| number = ML20151V152
| number = ML20151V152
| issue date = 09/04/1998
| issue date = 09/04/1998
| title = Updates 900402 Response to GL 89-13 Re Chlorine Monitoring. EPA Granted Request to Permanently Substitute Grab Samples for Continuous Chlorine Monitoring in 980826 Ltr.Util Does Not Plan to Reinstate Chlorine Monitoring
| title = Updates 900402 Response to GL 89-13 Re Chlorine Monitoring. EPA Granted Request to Permanently Substitute Grab Samples for Continuous Chlorine Monitoring in .Util Does Not Plan to Reinstate Chlorine Monitoring
| author name = Alexander J
| author name = Alexander J
| author affiliation = BOSTON EDISON CO.
| author affiliation = BOSTON EDISON CO.
Line 21: Line 21:
September 4, 1998 BECo Ltr. 2.98.125 U.S. Nuclear Regulatory Commission                                                                                            !
September 4, 1998 BECo Ltr. 2.98.125 U.S. Nuclear Regulatory Commission                                                                                            !
l                Attention: Document Control Desk Washington, DC 20555 i
l                Attention: Document Control Desk Washington, DC 20555 i
Docket No. 50-293 License No. DPR-35 Update of GL 89-13 Response: Chlorine Monitorina Purpose This. letter updates Boston Edison Company's .(BECo) April 2,1990, (No. 2.90.047) response to Generic Letter (GL) 89-13. In a subsequent September 18, 1997, letter (No. 2.97.095) Pilgrim updated GL89-13 conceming the reactor building closed cooling water (RBCCW) system mussel monitoring equipment, and committed to update the NRC on salt service water (SSW) continuous chlorine monitoring.
Docket No. 50-293 License No. DPR-35 Update of GL 89-13 Response: Chlorine Monitorina Purpose This. letter updates Boston Edison Company's .(BECo) April 2,1990, (No. 2.90.047) response to Generic Letter (GL) 89-13. In a subsequent {{letter dated|date=September 18, 1997|text=September 18, 1997, letter}} (No. 2.97.095) Pilgrim updated GL89-13 conceming the reactor building closed cooling water (RBCCW) system mussel monitoring equipment, and committed to update the NRC on salt service water (SSW) continuous chlorine monitoring.
i                Backaround Pilgrim removed the continuous chlorine monitoring equipment from service by cutting and capping for seismic reasons. " Grab samples" were substituted as allowed by Pilgrim's
i                Backaround Pilgrim removed the continuous chlorine monitoring equipment from service by cutting and capping for seismic reasons. " Grab samples" were substituted as allowed by Pilgrim's
,                NPDES Permit No.MA0003557. The permanent substitution of " grab samples" for continuous chlorine monitoring required the approval of the U.S. Environmental Protection Agency (USEPA) as an amendment to the NPDES permit.                                                                            ,
,                NPDES Permit No.MA0003557. The permanent substitution of " grab samples" for continuous chlorine monitoring required the approval of the U.S. Environmental Protection Agency (USEPA) as an amendment to the NPDES permit.                                                                            ,

Latest revision as of 22:59, 10 December 2021

Updates 900402 Response to GL 89-13 Re Chlorine Monitoring. EPA Granted Request to Permanently Substitute Grab Samples for Continuous Chlorine Monitoring in .Util Does Not Plan to Reinstate Chlorine Monitoring
ML20151V152
Person / Time
Site: Pilgrim
Issue date: 09/04/1998
From: Alexander J
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.98.125, GL-89-13, NUDOCS 9809140116
Download: ML20151V152 (2)


Text

. . . - - ~ . - . ..- - - --. . . . - . -. . . - . - - . . - . . -

.,& l O i Boston EgNoon Pilgrim Nuclear Power Station '

Rocky Hill Road Plymouth, Massachusetts 02360-5599 J

September 4, 1998 BECo Ltr. 2.98.125 U.S. Nuclear Regulatory Commission  !

l Attention: Document Control Desk Washington, DC 20555 i

Docket No. 50-293 License No. DPR-35 Update of GL 89-13 Response: Chlorine Monitorina Purpose This. letter updates Boston Edison Company's .(BECo) April 2,1990, (No. 2.90.047) response to Generic Letter (GL) 89-13. In a subsequent September 18, 1997, letter (No. 2.97.095) Pilgrim updated GL89-13 conceming the reactor building closed cooling water (RBCCW) system mussel monitoring equipment, and committed to update the NRC on salt service water (SSW) continuous chlorine monitoring.

i Backaround Pilgrim removed the continuous chlorine monitoring equipment from service by cutting and capping for seismic reasons. " Grab samples" were substituted as allowed by Pilgrim's

, NPDES Permit No.MA0003557. The permanent substitution of " grab samples" for continuous chlorine monitoring required the approval of the U.S. Environmental Protection Agency (USEPA) as an amendment to the NPDES permit. ,

Update By letter ~ dated August 26, 1998, the USEPA granted Pilgrim's request to permanently I g j

-substitute " grab samples" for continuous chlorine monitoring. Therefore, Pilgrim will use

" grab samples" to satisfy NPDES Permit No.MA0003557 requirements and does not plan to i reinstate chlorine monitoring. ,

Should you require further information on the SSW chlorine monitoring, please contact P.M.Kahler at (508) 830-7939.

! N LW$g J ne

. PMK/dmg /GL89-13 298125 9909140116 980904 7 4'

PDR ADOCK 05000293 I P Pm g

. _ _ _ _ _ _ J

O o I '~

cc's: see attached cc: Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWF 14820 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station i

l l