| number = ML20069A129
| number = ML20069A129
| issue date = 04/30/1994
| issue date = 04/30/1994
| title = Monthly Operating Repts for Apr 1994 for Sequoyah Nuclear Plant.W/940516 Ltr
| title = Monthly Operating Repts for Apr 1994 for Sequoyah Nuclear Plant
| author name = Hollomon T, Powers K
| author name = Hollomon T, Powers K
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:e      'y-
      .O -
Temessee Valley Autrymty, Post Ofhce Ek1x 2'J00. fRxkt/ On,, Tumssee37379 2000 Ken Powers vee Presakvt senryan Ntekair Piar:t May 16, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of                                                    )        Docket Nos. 50-327 Tennessee Valley Authority                                          )                    50-328 SEQUOYAH NUCLEAR PLANT (SQN) - APRIL 1994 MONTHLY OPERATING REPORT Enclosed is the April 1994 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.
If you have any questions concerning this matter, please call J. W. Proffitt at (615) 843-6651.
Sincere y, i
Ken Powers Enclosure cc: See page 2                                                                                  ,
25000D                    PR                                                                      }
 
                                                          ~ .. - . .
t U.S. Nuclear Regulatory Commission Page 2 May 16, 1994 cc (Enclosure):
INP0 Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Ted Marston, Director Electric Power Research' Institute P.O. Box 10412 Palo Alto, California 94304 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administration U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Mr. F. Yost Director Research Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C. 20005 i
: t. e r
TENNESSEE VALLEY AUTHORITY NUCLEAR. POWER GROUP SEQUOYAH NUCLEAR PIANT MONTHLY OPERATING REPORT.
                                  .1U THE
, ,                    NUCIEAR REGULATORY C0fftISSION APRIL 1994 UNIT 1
,                          DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2
"                          DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79
 
    ,,      .-.    ...- - -    -.  .        ..~        .-  ..  - .      .    -
  ,.                                          OPERATIONAL
 
==SUMMARY==
 
APRIL 1994 URIL1 Unit 1 generated 119,390 megawatthours (MWh) (gross) electrical power during April with a capacity factor of 14.4 percent. Unit 1 was in Mode 3 at the beginning of the month. The reactor was taken critical on April 13 at 1123 EDT. The Unit 1 Cycle 6 Refueling Outage ended on April 20 at 0338 EDT when the generator was synchronized to the grid. On April 27 at 1027 EDT, with reactor power at approximately 74 percent, a power decrease was initiated to allow the IB main feed pump to be removed from service for repairs. Unit I was operating at approximately 48 percent reactor power at the end of April.
UNIT 2 Unit 2 generated 842,987 megawatthours (MWh) (gross) electrical power during April with a capacity factor of 102.3 percent. Unit 2 operated at near 100 percent reactor power during the month of April.
P 1
 
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. __10-327          UNIT No. __One              DATE:  _05-01-94 COMPLETED BY: L J. !!allomon                        TELEPHONE: 1615) 843-7528 MONTH: _AERIL 1994 AVERAGE DAILY POWER LEVEL                AVERAGE DAILY POWER LEVEL DAY            (W.e-Eet)                DAY            (M e-Net) 1                -14                    17                -16 2                -14                    18                -14 3                -15                    19                -16 4                -16                    20                156 5                -14                    21                237 6                -14.                    22                248 7                -16                    23                246 8                -16                    24                313 9                -14                    25                632 10              -14                    26                738 11              -1_4                    27                620 12              -16                    28                475 13              -1B                    29                468 14              -14                    30                100 15                -16                    31                N/A 16              -14 l
l l
l l
 
l l
l AVERACE DAILY UNIT POWER IEVEL DOCKET NO. 50-328            UNIT No. Two              DATE:    05-01-94 COMPLETED BY:  L__J _.llollomon                        TELEPHONE:  (615) 843-7528 MONTH:  _E RIL 1994 AVERAGE DAILY POWER LEVEL                  AVERAGE DAILY POWER LEVEL DM              (MWe-Net)                DM              (MWe-Net) 1                1122                    17                1120 2                112h                    18              _1L22 3                L121                    19                112L 4                1128                    20                1122 5                1121                    21                1127 6                1123                    22                1132 7                1122                    23                1135 8                1121                    24                1132 9                1131                    25                1133 10              1123                    26                1096 11              1123                    27                1125 12              1111                    28                1134 13              ll22                    29                1126 14              1L23                    30                1140 15              1121                    31                N/A 16              1094_
i
 
1    -                  .        m    ,
E'N    ,,                                                                                                                .l' J                                                                                                                      l OPERATING DATA REPORT DOCKET NO. JQ-322 DATE 05/0.1/94 COMPLETED BY L J. Hollomon TELEPHONE (615) 843-7528 DER 611HG_.SIAnli l Notes-                        l
: 1. Unit Name: _ScuoyahJhtLL0ne_                                l                              :1
: 2. Reporting Period:      April 1994                          l                                l
: 3. Licensed thermal Power (MWt): 3411.0                        l _.                            l
: 4. Nameplate Rating (Gross MWe): 1220.6                        l                                l
: 5. Design Electrical Rating (Net HWe): _ll4LQ                  l                                l
: 6. Maximum Dependable Capacity (Gross MWe): _J15LO            l                                l
: 7. Maximum Dependable Capacity (Net MWe): 1111.0              l                                !
: 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since last Report, Give Reasons:
: 9. Power Level To Which Restricted If Any (Net MWe):      N/A
: 10. Reasons for Restrictions, If Any:          N/A This Month        Yr-to-Date        Cumulative
: 11. Hours in Reporting Period                          719                2.879          11 L43&. _      .
: 12. Number of Mours Reactor Was Critical                42Q.6                4Z0 1        S W 10
: 13. Reactor Reserve Shutdown Hours                        0                    0                  0
: 14. Hours Generator On-Line                            260.4                260.4.        55.088.9
: 15. Unit Reserve Shutdown Hours                          0                    0                  0
: 16. Gross Thermal Energy Generated (MWH)        _410.759.0              430.759.0    179 324 513 . . . _
: 17. Gross Electrical Energy Generated (MWH)        119 390              119.390      60.822.044
: 10. Het Electrical Energy Generated (HWH)          105.228                92J65        58.257.002 l ') . Unit Service Factor                              36.2                  9 0_            49.0
: 20. 'Jnit Availability Factor                            36.2                  90              42 L
: 21. Unit Capacity Factor (Using MDC Net)                13.2                  2.9              46.6
: 22. Unit Capacity Factor (Using DER Net)                12.7                  LfL              452 1 _ _  >
: 23. Unit Forced Outage Rate                              0                    0                38_1 _
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
(
h
: 25. If Shut Down At End Of Report Period -Estimated Date of Startup:
u I
i I
 
OPERATING DATA REPORT DOCKET NO. .jiD-328 DATE      05/01/94 COMPLETED BY L. J. Hollomon TELEPHONE (615) 843-7528 DfERATING STATUS l Notes                                  l'
: 1. Unit Name:    Sequuah Unit Two                                      l                                        .l
: 2. Reporting Period: April 1994                                        -l                                        l
: 3. Licensed Thermal Power (HWt): .3411.0                                l                                        l
: 4. Nameplate Rating (Gross MWe): 1220.6                                l                                        .l'
: 5. Design Electrical Rating (Net MWe): 1148.0                          'l                                        l
: 6. Maximum Dependable Capacity (Gross MWe): 1146.0                      l                                        l
: 7. Maximum Dependable Capacity (Net MWe): 1106.0                        l                                        l
: 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):          N/A
: 10. Reasons for Restrictions,' If Any:        N/A This Month            Yr-to-Date                Cumulative
: 11. Hours in Reporting Period                              719                2.879                104.448
: 12. Number of Hours Reactor Was Critical                  719.0              2 3]jk4__              61.578
: 13. Reactor Reserve Shutdown Hours                          0                      0_                    0              j
: 14. Hours Generator On-Line                                719.0              2.765.4                60.058.9
: 15. Unit Reserve Shutdown Hours                              0                      0                      0 16, Gross Thermal Energy Generated (MWH)        2.444.780.5            9.328.214.D_-          189.091.166              '!
: 17. Gross Electrical Energy Generated (MWH)        842.987              3.?J5 E 5              64.144.779
: 18. Net Electrical Energy Generated (MWH)          807.839              3.100.486              61.378.772
: 19. Unit Service Factor                                    100.0                  96.1 ,                57.5            )
: 20. Unit Availability factor                              100.0                  96.1                  57.5
: 21. Unit Capacity factor (Using MDC Net)                  10Lf_                  97.4                  SLL
: 22. Unit Capacity Factor (Using DER Net)                    97.9                  93.8.                  S L2_.
: 23. Unit forced Outage Rate                                  0.0                    3 2._                36.1
: 24. Shutdowns Scheduled Over Hext 6 Months (Type, Date, and Duration.of Each):
Unit 2 Cycle 6 Refuelino Outage scheduled to bealn 07/03/94 with duration of 67 days.
l 1
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:                                                        l l
                                                                                                                                            )
 
DOCKET NO:    50-327 '
UNIT SHUTDOWNS AND POWER REDUCTIONS                                          UNIT NAME:      One i
DATE:  05/09/94 REPORT MONTH: April 1994                                                COMPLETED BY:T. J. Hollompn*-
TELEPHONE:f615) 843-7528 l                                                                            Method of                Licensee                                      Cause and Corrective
              ,                                              Duration                    Shutting Down              Event        System      Component              . Action to No.      Date          Type l    (Hours)  Reason 2            Reactor                  Report No. Code 4
Code 5            Prevent Recurrence      .
4 1    940401              5          458.6      C                      4                        N/A          N/A        N/A-      Unit I was in Mode 3 at the beginning of the month. The Unit 1 Cycle 6 refueling outage ended when the generator was synchronized to the grid on April 20 at                    .;
0338 EDT.
4 2    940427            .F                      B                      S                                                          On April 27 at 1027 EDT. with reactor power at approximately 74              L percent, a power level decrease was initiated to allow 18 main feed pump to be removed from service for maintenance.. The IB main feed pump would not maintain speed as a result of particles in the speed control fluid. The fluid was drained and the system cleaned as appropriate. A lower micron filter has been installed on the system to reduce the particle size in the system.                    .
Unit'I was operating at                        i
(
approximately 48 percent reactor j                                                                                                                                                          power at the end of April.
l                                                                                                                                                                                                          r l
b 2                                                                        3                                      #
F: Forced              Reason:                                                                  Method:                                Exhibit G-Instructions S: Scheduled            A-Equipment Failure (Explain)                                            1-Manual                              for Preparation of Data B-Maintenance or Test                                                      2-Manual Scram                        Entry sheets for Licensee C-Refueling                                                                3-Automatic Scram                      Event Report (LER) File
                                      ' D-Regulatory Restruction                                                  4-Continuation of Existing Outage      (NUREG-1022)
E-Operator Training and License Examination                              5-Reduction
                                      -F-Administrative                                                          9-Other 5
G-Operational Error (Explain) .                                                                                Exhibit I-Same Source H-Other (Explain)
 
s 00CKET NO:  50-328 *~
UNIT SHUTD0tMS AND POWER REOUCTIONS                                      . UNIT NAME:      Two        . f..
DATE: 05/09/94- - '* --
REPORT MONTH: April 1994                                            COMPLETED BY:T. J. Hollomon* -
TELEPHONE:(615) 843-7528 Method of        Licensee                                            Cause and Corrective Duration              Shutting _Down    Event        System          Compgnent                Action to Type l 4
No.      Date                          (Hours)      Reason 2  Reactor S        Report No. Code            Code D
Prevent Recurrence      .
There were no outages or power reductions of greater than 20 percent to report during April.
2                                                            3                                            #
I:F Forced        Reason:                                                      Method:                                      Exhibit G-Instructions S: Scheduled'    A-Equipment Failure (Explain)                                1-Manual                                    for Preparation of Data B-Haintenance or Test'                                        2-Manual Scram                              Entry sheets for Licensee C-Refueling                                                  3-Automatic Scram                            Event Report (LER) File D-Regulatory Restruction                                      4-Continuation of Existing Outage            (NUREG-1022)
E-Operator Training and License Examination                  5-Reduction-F-Administrative                                              9-Other.
5 G-Operational Error (Explain)                                                                            Exhibit I-Same Source H-Other (Explain)
                                                                                            -}}

Latest revision as of 18:42, 28 August 2020

Monthly Operating Repts for Apr 1994 for Sequoyah Nuclear Plant
ML20069A129
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/30/1994
From: Hollomon T, Powers K
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9405240272
Download: ML20069A129 (10)


Text

e 'y-

.O -

Temessee Valley Autrymty, Post Ofhce Ek1x 2'J00. fRxkt/ On,, Tumssee37379 2000 Ken Powers vee Presakvt senryan Ntekair Piar:t May 16, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - APRIL 1994 MONTHLY OPERATING REPORT Enclosed is the April 1994 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.

If you have any questions concerning this matter, please call J. W. Proffitt at (615) 843-6651.

Sincere y, i

Ken Powers Enclosure cc: See page 2 ,

25000D PR }

~ .. - . .

t U.S. Nuclear Regulatory Commission Page 2 May 16, 1994 cc (Enclosure):

INP0 Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Ted Marston, Director Electric Power Research' Institute P.O. Box 10412 Palo Alto, California 94304 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administration U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Mr. F. Yost Director Research Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C. 20005 i

t. e r

TENNESSEE VALLEY AUTHORITY NUCLEAR. POWER GROUP SEQUOYAH NUCLEAR PIANT MONTHLY OPERATING REPORT.

.1U THE

, , NUCIEAR REGULATORY C0fftISSION APRIL 1994 UNIT 1

, DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2

" DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79

,, .-. ...- - - -. . ..~ .- .. - . . -

,. OPERATIONAL

SUMMARY

APRIL 1994 URIL1 Unit 1 generated 119,390 megawatthours (MWh) (gross) electrical power during April with a capacity factor of 14.4 percent. Unit 1 was in Mode 3 at the beginning of the month. The reactor was taken critical on April 13 at 1123 EDT. The Unit 1 Cycle 6 Refueling Outage ended on April 20 at 0338 EDT when the generator was synchronized to the grid. On April 27 at 1027 EDT, with reactor power at approximately 74 percent, a power decrease was initiated to allow the IB main feed pump to be removed from service for repairs. Unit I was operating at approximately 48 percent reactor power at the end of April.

UNIT 2 Unit 2 generated 842,987 megawatthours (MWh) (gross) electrical power during April with a capacity factor of 102.3 percent. Unit 2 operated at near 100 percent reactor power during the month of April.

P 1

1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. __10-327 UNIT No. __One DATE: _05-01-94 COMPLETED BY: L J. !!allomon TELEPHONE: 1615) 843-7528 MONTH: _AERIL 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (W.e-Eet) DAY (M e-Net) 1 -14 17 -16 2 -14 18 -14 3 -15 19 -16 4 -16 20 156 5 -14 21 237 6 -14. 22 248 7 -16 23 246 8 -16 24 313 9 -14 25 632 10 -14 26 738 11 -1_4 27 620 12 -16 28 475 13 -1B 29 468 14 -14 30 100 15 -16 31 N/A 16 -14 l

l l

l l

l l

l AVERACE DAILY UNIT POWER IEVEL DOCKET NO. 50-328 UNIT No. Two DATE: 05-01-94 COMPLETED BY: L__J _.llollomon TELEPHONE: (615) 843-7528 MONTH: _E RIL 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DM (MWe-Net) DM (MWe-Net) 1 1122 17 1120 2 112h 18 _1L22 3 L121 19 112L 4 1128 20 1122 5 1121 21 1127 6 1123 22 1132 7 1122 23 1135 8 1121 24 1132 9 1131 25 1133 10 1123 26 1096 11 1123 27 1125 12 1111 28 1134 13 ll22 29 1126 14 1L23 30 1140 15 1121 31 N/A 16 1094_

i

1 - . m ,

E'N ,, .l' J l OPERATING DATA REPORT DOCKET NO. JQ-322 DATE 05/0.1/94 COMPLETED BY L J. Hollomon TELEPHONE (615) 843-7528 DER 611HG_.SIAnli l Notes- l

1. Unit Name: _ScuoyahJhtLL0ne_ l :1
2. Reporting Period: April 1994 l l
3. Licensed thermal Power (MWt): 3411.0 l _. l
4. Nameplate Rating (Gross MWe): 1220.6 l l
5. Design Electrical Rating (Net HWe): _ll4LQ l l
6. Maximum Dependable Capacity (Gross MWe): _J15LO l l
7. Maximum Dependable Capacity (Net MWe): 1111.0 l  !
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since last Report, Give Reasons:
9. Power Level To Which Restricted If Any (Net MWe): N/A
10. Reasons for Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 719 2.879 11 L43&. _ .
12. Number of Mours Reactor Was Critical 42Q.6 4Z0 1 S W 10
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 260.4 260.4. 55.088.9
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) _410.759.0 430.759.0 179 324 513 . . . _
17. Gross Electrical Energy Generated (MWH) 119 390 119.390 60.822.044
10. Het Electrical Energy Generated (HWH) 105.228 92J65 58.257.002 l ') . Unit Service Factor 36.2 9 0_ 49.0
20. 'Jnit Availability Factor 36.2 90 42 L
21. Unit Capacity Factor (Using MDC Net) 13.2 2.9 46.6
22. Unit Capacity Factor (Using DER Net) 12.7 LfL 452 1 _ _ >
23. Unit Forced Outage Rate 0 0 38_1 _
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

(

h

25. If Shut Down At End Of Report Period -Estimated Date of Startup:

u I

i I

OPERATING DATA REPORT DOCKET NO. .jiD-328 DATE 05/01/94 COMPLETED BY L. J. Hollomon TELEPHONE (615) 843-7528 DfERATING STATUS l Notes l'

1. Unit Name: Sequuah Unit Two l .l
2. Reporting Period: April 1994 -l l
3. Licensed Thermal Power (HWt): .3411.0 l l
4. Nameplate Rating (Gross MWe): 1220.6 l .l'
5. Design Electrical Rating (Net MWe): 1148.0 'l l
6. Maximum Dependable Capacity (Gross MWe): 1146.0 l l
7. Maximum Dependable Capacity (Net MWe): 1106.0 l l
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons for Restrictions,' If Any: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 719 2.879 104.448
12. Number of Hours Reactor Was Critical 719.0 2 3]jk4__ 61.578
13. Reactor Reserve Shutdown Hours 0 0_ 0 j
14. Hours Generator On-Line 719.0 2.765.4 60.058.9
15. Unit Reserve Shutdown Hours 0 0 0 16, Gross Thermal Energy Generated (MWH) 2.444.780.5 9.328.214.D_- 189.091.166 '!
17. Gross Electrical Energy Generated (MWH) 842.987 3.?J5 E 5 64.144.779
18. Net Electrical Energy Generated (MWH) 807.839 3.100.486 61.378.772
19. Unit Service Factor 100.0 96.1 , 57.5 )
20. Unit Availability factor 100.0 96.1 57.5
21. Unit Capacity factor (Using MDC Net) 10Lf_ 97.4 SLL
22. Unit Capacity Factor (Using DER Net) 97.9 93.8. S L2_.
23. Unit forced Outage Rate 0.0 3 2._ 36.1
24. Shutdowns Scheduled Over Hext 6 Months (Type, Date, and Duration.of Each):

Unit 2 Cycle 6 Refuelino Outage scheduled to bealn 07/03/94 with duration of 67 days.

l 1

25. If Shut Down At End Of Report Period, Estimated Date of Startup: l l

)

DOCKET NO: 50-327 '

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: One i

DATE: 05/09/94 REPORT MONTH: April 1994 COMPLETED BY:T. J. Hollompn*-

TELEPHONE:f615) 843-7528 l Method of Licensee Cause and Corrective

, Duration Shutting Down Event System Component . Action to No. Date Type l (Hours) Reason 2 Reactor Report No. Code 4

Code 5 Prevent Recurrence .

4 1 940401 5 458.6 C 4 N/A N/A N/A- Unit I was in Mode 3 at the beginning of the month. The Unit 1 Cycle 6 refueling outage ended when the generator was synchronized to the grid on April 20 at .;

0338 EDT.

4 2 940427 .F B S On April 27 at 1027 EDT. with reactor power at approximately 74 L percent, a power level decrease was initiated to allow 18 main feed pump to be removed from service for maintenance.. The IB main feed pump would not maintain speed as a result of particles in the speed control fluid. The fluid was drained and the system cleaned as appropriate. A lower micron filter has been installed on the system to reduce the particle size in the system. .

Unit'I was operating at i

(

approximately 48 percent reactor j power at the end of April.

l r l

b 2 3 #

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File

' D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-1022)

E-Operator Training and License Examination 5-Reduction

-F-Administrative 9-Other 5

G-Operational Error (Explain) . Exhibit I-Same Source H-Other (Explain)

s 00CKET NO: 50-328 *~

UNIT SHUTD0tMS AND POWER REOUCTIONS . UNIT NAME: Two . f..

DATE: 05/09/94- - '* --

REPORT MONTH: April 1994 COMPLETED BY:T. J. Hollomon* -

TELEPHONE:(615) 843-7528 Method of Licensee Cause and Corrective Duration Shutting _Down Event System Compgnent Action to Type l 4

No. Date (Hours) Reason 2 Reactor S Report No. Code Code D

Prevent Recurrence .

There were no outages or power reductions of greater than 20 percent to report during April.

2 3 #

I:F Forced Reason: Method: Exhibit G-Instructions S: Scheduled' A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Haintenance or Test' 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-1022)

E-Operator Training and License Examination 5-Reduction-F-Administrative 9-Other.

5 G-Operational Error (Explain) Exhibit I-Same Source H-Other (Explain)

-