ML20151V152
| ML20151V152 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/04/1998 |
| From: | Alexander J BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BECO-2.98.125, GL-89-13, NUDOCS 9809140116 | |
| Download: ML20151V152 (2) | |
Text
.
. - - ~. -.
O i
Boston EgNoon Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 J
September 4, 1998 BECo Ltr. 2.98.125 U.S. Nuclear Regulatory Commission l
Attention: Document Control Desk Washington, DC 20555 i
Docket No. 50-293 License No. DPR-35 Update of GL 89-13 Response: Chlorine Monitorina Purpose This. letter updates Boston Edison Company's.(BECo) April 2,1990, (No. 2.90.047) response to Generic Letter (GL) 89-13. In a subsequent September 18, 1997, letter (No. 2.97.095) Pilgrim updated GL89-13 conceming the reactor building closed cooling water (RBCCW) system mussel monitoring equipment, and committed to update the NRC on salt service water (SSW) continuous chlorine monitoring.
i Backaround Pilgrim removed the continuous chlorine monitoring equipment from service by cutting and capping for seismic reasons. " Grab samples" were substituted as allowed by Pilgrim's NPDES Permit No.MA0003557.
The permanent substitution of " grab samples" for continuous chlorine monitoring required the approval of the U.S. Environmental Protection Agency (USEPA) as an amendment to the NPDES permit.
Update By letter ~ dated August 26, 1998, the USEPA granted Pilgrim's request to permanently I g j
-substitute " grab samples" for continuous chlorine monitoring. Therefore, Pilgrim will use
" grab samples" to satisfy NPDES Permit No.MA0003557 requirements and does not plan to i
reinstate chlorine monitoring.
Should you require further information on the SSW chlorine monitoring, please contact P.M.Kahler at (508) 830-7939.
N J
ne LW$g PMK/dmg /GL89-13 298125 9909140116 980904 7
PDR ADOCK 05000293 I
4' P
Pm g
J
O o I '~
cc's: see attached cc: Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWF 14820 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station i
l l
l e-.
_