscrepanciesbetweenthesimulatorandtheplantwhichpreventtheuseoftheEOPs.Concern20TheEOPtrainingprogramdescriptionshouldindicatehowtheoperatorsaretobe:evaluatedduringclassroominstruction,tabletopdiscussions,replicatecontrolroomwalkthroughs,andfuturesimulatorexercises.~ResonseTheoperatorsareevaluatedin.traininginaccordancewithtrainingdepartmentprocedures.Awrittenexamisusedforclassroomtraining,aformaloralexamisusedforcontrolroomwalkthroughs,andanoperationalexamisused.forsimulatortraining.TheseexamsaremodeledafterNRClicensingezams.Tabletopdiscussionsarenotusedasaprimarytrainingtool.18 b
            ,significance of the difference from the WOG ERGs.
Figure2STATUSTREEPRIORITYINDENTIFICATIONColorLineCodeSymbolCodeStatus/ResponseRedThecriticalsafetyfunctionisunderextremechallene;immediateoperatoractionisrequired.OrangerearYellow~~~~~Thecriticalsafetyfunctionisunderseverechaiiene;promptoperatoractionisrequired.Thecriticalsafetyfunctionconditonisoff-normal.Operatoractionmaybetaken.GreenThecriticalsafetyfunctionissatisfied.Nooperatoractionisneeded.
NOTE:       All    comments  must  be  resolved  before  the validation process is started.       In the event a  comment  cannot be  resolved the EPC shall review the proposed      change  and  resolve the comment.
,4<gI A-503.1:19FIGURE3CONTROLROOMEOP/APBINDERARRANGEMENT(TRI-FOLDBINDER)ATTACHMENTSIIIIIIEOPFOLDOVERPAGESIIIIIFOLDOUTPAGESIIISUMMARYATTACHMENTII-EOPIIIIII-coversheetII-purpose/entryconditions/symptoms//-immediate/IIsubsequentactionIIIIIIIIB1-FOLDBINDERAPFOLDOVERPAGESAttachmentIIIIoAPoIlII-coversheetII-purpose/entryconditions/symptom-immediate/subsequentactionsIIIII
3.3.3.4      Following completion of the verification process, the Technical Assistant to the Operations Manager or designee shall resolve any comments and follow up with any further reviews,         as  necessary,   and indicate resolution/completion by signature on ATTACHMENT 2.
3.5          Final Review and A royal:
3.5.1       Following validation and verification, the         TAOM  shall initiate a PCN for the procedure change                or new procedure and initiate the required. 10CFR50.59          review criteria as required by Reference 2.2 and 2.3.
Concern 15 Section 5.2.A (page 67) states that all EOPs will be verified, but Section 5.3.B (page 93) states that "yellow path" functional restoration procedures may not be validated. To assure complete validation of all the EOPs the program description should include an indication that the full com lement of EOPs will be validated.
~Res  ense While the    initial set of yellow path FR procedures have not been formally validated, they have been used successfully during simulator training. RG&E has a high confidence level in these procedures.       Future revisions to these procedures will receive validation.
14


Number:Title:RevisionNunber:PIGURE1 0lW Number:Title:RevisionNader:A.PURPOSE-Thisprocedureprovides.~~~~~~~~~~t~~~t~~~~~~~~~B.ENTRYCONDITIONS/SYMPTOMSl.ENTRYCONDITIONS-Thisprocedureisenteredfrom>a~b.d.2.SYMPTOMS-Thesymptomsof...'ProcedureTitle)...are;a~b.coFIGURE2
~ ~
Concern 16 The  validation  program description should state that all of the EOPs    will  be  validated on the dynamic simulator, once completed, using the procedures and scenarios described in the it  is current validation program description.          For the parts of the EOPs that cannot be validated on the simulator, the existing method of procedure validation may be relied upon.
Revisions to the EOPs need to be verified, and validated.            The verification and validation program descriptions should discuss the criteria or methods that will be used for determining the need to 'reverify and revalidate any changes in the EOPs,. and how the verification and validation process is to be carried out.
~Res ense Procedure A-601.6 contains the following      instructions:
3.4        VALIDATION PROCESS:
3.4.1      Validation is the process by which the useability of the procedure  is confirmed.
3.4.1.1    Validation provides a means by which minimum operating shift personnel test the procedure and proposed changes in a plant specific control room environment under scenario driven, simulated emergency conditions.
3.4.1.2
  ~   ~     Validation may be conducted by one of two methods; the simulator method or the walk through (t abletop) method. ~
Simulator validations will be utilized to the maximum h
3.4.1.3 extent possible on all procedures which affect action conducted in the Control Room.
3.4.1.4    Walk through  validations will be utilized for operator actions which are conducted outside the control room or where the simulator lacks the capability to properly validate the procedure or change.
3.4.2      Scenario Develo ment:
NOTE:      Validation shall    be performed on  all major changes  or  new procedures.
3.4.2.1    The  TAOM  or designee shall develop a detailed event scenario  using the final draft procedure after the verification process .is completed.           ATTACHMENT 3 provides a listing of scenarios.
3.4.2.2    For new procedures          the scenario must contain sufficient guidance to place the plant in a cold shutdown    or safe condition to ensure that all necessary transitions are accomplished.
15


Number:Title:RevisionNurber:STEPACTION/EXPECTEDRESPONSERESPONSENOTOBTAINEDImperitiveAction-RESULTAlternateCommanda.SequentialSubstep-RESULTa.AlternateCommandoNonsequentialsubstep-RESULToAlternateCommandNOTE:oThefollowingaretypicalexamplesofoperatoractionsteps;1VerifyReactorTrip:Tripreactormanually.oReactorTripBreakers-OPENoNeutronflux-DECREASINGCheckifallRCPsshouldbeStopped:a.SIpumps-ATLEASTONERUNNINGa.GOTOStep2*********************k**********************************************************CAUTIONALTERNATEWATERSOURCESFORAFWPUMPSWILLBENECESSARYIFCSTLEVELDECREASESTOLESSTHAN19.5FEET.**************k*****************************************************************CheckIntactS/GLevels:a.Narrowrangelevel-GREATERTHAN(LATER)a.Maintaintotalfeedflowlowgreaterthan(Later)FIGURE3 I1
For changes  to existing procedures, the scenario shall be developed  in such a manner that the step(s) changed are fully tested including Response Not Obtained (RNO) actions.
The TAOM or designee shall detail the scenario and the validation method to be used on the Validation Scenario sheet, ATTACHMENT 3A. For changes made as a result of simulator training feedback when using the procedures, the TAOM or designee shall consult the appropriate simulator instructor for scenario details.
Validation Performance:
NOTE:     For changes to procedures as a result of simulator training feedback, the TAOM or designee shall ensure that ,the validation performance      has    been  conducted    and.
documented in accordance with steps 3.4.3.1 through 3.4.3.8.
For both simulator or walk through methods,              the validation scenario shall be performed by the minimum control room complement of 3 licensed operators, with at least one being an SRO, and an STA.
The Validation Coordinator shall be either a SRO or a simulator instructor with SRO equivalent plant certification. The Validation Coordinator is normally the  TAOM or designee.
Using the Validation Scenario Sheet, the Validation Coordinator shall brief the validation team in all the necessary  initial conditions, systems and/or, entry conditions to begin the validation. At no time shall the details of the scenario be made known to the validation team.
The Validation Coordinator shall direct the entire scenario performance,        including any information necessary for operator decision making.           Included.
shall be determination when the scenario has progressed sufficiently to effect termination.
The validation team will respond to the data available to them (simulator or walk through) and perform the actions of the procedure.        The Validation Coordinator and simulator instructor shall observe the actions of the crew and assess    their performance.
The Validation Coordinator may terminate the scenario when the scenario objective has been accomplished.
16


Nwher:Titie:RevisionNumber:FOLDOUTPAGE1.Includeanyinformationneededbytheoperatorthroughouttheprocedure.~~~~~~~~~~~~~2~~~~~~~~~~~~~~~~~~~~~3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~4FIGURE5 O  
I 4
}}
 
3.4.3.7        Immediately following conclusion .of the scenario, the Validation Coordinator shall debrief the validation team using -the applicable      guidance contained in ATTACHMENT 3B, validation criteria',.
3.4.3.8
  ~  ~        The Validation Coordinator shall complete a Validation Performance    Sheet,  ATTACHMENT .3C',  and record any comments for further evaluation/resolution.      The TAOM
            ''or designee shall be responsible for resolution        of comments prior to submittal of the change for final processing.      Major changes as a result of comments shall require verification and revalidation.
e
: 3. 4'.=3. 9    The walk through (tabletop) validation method shall be conducted in a manner similar to'.;the simulator (steps
            ...3.4.3.1 through..3.4.3."8) 'except that no actual control manipulation will take place.      ,However, the process used, time required arid any necessary tools shall be factored into the . task(s) . required, for validity.
Documentation shall be'ompleted per ATTACHMENT 3C.
Details pertaining to Verification were discussed. in Concern 14.
r Concern      17-                                  Ya It e'ach is crucial that all operators be trained on all aspects of EOP. so that. all -operators- are prepared to execute each EOP to its fullest extent.            The training program should include. a-commitme nt to train, all operators on all EOPsss R~es  ense Upon    completing the development of the EOPs in 1985, all licensed individuals        were given classroom training on the EOPs. When the installation of the new plant specific simulator was completed, the simulator was utilized to train all licensed. personnel on all EOPs,."  'inally, Regual'ification Program.
ongoing EOP train'ing j.s provided in the As a      part of ~the - Licensed . Operat;or" Initial Training Program,
                ~
each    license candidate receives training on every EOP.          This consists of 'lassroom tiaining reinforced by simulator exercises.
Concern 18 The EOP      training program description should include a commitment to formal,EOP training (,or retraining) on the simulator when the simulator 'is finished, and plans for this training.                This description should indicate the ,'use of:,,'            wide variety of scenarios; including multiple failures, to fully exercise the EOPs on the simulator and thus expose the operators to a wide variety of EOP uses.
 
~i R~es onse Formal    EOP  simulator training  was  conducted  for all licensed individuals when the simulator was ready for training.            1n addition, the operators receive EOP training on the simulator each year as part of the Licensed Operator Requalification Program.      This training includes scenarios which exercise all EOPs.      The lessons are written to allow the instructor the flexibility to exercise many different paths through the procedures.      This training also includes scenarios with multiple failures.
Concern 19 The EOP    training program should include the method to be used to train operators in areas where the simulator does not react like the plant and in parts of the EOPs that cannot be run on the simulator.
~Res ense All EOPs    can be fully exercised on the simulator. There are no discrepancies between the simulator and the plant which prevent the use of the EOPs.
Concern 20 The  EOP  training  program description should indicate how the operators    are  to be: evaluated during classroom instruction, tabletop discussions, replicate control room walkthroughs, and future simulator exercises.
~Res onse The  operators are evaluated in. training in accordance with training department procedures.        A written exam is used for classroom training, a formal oral exam is used for control room walkthroughs, and an operational exam is used. for simulator training. These exams are modeled after NRC licensing ezams.
Tabletop discussions are not used as a primary training tool.
18
 
b Figure    2 STATUS TREE PRIORITY INDENTIFICATION Color    Line Code  Symbol Code  Status/Response Red                              The critical safety function is under extreme challen e; immediate operator action is required.
Orange  re a r                  The critical safety function is under severe chaiien e; prompt operator action is required.
Yellow  ~~~    ~ ~              The critical safety function conditon is off - normal.
Operator action may be taken.
Green                            The critical safety function is satisfied. No operator action is needed.
 
,4 <g I
 
A-503.1:19 FIGURE 3 CONTROL ROOM EOP/AP BINDER ARRANGEMENT (TRI-FOLD BINDER)
EOP FOLD OVER PAGES II                            II                  I ATTACHMENTS    II                        II  FOLD  OUT PAGES I II                            II II -          EOP            II II  coversheet II
                  - purpose/entry            II conditions/symptoms//
immediate/              II
 
==SUMMARY==
subsequent action ATTACHMENT    II                            II II                            II B1 -  FOLD BINDER AP FOLD OVER PAGES II                            II Attachment            o        AP            o Il                            II coversheet              II
                            - purpose/entry
                            - conditions/symptom immediate/
subsequent    actions II                            II I
 
Number:
 
==Title:==
Revision Nunber:
PIGURE 1
 
0 lW
 
Number:
 
==Title:==
Revision Nader:
A. PURPOSE  This    procedure provides          .
                    ~  ~ ~  ~  ~  ~ ~ ~ ~ ~ ~   ~   ~ t ~ ~ ~ ~ ~   ~ ~ ~  ~
B. ENTRY CONDITIONS/SYMPTOMS
: l. ENTRY CONDITIONS  This        procedure        is entered  from>
a ~
b.
d.
: 2. SYMPTOMS  The      symptoms  of  .  .    .'Procedure Title)      .  . . are; a ~
b.
co FIGURE 2
 
Number:
 
==Title:==
Revision Nurber:
STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED Imperitive Action      RESULT          Alternate  Command
: a. Sequential Substep      RESULT      a. Alternate    Command o  Nonsequential substep      RESULT    o  Alternate  Command NOTE:  o  The  following are typical examples of operator action steps; 1    Verify Reactor Trip:                    Trip reactor manually.
o  Reactor Trip Breakers  OPEN o  Neutron    flux  DECREASING Check  if all  RCPs  should be Stopped:
: a. SI pumps    AT LEAST ONE            a. GO TO  Step  2 RUNNING
    *********************k***********************************************
CAUTION ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY        IF CST LEVEL DECREASES TO LESS THAN 19.5 FEET.
    **************k******************************************************
Check  Intact  S/G  Levels:
: a. Narrow range    level              a. Maintain total feed flow GREATER THAN (LATER)                      low greater than (Later)
FIGURE 3
 
I 1
 
Nwher:          Ti tie:                                                        Revision Number:
FOLDOUT PAGE
: 1. Include any information needed by the operator throughout the procedure.
2~   ~ ~ ~ ~   ~ ~ ~ ~ ~ ~ ~ ~                       ~ ~ ~ ~ ~ ~ ~ ~
3 ~ ~ ~ ~ ~   ~ ~ ~ ~ ~ ~ ~ ~
4~   ~ ~ ~ ~   ~   ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
FIGURE 5
 
O}}

Latest revision as of 04:32, 4 February 2020

Forwards Response to 880627 Ltr Requesting Addl Info Re Plant Procedures Generation Package & Background Info Explaining Present Sys of Controlling Emergency Operating Procedures
ML17309A409
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1988
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17251A351 List:
References
NUDOCS 8811180128
Download: ML17309A409 (52)


Text

AC CELE RATED Dl UTI ON DE M ON STRA. N SYSTEM I3.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811180128 DOC.DATE: 88/10/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 NAME - AUTHOR AFFILIATION "'UTH.

MECREDY,R.C. Rochester Gas & Electric Corp. 5W RECIP.NAME RECIPIENT AFFILIATION STAHLE,C. Document Control Branch (Document Control Desk)

SUBJECT:

Forwards response to addi info re util procedures generation I

package.

DISTRIBUTION CODE: A003D TITLE: OR/Licensing Submittal: Suppl 1 to COPIES RECEIVED:LTR ( ENCL ( SIZE: 5+ 7~

NUREG-0737(Generic Ltr 82-33) 9 8

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES

/

ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 1 PD1-3 PD 7 7 STAHLE,C 1 1 INTERNAL: ARM/DAF/LFMB NUDOCS-ABSTRACT 1

1 0

1 NRR/DLPQ

~XKE

~~ 0 1 1

1 1

D RES/DSIR/EIB 1 1 ,S EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I h

MIX 'ZO ALL "RIDS" RECIPIERIS'IEASE HELP US TO REDUCE HASTE.'XRKACZ 'LHE DOCUMEÃZ COFZEKL DESK, ROOM Pl-37 (EXT. 20079) KO ELOCUTE YOUR NAME FRY DISTRIKlTIGN LISTS FOR DOCUMEXZS YOU DONiT NEEDt I.

TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16

~ ~

t 'ZZZZZZI gruzSZiz Iiiiti"'iii fiierrZZS gL4$ 0 f41 8K.::::

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 October 31, 1988 TCLEPHONC Ance coos vie 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Mr. Carl Stahle PWR Project Directorate No. 1 Washington, D.C. 20555

Subject:

Ginna Plant Procedures Generation Package (PGP)

Request for Additional Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Stahle:

Your letter to R. Kober, dated June 27, 1988 requested.

additional information regarding the Ginna Plant Procedures Generation Package (PGP). In response, please find attached the information you requested as well as background information explaining our present system of controlling EOPs.

If you have any questions regarding the information provided or require additional information, please call Charles J. Mambretti (716) 724-8071.

Ro ert C. cred General Manager Nuclear Production Attachment ZC: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road "

King of Prussia, PA 19406 Ginna Senior Resident Inspector goo~

88iliSOiZS SSi03i PDR ADOCK 05000244 "

PDC

RESPONSE TO CONCERNS REGARDING THE GINNA PROCEDURES GENERATION PACKAGE (PGP )

The Ginna PGP was formulated based upon interpretation of NRC requirements and the guidance of NUREG-0899. The PGP provided the guidelines required to generate the original EOPs which were implemented in December of 1985. In addition, the package described the development of the EOPs and the manner in which they were implemented.

thereafter, It is important to recognize that implementation and changes to the EOPs were controlled in accordance with the guidance contained in the following Ginna Administrative procedures.

A-502.1 Emergency and Abnormal Procedure Writers Guide A-503.1 Emergency and Abnormal Procedures Users Guide A-601.6 Procedure Changes Control Emergency and Abnormal Procedures These documents have evolved into the "living" governing documents (revised as necessary) for EOP maintenance and. the original PGP is not used to control Emergency and Abnormal Procedures.

The controlling documents for the training program have become procedures:

A-103.6 Operator Training Responsibilities TRC-5.1 Initial License Operator Training TRC-5.2 Operator Requalification Training As a result of an internal EOP assessment completed in February 1988, and NRC concerns resulting from the Ginna PGP review transmitted to RG&E on June 27, 1988, RG&E has initiated an EOP upgrade program scheduled for completion in April 1989. This program includes revision to the EOP governing procedures. Draft copies of these revisions are attached for information.

Responses to each of the NRC concerns are provided below including, where appropriate, references to sections of the draft procedures.

8811180128

I r"

CONCERNS AND RESPONSES Concern 1 The PGF states that deviations from and additions to the generic technical guidelines (WOG "ERGs) will be documented, and will include technical justification supporting these additions and/or deviations. The PGP should also state that the safety significance of these differences will be identified and documented in the PGP.

~Res onse Procedure A-606.1 Section 3.3 and.. Appendix 2B, items 22 and 22A (attached) address the need. to assess the safety significance of deviations from the technical guidelines (WOG ERG) and documentation thereof.

Concern 2 Sections 4.5.3 or 5.2 should be revised to indicate a specific method for highlighting notes (e.g., outlining/boxing) to differentiate them from cautions while drawing attention to their content.

~Res onse Procedure A-502.1 provides the following instructions:

4.5.2 CAUTION STATEMENTS - text should be in a block format, as shown in Figure 3, in addition to the following formatting requirements:

4.5.2.1 Caution'tatements should.'e enclosed at the top and bottom by a continuous line of asterisks which should begin three lines below the preceding text. This differentiates the CAUTION and NOTE.

4.5.2.2 The statement header CAUTION should be centered and placed two lines below he preceding line of asterisks.

4.5.2.3 Caution statement text. should begin two lines below the caution header and extend from margin to margin.

4.5.2.4 Caution statements should be emphasized as described in section 5.2, Emphasis Techniques, by using all upper case capitalization.

4.5.2.5 Caution statements which apply to the whole procedure shall be stated prior to any operator action step and be shown on the foldout page if applicable.

~,

L-h

4.5.2.6 Caution statements which apply to a particular step shall be stated prior to that step.

4.5.2.7 Caution statements should be written to preclude confusion as to which step or evolution they refer.

4.5.3 NOTE STATEMENTS t:ext should be in a block format as shown in Figure 3, in addition to the following formatting requirements:

4.5.3.1 The statement header NOTE should be on the same line as the text but separated from the text by a colon.

4.5.3.2 Note statement text should begin two lines below the preceding text and extend from margin to margin.

4.5.3.3 Note statements should be preceded with a bullet (o) to also differentiate them from a CAUTION.

4.5.3.4 Note statements which apply to a particular step shall be stated prior to that step.

Concern 3 Sections 4.5.2 and 4.5.3 should state that cautions and notes will not contain action steps, as is stated in Figure 4.2-2 of the PGP.

R~es onse Procedure A-502.1 contains the following instructions:

2.3.2 CAUTION STATEMENTS statements denote potential hazards to personnel or equipment. Cautions which apply to a particular action step should appear directly before that step. Cautions which apply throughout a procedure, or a portion of it, should appear at the start of the procedure or at the point where they become applicable. A caution statement will not contain a direct action. A passive action statement. may be appropriate. An example would be the continuous monitoring of a parameter with an associated action if a prescribed, value is reached.

2.3.3 NOTE STATEMENTS statements contain advisory or administrative information for subsequent action steps or for caution stat:ements. The directions in step 2.3.2 for placement and action content should be applied to notes. Where cautions and notes are included together all caution statements should be listed before any note statement.

5'Q 1

l

Concern 4 Section 5.12 addresses logic terms and conditional statements.

The writer's guide should be expanded to included examples of acceptable and. unacceptable combinations. See NUREG-0899, Appendix B, for additional guidance.

R~es onse Procedure A-502.1 This procedure has been expanded to include Appendix A (attached) which provides additional guidance on logic terms and conditional statements as well as examples illustrating this guidance.

Concern 5 Section 5e3 provides guidelines for referencing sections, subsections, and steps within a procedure and for referencing another procedure. However, criteria for writers,to it decide should also provide guidelines or when the steps of a referenced procedure are to be included. in the EOP, rather than referenced.

~Res onse Procedure A-502.1 provides the following instructions=

5.12.4

~ ~ REFERENCING referencing is used to denote a procedure which may provide useful or necessary information to the operator during the execution of an EOP/AP. In general, those procedures referenced cover low probability occurrences or normal plant operations whose inclusion within an EOP/AP would cause excessive complication and reduce effectiveness of the procedure in effect. Referencing is denoted by the term REFER followed by the procedure designator and title as shown by; REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS.

Concern 6 The format and. content of Critical Safety Function Status Trees (CSFSTs) should be specified in the writer's guide.

~Res onse Procedure A-502.1 6.0 FORMAT OF CRITICAL SAFETY FUNCTION STATUS TREES

I r

\

P I

h t

6.1 Critical Safety Function Status Trees (CSFSTs) are block format devices used in the evaluation of predefined safety concerns designated as Critical Safety Functions. (FIGURE 6 CSFST).

6.1.1

~ ~ The blocks are aligned so that the user will enter each tree on the left-hand side of its page and. move towards the right-hand side.

)

6.1.2 Each block contains a question concerning current plant conditions. The question in each block may be dependent on previous blocks.

6.1s3 Each question is written to obtain a YES or NO response. The response dictates which branch of the status tree will be taken.

6.1.4 Questions should be written so that a YES response branch will move the user down the page.

Each possible complete path through the tree ends in its own end point, or terminus. The last path segment and the associated terminus circle use a color-code and/or pattern-code as shown in FIGURE 7.

6.1.6 Terminals should be ordered so that the highest priority condition terminus is at the top of the page and the priority levels descend down the page. The priority order for color-coding, in descending order, is RED"ORANGE-YELLOW-GREEN.

6.1.7 All terminals color-coded other than GREEN will provide an applicable Functional Restoration procedure designator.

Concern 7 The writer's guide addresses simple action steps. However, should also include verification steps, continuous or periodic it steps, alternative and equally acceptable steps, and steps which refer the operator to another subsection of the procedure. The content and, format of each type of action step needs to be described in the writer's guide. See NUREG-0899, Subsections 5.7.2-5.7.8, for additional guidance.

~Res onse Procedure A-502.1 provides the following instructions:

5.12 BRANCHING branching encompasses transitioning, either to another step in the same procedure or to another EOP/AP; and referencing another procedure for supplemental information or direction. Transitioning in a series operation while referencing is a parallel operation.

f I QA 0

K

5.12.1 TRANSITION TO A LATER STEP WITHIN CURRENT EOP/AP-shall be performed by using the words GO TO as shown by; GO TO Step 20.

5.12.2 TRANSITION TO A PREVIOUS STEP WITHIN CURRENT EOP/AP-shall be performed by using the words RETURN TO as shown by; RETURN TO Step 20.

5.12.3 TRANSITION TO ANOTHER EOP (or AP) should be performed by using the words GO TO, followed by the procedure designator, number, title, and the specific procedure step as shown by; GO TO ES-0.1, REACTOR TRIP RESPONSE, Step 20.

5.12.3.1 If a specific step is not shown it is to be assumed.

that transition is to the beginning of the designated procedure.

5.12.3.2 Transition from an EOP. to an AP should not be used.

5.12.3.3 Procedures entered for supplemental guidance or from CSFST direction may use a RETURN TO statement. This statement should contain the appropriate procedure designator, title and step number where applicable. A procedure with multiple entry conditions may use an open return statement as shown by; RETURN TO PROCEDURE AND STEP IN EFFECT. This denotes a transition to the last previous EOP in use.

5.12.4 REFERENCING - referencing is used to denote a procedure which may provide useful or necessary information to the operator during the execution of an EOP/AP. In general, those procedures referenced cover low probability occurrences or normal plant operations whose inclusion within an EOP/AP would cause excessive complication and reduced effectiveness of the procedure in effect. Referencing is denoted by the term REFER followed by the procedu're designator and title as shown by; REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS.

5.12.4.1 Referencing a procedure does not constitute leaving the procedure in effect as additional information.

it is providing only 5.12.4.2 Referencing should be minimized for procedure continuity.

5.12.5 The referencing terms GO TO, RETURN TO and REFER TO and the procedure designator and title shall be all capitalized. and the word Step shall be initially capitalized for emphasis.

va t~

P

Concern 8 Sections 4.1.9 and 5.6.5 should. be revised to indicate that page rotation and breaking of words are unacceptable at all times.

R~es onse Procedure A-502.1 contains the following instructions:

4.1.8 TEXT 'CONTINUITY the text of operator action steps; with applicable substeps, cautions, notes; should be wholly contained on the same page. Where physical constraints preclude this the following guidelines apply.-

4.1.8.1 Cautions'nd/or notes may be placed alone on the immediately preceding page.

4.1.8.2 If a step must be continued on to another page, then:

4.1.8.2.1 The initial page shall be annotated at the bottom of the action step field portion of the page to indicate that the step continues. (i.e., THIS STEP CONTINUED ON FOLLOWING PAGE.)

4.1.8.2.2 The following page shall have the initial action step heading repeated and. be annotated to indicate that the step is being continued from a previous page.

ex.,Establish letdown THIS STEP CONTINUED FROM PREVIOUS PAGE 4.1.9 PAGE ROTATION necessary should be minimized but when to rotate a page for the sake of clarity and it is readability (i.e., proper graph construction), the following rules are applicable; 4.1.9.1 The left hand edge of the normal page shall become the top of the rotated page.

4.1.9.2 Page margins, identification and. numbering shall n'ot rotate.

Concern 9 Because the licensee has chosen check spaces as a method of placekeeping the writer's guide should state that all action steps should have check-off spaces.

l

~Res onse The original intent was to use checkoff spaces, however, during the development and validation of the EOPs, the value of checkoffs became questionable for placekeeping purposes. As a result, the requirement was removed from Procedure A-502.1.

Alternatives for. placekeeping are contained in Procedure A-503.1 as follows:

3.7.3 Placekeeping is the responsibility of the EOP User; normally the Control Room Foreman. In order to ensure proper placekeeping, the EOP User may checkoff or annotate steps by using pen/pencil markings to the immediate right of the Action Step or Response Not Obtained (RNO) performed. Also available to him,. are stick-on pads or note pads which may be affixed to pages where transition or looping are necessary.

Concern 10 Section 5.6e9 states that brackets are to be used. only in calculations. The writer's guide should describe how values for adverse containment conditions will be specified in the EOPs.

R~es onse Procedure A-502.1 contains the following guidance:.

5.6.6

~ ~ .PARENTHESES are used to provide the adverse containment values for instrumentation readings in applicable steps. They are used to provide valve number designations and instrument designators when these are noted in addition to a word descriptor.

Parentheses may also be use to provide amplifying or useful information such as locations, breaker cubicle designations, and information which cannot be placed in a note prior to a step as substep condition.

it only applies to a specific Concern 11 Regarding action statements, the following concerns should be specifically addressed in the writer's guide:

a. Action steps should be structured so that they can be executed by the minimum shift staffing required by the Technical Specifications.
b. Action steps should be structured to be consistent with the roles and responsibilities of the operators.
c. Action steps should be structured so as to minimize the movement of personnel around the control room while carrying out procedural steps..

8

e

d. Action steps should be structured. to avoid unintentional duplication of tasks.
e. Action steps should be structured to enable the control room supervisor to follow staff actions and monitor plant status.

~Res ense Procedure A-502.1 contains the following guidance:

2 ' ,

OPERATOR ACTION STEPS general requirements are that action steps be structured so that they can be executed. by minimum shift staffing as required by Technical Specifications, and be consistent with the responsibilities of the shift positions. In addition, the action steps should minimize the movement of personnel in the Control Room and enable the effective supervisory overview to monitor plant status.

2.3.1 OPERATOR ACTION STEPS are short, precise statements presenting exactly the task to be performed and the expected response or result of that task. It is not necessary to state expected results of routine tasks.

Steps are assumed to be performed in sequence unless otherwise denoted. Actions directed in a step should not be expected to be complete before the next step is begun. If a particular action must be completed before continuation,: this must be stated in that step or substep. The action steps are presented in a dual column format and are identif ied as immediate or subsequent actions.

5.5 NARRATIVE STYLE steps may be written as complete sentences, short phrases, or some combination of the two. Notes and cautions should be written as complete sentences. Sentences, clauses and phrases should be short and precise utilizing 'normal American English word order where practical. Operator action steps should:

5.5.1 Be short, imperative statements which state the exact task that the operator is expected to perform.

5.5.2 Deal with only one idea. Complex evolutions should be broken down into a series of steps and substeps.

5.5.3 Be clear as to the objectives of operator actions.

5.5e4 Be written in sentence form in the right-hand. column.

tt J1

Concern 12 The PGP should address the accessibility of EOPs and techniques to distinguish them from other plant procedures.

~Res ense Presently the EOPs are contained in volumes with red covered jackets. The EOPs are the only control room procedures differentiated in this manner and are easily distinguishable.

Upon completion of the EOP update in April 1989, the EOPs will be stored in a bookcase separate from all other procedures.

Additionally, the EOPs will have a unique binder and format, as described below.

Procedure A-,503.1,provides the following instructions:

2.0 EOP/AP Section Or anization in order to facilitate rapid location of specific sections and subsections of the EOP/AP, the control room copy is arranged per FIGURE 3 as follows:

2.1 COVER SHEET which is used for administrative purposes and does not provide any active function in the EOP/AP to be used. The Cover Sheet of the control room copy is the first page seen in the binder.

2.2 PURPOSE and ENTRY CONDITIONS/SYMPTOMS PAGE - in the control room copy is immediately following the cover sheet.

2.2.1

~ ~ A Purpose Statement which specifically describes the intent of the procedure.

2.2.2 Entry conditions and/or Symptoms sections which specify the conditions, transitions and/or symptoms which dictate or direct entry into the procedure. The symptoms used should be unique to the procedure.

2.3 OPERATOR ACTION STEP PAGES which may be subdivided into Immediate Operator Action pages, followed by subsequent operator action pages. Operator action step pages may contain; 2.3.1 CAUTION STATEMENTS which provide information about hazards to personnel or equipment and advice on actions or transitions which may become necessary depending on changes in plant conditions.

2.3.2 NOTE STATEMENTS which provide administrative or advisory information which supports operator actions.

10

I P

OPERATOR ACTION STEPS presented in a two column format, direct the operator through specific step by step tasks, give the expected results from those tasks and provide contingency actions to be taken should an expected task method not be available or an expected result not be obtained.

ATTACHMENT PAGES which may be used to provide additional information to the operator. They provide information concerning a particular step or evolution addressed in the procedure. The information presented is of importance to the action or decision where referenced, but is of a length or format which precludes incorporation into the procedure step.

Similar information is contained in A-502.1 Section 3.5.

11

A-503.1:19 FIGURE 3 CONTROL ROOM EOP/AP BINDER AEGUQIGEMENT (TRI-FOLD BINDER)

EOP FOLD OVER PAGES II II ATTACHMENTS II IIFOLD OUT PAGES II II II EOP II II II coversheet purpose/entry II conditions/symptomsll immediate/

(( subsequent action ((

SUMMARY

II II ATTACHMENT B1 FOLD BINDER FOLD OVER PAGES II II Attachment I I o AP o II II II II coversheet II II purpose/entry II II conditions/symptom II immediate/

II subsequent actions (I II II I

12

0 Concern 13 The quality of the reproduced copies of the EOPs should be addressed in the PGP since all copies of the EOPs need to be legible and complete.

~Res onse Since EOPs/APs are considered Plant procedures, these procedures and any changes to these procedures are governed by the provisions of A-601.2 (Procedure Control Permanent Changes) and A-602 (Procedure Distribution). These procedures provide for proofreading and distribution of EOPs/APs to address this concern.

Concern 14 Particular attention should be paid. to deviations from and additions to the generic technical guidelines that are of safety significance during the verification and validation programs.

The PGP should discuss how the deviations and additions will be verified and validated.

~Res onse Procedure A-601.6 provides the following directions:

3.3.2 Verification Performance:

3.3.2.1 The verification process shall be performed by pre-

~

~

identifying the knowledgeable individuals needed to

~

perform the reviews on

~

ATTACHMENT 2.

~

3.3.2.2 Individuals performing the technical accuracy review should include operations, STA, training staff, operations supervision, technical staff, nuclear engineering, etc., as deemed'ecessary by the Technical Assistant to the Operations manager or designee.

3.3.2.3 The Technical Assistant to, the Operations Manager or designee shall perfo'rm the written accuracy review.

3.3.2.4 Deviation or changes to existing setpoints (footnotes) or new setpoints shall require review by technical staff and independent review by nuclear engineering.

Included with the review shall be a documented basis, to include calculations or analysis, as applicable.

3.3.2.5 Deviations from the WOG ERG guidance shall require review by knowledgeable licensed operations staff.

Included shall be a documented basis which assesses the safety significance of the deviation.

13

S l

3.3.3 Verification Documentation:

3.3.3.1 Verification shall be completed by documentation on ATTACHMENT 2.

3.3.3.2

~ ~ ~ The Technical Assistant to the Operation Manager (TAOM) or designee shall pre-identify the individuals needed to perform the technical review by name and asterisks on ATTACHMENT 2.

3.3.3.3 The Technical Assistant to the Operations Manager or designee shall document any deviations from the WOG

'ERGs or setpoint changes on ATTACHMENT 2, adding any additional pages as necessary. Included with any deviations shall be the justification and. the,. safety

,significance of the difference from the WOG ERGs.

NOTE: All comments must be resolved before the validation process is started. In the event a comment cannot be resolved the EPC shall review the proposed change and resolve the comment.

3.3.3.4 Following completion of the verification process, the Technical Assistant to the Operations Manager or designee shall resolve any comments and follow up with any further reviews, as necessary, and indicate resolution/completion by signature on ATTACHMENT 2.

3.5 Final Review and A royal:

3.5.1 Following validation and verification, the TAOM shall initiate a PCN for the procedure change or new procedure and initiate the required. 10CFR50.59 review criteria as required by Reference 2.2 and 2.3.

Concern 15 Section 5.2.A (page 67) states that all EOPs will be verified, but Section 5.3.B (page 93) states that "yellow path" functional restoration procedures may not be validated. To assure complete validation of all the EOPs the program description should include an indication that the full com lement of EOPs will be validated.

~Res ense While the initial set of yellow path FR procedures have not been formally validated, they have been used successfully during simulator training. RG&E has a high confidence level in these procedures. Future revisions to these procedures will receive validation.

14

~ ~

Concern 16 The validation program description should state that all of the EOPs will be validated on the dynamic simulator, once completed, using the procedures and scenarios described in the it is current validation program description. For the parts of the EOPs that cannot be validated on the simulator, the existing method of procedure validation may be relied upon.

Revisions to the EOPs need to be verified, and validated. The verification and validation program descriptions should discuss the criteria or methods that will be used for determining the need to 'reverify and revalidate any changes in the EOPs,. and how the verification and validation process is to be carried out.

~Res ense Procedure A-601.6 contains the following instructions:

3.4 VALIDATION PROCESS:

3.4.1 Validation is the process by which the useability of the procedure is confirmed.

3.4.1.1 Validation provides a means by which minimum operating shift personnel test the procedure and proposed changes in a plant specific control room environment under scenario driven, simulated emergency conditions.

3.4.1.2

~ ~ Validation may be conducted by one of two methods; the simulator method or the walk through (t abletop) method. ~

Simulator validations will be utilized to the maximum h

3.4.1.3 extent possible on all procedures which affect action conducted in the Control Room.

3.4.1.4 Walk through validations will be utilized for operator actions which are conducted outside the control room or where the simulator lacks the capability to properly validate the procedure or change.

3.4.2 Scenario Develo ment:

NOTE: Validation shall be performed on all major changes or new procedures.

3.4.2.1 The TAOM or designee shall develop a detailed event scenario using the final draft procedure after the verification process .is completed. ATTACHMENT 3 provides a listing of scenarios.

3.4.2.2 For new procedures the scenario must contain sufficient guidance to place the plant in a cold shutdown or safe condition to ensure that all necessary transitions are accomplished.

15

For changes to existing procedures, the scenario shall be developed in such a manner that the step(s) changed are fully tested including Response Not Obtained (RNO) actions.

The TAOM or designee shall detail the scenario and the validation method to be used on the Validation Scenario sheet, ATTACHMENT 3A. For changes made as a result of simulator training feedback when using the procedures, the TAOM or designee shall consult the appropriate simulator instructor for scenario details.

Validation Performance:

NOTE: For changes to procedures as a result of simulator training feedback, the TAOM or designee shall ensure that ,the validation performance has been conducted and.

documented in accordance with steps 3.4.3.1 through 3.4.3.8.

For both simulator or walk through methods, the validation scenario shall be performed by the minimum control room complement of 3 licensed operators, with at least one being an SRO, and an STA.

The Validation Coordinator shall be either a SRO or a simulator instructor with SRO equivalent plant certification. The Validation Coordinator is normally the TAOM or designee.

Using the Validation Scenario Sheet, the Validation Coordinator shall brief the validation team in all the necessary initial conditions, systems and/or, entry conditions to begin the validation. At no time shall the details of the scenario be made known to the validation team.

The Validation Coordinator shall direct the entire scenario performance, including any information necessary for operator decision making. Included.

shall be determination when the scenario has progressed sufficiently to effect termination.

The validation team will respond to the data available to them (simulator or walk through) and perform the actions of the procedure. The Validation Coordinator and simulator instructor shall observe the actions of the crew and assess their performance.

The Validation Coordinator may terminate the scenario when the scenario objective has been accomplished.

16

I 4

3.4.3.7 Immediately following conclusion .of the scenario, the Validation Coordinator shall debrief the validation team using -the applicable guidance contained in ATTACHMENT 3B, validation criteria',.

3.4.3.8

~ ~ The Validation Coordinator shall complete a Validation Performance Sheet, ATTACHMENT .3C', and record any comments for further evaluation/resolution. The TAOM

or designee shall be responsible for resolution of comments prior to submittal of the change for final processing. Major changes as a result of comments shall require verification and revalidation.

e

3. 4'.=3. 9 The walk through (tabletop) validation method shall be conducted in a manner similar to'.;the simulator (steps

...3.4.3.1 through..3.4.3."8) 'except that no actual control manipulation will take place. ,However, the process used, time required arid any necessary tools shall be factored into the . task(s) . required, for validity.

Documentation shall be'ompleted per ATTACHMENT 3C.

Details pertaining to Verification were discussed. in Concern 14.

r Concern 17- Ya It e'ach is crucial that all operators be trained on all aspects of EOP. so that. all -operators- are prepared to execute each EOP to its fullest extent. The training program should include. a-commitme nt to train, all operators on all EOPsss R~es ense Upon completing the development of the EOPs in 1985, all licensed individuals were given classroom training on the EOPs. When the installation of the new plant specific simulator was completed, the simulator was utilized to train all licensed. personnel on all EOPs,." 'inally, Regual'ification Program.

ongoing EOP train'ing j.s provided in the As a part of ~the - Licensed . Operat;or" Initial Training Program,

~

each license candidate receives training on every EOP. This consists of 'lassroom tiaining reinforced by simulator exercises.

Concern 18 The EOP training program description should include a commitment to formal,EOP training (,or retraining) on the simulator when the simulator 'is finished, and plans for this training. This description should indicate the ,'use of:,,' wide variety of scenarios; including multiple failures, to fully exercise the EOPs on the simulator and thus expose the operators to a wide variety of EOP uses.

~i R~es onse Formal EOP simulator training was conducted for all licensed individuals when the simulator was ready for training. 1n addition, the operators receive EOP training on the simulator each year as part of the Licensed Operator Requalification Program. This training includes scenarios which exercise all EOPs. The lessons are written to allow the instructor the flexibility to exercise many different paths through the procedures. This training also includes scenarios with multiple failures.

Concern 19 The EOP training program should include the method to be used to train operators in areas where the simulator does not react like the plant and in parts of the EOPs that cannot be run on the simulator.

~Res ense All EOPs can be fully exercised on the simulator. There are no discrepancies between the simulator and the plant which prevent the use of the EOPs.

Concern 20 The EOP training program description should indicate how the operators are to be: evaluated during classroom instruction, tabletop discussions, replicate control room walkthroughs, and future simulator exercises.

~Res onse The operators are evaluated in. training in accordance with training department procedures. A written exam is used for classroom training, a formal oral exam is used for control room walkthroughs, and an operational exam is used. for simulator training. These exams are modeled after NRC licensing ezams.

Tabletop discussions are not used as a primary training tool.

18

b Figure 2 STATUS TREE PRIORITY INDENTIFICATION Color Line Code Symbol Code Status/Response Red The critical safety function is under extreme challen e; immediate operator action is required.

Orange re a r The critical safety function is under severe chaiien e; prompt operator action is required.

Yellow ~~~ ~ ~ The critical safety function conditon is off - normal.

Operator action may be taken.

Green The critical safety function is satisfied. No operator action is needed.

,4 <g I

A-503.1:19 FIGURE 3 CONTROL ROOM EOP/AP BINDER ARRANGEMENT (TRI-FOLD BINDER)

EOP FOLD OVER PAGES II II I ATTACHMENTS II II FOLD OUT PAGES I II II II - EOP II II coversheet II

- purpose/entry II conditions/symptoms//

immediate/ II

SUMMARY

subsequent action ATTACHMENT II II II II B1 - FOLD BINDER AP FOLD OVER PAGES II II Attachment o AP o Il II coversheet II

- purpose/entry

- conditions/symptom immediate/

subsequent actions II II I

Number:

Title:

Revision Nunber:

PIGURE 1

0 lW

Number:

Title:

Revision Nader:

A. PURPOSE This procedure provides .

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~

B. ENTRY CONDITIONS/SYMPTOMS

l. ENTRY CONDITIONS This procedure is entered from>

a ~

b.

d.

2. SYMPTOMS The symptoms of . . .'Procedure Title) . . . are; a ~

b.

co FIGURE 2

Number:

Title:

Revision Nurber:

STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED Imperitive Action RESULT Alternate Command

a. Sequential Substep RESULT a. Alternate Command o Nonsequential substep RESULT o Alternate Command NOTE: o The following are typical examples of operator action steps; 1 Verify Reactor Trip: Trip reactor manually.

o Reactor Trip Breakers OPEN o Neutron flux DECREASING Check if all RCPs should be Stopped:

a. SI pumps AT LEAST ONE a. GO TO Step 2 RUNNING
                                          • k***********************************************

CAUTION ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY IF CST LEVEL DECREASES TO LESS THAN 19.5 FEET.

                            • k******************************************************

Check Intact S/G Levels:

a. Narrow range level a. Maintain total feed flow GREATER THAN (LATER) low greater than (Later)

FIGURE 3

I 1

Nwher: Ti tie: Revision Number:

FOLDOUT PAGE

1. Include any information needed by the operator throughout the procedure.

2~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

3 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

4~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

FIGURE 5

O