{{#Wiki_filter:August 5, 2002 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:            FirstEnergy Nuclear Operating Company Name of Facility:            Davis-Besse Nuclear Power Station Docket No:                    50-346 Date and Time of Meeting:    Thursday, August 15, 2002, at 1:00 p.m. (CDT)
Location of Meeting:          NRC Region III office 801 Warrenville Road Lisle, IL 60532 Purpose of Meeting:          Discuss the licensees root cause analysis of the non-technical issues that led to the reactor pressure vessel head degradation Category 1:                  This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRC Attendees:
J. Dyer, Regional Administrator J. Grobe, Director, IMC 0350 Oversight Panel T. Kozak, Acting Deputy Director, Division of Reactor Safety C. Lipa, Chief, Branch 4, Division of Reactor Projects G. Wright, Project Engineer, Branch 2, Division of Reactor Projects Others as designated Licensee Attendees:
L. Myers, Chief Operating Officer, FENOC H. Bergendahl, Vice-President, Davis-Besse R. Fast, Plant Manager, Davis-Besse NOTE:    Attendance at this meeting by NRC personnel, other than those listed above, should be made known to me at 630-829-9619 by COB August 14, 2002.
Stakeholders wishing to participate via telephone may call the bridge line at (877) 352-5210. Provide the bridge operator the pass code Davis Besse and the name Cheryl Hausman. One hundred bridge lines will be available.
Approved By:    /RA/
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects
 
Notice of Significant                            Licensee Meeting Distribution:
B. W. Sheron, Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski, Director, Division of Licensing and Project Management, NRR G. Tracy, Chief, Division of Inspection Program Management, IOLB, NRR S. Rosenberg, Region III Coordinator, OEDO S. Bajwa, Project Directorate, Division of Licensing and Project Management, NRR D. Pickett, Project Manager, Project Directorate, Division of Licensing and Project Management, NRR G. E. Grant, Director, Division of Reactor Projects, RIII S. A. Reynolds, Deputy Director, Division of Reactor Projects, RIII J. A. Grobe, Director, Division of Reactor Safety, RIII R. J. Caniano, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief S. Thomas, SRI, Davis-Besse DRS Branch Chiefs (RNG, DEH, DLP1, KXR)
R. M. Lickus, Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)
J. Kweiser, ORA P. Buckley, ORA DB0350}}

Latest revision as of 11:51, 26 March 2020

Meeting Notice with Firstenergy Nuclear Operating Co to Discuss Licensee'S Root Cause Analysis of the non-technical Issues That Led to the Reactor Pressure Vessel Head Degradation. (1:00p.m. CDT)
ML022170798
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/05/2002
From: Christine Lipa
NRC/RGN-III
To:
References
Download: ML022170798 (3)


Text

August 5, 2002 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Date and Time of Meeting: Thursday, August 15, 2002, at 1:00 p.m. (CDT)

Location of Meeting: NRC Region III office 801 Warrenville Road Lisle, IL 60532 Purpose of Meeting: Discuss the licensees root cause analysis of the non-technical issues that led to the reactor pressure vessel head degradation Category 1: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

J. Dyer, Regional Administrator J. Grobe, Director, IMC 0350 Oversight Panel T. Kozak, Acting Deputy Director, Division of Reactor Safety C. Lipa, Chief, Branch 4, Division of Reactor Projects G. Wright, Project Engineer, Branch 2, Division of Reactor Projects Others as designated Licensee Attendees:

L. Myers, Chief Operating Officer, FENOC H. Bergendahl, Vice-President, Davis-Besse R. Fast, Plant Manager, Davis-Besse NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to me at 630-829-9619 by COB August 14, 2002.

Stakeholders wishing to participate via telephone may call the bridge line at (877) 352-5210. Provide the bridge operator the pass code Davis Besse and the name Cheryl Hausman. One hundred bridge lines will be available.

Approved By: /RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

B. W. Sheron, Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski, Director, Division of Licensing and Project Management, NRR G. Tracy, Chief, Division of Inspection Program Management, IOLB, NRR S. Rosenberg, Region III Coordinator, OEDO S. Bajwa, Project Directorate, Division of Licensing and Project Management, NRR D. Pickett, Project Manager, Project Directorate, Division of Licensing and Project Management, NRR G. E. Grant, Director, Division of Reactor Projects, RIII S. A. Reynolds, Deputy Director, Division of Reactor Projects, RIII J. A. Grobe, Director, Division of Reactor Safety, RIII R. J. Caniano, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief S. Thomas, SRI, Davis-Besse DRS Branch Chiefs (RNG, DEH, DLP1, KXR)

R. M. Lickus, Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser, ORA P. Buckley, ORA DB0350