ML19257D447: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 24: Line 24:
                                                                                                                                                                                 $/ C A I bd l@
                                                                                                                                                                                 $/ C A I bd l@
CON'T
CON'T
                              "
/
/
0    1 8
0    1 8
[[RCE l xl@l  t,J            61 0l 5DOCKET    l 0 l NUYBER 0 l 0 3l3lbd8l@l C1        63 11 Il 8l 8l 0l@l 0]HEPOH EVENT DATE              /4      /?            Il 3l    Il Rl 080 @
((RCE l xl@l  t,J            61 0l 5DOCKET    l 0 l NUYBER 0 l 0 3l3lbd8l@l C1        63 11 Il 8l 8l 0l@l 0]HEPOH EVENT DATE              /4      /?            Il 3l    Il Rl 080 @
T DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o    2      L n a nu ry 18, 1 10, Stone & uetster reported that an overstressed condition on eveessl 1
T DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o    2      L n a nu ry 18, 1 10, Stone & uetster reported that an overstressed condition on eveessl 1
o    3      l 1e tdown lines 3/4"-CH-275-1502-Q1 and 3/4-CH-123-1502-02 had been i.dentified durine o  4      l the review for IE Bulletin 79-14.                                          The stress on each pipe exceeds the nomal or                                                      I o    s      l upse t allowable but is less than faulted allowable.                                                              The health and safety of the                                I o  6      l general public were not af fected by this event.                                                          Reportable pursuant to T.S.                              6. 9 . 1. I o  7      l 8.i.                                                                                                                                                                          l O  H 7          8 9 SYSTEM                CAUSE            CAUSE                                                          COVP.              VALVE CODE                    CODE        SU8 CODE                COVPONENT CODE                          SUSCODE            SU8 CODE 7
o    3      l 1e tdown lines 3/4"-CH-275-1502-Q1 and 3/4-CH-123-1502-02 had been i.dentified durine o  4      l the review for IE Bulletin 79-14.                                          The stress on each pipe exceeds the nomal or                                                      I o    s      l upse t allowable but is less than faulted allowable.                                                              The health and safety of the                                I o  6      l general public were not af fected by this event.                                                          Reportable pursuant to T.S.                              6. 9 . 1. I o  7      l 8.i.                                                                                                                                                                          l O  H 7          8 9 SYSTEM                CAUSE            CAUSE                                                          COVP.              VALVE CODE                    CODE        SU8 CODE                COVPONENT CODE                          SUSCODE            SU8 CODE 7
Line 39: Line 38:
_ 21          22            23              24            26        27                23        29          JJ SHUTDOWN                                                            NPHD4          PRIME COVP.                COMPONENT ACTION FUTURE                      EFFECT                                                            A TT AC HV E N T FORM SUB,                                MANUFACTURER TAKEN ACTION                    ON PLANT                METHOD                  HOURS                S US VI TT ED                        SUPPLIER Lx_J@l JJ          J4 l@ 35 l@ l36zl@ J/I                                      I                I 40 IY@
_ 21          22            23              24            26        27                23        29          JJ SHUTDOWN                                                            NPHD4          PRIME COVP.                COMPONENT ACTION FUTURE                      EFFECT                                                            A TT AC HV E N T FORM SUB,                                MANUFACTURER TAKEN ACTION                    ON PLANT                METHOD                  HOURS                S US VI TT ED                        SUPPLIER Lx_J@l JJ          J4 l@ 35 l@ l36zl@ J/I                                      I                I 40 IY@
43                42 N[@              43 Aj@
43                42 N[@              43 Aj@
44 Gl3l4 4[@  41 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i  o      lThe cause for the overstressed piping is that incorrect valve we igh t s we re used in the l l3 l3 ; l pipe stress calculations due to a change in the center of gravity for valvo PCV-1201                                                                                                    1
44 Gl3l4 4[@  41 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i  o      lThe cause for the overstressed piping is that incorrect valve we igh t s we re used in the l l3 l3 ; l pipe stress calculations due to a change in the center of gravity for valvo PCV-1201                                                                                                    1 and a change in we ight for the vent valve in the inlet to the excess letdown heat ex-                                                                                          l 3  3 changer.              A snubber will be designed and added to the line in the area of HCV-1201                                                                                  l
      ,    ,
and a change in we ight for the vent valve in the inlet to the excess letdown heat ex-                                                                                          l 3  3 changer.              A snubber will be designed and added to the line in the area of HCV-1201                                                                                  l
       ,  ,        ;during the next outage of suf ficient duration.                                                                                                                                  I 80 7          8 9 STA S                  NPCAER                              oTHER STATUS              ISCOV RY                                    DISCOVERY DESCRIPTION i  s 9 @ l 0l 0      0 gj NA                                      l    lBl@l                Notification from A/E                                                l 8 9                  10                12        Il                              44      45            46                                                                        80 7
       ,  ,        ;during the next outage of suf ficient duration.                                                                                                                                  I 80 7          8 9 STA S                  NPCAER                              oTHER STATUS              ISCOV RY                                    DISCOVERY DESCRIPTION i  s 9 @ l 0l 0      0 gj NA                                      l    lBl@l                Notification from A/E                                                l 8 9                  10                12        Il                              44      45            46                                                                        80 7
A C TIVI TY    CO N T E '.T RELE ASED OF RE LE ASE                            AVOUNT OF ACTIVITY                                                              LOCATION OF RELEASE 6          Z                                      NA                                                l              NA                                                                  l i                            lZ 8 9                  10            11                                            44            45                                                                                80 7
A C TIVI TY    CO N T E '.T RELE ASED OF RE LE ASE                            AVOUNT OF ACTIVITY                                                              LOCATION OF RELEASE 6          Z                                      NA                                                l              NA                                                                  l i                            lZ 8 9                  10            11                                            44            45                                                                                80 7
Line 56: Line 53:
                                                                                             -                                                                                        -    ?            E
                                                                                             -                                                                                        -    ?            E


- .
Virginia Electric and Power Company North Anna Power Station, Unit #1                           
Virginia Electric and Power Company North Anna Power Station, Unit #1                           



Latest revision as of 14:43, 16 March 2020

LER 80-001/01T-0:on 800118,during Review for IE Bulletin 79-14,letdown Lines 3/4-CH-275-1502Q1 & 3/4-CH-123-1502-Q2 Reported Overstressed.Caused by Incorrect Valve Weights Used in Pipe Stress Calculations
ML19257D447
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/31/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19257D444 List:
References
IEB-79-14, LER-80-001-01T, LER-80-1-1T, NUDOCS 8002040418
Download: ML19257D447 (2)


Text

NRC FORM 366 U. S. NUCLEAR REGULATORY COMMISSION (7 7.7) ,

LICENSEE EVENT REPORT CONTROL BLOCK: l l l l l l l (PLEASE PRINT OR TYPE ALL REQUtRED INFORMATION) 1 6 l

o11 8 9 Vl A N Al S LICEN5EE CODE 1 gl 0 0l-14 lb 0 0 0 0 LICENSE NUVdEH 0 -

0l0 @l4l1l1l1 D 26 LICEbE TYPE JO 1

@l l

$/ C A I bd l@

CON'T

/

0 1 8

((RCE l xl@l t,J 61 0l 5DOCKET l 0 l NUYBER 0 l 0 3l3lbd8l@l C1 63 11 Il 8l 8l 0l@l 0]HEPOH EVENT DATE /4 /? Il 3l Il Rl 080 @

T DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o 2 L n a nu ry 18, 1 10, Stone & uetster reported that an overstressed condition on eveessl 1

o 3 l 1e tdown lines 3/4"-CH-275-1502-Q1 and 3/4-CH-123-1502-02 had been i.dentified durine o 4 l the review for IE Bulletin 79-14. The stress on each pipe exceeds the nomal or I o s l upse t allowable but is less than faulted allowable. The health and safety of the I o 6 l general public were not af fected by this event. Reportable pursuant to T.S. 6. 9 . 1. I o 7 l 8.i. l O H 7 8 9 SYSTEM CAUSE CAUSE COVP. VALVE CODE CODE SU8 CODE COVPONENT CODE SUSCODE SU8 CODE 7

O 9 8 9 lP C 10

@l El@ l A l @

11 12 13 PlIlP El Xl Xl@

18 W@ W @

19 20 SEQUEN TI AL OCCUHHENCE REPORT REV'SloN REPOR T NO. CODE TYPE N O.

LER RO _ EVENT VE AR h REPORr l 8l 0l _

l 0l 0l 1l l/l l0l1l Tl l-l 31 l0l 32

_ 21 22 23 24 26 27 23 29 JJ SHUTDOWN NPHD4 PRIME COVP. COMPONENT ACTION FUTURE EFFECT A TT AC HV E N T FORM SUB, MANUFACTURER TAKEN ACTION ON PLANT METHOD HOURS S US VI TT ED SUPPLIER Lx_J@l JJ J4 l@ 35 l@ l36zl@ J/I I I 40 IY@

43 42 N[@ 43 Aj@

44 Gl3l4 4[@ 41 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i o lThe cause for the overstressed piping is that incorrect valve we igh t s we re used in the l l3 l3 ; l pipe stress calculations due to a change in the center of gravity for valvo PCV-1201 1 and a change in we ight for the vent valve in the inlet to the excess letdown heat ex- l 3 3 changer. A snubber will be designed and added to the line in the area of HCV-1201 l

, , ;during the next outage of suf ficient duration. I 80 7 8 9 STA S NPCAER oTHER STATUS ISCOV RY DISCOVERY DESCRIPTION i s 9 @ l 0l 0 0 gj NA l lBl@l Notification from A/E l 8 9 10 12 Il 44 45 46 80 7

A C TIVI TY CO N T E '.T RELE ASED OF RE LE ASE AVOUNT OF ACTIVITY LOCATION OF RELEASE 6 Z NA l NA l i lZ 8 9 10 11 44 45 80 7

PERSONNEL E upC5JES NoviER TY2E O E S C RI P TI ON i i 10l0101@lz @l 12 13 B

  • B0 8 9 11 7

PERSONNF L INLMIES j Q 7 NU'9ER GESCR18 TION lQ f 0 I

/

i a 8 9 10 0l@l 11 12 E0 L OZ OF OH D AY AGE T 3 F ACILITy TYPE DE SCm a il 0 N i o Zl@ 'o NA /

' " ~

l so

' " " 6002 U 40 NRC USE ONLY P m 'C ',r ,v , @ ,

12lol @l NA l lllllllll1IIl}

10 68 69 80-5 7 8 9

- -  ? E

Virginia Electric and Power Company North Anna Power Station, Unit #1

Attachment:

Page 1 of 1 Doc ke t No. 50-338 Report No. LER 80-001/01T-0 Description of Event On January 18, 1980, during a review for IE Bulletin 79-14, Stone & Uebster discovered several points on excess le tdown lines 3/4"-CH-275-1502-Q1 and 3/4"-CH-123-1502-Q2 which are stressed over the normal or upset allowable.

The stress on these lines, however, is less than faulted allowable.

Probable Cansequences of Event Because the stress on the pipes is groter than the normal allowable, it is possible that minor deformation of the piping could develop during a seismic event. But because the stress does not exceed the emergency or faulted allowable, no major deformation or actual pipe separation should occur. Also, the effects of this nonconformance are minimized by the fact that the overstressed point is normally isolated from the primary system during normal plant operat2on. As a result, the health and safety of the general public were not af fected by this event. The re are no generic implications associated with this occurrence.

Cause of Event:

The piping is overstressed because incorrect valve weights were used in the pipe stress calculations. The center of gravity for valve HCV-1201 changed from 37 inches of f centerline to 173 inches of f centerline and the weight of the vent valve on the in le t to the excess le tdown heat exchanger changed from 7 lbs. to 12 lbs.

Innediate Corrective Action A snubber is being designed to support the piping and alleviate the overstressed cor.dition.

Scheduled Corrective Action During the next outage of sufficient duration, the snubber will be added to the line in the area of valve HCV-1201.

Actions Taken to Prevent Recurrance No further actions are required.