{{#Wiki_filter: March 27, 2014 EA-12-021
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 27, 2014


EA-13-019
==SUBJECT:==
 
WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION - NRC INTEGRATED INSPECTION REPORT 05000391/2014602
Mr. Michael Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
 
SUBJECT: WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION - NRC INTEGRATED INSPECTION REPORT 05000391/2014602


==Dear Mr. Skaggs:==
==Dear Mr. Skaggs:==
On February 15, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of construction activities at your Watts Bar Unit 2 reactor facility. The enclosed integrated inspection report documents the inspection results, which were discussed on February 20, 2014 with Mr. Hruby and other members of your staff.
On February 15, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of construction activities at your Watts Bar Unit 2 reactor facility. The enclosed integrated inspection report documents the inspection results, which were discussed on February 20, 2014 with Mr. Hruby and other members of your staff.


This inspection examined activities conducted under your Unit 2 construction permit as they relate to safety and compliance with the Commission's rules and regulations, the conditions of your construction permit, and fulfillment of Unit 2 regulatory framework commitments. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This inspection examined activities conducted under your Unit 2 construction permit as they relate to safety and compliance with the Commissions rules and regulations, the conditions of your construction permit, and fulfillment of Unit 2 regulatory framework commitments. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, the enclosed report documents one NRC-identified finding which was determined to involve a violation of NRC requirements. However, because the finding was a Severity Level IV violation and was entered into your corrective action program, the NRC is treating the violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy. The enclosed report also documents the closure of three violations related to a Severity Level III issue that dealt with the commercial grade dedication program. Inspections were also completed for a Confirmatory Order involving falsification of  
Based on the results of this inspection, the enclosed report documents one NRC-identified finding which was determined to involve a violation of NRC requirements. However, because the finding was a Severity Level IV violation and was entered into your corrective action program, the NRC is treating the violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy. The enclosed report also documents the closure of three violations related to a Severity Level III issue that dealt with the commercial grade dedication program. Inspections were also completed for a Confirmatory Order involving falsification of records.


records. If you contest the non-cited violation in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTENTION: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Watts Bar Unit 2 Nuclear Plant.
If you contest the non-cited violation in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTENTION: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Watts Bar Unit 2 Nuclear Plant. In accordance with 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 In accordance with 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Should you have questions concerning this letter, please contact us.
Should you have questions concerning this letter, please contact us.


Sincerely,
Sincerely,
/RA/  
/RA/
 
Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects Docket No. 50-391 Construction Permit No: CPPR-92
Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects  
 
Docket No. 50-391 Construction Permit No: CPPR-92  


===Enclosure:===
===Enclosure:===
Inspection Report 05000391/2014602 w/Attachment  
Inspection Report 05000391/2014602 w/Attachment


REGION II==
REGION II==
Docket No.:  50-391 Construction Permit No.: CPPR-92 Report No.:  05000391/2014602 Applicant:  Tennessee Valley Authority (TVA)
Facility:  Watts Bar Nuclear Plant, Unit 2 Location:  Spring City, TN 37381 Dates:  January 1-February 15, 2014 Inspectors:  T. Nazario, Senior Resident Inspector, Construction Projects Branch (CPB) 3, Division of Construction Projects (DCP),
Region II (RII)
C. Jones, Resident Inspector, CPB3, DCP, RII E. Patterson, Resident Inspector, CPB3, DCP, RII S. Temple, Resident Inspector, CPB3, DCP, RII N. Karlovich, Resident Inspector, CPB3, DCP, RII R. Monk, Senior Resident Inspector, Projects Branch (PB) 6, Division of Reactor Projects (DRP), RII E. Michel, Senior Construction Inspector, Construction Inspection Branch (CIB) 3, Division of Construction Inspection (DCI), RII, Section OA.1.1 A. Matos, Construction Inspector, CIB1, DCI, RII, Sections C.1.3 and OA.1.11 T. Steadham, Senior Construction Inspector, CIB3, DCI, RII, Sections E.1.1 and E.1.2 L. Suggs, Senior Construction Project Inspector, CPB2, DCP, RII, Sections E.1.1 and E.1.2 K. Steddenbenz, Construction Inspector, CIB3, DCI, RII, Sections E.1.1 and E.1.2 J. Christensen, Construction Inspector, CIB3, DCI, RII, Section OA.1.10 J. Baptist, Senior Construction Project Inspector, CPB3, DCP, RII, Sections P.1.1, P.1.2, P.1.3, P.1.4, P.1.6, OA.1.2, OA.1.14, and OA.1.15, C. Even, Senior Construction Project Inspector, CPB3, DCP, RII, Sections Q.1.2, P.1.7, OA.1.12, and OA.1.17 J. Seat, Construction Project Inspector, CPB3, DCP, RII, Sections, E.1.1, E.1.2, and OA.1.19 A. Wilson, Construction Project Inspector, CPB3, DCP, RII, Sections P.1.5, OA.1.7, OA.1.8, and OA.1.13 Enclosure


Docket No.: 50-391
Approved by: Robert C. Haag, Chief Construction Projects Branch 3 Division of Construction Projects
 
Construction Permit No.: CPPR-92
 
Report No.: 05000391/2014602
 
Applicant: Tennessee Valley Authority (TVA)
Facility: Watts Bar Nuclear Plant, Unit 2 Location: Spring City, TN 37381
 
Dates: January 1-February 15, 2014
 
Inspectors:
T. Nazario, Senior Resident Inspector, Construction Projects Branch (CPB) 3, Division of Construction Projects (DCP),
Region II (RII) C. Jones, Resident Inspector, CPB3, DCP, RII E. Patterson, Resident Inspector, CPB3, DCP, RII S. Temple, Resident Inspector, CPB3, DCP, RII N. Karlovich, Resident Inspector, CPB3, DCP, RII R. Monk, Senior Resident Inspector, Projects Branch (PB) 6, Division of Reactor Projects (DRP), RII E. Michel, Senior Construction Inspector, Construction Inspection Branch (CIB) 3, Division of Construction Inspection (DCI), RII, Section OA.1.1 A. Matos, Construction Inspector, CIB1, DCI, RII, Sections C.1.3 and OA.1.11 T. Steadham, Senior Construction Inspector, CIB3, DCI, RII, Sections E.1.1 and E.1.2 L. Suggs, Senior Construction Project Inspector, CPB2, DCP, RII, Sections E.1.1 and E.1.2 K. Steddenbenz, Construction Inspector, CIB3, DCI, RII, Sections E.1.1 and E.1.2 J. Christensen, Construction Inspector, CIB3, DCI, RII, Section OA.1.10 J. Baptist, Senior Construction Project Inspector, CPB3, DCP, RII, Sections P.1.1, P.1.2, P.1.3, P.1.4, P.1.6, OA.1.2, OA.1.14, and OA.1.15, C. Even, Senior Construction Project Inspector, CPB3, DCP, RII, Sections Q.1.2, P.1.7, OA.1.12, and OA.1.17 J. Seat, Construction Project Inspector, CPB3, DCP, RII, Sections, E.1.1, E.1.2, and OA.1.19 A. Wilson, Construction Project Inspector, CPB3, DCP, RII, Sections P.1.5, OA.1.7, OA.1.8, and OA.1.13
 
2 Approved by: Robert C. Haag, Chief Construction Projects Branch 3 Division of Construction Projects  


=EXECUTIVE SUMMARY=
=EXECUTIVE SUMMARY=
Watts Bar Nuclear Plant, Unit 2  
Watts Bar Nuclear Plant, Unit 2


This integrated inspection included aspects of engineering and construction activities performed by TVA associated with the Watts Bar Nuclear (WBN) Plant Unit 2 construction project. This report covered a seven-week period of inspections in the areas of quality assurance (QA),
This integrated inspection included aspects of engineering and construction activities performed by TVA associated with the Watts Bar Nuclear (WBN) Plant Unit 2 construction project. This report covered a seven-week period of inspections in the areas of quality assurance (QA),
identification and resolution of construction problems, engineering and construction activities, pre-operational testing, and follow-up of other activities. The inspection program for Unit 2 construction activities is described in NRC Inspection Manual Chapter 2517, "Watts Bar Unit 2 Construction Inspection Program.Information regarding the WBN Unit 2 Construction Project and NRC inspections can be found at http://www.nrc.gov/info-finder/reactor/wb/watts-bar.html. Inspection Results
identification and resolution of construction problems, engineering and construction activities, pre-operational testing, and follow-up of other activities. The inspection program for Unit 2 construction activities is described in NRC Inspection Manual Chapter 2517, Watts Bar Unit 2 Construction Inspection Program. Information regarding the WBN Unit 2 Construction Project and NRC inspections can be found at http://www.nrc.gov/info-finder/reactor/wb/watts-bar.html.
* The inspectors determined that the causal analysis and corrective actions for the three violations related to Severity Level III issue EA-13-019, for commercial grade dedication (CDG), were adequate and fully implemented, and compliance with the associated regulatory requirements has been restored. These violations are closed.  (Section


OA.1.1)
Inspection Results
* The NRC identified a severity level (SL) IV non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50, Appendix B, Criterion XVI, "Corrective Actions," for inadequate corrective actions associated with historical 10CFR21 issues. Specifically, the applicant failed to identify all historical WBN Unit 1 10CFR Part 21 issues with potential Unit 2 applicability, and was therefore unable to subsequently review for Unit 2 impact and resolution. The inspectors determined that the applicant's inadequate corrective action was a performance deficiency. This performance deficiency was considered more than minor in accordance with Inspection Manual Chapter (IMC) 0613, Appendix E because it represented an adverse condition that rendered the quality of structures, systems, or components (SSCs) indeterminate and required substantive corrective action to satisfy the original intent of the corrective action document. Based on the applicant's assessment, it was determined that the population of historical items that were originally omitted for resolution did not require re-work of any equipment. The finding was determined to be of very low safety significance in accordance with Section 6.5 of the NRC Enforcement Policy because it does not represent a breakdown in the QA process. The applicant issued PER 806990 to address the identified conditions.
* The inspectors determined that the causal analysis and corrective actions for the three violations related to Severity Level III issue EA-13-019, for commercial grade dedication (CDG), were adequate and fully implemented, and compliance with the associated regulatory requirements has been restored. These violations are closed. (Section OA.1.1)
* The NRC identified a severity level (SL) IV non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50, Appendix B, Criterion XVI, Corrective Actions, for inadequate corrective actions associated with historical 10CFR21 issues. Specifically, the applicant failed to identify all historical WBN Unit 1 10CFR Part 21 issues with potential Unit 2 applicability, and was therefore unable to subsequently review for Unit 2 impact and resolution. The inspectors determined that the applicants inadequate corrective action was a performance deficiency. This performance deficiency was considered more than minor in accordance with Inspection Manual Chapter (IMC) 0613,
Appendix E because it represented an adverse condition that rendered the quality of structures, systems, or components (SSCs) indeterminate and required substantive corrective action to satisfy the original intent of the corrective action document. Based on the applicants assessment, it was determined that the population of historical items that were originally omitted for resolution did not require re-work of any equipment. The finding was determined to be of very low safety significance in accordance with Section 6.5 of the NRC Enforcement Policy because it does not represent a breakdown in the QA process. The applicant issued PER 806990 to address the identified conditions.


The inspectors reviewed this finding against cross-cutting area components as described in IMC 0310 "Components Within the Cross-Cutting Areas" and determined that no cross-cutting aspect applied. (Section OA.1.2)
The inspectors reviewed this finding against cross-cutting area components as described in IMC 0310 Components Within the Cross-Cutting Areas and determined that no cross-cutting aspect applied. (Section OA.1.2)
* The inspections of action items for Confirmatory Order EA-12-021 which dealt with falsification of records were completed. This order is closed. (Section OA.1.3)
* The inspections of action items for Confirmatory Order EA-12-021 which dealt with falsification of records were completed. This order is closed. (Section OA.1.3)
* The inspectors concluded that issues pertaining to several open items, including three Construction Deficiency Reports (CDRs), three Bulletins (BLs), one Generic Letter (GL), four Temporary Instructions (TIs), three Three Mile Island (TMI) Action Items (AIs), three Appendix HH items, three Inspection Procedures (IPs), one Unresolved Item (URI), and one other open item have been appropriately addressed for WBN Unit 2. These items are closed.
* The inspectors concluded that issues pertaining to several open items, including three Construction Deficiency Reports (CDRs), three Bulletins (BLs), one Generic Letter (GL),
four Temporary Instructions (TIs), three Three Mile Island (TMI) Action Items (AIs), three Appendix HH items, three Inspection Procedures (IPs), one Unresolved Item (URI), and one other open item have been appropriately addressed for WBN Unit 2. These items are closed.
* Other areas inspected were adequate with no findings identified. These areas included QA; piping and supports; mechanical systems and components; electrical systems and components; engineering activities; pre-operational testing activities; operational readiness activities; and various NRC inspection procedures.
* Other areas inspected were adequate with no findings identified. These areas included QA; piping and supports; mechanical systems and components; electrical systems and components; engineering activities; pre-operational testing activities; operational readiness activities; and various NRC inspection procedures.


Table of Contents I. QUALITY ASSURANCE PROGRAM .................................................................................... 7 Q.1 Quality Assurance Oversight Activities ......................................................................... 7 Q.1.1 Identification and Resolution of Construction Problems (Inspection Procedure 35007) ................................................................................................................... 7 Q.1.2 (Closed) Audit of Applicant's Surveillance of Contractor QA/QC Activities (Inspection Procedure 35020) ............................................................................... 7 II. MANAGEMENT OVERSIGHT AND CONTROLS ................................................................. 8 C.1 Construction Activities .................................................................................................... 8 C.1.1 Unit 1 and Unit 2 Construction Activity Interface Controls ..................................... 8 C.1.2 (Closed) Structural Steel and Supports Work Observation (Inspection Procedure 48053) ................................................................................................................... 9 C.1.3 Electric Cable - Work Observation (Inspection Procedure 51063) ...................... 11 E.1 Engineering Activities ................................................................................................... 12 E.1.1 (Closed) Onsite Design Activities (Inspection Procedures 37055, 49063, 50073, and 50075) .......................................................................................................... 12 E.1.2 Verification of As-Builts for safety-related piping systems (Inspection Procedures 37051, 49063, 50073, and 50075) ................................................... 16 P.1 Pre-Operational Activities ............................................................................................. 17 P.1.1 Pre-Operational Test Program Implementation Verification (Inspection Procedure 71302) ................................................................................................................. 17 P.1.2 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 18 P.1.3 Pre-Operational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 19 P.1.4 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 20 P.1.5 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70333) ................................................................................................................. 21 P.1.6 Preoperational Test Witnessing (Inspection Procedures 70312 and 70302) ...... 22 P.1.7 Preoperational Test Results Evaluation (Inspection Procedure 70400) .............. 23 III. OPERATIONAL READINESS ACTIVITIES ....................................................................... 25 O.1 Operations ....................................................................................................................
Table of Contents I. QUALITY ASSURANCE PROGRAM .................................................................................... 7 Q.1 Quality Assurance Oversight Activities ......................................................................... 7 Q.1.1       Identification and Resolution of Construction Problems (Inspection Procedure 35007) ................................................................................................................... 7 Q.1.2       (Closed) Audit of Applicants Surveillance of Contractor QA/QC Activities (Inspection Procedure 35020) ............................................................................... 7 II. MANAGEMENT OVERSIGHT AND CONTROLS ................................................................. 8 C.1 Construction Activities .................................................................................................... 8 C.1.1       Unit 1 and Unit 2 Construction Activity Interface Controls ..................................... 8 C.1.2       (Closed) Structural Steel and Supports Work Observation (Inspection Procedure 48053) ................................................................................................................... 9 C.1.3       Electric Cable - Work Observation (Inspection Procedure 51063) ...................... 11 E.1 Engineering Activities ................................................................................................... 12 E.1.1       (Closed) Onsite Design Activities (Inspection Procedures 37055, 49063, 50073, and 50075) .......................................................................................................... 12 E.1.2       Verification of As-Builts for safety-related piping systems (Inspection Procedures 37051, 49063, 50073, and 50075) ................................................... 16 P.1 Pre-Operational Activities ............................................................................................. 17 P.1.1       Pre-Operational Test Program Implementation Verification (Inspection Procedure 71302) ................................................................................................................. 17 P.1.2       Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 18 P.1.3       Pre-Operational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 19 P.1.4       Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 20 P.1.5       Preoperational Test Procedure Review (Inspection Procedures 70300 and 70333) ................................................................................................................. 21 P.1.6       Preoperational Test Witnessing (Inspection Procedures 70312 and 70302) ...... 22 P.1.7       Preoperational Test Results Evaluation (Inspection Procedure 70400) .............. 23 III. OPERATIONAL READINESS ACTIVITIES ....................................................................... 25 O.1 Operations ...................................................................................................................... 25 O.1.1       Pre-Licensing Review of Training and Qualification Programs (Inspection Procedure 41301) ................................................................................................ 25 IV. OTHER ACTIVITES ........................................................................................................... 26 OA.1.1     Review of Actions for Violations (VIOs) associated with EA-13-019 for Commercial Grade Dedication (Inspection Procedure 92702) ............................ 26
.. 25 O.1.1 Pre-Licensing Review of Training and Qualification Programs (Inspection Procedure 41301) ................................................................................................ 25 IV. OTHER ACTIVITES ........................................................................................................... 26 OA.1.1 Review of Actions for Violations (VIOs) associated with EA-13-019 for Commercial Grade Dedication (Inspection Procedure 92702) ............................ 26 OA.1.2 (Closed) Historical 10CFR21 Reviews and Unresolved Item 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues (Inspection Procedure 92701) ................................................................................................ 27 OA.1.3 (Closed) Confirmatory Order EA-12-021, Completeness and Accuracy of Information (Inspection Procedure 35007) .......................................................... 29 OA.1.4 (Closed) SSER, Appendix HH, Item 49 Associated with Training Qualification Requirements (Inspection Procedure 92701) ..................................................... 31 OA.1.5 (Closed) SSER, Appendix HH, Item 51 Associated with the Definition of Significant Cracks (Inspection Procedure 92701) ............................................... 33 OA.1.6 (Closed) SSER, Appendix HH, Open Item 64, Eagle 21 Rack 2 RTD Testing Results Review (Inspection Procedure 52055) ................................................... 33 OA.1.7 (Closed) Three Mile Island Action Item II.K.1.10, Operability Status (Inspection Procedure 92701) ................................................................................................ 34 OA.1.8 (Closed) Generic Letter 1998-02, Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition, and Temporary Instruction 2515/142, Draindown During Shutdown and Common-Mode Failure (Temporary Instruction 2515/142 and Inspection Procedure 92701) .............................................................................. 35 OA.1.9 (Closed) NRC Bulletin 76-02 and 84-02, Relay Coil Failures (Inspection Procedures 51053 and 92717) ............................................................................ 37 OA.1.10 (Closed) NRC Bulletin 85-01 and Temporary Instruction 2515/069: Steam Binding of Auxiliary Feedwater Pumps (Inspection Procedure 92717 and Temporary Instruction 2515/069) ........................................................................ 38 OA.1.11 (Closed) Construction Deficiency Report 391/85-37: Incorrect Use of AMP PIDG   Terminals (Inspection Procedure 35007) ............................................................ 39 OA.1.12 (Closed) Construction Deficiency Report 86-14: Failure to Follow Procedures (Inspection Procedures 50073 and 50075) ......................................................... 40 OA.1.13 (Closed) Three Mile Island Action Item I.C.8, Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants (Inspection Procedure 92701) ................................................................................................ 41 OA.1.14 (Closed) Control Room Design Review Special Program and Three Mile Island Action Item I.D.1 (Temporary Instruction 2512/035 and Inspection Procedure 92701) ................................................................................................................. 42 OA.1.15 (Closed) Inspection of Watts Bar Nuclear Plant Employee Concerns Program (Temporary Instruction 2512/015) ....................................................................... 43 OA 1.16 (Closed) Construction Deficiency Report 391/91-31: Use of Non-Dedicated Commercial Grade Electrical Devices in Safety-Related Applications (Inspection Procedure 35007) ................................................................................................ 44 OA.1.17 (Discussed) QA Records Corrective Action Program Plan (Temporary Instruction 2512/028 and Inspection Procedure 51055) ....................................................... 45 OA.1.18 (Discussed) Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62 (Temporary Instruction 2500/020) ............................................................. 46 OA.1.19 (Discussed) Construction Deficiency Report 391/85-19: Potential Interaction of Flux Mapping System and Seal Table (Temporary Instruction 2500/16 and Inspection Procedure 35007) .............................................................................. 47 V. MANAGEMENT MEETINGS .............................................................................................. 48 X1 Exit Meeting Summary ................................................................................................... 48
 
OA.1.2   (Closed) Historical 10CFR21 Reviews and Unresolved Item 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues (Inspection Procedure 92701) ................................................................................................ 27 OA.1.3   (Closed) Confirmatory Order EA-12-021, Completeness and Accuracy of Information (Inspection Procedure 35007) .......................................................... 29 OA.1.4   (Closed) SSER, Appendix HH, Item 49 Associated with Training Qualification Requirements (Inspection Procedure 92701) ..................................................... 31 OA.1.5   (Closed) SSER, Appendix HH, Item 51 Associated with the Definition of Significant Cracks (Inspection Procedure 92701) ............................................... 33 OA.1.6   (Closed) SSER, Appendix HH, Open Item 64, Eagle 21 Rack 2 RTD Testing Results Review (Inspection Procedure 52055) ................................................... 33 OA.1.7   (Closed) Three Mile Island Action Item II.K.1.10, Operability Status (Inspection Procedure 92701) ................................................................................................ 34 OA.1.8   (Closed) Generic Letter 1998-02, Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition, and Temporary Instruction 2515/142, Draindown During Shutdown and Common-Mode Failure (Temporary Instruction 2515/142 and Inspection Procedure 92701) .............................................................................. 35 OA.1.9   (Closed) NRC Bulletin 76-02 and 84-02, Relay Coil Failures (Inspection Procedures 51053 and 92717) ............................................................................ 37 OA.1.10   (Closed) NRC Bulletin 85-01 and Temporary Instruction 2515/069: Steam Binding of Auxiliary Feedwater Pumps (Inspection Procedure 92717 and Temporary Instruction 2515/069) ........................................................................ 38 OA.1.11   (Closed) Construction Deficiency Report 391/85-37: Incorrect Use of AMP PIDG Terminals (Inspection Procedure 35007) ............................................................ 39 OA.1.12   (Closed) Construction Deficiency Report 86-14: Failure to Follow Procedures (Inspection Procedures 50073 and 50075) ......................................................... 40 OA.1.13   (Closed) Three Mile Island Action Item I.C.8, Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants (Inspection Procedure 92701) ................................................................................................ 41 OA.1.14   (Closed) Control Room Design Review Special Program and Three Mile Island Action Item I.D.1 (Temporary Instruction 2512/035 and Inspection Procedure 92701) ................................................................................................................. 42 OA.1.15   (Closed) Inspection of Watts Bar Nuclear Plant Employee Concerns Program (Temporary Instruction 2512/015) ....................................................................... 43 OA 1.16   (Closed) Construction Deficiency Report 391/91-31: Use of Non-Dedicated Commercial Grade Electrical Devices in Safety-Related Applications (Inspection Procedure 35007) ................................................................................................ 44 OA.1.17   (Discussed) QA Records Corrective Action Program Plan (Temporary Instruction 2512/028 and Inspection Procedure 51055) ....................................................... 45 OA.1.18   (Discussed) Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62 (Temporary Instruction 2500/020) ............................................................. 46 OA.1.19   (Discussed) Construction Deficiency Report 391/85-19: Potential Interaction of Flux Mapping System and Seal Table (Temporary Instruction 2500/16 and Inspection Procedure 35007) .............................................................................. 47 V. MANAGEMENT MEETINGS .............................................................................................. 48 X1 Exit Meeting Summary ................................................................................................... 48


=REPORT DETAILS=
=REPORT DETAILS=
Line 91: Line 75:
===Summary of Plant Status===
===Summary of Plant Status===


During the inspection period covered by this report, Tennessee Valley Authority (TVA) performed construction completion and pre-operational testing activities on safety-related systems and continued engineering design activities of the Watts Bar Nuclear (WBN) Plant,
During the inspection period covered by this report, Tennessee Valley Authority (TVA)performed construction completion and pre-operational testing activities on safety-related systems and continued engineering design activities of the Watts Bar Nuclear (WBN) Plant, Unit 2.
 
Unit 2.
 
I. QUALITY ASSURANCE PROGRAM


Q.1 Quality Assurance Oversight Activities Q.1.1 Identification and Resolution of Construction Problems (Inspection Procedure 35007)
I. QUALITY ASSURANCE PROGRAM Q.1     Quality Assurance Oversight Activities Q.1.1 Identification and Resolution of Construction Problems (Inspection Procedure 35007)


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors continued to review problem evaluation reports (PERs), as part of the applicant's corrective action program, to verify that issues being identified under the corrective action program were being properly identified, addressed, and resolved by the applicant.
The inspectors continued to review problem evaluation reports (PERs), as part of the applicants corrective action program, to verify that issues being identified under the corrective action program were being properly identified, addressed, and resolved by the applicant.


The inspectors reviewed PER 818910 to verify that the corrective actions removed the foreign material in the section of pipe upstream of 2-CKV-062-0507, the pipe section was boroscoped, and the cleaning plan for the section of piping adequately described the flushing path and acceptance criteria to verify cleanliness of the piping.
The inspectors reviewed PER 818910 to verify that the corrective actions removed the foreign material in the section of pipe upstream of 2-CKV-062-0507, the pipe section was boroscoped, and the cleaning plan for the section of piping adequately described the flushing path and acceptance criteria to verify cleanliness of the piping.


Inspectors also reviewed PERs 832900 and 830670 associated with a gasket failure of  
Inspectors also reviewed PERs 832900 and 830670 associated with a gasket failure of the temporary 2A sidestream filter during the Component Cooling Water System (CCS)flush. The inspectors reviewed corrective actions including personnel response, engineering evaluations, extent of condition review, and protection of adjacent equipment.
 
the temporary 2A sidestream filter during the Component Cooling Water System (CCS) flush. The inspectors reviewed corrective actions including personnel response, engineering evaluations, extent of condition review, and protection of adjacent  
 
equipment.


====b. Observations and Findings====
====b. Observations and Findings====
Line 116: Line 92:
The issues identified in the PERs reviewed were adequately identified, addressed, and resolved.
The issues identified in the PERs reviewed were adequately identified, addressed, and resolved.


Q.1.2 (Closed) Audit of Applicant's Surveillance of Contractor QA/QC Activities (Inspection Procedure 35020)
Q.1.2 (Closed) Audit of Applicants Surveillance of Contractor QA/QC Activities (Inspection Procedure 35020)


====a. Inspection Scope====
====a. Inspection Scope====
Line 127: Line 103:


====c. Conclusions====
====c. Conclusions====
Based on the review of the applicant's planned activities and corrective actions for identified deficiencies, and because the NRC has not identified any substantive deficiencies or concerns about the adequacy of the applicant's execution of contractor surveillance responsibilities, this inspection procedure (IP) is closed. However, if deficiencies are identified through observations of future activities, the inspectors will inspect them as necessary to satisfy the requirements of this inspection procedure.
Based on the review of the applicants planned activities and corrective actions for identified deficiencies, and because the NRC has not identified any substantive deficiencies or concerns about the adequacy of the applicants execution of contractor surveillance responsibilities, this inspection procedure (IP) is closed. However, if deficiencies are identified through observations of future activities, the inspectors will inspect them as necessary to satisfy the requirements of this inspection procedure.


II. MANAGEMENT OVERSIGHT AND CONTROLS C.1 Construction Activities C.1.1 Unit 1 and Unit 2 Construction Activity Interface Controls
II. MANAGEMENT OVERSIGHT AND CONTROLS C.1     Construction Activities C.1.1 Unit 1 and Unit 2 Construction Activity Interface Controls


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors independently assessed applicant controls, associated with Unit 2 construction work activities, to prevent adv erse impact on Unit 1 operational safety. The inspectors attended routine Unit 1/Unit 2 interface meetings to assess the exchange and sharing of information between the two site organizations. Periodic construction and planning meetings were observed, at least once per week, to assess the adequacy of the applicant's efforts to identify those construction activities that could potentially impact the operating unit. This included the review of select work activities, which the applicant had screened as not affecting Unit 1, to verify the adequacy of that screening effort.
The inspectors independently assessed applicant controls, associated with Unit 2 construction work activities, to prevent adverse impact on Unit 1 operational safety. The inspectors attended routine Unit 1/Unit 2 interface meetings to assess the exchange and sharing of information between the two site organizations. Periodic construction and planning meetings were observed, at least once per week, to assess the adequacy of the applicants efforts to identify those construction activities that could potentially impact the operating unit. This included the review of select work activities, which the applicant had screened as not affecting Unit 1, to verify the adequacy of that screening effort.


Additionally, the inspectors independently assessed select construction activities to verify that potential impacts on the operating unit had been identified and adequately characterized with appropriate management strategies planned for implementation. Furthermore, the inspectors performed independent walkdowns of select construction work locations to verify that controls to protect the operating unit provided an adequate level of protection and had been properly implemented.
Additionally, the inspectors independently assessed select construction activities to verify that potential impacts on the operating unit had been identified and adequately characterized with appropriate management strategies planned for implementation.
 
Furthermore, the inspectors performed independent walkdowns of select construction work locations to verify that controls to protect the operating unit provided an adequate level of protection and had been properly implemented.


Specific work activity observed included work associated with:
Specific work activity observed included work associated with:
* Preoperational Test Instruction (PTI)-067-02-A, Essential Raw Cooling Water (ERCW) System Flow Balance Train A
* Preoperational Test Instruction (PTI)-067-02-A, Essential Raw Cooling Water (ERCW) System Flow Balance Train A
* 2-CP-070-01-2, CCS Miscellaneous and Reactor Building Header Cleanness Plan Specific work activities that the applicant had screened out as not affecting Unit 1 included, but were not limited to, electrical work activities and refurbishment activities as noted in this inspection report.
* 2-CP-070-01-2, CCS Miscellaneous and Reactor Building Header Cleanness Plan Specific work activities that the applicant had screened out as not affecting Unit 1 included, but were not limited to, electrical work activities and refurbishment activities as noted in this inspection report.


====b. Observations and Findings====
====b. Observations and Findings====
Line 149: Line 127:


====a. Inspection Scope====
====a. Inspection Scope====
Background: As described in Inspection Manual Chapter (IMC) 2517, TVA addressed WBN Unit 1 construction quality issues as part of the implementation of its nuclear performance plant (NPP). The results of the NRC inspection program were published in NUREG-1528, "Reconstitution of the IMC 2512 Construction Inspection Program for Watts Bar Unit 1.In 1985, construction on Watts Bar Unit 1 and Watts Bar Unit 2 was stopped due to the identification of multiple construction QA issues. TVA completed Unit 1 in 1995 but had conducted very little Unit 2-specific work since 1985. In 2007, TVA decided to finish the Unit 2 plant. As part of confirming that all issues and inspection  
Background: As described in Inspection Manual Chapter (IMC) 2517, TVA addressed WBN Unit 1 construction quality issues as part of the implementation of its nuclear performance plant (NPP). The results of the NRC inspection program were published in NUREG-1528, Reconstitution of the IMC 2512 Construction Inspection Program for Watts Bar Unit 1. In 1985, construction on Watts Bar Unit 1 and Watts Bar Unit 2 was stopped due to the identification of multiple construction QA issues. TVA completed Unit 1 in 1995 but had conducted very little Unit 2-specific work since 1985. In 2007, TVA decided to finish the Unit 2 plant. As part of confirming that all issues and inspection requirements will be completed for Unit 2, a review of all NRC inspection reports was initiated to determine the status of the required IPs, contained in NRC Manual Chapter 2512, in effect at the time construction was stopped. This effort was called the reconstitution process. The NRC used the results of the reconstitution process to identify areas which require additional inspections. Integrated Inspection Report (IIR)05000391/2009602 (ADAMS Accession No. ML091210420), Attachment 2, documented the reconstitution results for IP 48053 and determined that the requirements of the IP were met for Unit 2.


requirements will be completed for Unit 2, a review of all NRC inspection reports was initiated to determine the status of the required IPs, contained in NRC Manual Chapter 2512, in effect at the time construction was stopped. This effort was called the reconstitution process. The NRC used the results of the reconstitution process to identify areas which require additional inspections. Integrated Inspection Report (IIR)
Inspection Activities: The purpose of this IP was to verify, by observation and independent evaluation of work performed and completed, that activities related to structural steel were accomplished in accordance with approved procedures and NRC requirements.
 
05000391/2009602 (ADAMS Accession No. ML091210420), Attachment 2, documented the reconstitution results for IP 48053 and determined that the requirements of the IP were met for Unit 2.
 
Inspection Activities: The purpose of this IP was to verify, by observation and independent evaluation of work performed and completed, that activities related to structural steel were accomplished in accordance with approved procedures and NRC requirements.


The following table lists the inspections that were previously performed under this IP.
The following table lists the inspections that were previously performed under this IP.


IP Section Inspection Report 02.02 Review the specifications, drawings, and QA/QC and construction procedures 05000391/2009603 (ADAMS Accession No.
IP Section                                   Inspection Report 05000391/2009603 (ADAMS Accession No.


ML092120326)05000391/2009604 (ADAMS Accession No.
ML092120326)05000391/2009604 (ADAMS Accession No.


ML093030479)05000391/2012605 (ADAMS Accession No. ML12220A536)05000391/2013604 (ADAMS Accession No. ML13179A079) 02.03a Receipt Inspection and Storage 05000391/2009604 05000391/2010605 (ADAMS Accession No.
02.02 Review the specifications, drawings,                      ML093030479)and QA/QC and construction procedures          05000391/2012605 (ADAMS Accession No.
 
ML12220A536)05000391/2013604 (ADAMS Accession No.


ML110410680) 02.03b Use of Specified Materials and Components 05000391/2009604 05000391/2010605  
ML13179A079)05000391/2009604 02.03a Receipt Inspection and Storage        05000391/2010605 (ADAMS Accession No.


05000391/2013604 02.03c Installation and Erection 05000391/2009603 05000391/2009604 05000391/2011602 (ADAMS Accession No.
ML110410680)05000391/2009604 02.03b Use of Specified Materials and 05000391/2010605 Components 05000391/2013604 05000391/2009603 05000391/2009604 05000391/2011602 (ADAMS Accession No.


ML110800483)05000391/2012605
02.03c Installation and Erection ML110800483)05000391/2012605 05000391/2013604 05000391/2011603 (ADAMS Accession No.


05000391/2013604 02.03d Inspection, Testing, NDE, and Records 05000391/2011603 (ADAMS Accession No.
ML111370702)02.03d Inspection, Testing, NDE, and         05000391/2012608 (ADAMS Accession No.


ML111370702)05000391/2012608 (ADAMS Accession No. ML12319A368)05000391/2013605 (ADAMS Accession No. ML13220A640) 02.04 Informal interviews with field craft and inspection (QA/QC) personnel 05000391/2009603 05000391/2010605
Records                                      ML12319A368)05000391/2013605 (ADAMS Accession No.


05000391/2013605 Section 2.01 of this IP required the review of the results of the inspection performed under IP 48051. The results of inspection performed under this IP were discussed and this IP was closed in NRC Inspection Report 05000391/2010605 (ADAMS Accession No. ML110410680).
ML13220A640)05000391/2009603 02.04 Informal interviews with field craft and 05000391/2010605 inspection (QA/QC) personnel 05000391/2013605 Section 2.01 of this IP required the review of the results of the inspection performed under IP 48051. The results of inspection performed under this IP were discussed and this IP was closed in NRC Inspection Report 05000391/2010605 (ADAMS Accession No. ML110410680).


Section 02.05 allowed for an expansion of the sample size as appropriate. At this time the additional sampling sections are not required based on assessment of TVA's performance of construction for Watts Bar Unit 2. No new inspections were performed during this reporting period.
Section 02.05 allowed for an expansion of the sample size as appropriate. At this time the additional sampling sections are not required based on assessment of TVAs performance of construction for Watts Bar Unit 2. No new inspections were performed during this reporting period.


====b. Observations and Findings====
====b. Observations and Findings====
Line 183: Line 159:


====c. Conclusions====
====c. Conclusions====
The structural steel supports previously observed met procedural, specification, and drawing requirements. IP 48053 is considered closed; however, if additional structural steel or supports activities are perform ed, inspections may be performed at the NRC's discretion.
The structural steel supports previously observed met procedural, specification, and drawing requirements. IP 48053 is considered closed; however, if additional structural steel or supports activities are performed, inspections may be performed at the NRCs discretion.


C.1.3 Electric Cable - Work Observation (Inspection Procedure 51063)
C.1.3 Electric Cable - Work Observation (Inspection Procedure 51063)
Line 208: Line 184:
The inspectors determined that adequate measures were in place to ensure that electrical cable work was performed in accordance with applicable procedures and drawings.
The inspectors determined that adequate measures were in place to ensure that electrical cable work was performed in accordance with applicable procedures and drawings.


E.1 Engineering Activities E.1.1 (Closed) Onsite Design Activities (Inspection Procedures 37055, 49063, 50073, and 50075)
E.1   Engineering Activities E.1.1 (Closed) Onsite Design Activities (Inspection Procedures 37055, 49063, 50073, and 50075)


====a. Inspection Scope====
====a. Inspection Scope====
Background: The purpose of IP 37055 was to determine whether the applicant's, architect engineer's, and contractor's onsite design activity, including controls for engineering and construction initiated field changes, was conducted in compliance with the technical and QA requirements described in the facility safety analysis report (SAR).
Background: The purpose of IP 37055 was to determine whether the applicants, architect engineers, and contractors onsite design activity, including controls for engineering and construction initiated field changes, was conducted in compliance with the technical and QA requirements described in the facility safety analysis report (SAR).


The 2009 readiness inspection, as documented in Attachment 3 of IIR 05000391/2009602 (ADAMS Accession No. ML091210420), determined that that the inspection requirements for IP 37055 were fully met for all sections except Section 02.06. For Section 02.06, it was determined that the inspection of two more design activities would completely fulfill the requirements of IP 37055. Inspections associated with this IP were previously documented in the following inspection reports:
The 2009 readiness inspection, as documented in Attachment 3 of IIR 05000391/2009602 (ADAMS Accession No. ML091210420), determined that that the inspection requirements for IP 37055 were fully met for all sections except Section 02.06. For Section 02.06, it was determined that the inspection of two more design activities would completely fulfill the requirements of IP 37055. Inspections associated with this IP were previously documented in the following inspection reports:
Line 224: Line 200:
* IIR 05000391/2012610, Section Q.1.7 (ADAMS Accession No. ML13035A201)
* IIR 05000391/2012610, Section Q.1.7 (ADAMS Accession No. ML13035A201)
Inspection Activities: The inspectors reviewed documents, interviewed personnel, and performed walkdowns of as-built structures, systems, and components. The inspectors performed these activities to determine if:
Inspection Activities: The inspectors reviewed documents, interviewed personnel, and performed walkdowns of as-built structures, systems, and components. The inspectors performed these activities to determine if:
* Bechtel's engineering and design controls complied with the technical and QA requirements described in the SAR;
* Bechtels engineering and design controls complied with the technical and QA requirements described in the SAR;
* as-built design and construction drawings and specifications correctly reflected the as-built condition of the plant; and
* as-built design and construction drawings and specifications correctly reflected the as-built condition of the plant; and
* changes from the original design were properly reviewed and approved.
* changes from the original design were properly reviewed and approved.


The inspectors performed these inspection activities on the following mechanical structures, systems, or components:  
The inspectors performed these inspection activities on the following mechanical structures, systems, or components:
 
System 067 (ERCW):
System 067 (ERCW):
* flood mode return valves 0-ISV-067-0558B and 0-ISV-067-0559B including associated spool pieces 0-SPPC-067-0558B and 0-SPPC-067-0559B;
* flood mode return valves 0-ISV-067-0558B and 0-ISV-067-0559B including associated spool pieces 0-SPPC-067-0558B and 0-SPPC-067-0559B;
Line 249: Line 224:
* pipe section between nodes 180 and 210 on drawing 2-47W464-268 including support 47A464-4-166.
* pipe section between nodes 180 and 210 on drawing 2-47W464-268 including support 47A464-4-166.


For each of the above supports, the inspectors reviewed plant seismic calculations to determine if they were consistent with the as-built condition of the plant. Additionally, the inspectors reviewed valve manufacturer drawings and American Society of Mechanical Engineers (ASME) Form NV-1 valve data reports to determine if the valve materials, size, type, and ratings were consistent with the requirements in the purchase specification and the applicable valve data sheets. For each of the above MOVs, the  
For each of the above supports, the inspectors reviewed plant seismic calculations to determine if they were consistent with the as-built condition of the plant. Additionally, the inspectors reviewed valve manufacturer drawings and American Society of Mechanical Engineers (ASME) Form NV-1 valve data reports to determine if the valve materials, size, type, and ratings were consistent with the requirements in the purchase specification and the applicable valve data sheets. For each of the above MOVs, the inspectors reviewed the vendor drawings, design requirements, and valve data sheets to determine if the as-built conditions of the valves were consistent with the design inputs contained in the associated MOV calculation.
 
inspectors reviewed the vendor drawings, design requirements, and valve data sheets to determine if the as-built conditions of the valves were consistent with the design inputs contained in the associated MOV calculation.


For both of the thermal barrier booster pumps, the inspectors reviewed the vendor test performance data on the replacement pumps to determine if the pump performance (head vs. capacity, net positive suction head required, and brake horse power) was similar to the original pumps.
For both of the thermal barrier booster pumps, the inspectors reviewed the vendor test performance data on the replacement pumps to determine if the pump performance (head vs. capacity, net positive suction head required, and brake horse power) was similar to the original pumps.
Line 284: Line 257:
* design control procedures were available for the design activities being conducted.
* design control procedures were available for the design activities being conducted.


The inspectors interviewed engineering staff to determine if the staff was knowledgeable on drawing control requirements. The inspectors reviewed the method used to control drawings in the applicant's electronic document management system to determine if the drawings were sufficiently legible, retrievable, and protected from damage, loss, or unauthorized alteration.
The inspectors interviewed engineering staff to determine if the staff was knowledgeable on drawing control requirements. The inspectors reviewed the method used to control drawings in the applicants electronic document management system to determine if the drawings were sufficiently legible, retrievable, and protected from damage, loss, or unauthorized alteration.


The inspectors reviewed surveillances and audits, and interviewed staff to determine if:
The inspectors reviewed surveillances and audits, and interviewed staff to determine if:
Line 307: Line 280:
* IP 49063 Section 02.03-two samples (two piping systems outside reactor coolant system (RCS))
* IP 49063 Section 02.03-two samples (two piping systems outside reactor coolant system (RCS))
* IP 49063 Section 02.04-two samples (two piping systems outside RCS)
* IP 49063 Section 02.04-two samples (two piping systems outside RCS)
* IP 50073 Section 02.04-eight samples (eight drawings and thirteen safety-related mechanical components)
* IP 50073 Section 02.04-eight samples (eight drawings and thirteen safety-related mechanical components)
* IP 50075 Section 02.03.d-eight records/samples (eight drawings and 13 safety-related mechanical components)
* IP 50075 Section 02.03.d-eight records/samples (eight drawings and 13 safety-related mechanical components)
Documents reviewed are listed in the Attachment.
Documents reviewed are listed in the Attachment.


Line 320: Line 293:
* Section 02.05.b - Not required
* Section 02.05.b - Not required
* Section 02.05.c - Complete
* Section 02.05.c - Complete
* Section 02.06 - Complete c. Conclusion Based on the activities reviewed in this and previous inspections, the inspectors concluded that the applicant's and contractor's onsite design activity, including controls for engineering and construction initiated field changes, was being conducted in compliance with the technical and QA requirements described in the facility SAR. Based  
* Section 02.06 - Complete c. Conclusion Based on the activities reviewed in this and previous inspections, the inspectors concluded that the applicants and contractor's onsite design activity, including controls for engineering and construction initiated field changes, was being conducted in compliance with the technical and QA requirements described in the facility SAR. Based on the historical NRC inspections and the recent inspection efforts, a sufficient number of samples have been reviewed and IP 37055 is closed.
 
on the historical NRC inspections and the recent inspection efforts, a sufficient number of samples have been reviewed and IP 37055 is closed.


E.1.2 Verification of As-Builts for safety-related piping systems (Inspection Procedures 37051, 49063, 50073, and 50075)
E.1.2 Verification of As-Builts for safety-related piping systems (Inspection Procedures 37051, 49063, 50073, and 50075)
Line 328: Line 299:
====a. Inspection Scope====
====a. Inspection Scope====
As discussed in Section E.1.1 of this report, the inspectors performed field walkdowns of selected portions of two safety-related piping systems to determine if:
As discussed in Section E.1.1 of this report, the inspectors performed field walkdowns of selected portions of two safety-related piping systems to determine if:
* as-built design and construction drawings and specifications correctly reflected the as-built condition of the plant (including supports, pipe welds, and piping);
* as-built design and construction drawings and specifications correctly reflected the as-built condition of the plant (including supports, pipe welds, and piping);and
and
* changes from the original design were properly reviewed and approved.
* changes from the original design were properly reviewed and approved.


Line 341: Line 311:
c. Conclusion Based on the limited sample of as-built inspections conducted during this inspection, no additional conclusion is warranted. Additional inspection samples are required to meet the requirements of this IP.
c. Conclusion Based on the limited sample of as-built inspections conducted during this inspection, no additional conclusion is warranted. Additional inspection samples are required to meet the requirements of this IP.


P.1 Pre-Operational Activities P.1.1 Pre-Operational Test Program Implementation Verification (Inspection Procedure 71302)
P.1   Pre-Operational Activities P.1.1 Pre-Operational Test Program Implementation Verification (Inspection Procedure 71302)


====a. Inspection Scope====
====a. Inspection Scope====
02.01 (Weekly Inspection Activities): The inspectors verified that the applicant's management control system was effectively discharging its responsibilities over the preoperational testing program by direct observation of activities, tours of the facility, interviews and discussions with applicant personnel, and review of facility records.
02.01 (Weekly Inspection Activities): The inspectors verified that the applicants management control system was effectively discharging its responsibilities over the preoperational testing program by direct observation of activities, tours of the facility, interviews and discussions with applicant personnel, and review of facility records.


Preoperational testing activities were limited during the inspection period and included the following systems or portions thereof:
Preoperational testing activities were limited during the inspection period and included the following systems or portions thereof:
Line 350: Line 320:
* System 67, ERCW
* System 67, ERCW
* System 74, Residual Heat Removal (RHR)
* System 74, Residual Heat Removal (RHR)
As systems became available for preoperational testing, inspectors toured the accessible areas of the facility to make an independent assessment of equipment conditions, plant conditions, security, and adherence to regulatory requirements. Inspectors also verified the following, as available and on a sampling basis during the tours:
As systems became available for preoperational testing, inspectors toured the accessible areas of the facility to make an independent assessment of equipment conditions, plant conditions, security, and adherence to regulatory requirements.
 
Inspectors also verified the following, as available and on a sampling basis during the tours:
* general plant/equipment conditions;
* general plant/equipment conditions;
* activities in progress (e.g., maintenance, preoperational testing, etc.) were being conducted in accordance with applicant's  procedures; and
* activities in progress (e.g., maintenance, preoperational testing, etc.) were being conducted in accordance with applicants procedures; and
* construction work force was authorized to perform activities on systems or equipment.
* construction work force was authorized to perform activities on systems or equipment.


02.02 (Monthly Inspection Activities): During this inspection period, the inspectors reviewed the turnover package for the Unit 2 portion of the Safety Injection System (System 63) as part of Startup Manual Procedure (SMP) 4.0, "System Completion and Turnover," Rev.9, to verify jurisdiction controls were appropriate and applicant procedures were followed. Additionally, the inspectors reviewed the turnover package to ensure required preventative maintenance was incorporated into a schedule for accomplishment.
02.02 (Monthly Inspection Activities): During this inspection period, the inspectors reviewed the turnover package for the Unit 2 portion of the Safety Injection System (System 63) as part of Startup Manual Procedure (SMP) 4.0, System Completion and Turnover, Rev.9, to verify jurisdiction controls were appropriate and applicant procedures were followed. Additionally, the inspectors reviewed the turnover package to ensure required preventative maintenance was incorporated into a schedule for accomplishment.


The inspectors reviewed maintenance plans on safety-related equipment, to determine if the maintenance was scheduled in accordance with developed procedures and that these procedures were adequate for the maintenance being performed. The maintenance had not been performed but the methodology was discussed with the Refurbishment and Preventative Maintenance Manager to determine how systems with completed preoperational testing would be protected.
The inspectors reviewed maintenance plans on safety-related equipment, to determine if the maintenance was scheduled in accordance with developed procedures and that these procedures were adequate for the maintenance being performed. The maintenance had not been performed but the methodology was discussed with the Refurbishment and Preventative Maintenance Manager to determine how systems with completed preoperational testing would be protected.
Line 363: Line 335:


====c. Conclusions====
====c. Conclusions====
The applicant's preoperational test program was implemented in accordance with procedures for those activities observed during the inspection period.
The applicants preoperational test program was implemented in accordance with procedures for those activities observed during the inspection period.


P.1.2 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311)
P.1.2 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311)


====a. Inspection Scope====
====a. Inspection Scope====
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility  
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -
 
Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
records that:
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
Line 376: Line 347:
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.


Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-063-05-B, Safety Injection System Pump/Valve Logic Test - Train B, Rev.0001 to verify that the procedure contained the following administrative good practice attributes:
Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-063-05-B, Safety Injection System Pump/Valve Logic Test - Train B, Rev.0001 to verify that the procedure contained the following administrative good practice attributes:
* the title described the purpose of the procedure
* the title described the purpose of the procedure
* the cover page had appropriate information and approval signatures
* the cover page had appropriate information and approval signatures
Line 393: Line 364:
* clear instructions for system restoration
* clear instructions for system restoration
* guidance for follow-up actions and points of contact
* guidance for follow-up actions and points of contact
* overall, clear concise steps for testing with action critical (acceptance criteria) steps identified
* overall, clear concise steps for testing with action critical (acceptance criteria)steps identified
* clear quantitative acceptance criteria with acceptability and contingencies
* clear quantitative acceptance criteria with acceptability and contingencies
* overall sequence of the procedure consistent with the obtaining the intended result The inspectors also reviewed the procedure to verify that precautions or explanations were placed immediately ahead of the steps to which they applied. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.
* overall sequence of the procedure consistent with the obtaining the intended result The inspectors also reviewed the procedure to verify that precautions or explanations were placed immediately ahead of the steps to which they applied. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.
Line 401: Line 372:


====c. Conclusions====
====c. Conclusions====
The inspectors determined that the applicant's test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, "Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions," Rev. 9. P.1.3 Pre-Operational Test Procedure Review (Inspection Procedures 70300 and 70311)
The inspectors determined that the applicants test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions, Rev. 9.
 
P.1.3 Pre-Operational Test Procedure Review (Inspection Procedures 70300 and 70311)


====a. Inspection Scope====
====a. Inspection Scope====
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility  
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -
 
Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
records that:
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
Line 412: Line 384:
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.


Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-063-05-A, Safety Injection System Pump/Valve Logic Test - Train A, Rev.0001 to verify that the procedure was written to the same standard as 2-PTI-063-05-B, Safety Injection System Pump/Valve Logic Test - Train B. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the  
Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-063-05-A, Safety Injection System Pump/Valve Logic Test - Train A, Rev.0001 to verify that the procedure was written to the same standard as 2-PTI-063-05-B, Safety Injection System Pump/Valve Logic Test - Train B. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the
.
.


Line 419: Line 391:


====c. Conclusions====
====c. Conclusions====
The inspectors determined that the applicant's test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, "Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions,Rev. 9. P.1.4 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311)
The inspectors determined that the applicants test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions, Rev. 9.
 
P.1.4 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311)


====a. Inspection Scope====
====a. Inspection Scope====
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -
Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
Line 428: Line 403:
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.


Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-067-02-A, ERCW System Flow Balance - Train A, Rev. 0004 to verify that the procedure was written to the same standard as 2-PTI-067-02-A, ERCW System Flow Balance - Train A, Rev. 0003. The inspectors had previously reviewed 2-PTI-067-02-A Rev. 0003 in IIR 05000391/2013610 (ADAMS Accession No. ML14049A158) but the applicant had made a revision to the test acceptance criteria. This change warranted additional inspection review of the procedure due to the importance of the revised acceptance criteria. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.
Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-067-02-A, ERCW System Flow Balance - Train A, Rev. 0004 to verify that the procedure was written to the same standard as 2-PTI-067-02-A, ERCW System Flow Balance -
Train A, Rev. 0003. The inspectors had previously reviewed 2-PTI-067-02-A Rev. 0003 in IIR 05000391/2013610 (ADAMS Accession No. ML14049A158) but the applicant had made a revision to the test acceptance criteria. This change warranted additional inspection review of the procedure due to the importance of the revised acceptance criteria. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.


====b. Observations and Findings====
====b. Observations and Findings====
Line 434: Line 410:


====c. Conclusions====
====c. Conclusions====
The inspectors determined that the applicant's test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, "Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions,"
The inspectors determined that the applicants test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions, Rev. 9.
Rev. 9.


P.1.5 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70333)
P.1.5 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70333)


====a. Inspection Scope====
====a. Inspection Scope====
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -
Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
Line 446: Line 422:
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.


Inspection Activities: The inspectors reviewed preoperational test instruction 2-PTI-062-01, Charging and Letdown Logic Test, Rev. 0000, to verify that the procedure contained the following administrative good practice attributes:
Inspection Activities: The inspectors reviewed preoperational test instruction 2-PTI-062-01, Charging and Letdown Logic Test, Rev. 0000, to verify that the procedure contained the following administrative good practice attributes:
* the title described the purpose of the procedure
* the title described the purpose of the procedure
* the cover page had appropriate information and approval signatures
* the cover page had appropriate information and approval signatures
Line 462: Line 438:
* clear instructions for system restoration
* clear instructions for system restoration
* guidance for follow-up actions and points of contact
* guidance for follow-up actions and points of contact
* overall, clear concise steps for testing with action critical (acceptance criteria) steps identified
* overall, clear concise steps for testing with action critical (acceptance criteria)steps identified
* clear quantitative acceptance criteria with acceptability and contingencies
* clear quantitative acceptance criteria with acceptability and contingencies
* overall sequence of the procedure consistent with the obtaining the intended result The inspectors also reviewed the procedure to verify that precautions or explanations were placed immediately ahead of the steps to which they applied. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.
* overall sequence of the procedure consistent with the obtaining the intended result The inspectors also reviewed the procedure to verify that precautions or explanations were placed immediately ahead of the steps to which they applied. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.
Line 470: Line 446:


====c. Conclusions====
====c. Conclusions====
The inspectors determined that the applicant's test procedure was written in a manner consistent with the guidance of procedure SMP-8.0, "Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions," Rev. 9.
The inspectors determined that the applicants test procedure was written in a manner consistent with the guidance of procedure SMP-8.0, Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions, Rev. 9.


P.1.6 Preoperational Test Witnessing (Inspection Procedures 70312 and 70302)
P.1.6 Preoperational Test Witnessing (Inspection Procedures 70312 and 70302)
Line 476: Line 452:
====a. Inspection Scope====
====a. Inspection Scope====
:
:
 
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility  
Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
 
records that:
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
Line 485: Line 459:
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the pre-operational test witnessing of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed to in relation to satisfying the required pre-operational test witnessing.
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the pre-operational test witnessing of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed to in relation to satisfying the required pre-operational test witnessing.


Inspection Activities: The inspectors witnessed the performance of pre-operational test instruction 2-PTI-067-02A, ERCW System Flow Balance -Train A, Rev. 0003 and 0004 to verify that the testing was conducted in accordance with approved procedures and to verify the adequacy of test program records and preliminary evaluation of test results.
Inspection Activities: The inspectors witnessed the performance of pre-operational test instruction 2-PTI-067-02A, ERCW System Flow Balance -Train A, Rev. 0003 and 0004 to verify that the testing was conducted in accordance with approved procedures and to verify the adequacy of test program records and preliminary evaluation of test results.


The inspectors assessed the following attributes associated with this test observation:
The inspectors assessed the following attributes associated with this test observation:
Line 499: Line 473:
* Temporary equipment was installed and tracked appropriately
* Temporary equipment was installed and tracked appropriately
* Administrative test controls were properly followed
* Administrative test controls were properly followed
* Test personnel were using approved drawings and vendor manuals The inspectors observed the test to verify that the overall test acceptance was met. The inspectors conducted a review with the responsible test engineer to assure that the preliminary test evaluations were consistent with the inspector's observations. During the test inspectors observed important data gathering activities to ensure the data was properly gathered and recorded. A posttest cursory review of the test data was performed to verify legibility, traceability, and permanence of the data sheet entries.
* Test personnel were using approved drawings and vendor manuals The inspectors observed the test to verify that the overall test acceptance was met. The inspectors conducted a review with the responsible test engineer to assure that the preliminary test evaluations were consistent with the inspectors observations. During the test inspectors observed important data gathering activities to ensure the data was properly gathered and recorded. A posttest cursory review of the test data was performed to verify legibility, traceability, and permanence of the data sheet entries.


The inspectors verified through direct questioning that the on-shift operations supervisor and test engineer were familiar with administrative controls covering the conduct of corrective and preventative maintenance during testing.
The inspectors verified through direct questioning that the on-shift operations supervisor and test engineer were familiar with administrative controls covering the conduct of corrective and preventative maintenance during testing.
Line 505: Line 479:
The inspectors reviewed four drawings used by test personnel to verify that they were the correct revisions as compared to master indices.
The inspectors reviewed four drawings used by test personnel to verify that they were the correct revisions as compared to master indices.


The inspectors conducted interviews and reviewed training records for two personnel  
The inspectors conducted interviews and reviewed training records for two personnel involved in the above test to verify they had received appropriate training for performing the test. Documents reviewed are listed in the Attachment.
 
involved in the above test to verify they had received appropriate training for performing the test. Documents reviewed are listed in the Attachment.


The following samples were inspected:
The following samples were inspected:
Line 516: Line 488:


====b. Observations and Findings====
====b. Observations and Findings====
No findings were identified. This test was performed twice in its entirety due to a change of acceptance criteria after completion of the first test (Rev. 0003).
No findings were identified. This test was performed twice in its entirety due to a change       of acceptance criteria after completion of the first test (Rev. 0003).


====c. Conclusions====
====c. Conclusions====
The inspectors determined that the applicant's test procedure was performed in a manner consistent with the guidance of procedure SMP-9, "Watts Bar Nuclear Plant Unit 2 Conduct of Test," Rev. 2.
The inspectors determined that the applicants test procedure was performed in a manner consistent with the guidance of procedure SMP-9, Watts Bar Nuclear Plant Unit 2 Conduct of Test, Rev. 2.


P.1.7 Preoperational Test Results Evaluation (Inspection Procedure 70400)
P.1.7 Preoperational Test Results Evaluation (Inspection Procedure 70400)
Line 525: Line 497:
====a. Inspection Scope====
====a. Inspection Scope====
:
:
 
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -
Background: The purpose of IMC 2513, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
* Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.
Line 532: Line 504:
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the pre-operational test results review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed to in relation to satisfying the required pre-operational test results review.
IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the pre-operational test results review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed to in relation to satisfying the required pre-operational test results review.


Inspection Activities: The inspectors performed a detailed review of the results for pre-operational test procedure 2-PTI-072-02, Containment Spray System Air Flow Test, Rev.
Inspection Activities: The inspectors performed a detailed review of the results for pre-operational test procedure 2-PTI-072-02, Containment Spray System Air Flow Test, Rev.


1 to verify that the applicant's evaluation of the procedure performance and results was conducted in accordance with approved procedures. This review was performed to provide assurance that the test data was within the established acceptance criteria and the applicant's methods for identifying and correcting deficiencies were adequate. The inspectors performed the following activities associated with this test results review:
1 to verify that the applicants evaluation of the procedure performance and results was conducted in accordance with approved procedures. This review was performed to provide assurance that the test data was within the established acceptance criteria and the applicants methods for identifying and correcting deficiencies were adequate. The inspectors performed the following activities associated with this test results review:
* Reviewed all changes made to the test procedure to verify they were properly annotated, did not affect the objective of the test, and were performed in accordance with administrative procedures.
* Reviewed all changes made to the test procedure to verify they were properly annotated, did not affect the objective of the test, and were performed in accordance with administrative procedures.
* Reviewed the test summary and evaluation to verify that the system was evaluated to meet design requirements and acceptance criteria.
* Reviewed the test summary and evaluation to verify that the system was evaluated to meet design requirements and acceptance criteria.
* Reviewed the original "as-run" copy of the test to verify completion of data sheets, calculations and signatures/initials.
* Reviewed the original as-run copy of the test to verify completion of data sheets, calculations and signatures/initials.
* QA inspection records were reviewed to verify they were completed as required by the test procedure.
* QA inspection records were reviewed to verify they were completed as required by the test procedure.
* The approval of the test results was reviewed for completeness with respect to the acceptance of the test results.
* The approval of the test results was reviewed for completeness with respect to the acceptance of the test results.
Line 547: Line 519:


====c. Conclusions====
====c. Conclusions====
The inspectors determined that the applicant's test procedure was written in a manner consistent with the guidance of procedure SMP-10.0, "Watts Bar Nuclear Plant Unit 2 Packaging and Processing Test Results," Rev. 1.
The inspectors determined that the applicants test procedure was written in a manner consistent with the guidance of procedure SMP-10.0, Watts Bar Nuclear Plant Unit 2 Packaging and Processing Test Results, Rev. 1.


III. OPERATIONAL READINESS ACTIVITIES O.1 Operations O.1.1 Pre-Licensing Review of Training and Qualification Programs (Inspection Procedure 41301)
III. OPERATIONAL READINESS ACTIVITIES O.1     Operations O.1.1 Pre-Licensing Review of Training and Qualification Programs (Inspection Procedure 41301)


====a. Inspection Scope====
====a. Inspection Scope====
Line 561: Line 533:
* U1/U2 RVLIS, CETs, SCM Differences (Common Q)
* U1/U2 RVLIS, CETs, SCM Differences (Common Q)
* Common Systems Impacted by U2
* Common Systems Impacted by U2
* U1/U2 Electrical & FP Differences  
* U1/U2 Electrical & FP Differences
* "Other" U1/U2 Differences Inspectors observed that the first three elements described in paragraph 03.01.b of IP 41301, as listed below, were met:
* Other U1/U2 Differences Inspectors observed that the first three elements described in paragraph 03.01.b of IP 41301, as listed below, were met:
* systematic analysis of the jobs to be performed
* systematic analysis of the jobs to be performed
* learning objectives derived from the analysis which describe desired performance after training
* learning objectives derived from the analysis which describe desired performance after training
* training design and implementation based on the learning objectives
* training design and implementation based on the learning objectives b . Observations and Findings.
 
====b. Observations and Findings====
.


No findings were identified.
No findings were identified.


c. Conclusion.
c . Conclusion.


Instructors were well prepared and the lesson material was adequate. Students were attentive as the information was new.
Instructors were well prepared and the lesson material was adequate. Students were attentive as the information was new.


IV. OTHER ACTIVITES OA.1.1 Review of Actions for Violations (VIOs) associated with EA-13-019 for Commercial Grade Dedication (Inspection Procedure 92702)
IV. OTHER ACTIVITES OA.1.1 Review of Actions for Violations (VIOs) associated with EA-13-019 for Commercial Grade Dedication (Inspection Procedure 92702)
OA.1.1.1 (CLOSED) VIO 05000391/2013611-01, Commercial Grade Dedication Program Breakdown  
OA.1.1.1 (CLOSED) VIO 05000391/2013611-01, Commercial Grade Dedication Program Breakdown OA.1.1.2 (CLOSED) VIO 05000391/2013611-02, Failure to Make a Required 10 CFR 50.55(e) Report OA.1.1.3 (CLOSED) VIO 05000391/2013611-03, Failure to Identify Significant Condition Adverse to Quality
 
OA.1.1.2 (CLOSED) VIO 05000391/2013611-02, Failure to Make a Required 10 CFR 50.55(e) Report  
 
OA.1.1.3 (CLOSED) VIO 05000391/2013611-03, Failure to Identify Significant Condition Adverse to Quality


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the applicant's response to the Severity Level III problem (EA-
The inspectors reviewed the applicants response to the Severity Level III problem (EA-13-019) described in NRC inspection report 05000391/2013614 (ADAMS Accession No.


13-019) described in NRC inspection report 05000391/2013614 (ADAMS Accession No. ML13169A030). This SL III problem consisted of three violations all related to the CGD program. The first violation involved a breakdown of the 10 CFR Part 50, Appendix B QA program in the single work area of CGD. Specifically, TVA failed to translate or include the 10 CFR Part 21 definition of critical characteristic in its procedure NEDP-8, "Technical Evaluation for Procurement of Materials and Services.As such, TVA had not verified critical characteristics fo r an unknown number of safety-related items procured for the WB2 project starting from the resumption of construction activities in 2008. A second violation involved a failure to report the aforementioned breakdown in the QA program as required by 10 CFR 50.55(e)(4) and (5). The apparent cause of this violation was the failure of procedure NC-PP-13, "Reporting Requirements," Rev. 0 to require a significant breakdown of the QA program to be reportable whether or not the breakdown actually resulted in a defect. The third violation involved the failure to identify a significant condition adverse to quality related to the previously mentioned breakdown in the QA program. The inspectors reviewed the applicant's letter in response to EA-13-019 (ADAMS Accession No. ML13204A383), which addressed reasons for the violations, corrective steps, and the date when full compliance was achieved for all three violations.
ML13169A030). This SL III problem consisted of three violations all related to the CGD program. The first violation involved a breakdown of the 10 CFR Part 50, Appendix B QA program in the single work area of CGD. Specifically, TVA failed to translate or include the 10 CFR Part 21 definition of critical characteristic in its procedure NEDP-8, Technical Evaluation for Procurement of Materials and Services. As such, TVA had not verified critical characteristics for an unknown number of safety-related items procured for the WB2 project starting from the resumption of construction activities in 2008. A second violation involved a failure to report the aforementioned breakdown in the QA program as required by 10 CFR 50.55(e)(4) and (5). The apparent cause of this violation was the failure of procedure NC-PP-13, Reporting Requirements, Rev. 0 to require a significant breakdown of the QA program to be reportable whether or not the breakdown actually resulted in a defect. The third violation involved the failure to identify a significant condition adverse to quality related to the previously mentioned breakdown in the QA program. The inspectors reviewed the applicants letter in response to EA-13-019 (ADAMS Accession No. ML13204A383), which addressed reasons for the violations, corrective steps, and the date when full compliance was achieved for all three violations.


With regard to the Criterion III violation, the inspectors reviewed the applicant's root cause analysis reports, self-assessments, associated PER, verified that all corrective actions to prevent recurrence (CAPR) were completed, sampled completion of other corrective actions, and reviewed the available effectiveness reviews for those corrective actions. Corrective actions that were verified included ensuring that the TVA and Bechtel CGD procedures were revised to reflect current regulatory requirements, audits and surveillances of the CGD program were scheduled and being completed, and that training for Bechtel CGD personnel was accomplished and adequate. The inspectors also reviewed a sample of five sets of CGD procurement data sheets (PDS) and associated technical evaluations (TE) to ensure the revised CGD packages met current regulatory requirements. In addition, for any items procured under the original, unrevised PDSs within the sample, the inspectors also reviewed the results of testing to ensure those items met the new PDS and TE critical characteristic requirements.
With regard to the Criterion III violation, the inspectors reviewed the applicants root cause analysis reports, self-assessments, associated PER, verified that all corrective actions to prevent recurrence (CAPR) were completed, sampled completion of other corrective actions, and reviewed the available effectiveness reviews for those corrective actions. Corrective actions that were verified included ensuring that the TVA and Bechtel CGD procedures were revised to reflect current regulatory requirements, audits and surveillances of the CGD program were scheduled and being completed, and that training for Bechtel CGD personnel was accomplished and adequate. The inspectors also reviewed a sample of five sets of CGD procurement data sheets (PDS) and associated technical evaluations (TE) to ensure the revised CGD packages met current regulatory requirements. In addition, for any items procured under the original, unrevised PDSs within the sample, the inspectors also reviewed the results of testing to ensure those items met the new PDS and TE critical characteristic requirements.


With regard to the 10 CFR 50.55(e) violation, the inspectors reviewed the applicant's causal analysis, extent of condition review, PER, and the revised reporting procedure to ensure it accurately reflected current regulatory requirements. Corrective actions for this violation also included a review of past PERs for reportability.
With regard to the 10 CFR 50.55(e) violation, the inspectors reviewed the applicants causal analysis, extent of condition review, PER, and the revised reporting procedure to ensure it accurately reflected current regulatory requirements. Corrective actions for this violation also included a review of past PERs for reportability.


With regard to the Criterion XVI violation, the inspectors reviewed the applicant's causal analysis, PER, and extent of condition review. The cause of this violation was related to the failure to present the results of PER 403095 Corrective Action #008 (conduct a full 100% CGD extent of condition review) to the Construction Completion Management Review Committee (CCMRC). The CCMRC was to consider whether the results of the extent of condition review indicated a significant condition adverse to quality, and therefore whether PER 403095 should be reassigned as a Level A PER. The requirement to conduct this review was adequately captured in procedure NC-PP-3, "Watts Bar Unit 2 Corrective Action Program," Rev 15, and had been documented in the applicant's corrective action program prior to the violation. Completed corrective actions taken for this violation included presenting the results of the 100% extent of condition review to the CCMRC; and briefing PER coordinators on this issue.
With regard to the Criterion XVI violation, the inspectors reviewed the applicants causal analysis, PER, and extent of condition review. The cause of this violation was related to the failure to present the results of PER 403095 Corrective Action #008 (conduct a full 100% CGD extent of condition review) to the Construction Completion Management Review Committee (CCMRC). The CCMRC was to consider whether the results of the extent of condition review indicated a significant condition adverse to quality, and therefore whether PER 403095 should be reassigned as a Level A PER. The requirement to conduct this review was adequately captured in procedure NC-PP-3, Watts Bar Unit 2 Corrective Action Program, Rev 15, and had been documented in the applicants corrective action program prior to the violation. Completed corrective actions taken for this violation included presenting the results of the 100% extent of condition review to the CCMRC; and briefing PER coordinators on this issue.


Documents reviewed are listed in the Attachment.
Documents reviewed are listed in the Attachment.
Line 600: Line 565:


====c. Conclusions====
====c. Conclusions====
The applicant's causal analysis and corrective actions for the three violations related to EA-13-019 were adequate and fully implemented, and compliance with the associated regulatory requirements has been restored. These violations are closed.
The applicants causal analysis and corrective actions for the three violations related to EA-13-019 were adequate and fully implemented, and compliance with the associated regulatory requirements has been restored. These violations are closed.


OA.1.2 (Closed) Historical 10CFR21 Reviews and Unresolved Item 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues (Inspection  
OA.1.2 (Closed) Historical 10CFR21 Reviews and Unresolved Item 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues (Inspection Procedure 92701)


Procedure 92701)
====a. Inspection Scope====
:
The applicant committed to perform a review of historical 10CFR21 (Part 21) issues that were applicable to WBN Unit 1 for applicability and potential resolution for WBN Unit 2.


====a. Inspection Scope====
The review process was captured in applicant procedure 25402-3DP-G04G-00501, Historical Document Review Process and subsequently expanded upon in applicant PER 494917. The procedural guidance utilizes a review of all issues documented in the applicants historical database (Watts Bar Nuclear Plant Unit 2 Startup Integration Task Equipment List (WITEL)) and PER 494917 outlined the methodology the applicant planned to use to quantify, qualify, and subsequently resolve issues identified from historical Part 21s. The inspectors reviewed the procedure, assessed the methodology of the review, and performed an independent verification of the applicants historical Part 21 results to ensure that the review encompassed all applicable historical issues.
The applicant committed to perform a review of historical 10CFR21 (Part 21) issues that were applicable to WBN Unit 1 for applicability and potential resolution for WBN Unit 2.


The review process was captured in applicant procedure 25402-3DP-G04G-00501, "Historical Document Review Process" and subsequently expanded upon in applicant PER 494917. The procedural guidance utilizes a review of all issues documented in the applicant's historical database (Watts Bar Nuclear Plant Unit 2 Startup Integration Task Equipment List (WITEL)) and PER 494917 outlined the methodology the applicant planned to use to quantify, qualify, and subsequently resolve issues identified from historical Part 21's. The inspectors reviewed the procedure, assessed the methodology of the review, and performed an independent verification of the applicants historical Part 21 results to ensure that the review encompassed all applicable historical issues. Additionally, the inspectors held interviews with applicant staff to understand the rationale for screening historical Part 21's for applicability to WBN Unit 2.
Additionally, the inspectors held interviews with applicant staff to understand the rationale for screening historical Part 21s for applicability to WBN Unit 2.


====b. Observations and Findings====
====b. Observations and Findings====
:   The following SL IV NCV was identified.
:
The following SL IV NCV was identified.  


=====Introduction:=====
=====Introduction:=====
The inspectors identified a SL IV NCV associated with the corrective actions of PER 49417 to identify and correct historical issues contained in the applicant's WITEL database. This issue was previously identified as URI 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues.
The inspectors identified a SL IV NCV associated with the corrective actions of PER 49417 to identify and correct historical issues contained in the applicants WITEL database. This issue was previously identified as URI 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues.


=====Description:=====
=====Description:=====
The review of PER 494917 revealed that the applicant's intention was to "obtain a listing of all 10CFR Part 21 issues applicable to Unit 1, perform a review for Unit 2 applicability, and assign the Unit 2 applicable 10CFR21 issues to the appropriate Unit 2 design discipline.The applicant's search returned 15 historical items, of which, 11 were identified as applicable to Unit 2. The inspectors performed an independent sample of historical items in the WITEL database and identified additional WBN Unit 1 Part 21's, which were not identified by the applicant, and WBN Unit 2 applicable Part 21's with inadequate justification for closure. The applicant subsequently dedicated additional efforts towards identifying the total population and concluded in PER 806990 that a total of 236 items existed. Of the 236 items identified, 49 were screened as applicable to WBN Unit 2 and required efforts to ensure that the Part 21 issue had been resolved for Unit 2. Along with this disparity in population was the rationale for closure of some items that were classified as applicable. The resolution of PER 806990 also corrected the issue of inaccurate closure rationale.
The review of PER 494917 revealed that the applicants intention was to obtain a listing of all 10CFR Part 21 issues applicable to Unit 1, perform a review for Unit 2 applicability, and assign the Unit 2 applicable 10CFR21 issues to the appropriate Unit 2 design discipline. The applicants search returned 15 historical items, of which, 11 were identified as applicable to Unit 2. The inspectors performed an independent sample of historical items in the WITEL database and identified additional WBN Unit 1 Part 21s, which were not identified by the applicant, and WBN Unit 2 applicable Part 21s with inadequate justification for closure. The applicant subsequently dedicated additional efforts towards identifying the total population and concluded in PER 806990 that a total of 236 items existed. Of the 236 items identified, 49 were screened as applicable to WBN Unit 2 and required efforts to ensure that the Part 21 issue had been resolved for Unit 2. Along with this disparity in population was the rationale for closure of some items that were classified as applicable. The resolution of PER 806990 also corrected the issue of inaccurate closure rationale.
 
The inspectors determined that the applicant's inadequate corrective action was a performance deficiency. This performance deficiency was considered more than minor in accordance with IMC 0613, Appendix E because it represented an adverse condition that rendered the quality of structures, systems, or components (SSCs) indeterminate and required substantive corrective action to satisfy the original intent of the corrective action document. Based on the applicant's assessment, it was determined that the population of historical items that were originally omitted for resolution did not require re-work of any equipment. The finding was determined to be of very low safety significance


in accordance with Section 6.5 of the NRC Enforcement Policy because it is does not represent a breakdown in the QA process. The applicant issued PER 806990 to address the identified conditions. The inspectors reviewed this finding against cross-cutting area components as described in IMC 0310 "Components Within the Cross-Cutting Areas" and determined that no cross-cutting aspect applied.
The inspectors determined that the applicants inadequate corrective action was a performance deficiency. This performance deficiency was considered more than minor in accordance with IMC 0613, Appendix E because it represented an adverse condition that rendered the quality of structures, systems, or components (SSCs) indeterminate and required substantive corrective action to satisfy the original intent of the corrective action document. Based on the applicants assessment, it was determined that the population of historical items that were originally omitted for resolution did not require re-work of any equipment. The finding was determined to be of very low safety significance in accordance with Section 6.5 of the NRC Enforcement Policy because it is does not represent a breakdown in the QA process. The applicant issued PER 806990 to address the identified conditions. The inspectors reviewed this finding against cross-cutting area components as described in IMC 0310 Components Within the Cross-Cutting Areas and determined that no cross-cutting aspect applied.


=====Enforcement:=====
=====Enforcement:=====
10 CFR 50, Appendix B, Criterion XVI, "Corrective Action," requires, in part, that, "conditions adverse to quality are promptly identified and corrected." PER 494917 directed, in part, to "obtain a listing of all 10CFR Part 21 issues applicable to Unit 1, perform a review for Unit 2 applicability, and assign the Unit 2 applicable 10CFR21 issues to the appropriate Unit 2 design discipline."
10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires, in part, that, conditions adverse to quality are promptly identified and corrected. PER 494917 directed, in part, to obtain a listing of all 10CFR Part 21 issues applicable to Unit 1, perform a review for Unit 2 applicability, and assign the Unit 2 applicable 10CFR21 issues to the appropriate Unit 2 design discipline.


Contrary to the above, on November 8, 2013 the applicant failed to identify all potential 10CFR Part 21 issues and was therefore unable to subsequently review for Unit 2 applicability and potentially resolve. Specifically, the questioning from NRC led the applicant to identify that 221 potential conditions adverse to quality were omitted from the corrective action review.
Contrary to the above, on November 8, 2013 the applicant failed to identify all potential 10CFR Part 21 issues and was therefore unable to subsequently review for Unit 2 applicability and potentially resolve. Specifically, the questioning from NRC led the applicant to identify that 221 potential conditions adverse to quality were omitted from the corrective action review.


Because this was a SL IV violation and it was entered into the applicant's corrective action program as PER 806990, this violation is being treated as an NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy. This violation is identified as NCV 05000391/2014602-01, "Inadequate Corrective Actions for Historical Issues."
Because this was a SL IV violation and it was entered into the applicants corrective action program as PER 806990, this violation is being treated as an NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy. This violation is identified as NCV 05000391/2014602-01, Inadequate Corrective Actions for Historical Issues.


c. Conclusion Based on a review of the applicant's corrective actions outlined in PER 806990 and the aforementioned inspection activities, the inspectors determined that the applicant had implemented actions that would be sufficient to address the review of historical 10CFR21 reviews. This inspection item, historical 10CFR21 reviews, is closed.
c. Conclusion Based on a review of the applicants corrective actions outlined in PER 806990 and the aforementioned inspection activities, the inspectors determined that the applicant had implemented actions that would be sufficient to address the review of historical 10CFR21 reviews. This inspection item, historical 10CFR21 reviews, is closed.


Additionally, this closes URI 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues.
Additionally, this closes URI 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues.
Line 638: Line 603:


====a. Inspection Scope====
====a. Inspection Scope====
Background: In July 2012, the NRC issued a Confirmatory Order (ADAMS Accession No. ML12173A020) as the result of an agreement reached during an alternative dispute resolution (ADR) mediation session conducted on May 21, 2012, regarding falsification  
Background: In July 2012, the NRC issued a Confirmatory Order (ADAMS Accession No. ML12173A020) as the result of an agreement reached during an alternative dispute resolution (ADR) mediation session conducted on May 21, 2012, regarding falsification at WBN Unit 2. In early 2012, the NRC's Office of Investigations completed an investigation regarding activities at the Watts Bar Nuclear Plant. Based on the evidence developed during the investigation, the NRC staff concluded that, in August 2010, an electrician and foreman employed by a subcontractor at WBN Unit 2 deliberately falsified work order packages for primary containment penetrations and caused the applicant, TVA, to be in apparent violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, and 10 CFR 50.9, Completeness and Accuracy of Information.
 
at WBN Unit 2. In early 2012, the NRC's Office of Investigations completed an investigation regarding activities at the Watts Bar Nuclear Plant. Based on the evidence developed during the investigation, the NRC staff concluded that, in August 2010, an electrician and foreman employed by a subcontra ctor at WBN Unit 2 deliberately falsified work order packages for primary containment penetrations and caused the applicant, TVA, to be in apparent violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," and 10 CFR 50.9, "Completeness and  
 
Accuracy of Information."


At the ADR session, TVA discussed the corrective actions and enhancements taken shortly after its identification of the incident in August 2010. In addition, TVA agreed to a number of corrective actions to preclude recurrence of the violation.
At the ADR session, TVA discussed the corrective actions and enhancements taken shortly after its identification of the incident in August 2010. In addition, TVA agreed to a number of corrective actions to preclude recurrence of the violation.


The NRC reviewed actions taken in response to the order as documented in IIR 05000391/2013604 (ADAMS Accession No. ML13179A079) issued on June 27, 2013. The inspection report documented that six of the nine actions specified in the Confirmatory Order for WBN Unit 2 had been implemented (actions V.3.a, V.3.b, V.3.c, V.3.d, V.3.f, and V.3.g).
The NRC reviewed actions taken in response to the order as documented in IIR 05000391/2013604 (ADAMS Accession No. ML13179A079) issued on June 27, 2013.
 
On August 29, 2013 TVA issued a letter (ADAMS Accession No. ML13248A457) to the NRC providing a status update to the Confirmatory Order. In this letter, TVA documented confirmed completion of actions V.3.a, V.3.b, V.3.c, V.3.d, V.3.f, V.3.g, and


V.3.h.
The inspection report documented that six of the nine actions specified in the Confirmatory Order for WBN Unit 2 had been implemented (actions V.3.a, V.3.b, V.3.c, V.3.d, V.3.f, and V.3.g).


Inspection Activities:  The inspectors reviewed and verified that actions to preclude recurrence were implemented. The actions are numbered by section as contained in Section V of the Confirmatory Order (ADAMS Accession No. ML12173A020). Review and inspection of most of these actions were previously documented in IIR
On August 29, 2013 TVA issued a letter (ADAMS Accession No. ML13248A457) to the NRC providing a status update to the Confirmatory Order. In this letter, TVA documented confirmed completion of actions V.3.a, V.3.b, V.3.c, V.3.d, V.3.f, V.3.g, and V.3.h.


05000391/2013604.
Inspection Activities: The inspectors reviewed and verified that actions to preclude recurrence were implemented. The actions are numbered by section as contained in Section V of the Confirmatory Order (ADAMS Accession No. ML12173A020). Review and inspection of most of these actions were previously documented in IIR 05000391/2013604.


The actions specified in the Confirmatory Order for Watts Bar Unit 2 were implemented with the exception of those noted below (Actions V.3.e and V.3.i).
The actions specified in the Confirmatory Order for Watts Bar Unit 2 were implemented with the exception of those noted below (Actions V.3.e and V.3.i).


Action Inspector Activities V.3.a Documented in inspection report 05000391/2013604 V.3.b Documented in inspection report 05000391/2013604 V.3.c Documented in inspection report 05000391/2013604 V.3.d Documented in inspection report 05000391/2013604.
Action                                   Inspector Activities V.3.a     Documented in inspection report 05000391/2013604 V.3.b     Documented in inspection report 05000391/2013604 V.3.c     Documented in inspection report 05000391/2013604 V.3.d     Documented in inspection report 05000391/2013604.


Inspectors reviewed an updated list of individuals trained in 2013 and the list of those who did not receive training because of extended sick leave, assignments to other plants, or because they were part of an independent organization.
Inspectors reviewed an updated list of individuals trained in 2013 and the list of those who did not receive training because of extended sick leave, assignments to other plants, or because they were part of an independent organization.


V.3.e Documented in inspection report 05000391/2013604.
V.3.e     Documented in inspection report 05000391/2013604.


The inspectors reviewed actions documented in PER 533342 and tracked by TVA's corrective action program. These actions specifically include 10 CFR 50.9 refresher training to be provided by November of 2014 and 2016.
The inspectors reviewed actions documented in PER 533342 and tracked by TVAs corrective action program. These actions specifically include 10 CFR 50.9 refresher training to be provided by November of 2014 and 2016.


V.3.f Documented in in inspection report 05000391/2013604 V.3.g Documented in inspection report 05000391/2013604.
V.3.f     Documented in in inspection report 05000391/2013604 V.3.g     Documented in inspection report 05000391/2013604.


Inspectors reviewed the results from the follow-up survey performed in 2013 and did not identify any significant adverse trends. V.3.h Documented in inspection report 05000391/2013604.
Inspectors reviewed the results from the follow-up survey performed in 2013 and did not identify any significant adverse trends.


The inspectors reviewed results from the effectiveness review performed in 2013 and documented in PER 533342 and did not identify any significant
V.3.h    Documented in inspection report 05000391/2013604.


adverse trends.
The inspectors reviewed results from the effectiveness review performed in 2013 and documented in PER 533342 and did not identify any significant adverse trends.


Additionally, the inspectors reviewed SR 843165 which documented a review of the Employee Concerns Program (ECP) database and the Corrective Action Program (CAP) for any potential falsification issues between January 1, 2013 and February 5, 2014. The evaluation determined that actions taken as a result of the ADR remained effective.
Additionally, the inspectors reviewed SR 843165 which documented a review of the Employee Concerns Program (ECP) database and the Corrective Action Program (CAP) for any potential falsification issues between January 1, 2013 and February 5, 2014. The evaluation determined that actions taken as a result of the ADR remained effective.


V.3.i Documented in inspection report 05000391/2013604.
V.3.i     Documented in inspection report 05000391/2013604.


On August 29, 2013 TVA issued a letter (ADAMS Accession No.
On August 29, 2013 TVA issued a letter (ADAMS Accession No.
Line 688: Line 647:
The actions specified in the Confirmatory Order for WBN Unit 2 have been fully implemented with the exception of actions V.3.e and V.3.i.
The actions specified in the Confirmatory Order for WBN Unit 2 have been fully implemented with the exception of actions V.3.e and V.3.i.


Action V.3.e is considered a continuing action tracked in TVA's corrective action program as PER 533342 and consists of refresher training which is to be provided every two years through 2016. Action V.3.i stated that TVA will provide a letter to the NRC discussing its basis for concluding the Order action items are completed.
Action V.3.e is considered a continuing action tracked in TVAs corrective action program as PER 533342 and consists of refresher training which is to be provided every two years through 2016. Action V.3.i stated that TVA will provide a letter to the NRC discussing its basis for concluding the Order action items are completed.


Based on the review of actions completed to date, sufficient inspections of the Confirmatory Order implementation have been completed. Confirmatory Order EA-12-021 is closed.
Based on the review of actions completed to date, sufficient inspections of the Confirmatory Order implementation have been completed. Confirmatory Order EA-12-021 is closed.
Line 695: Line 654:


====a. Inspection Scope====
====a. Inspection Scope====
: Background
:
: The subject item was initially captured in NRC letter to TVA dated July 2, 2010, "Watts Bar Nuclear Plant, Unit 2 Program for Refurbishment" (ADAMS Accession No. ML101720050) which identified an NRC inspection follow-up item. At the time of review by NRC staff, the reviewer was unable to determine how the training qualification requirements from American National Standards Institute (ANSI) 45.2-1971 and procedure TI-119, "Maintenance Rule," were linked. This was deemed an item subject to future inspections.
Background: The subject item was initially captured in NRC letter to TVA dated July 2, 2010, Watts Bar Nuclear Plant, Unit 2 Program for Refurbishment (ADAMS Accession No. ML101720050) which identified an NRC inspection follow-up item. At the time of review by NRC staff, the reviewer was unable to determine how the training qualification requirements from American National Standards Institute (ANSI) 45.2-1971 and procedure TI-119, Maintenance Rule, were linked. This was deemed an item subject to future inspections.
 
As part of final closure, documentation associated with Item 49 was provided to NRC inspectors for review on December 17, 2013; the documentation included actions taken
 
by Unit 1 and Unit 2 to address this item.


For Unit 1, TVA stated that the unit is an operating nuclear unit which complies with Regulatory Guide (RG) 1.33, "Quality Assurance Program Requirements (Operations)."
As part of final closure, documentation associated with Item 49 was provided to NRC inspectors for review on December 17, 2013; the documentation included actions taken by Unit 1 and Unit 2 to address this item.


RG 1.33 endorses ANSI N18.7-1976/ American Nuclear Society (ANS) 3.2 which are found to be acceptable to the NRC staff and provide an adequate basis for complying
For Unit 1, TVA stated that the unit is an operating nuclear unit which complies with Regulatory Guide (RG) 1.33, Quality Assurance Program Requirements (Operations).


with the quality assurance program requirements of 10CFR50 Appendix B for the operations phase. Additionally, TVA is committed to comply with requirements of ANSI N18.1-1971 and ANSI/ANS 3.1-1981 as endorsed by RG 1.8, Rev. 2, April 1987, "Qualification and Training of Personnel for Nuclear Power Plants.Both standards provide criteria for the selection of training of personnel for nuclear power plants.
RG 1.33 endorses ANSI N18.7-1976/ American Nuclear Society (ANS) 3.2 which are found to be acceptable to the NRC staff and provide an adequate basis for complying with the quality assurance program requirements of 10CFR50 Appendix B for the operations phase. Additionally, TVA is committed to comply with requirements of ANSI N18.1-1971 and ANSI/ANS 3.1-1981 as endorsed by RG 1.8, Rev. 2, April 1987, Qualification and Training of Personnel for Nuclear Power Plants. Both standards provide criteria for the selection of training of personnel for nuclear power plants.


Implementation of these training requirements are outlined in procedure NPG-SPP-17.1, Rev. 9, "Systematic Approach to Training (SAT) Overview," and MMDP-1, Rev 27, "Maintenance Management System.As part of the closure documentation, the applicant stated that the [training] process is very similar to the process for Unit 2 where the use of a qualification matrix is utilized.
Implementation of these training requirements are outlined in procedure NPG-SPP-17.1, Rev. 9, Systematic Approach to Training (SAT) Overview, and MMDP-1, Rev 27, Maintenance Management System. As part of the closure documentation, the applicant stated that the [training] process is very similar to the process for Unit 2 where the use of a qualification matrix is utilized.


For Unit 2, TVA provided procedures 25402-000-GPP-0000-TI 216, "WBN Unit 2 Completion Project Refurbishment Program" and 25402-MGT-0002, "Training," which reference back to Bechtel's Project Nuclear Quality Assurance Plan (PNQAM). The PNQAM committed to ANSI 45.2-1971. In summary for Unit 2, TVA stated that implementing procedures define and/or contain qualification requirements.
For Unit 2, TVA provided procedures 25402-000-GPP-0000-TI 216, WBN Unit 2 Completion Project Refurbishment Program and 25402-MGT-0002, Training, which reference back to Bechtels Project Nuclear Quality Assurance Plan (PNQAM). The PNQAM committed to ANSI 45.2-1971. In summary for Unit 2, TVA stated that implementing procedures define and/or contain qualification requirements.


Inspection Activities: The inspectors performed the following:
Inspection Activities: The inspectors performed the following:
* Reviewed TVA's final closure package for Appendix HH, Item 49 associated with training requirements to verify how TVA documented the relationship between ANSI 45.2-1971 and TI 119;
* Reviewed TVAs final closure package for Appendix HH, Item 49 associated with training requirements to verify how TVA documented the relationship between ANSI 45.2-1971 and TI 119;
* Reviewed TVA's Nuclear Quality Assurance Plan (NQAP), Rev. 28, specifically the following sections:
* Reviewed TVAs Nuclear Quality Assurance Plan (NQAP), Rev. 28, specifically the following sections:
* Section 11 which discusses the training program elements,
* Section 11 which discusses the training program elements,
* Appendix B contains a matrix of regulatory guides and standards which apply to quality assurance requirements,
* Appendix B contains a matrix of regulatory guides and standards which apply to quality assurance requirements,
* Appendix F which delegates the WBN Unit 2 construction completion, construction phase tests and inspections, and related to QA activities to Bechtel and the Bechtel Quality Assurance Manual (QAM);
* Appendix F which delegates the WBN Unit 2 construction completion, construction phase tests and inspections, and related to QA activities to Bechtel and the Bechtel Quality Assurance Manual (QAM);
* Reviewed Bechtel's PNQAM, Rev 12 spec ifically Section 1.3 which outlines the requirements and responsibilities for indoctrination and training programs; and
* Reviewed Bechtels PNQAM, Rev 12 specifically Section 1.3 which outlines the requirements and responsibilities for indoctrination and training programs; and
* Reviewed two qualifications (one for each unit) for Unit 1 and Unit 2 personnel performing NDE and two qualifications (one for each unit) for personnel performing civil related examinations to verify that established training requirements and experience were comparable Documents reviewed are listed in the Attachment.
* Reviewed two qualifications (one for each unit) for Unit 1 and Unit 2 personnel performing NDE and two qualifications (one for each unit) for personnel performing civil related examinations to verify that established training requirements and experience were comparable Documents reviewed are listed in the Attachment.


====b. Observations and Findings====
====b. Observations and Findings====
:   No findings were identified. Inspectors reviewed TVA's conclusion that there was no direct link between the training qualification requirements of ANSI 45.2 to TVA TI-119.
:
No findings were identified. Inspectors reviewed TVAs conclusion that there was no direct link between the training qualification requirements of ANSI 45.2 to TVA TI-119.


Additionally, the inspectors reviewed TVA's NQAP which outlined the training program elements for personnel performing quality-related activities for Unit 1 and Unit 2.
Additionally, the inspectors reviewed TVAs NQAP which outlined the training program elements for personnel performing quality-related activities for Unit 1 and Unit 2.


Even though Unit 1 and Unit 2 personnel receive unique qualification to perform their tasks, the implementing procedures for both Unit 1 (operations) and Unit 2 (construction)are governed by the NQAP and have been written to meet 10CFR50 Appendix B requirements and training standards established by ASME, ANSI, and American Nuclear Society (ANS).
Even though Unit 1 and Unit 2 personnel receive unique qualification to perform their tasks, the implementing procedures for both Unit 1 (operations) and Unit 2 (construction)are governed by the NQAP and have been written to meet 10CFR50 Appendix B requirements and training standards established by ASME, ANSI, and American Nuclear Society (ANS).
Line 731: Line 687:


====c. Conclusions====
====c. Conclusions====
:   Based on the review of the final closure package, the inspectors determined that Appendix HH, Item 49 associated with training qualification requirements is closed.
:
Based on the review of the final closure package, the inspectors determined that Appendix HH, Item 49 associated with training qualification requirements is closed.


OA.1.5 (Closed) SSER, Appendix HH, Item 51 Associated with the Definition of Significant Cracks (Inspection Procedure 92701)
OA.1.5 (Closed) SSER, Appendix HH, Item 51 Associated with the Definition of Significant Cracks (Inspection Procedure 92701)
Line 737: Line 694:
====a. Inspection Scope====
====a. Inspection Scope====
:
:
Background
Background: The subject item was initially captured in NRC letter to TVA dated July 2, 2010, Watts Bar Nuclear Plant, Unit 2 Program for Refurbishment which identified an NRC inspection follow-up item.
: The subject item was initially captured in NRC letter to TVA dated July 2, 2010, "Watts Bar Nuclear Plant, Unit 2 Program for Refurbishment" which identified an  


NRC inspection follow-up item.
The NRC staff reviewed TVA's Maintenance Rule Programs Procedure TI-119 and found in Section 3.3, "Structural Monitoring Database, that the procedure provided the types of degradation for inspection (e.g., under Concrete and Masonry Walls). At the time of review by the NRC staff, the reviewer noted that the procedure specified actions for significant cracks; however, the term "significant crack" was not quantified. Therefore, the implementation of Procedure TI-119 was deemed as an inspection follow-up item to determine if the program requirements were adequately implemented.


The NRC staff reviewed TVA's Maintenance Rule Programs Procedure TI-119 and found in Section 3.3, "Structural Monitoring Database," that the procedure provided the types of degradation for inspection (e.g., under Concrete and Masonry Walls). At the time of review by the NRC staff, the reviewer noted that the procedure specified actions for significant cracks; however, the term "significant crack" was not quantified. Therefore, the implementation of Procedure TI-119 was deemed as an inspection follow-up item to determine if the program requirements were adequately implemented
Inspection Activities: The inspectors performed the following:
.
* Reviewed 0-TI-445, Examination of Structures for Maintenance Rule, Rev. 0 and verified 0-TI-445 was consistent with American Concrete Institute (ACI) 349.3R-02
Inspection Activities: The inspectors performed the following:
* Reviewed 0-TI-445, Examination of Structures for Maintenance Rule, Rev. 0 and verified 0-TI-445 was consistent with American Concrete Institute (ACI) 349.3R-02


====b. Observations and Findings====
====b. Observations and Findings====
:   No findings were identified. TVA's Maintenance Rule Programs Procedure TI-119 was not revised to quantify cracks; instead, 0-TI-445, Examination of Structures for Maintenance Rule, Rev. 0 was revised. The programmatic requirements for the examinations of existing structures are contained in TI-119. Procedure 0-TI-445 provides the technical guidance for periodic examination of existing structures in support of the implementation and continued compliance with the Maintenance Rule.
:
No findings were identified. TVA's Maintenance Rule Programs Procedure TI-119 was not revised to quantify cracks; instead, 0-TI-445, Examination of Structures for Maintenance Rule, Rev. 0 was revised. The programmatic requirements for the examinations of existing structures are contained in TI-119. Procedure 0-TI-445 provides the technical guidance for periodic examination of existing structures in support of the implementation and continued compliance with the Maintenance Rule.


2 of 0-TI-445 contains specific acceptance criteria to classify cracks as acceptable, acceptable with deficiency, or as a condition that requires further evaluation/remediation.
2 of 0-TI-445 contains specific acceptance criteria to classify cracks as acceptable, acceptable with deficiency, or as a condition that requires further evaluation/remediation.


====c. Conclusions====
====c. Conclusions====
:   Based on the review of the final closure package, the inspectors determined that Appendix HH, Item 51 associated with the definition of significant cracks is closed.
:
Based on the review of the final closure package, the inspectors determined that Appendix HH, Item 51 associated with the definition of significant cracks is closed.


OA.1.6 (Closed) SSER, Appendix HH, Open Item 64, Eagle 21 Rack 2 RTD Testing Results Review (Inspection Procedure 52055)
OA.1.6 (Closed) SSER, Appendix HH, Open Item 64, Eagle 21 Rack 2 RTD Testing Results Review (Inspection Procedure 52055)


====a. Inspection Scope====
====a. Inspection Scope====
Background: This issue is documented in Supplemental Safety Evaluation Report (SSER) 23 to NUREG-0847 (ADAMS Accession No. ML11206A499) as Open Item 64 in Appendix HH. By letter dated June 18, 2010 (ADAMS Accession No. ML101940236), TVA stated that the Eagle 21 system factory acceptance test of Rack 2 revealed that the temperature inputs to the narrow range resistance temperature detector (RTD) were consistently reading about 0.2 degrees Fahrenheit higher than expected. Westinghouse determined that it had incorrectly configured the inputs as a shared RTD in the loop calculation processor (LCP) software. Westinghouse initiated Corrective Action Item 10-140-M021 and performed an evaluation of a potential nuclear safety issue. It determined that this issue did not represent a substantial safety hazard even if it was left uncorrected. By letter dated October 29, 2010 (ADAMS Accession No. ML103120711),
Background: This issue is documented in Supplemental Safety Evaluation Report (SSER) 23 to NUREG-0847 (ADAMS Accession No. ML11206A499) as Open Item 64 in Appendix HH. By letter dated June 18, 2010 (ADAMS Accession No. ML101940236),
TVA described the final resolution proposed by Westinghouse. In accordance with the proposed resolution, the spare input available on the RTD input board will be wired to the active channels. The spare input will provide the parallel resistance to resolve the problem. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing narrow-range RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the LCP will provide the correct temperature calculation for the narrow-range RTDs. TVA stated that "Post modification testing will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD accuracy issue prior to WBN Unit 2 fuel load." The Open Item was to review the testing.
TVA stated that the Eagle 21 system factory acceptance test of Rack 2 revealed that the temperature inputs to the narrow range resistance temperature detector (RTD) were consistently reading about 0.2 degrees Fahrenheit higher than expected. Westinghouse determined that it had incorrectly configured the inputs as a shared RTD in the loop calculation processor (LCP) software. Westinghouse initiated Corrective Action Item 10-140-M021 and performed an evaluation of a potential nuclear safety issue. It determined that this issue did not represent a substantial safety hazard even if it was left uncorrected. By letter dated October 29, 2010 (ADAMS Accession No. ML103120711),
TVA described the final resolution proposed by Westinghouse. In accordance with the proposed resolution, the spare input available on the RTD input board will be wired to the active channels. The spare input will provide the parallel resistance to resolve the problem. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing narrow-range RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the LCP will provide the correct temperature calculation for the narrow-range RTDs. TVA stated that "Post modification testing will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD accuracy issue prior to WBN Unit 2 fuel load." The Open Item was to review the testing.
 
Inspection Activities: The inspectors reviewed the test in WO 11347100 and the change package to verify that the 0.2 degree Fahrenheit bias was corrected. The inspectors also reviewed the WO to verify that the test equipment was properly calibrated.


Inspection Activities:  The inspectors reviewed the test in WO 11347100 and the change package to verify that the 0.2 degree Fahrenheit bias was corrected. The inspectors also reviewed the WO to verify that t he test equipment was properly calibrated. Documents reviewed are listed in the Attachment.
Documents reviewed are listed in the Attachment.


====b. Observations and Findings====
====b. Observations and Findings====
Line 772: Line 731:


====a. Inspection Scope====
====a. Inspection Scope====
Background: This commitment was documented in TVA framework letter dated January 29, 2008, Watts Bar Nuclear Plant (WBN) Unit 2 - Regulatory Framework for the Completion of Construction and Licensing for Unit 2 (ADAMS Accession No. ML080320443). The commitment was contained in Enclosure 2, Item 129, II.K.1.10, "Operability Status" - Confirm multi-unit operation will have no impact on administrative procedures with respect to operability status. Standard Department Procedure OPDP-8, "Operability Determination Process and Limiting Conditions for Operation Tracking," Rev. 15, is the primary administrative procedure that controls operability status. This procedure is a common nuclear fleet corporate procedure that is presently in use on WBN Unit 1 and other TVA nuclear units.
Background: This commitment was documented in TVA framework letter dated January 29, 2008, Watts Bar Nuclear Plant (WBN) Unit 2 - Regulatory Framework for the Completion of Construction and Licensing for Unit 2 (ADAMS Accession No.
 
ML080320443). The commitment was contained in Enclosure 2, Item 129, II.K.1.10, Operability Status - Confirm multi-unit operation will have no impact on administrative procedures with respect to operability status. Standard Department Procedure OPDP-8, Operability Determination Process and Limiting Conditions for Operation Tracking, Rev. 15, is the primary administrative procedure that controls operability status. This procedure is a common nuclear fleet corporate procedure that is presently in use on WBN Unit 1 and other TVA nuclear units.


Inspection Activities: The inspectors reviewed OPDP-8, and NPG-SPP-10.2, "Clearance Procedure to Safely Control Energy," Rev. 6, to verify that the procedures require the following:
Inspection Activities: The inspectors reviewed OPDP-8, and NPG-SPP-10.2, Clearance Procedure to Safely Control Energy, Rev. 6, to verify that the procedures require the following:
* Each operating unit shall maintain an independent limiting condition for operation (LCO) tracking log.
* Each operating unit shall maintain an independent limiting condition for operation (LCO) tracking log.
* Each LCO tracking log record shall be assigned a unique identification number.
* Each LCO tracking log record shall be assigned a unique identification number.
* Active LCOs shall be tracked and passed from shift to shift as part of the shift turnover.
* Active LCOs shall be tracked and passed from shift to shift as part of the shift turnover.
* Operations shall verify the operability of redundant safety-related systems prior to the removal of any safety-related system from service.
* Operations shall verify the operability of redundant safety-related systems prior to the removal of any safety-related system from service.
* Operations shall have assurance that all work activities are complete before declaring any equipment affected by main tenance or surveillance activities operable.
* Operations shall have assurance that all work activities are complete before declaring any equipment affected by maintenance or surveillance activities operable.
* A means of notifying Operations personnel whenever a safety-related system is removed from and returned to service is required.
* A means of notifying Operations personnel whenever a safety-related system is removed from and returned to service is required.


Line 793: Line 754:


====a. Inspection Scope====
====a. Inspection Scope====
Background: Generic Letter (GL) 98-02 was issued following several nuclear industry events involving the inadvertent loss of RCS inventory while in a shutdown condition.
Background: Generic Letter (GL) 98-02 was issued following several nuclear industry events involving the inadvertent loss of RCS inventory while in a shutdown condition.


The GL requested that licensees assess the susceptibility of their RHR and emergency core cooling systems (ECCS) to common-cause failure as a result of RCS draindown while in a shutdown condition.
The GL requested that licensees assess the susceptibility of their RHR and emergency core cooling systems (ECCS) to common-cause failure as a result of RCS draindown while in a shutdown condition.


Unit 1 Actions: WBN Unit 1 issued a response to GL 98-02, dated November 24, 1998 (ADAMS Accession No. ML082460081). The response identified susceptible RCS draindown pathways and vulnerabilities and described the Appendix B processes and controls in place that would prevent such an event from occurring. No corrective actions were identified, although several enhancements were documented. TVA's assessment was reviewed by the NRC using TI 2515/142, which was documented in NRC inspection report (IR) 50-390/99-11 and 50-391/99-11(ADAMS Accession No. ML003683323).
Unit 1 Actions: WBN Unit 1 issued a response to GL 98-02, dated November 24, 1998 (ADAMS Accession No. ML082460081). The response identified susceptible RCS draindown pathways and vulnerabilities and described the Appendix B processes and controls in place that would prevent such an event from occurring. No corrective actions were identified, although several enhancements were documented. TVAs assessment was reviewed by the NRC using TI 2515/142, which was documented in NRC inspection report (IR) 50-390/99-11 and 50-391/99-11(ADAMS Accession No. ML003683323).


The inspectors concluded that TVA performed a thorough assessment of plant vulnerabilities. The inspectors also verified operational controls utilized, and found that TVA adequately implemented elements of the QA program described in the GL response at WBN.
The inspectors concluded that TVA performed a thorough assessment of plant vulnerabilities. The inspectors also verified operational controls utilized, and found that TVA adequately implemented elements of the QA program described in the GL response at WBN.


Unit 2 Actions: The applicant submitted a supplemental response for GL 98-02, specific for Unit 2, on April 10, 2010 (ADAMS Accession No. ML100950044). This contained commitments for the applicant to document their review of ECCS designs to ensure they do not contain design features which can render them susceptible to common-cause failures. The NRC's Office of Nuclea r Reactor Regulation found this approach acceptable as documented in the safety evaluation dated May 11, 2010 (ADAMS Accession No. ML101200155). WBN Unit 2 provided an endorsement of the Unit 1 GL 98-02 response in the document titled "Endorsement of Unit 1 Report on Generic Letter  
Unit 2 Actions: The applicant submitted a supplemental response for GL 98-02, specific for Unit 2, on April 10, 2010 (ADAMS Accession No. ML100950044). This contained commitments for the applicant to document their review of ECCS designs to ensure they do not contain design features which can render them susceptible to common-cause failures. The NRCs Office of Nuclear Reactor Regulation found this approach acceptable as documented in the safety evaluation dated May 11, 2010 (ADAMS Accession No. ML101200155). WBN Unit 2 provided an endorsement of the Unit 1 GL 98-02 response in the document titled Endorsement of Unit 1 Report on Generic Letter 1998-02, Watts Bar Unit 2, dated May 11, 2011. The applicant did not identify any substantial design differences that could become affected by this issue. Enhancements made following the WBN Unit 1 response were intended to be carried over into Unit 2 procedures.
 
Inspection Activities: The inspectors reviewed the applicants conclusions to determine the adequacy of the applicants assessment of the susceptibility of the plant to a draindown event while in a shutdown condition. The inspectors reviewed ECCS flow diagrams and the applicants conclusions to verify that design features and administrative controls were in place to prevent inadvertent RCS draindown, in the shutdown mode, caused by misoperation of valves. The inspectors reviewed Watts Bar Nuclear Plant Unit 2 - List of Design Differences, Rev. 1 (ADAMS Accession No.


1998-02, Watts Bar Unit 2," dated May 11, 2011. The applicant did not identify any substantial design differences that could become affected by this issue. Enhancements made following the WBN Unit 1 response were intended to be carried over into Unit 2 procedures.
ML111010490) to verify that the ECCS design features between Unit 1 and Unit 2 do not have any appreciable differences. The inspectors reviewed general operating instruction GO-6, Unit Shutdown From Hot Standby to Cold Shutdown, and GO-1, Unit Startup From Cold Shutdown to Hot Standby, to verify that configuration controls are in place to prevent RCS draindown during shutdown. Specifically, when decreasing power, valve HCV-74-34, Refueling Water Return, has a hold order placed with specific release criteria before entry into Mode 4 and to remove the hold order before entry into Mode 3 when returning to power. The inspectors reviewed changes made to operating practices and procedures in response to GL 98-02 to verify that enhancements made following the WBN Unit 1 response were carried over into Unit 2 procedures. Additionally, the inspectors reviewed the operator training lesson plan to verify that training focused on draindown events is part of the continuous training program for licensed operators.


Inspection Activities:  The inspectors reviewed the applicant's conclusions to determine the adequacy of the applicant's assessment of the susceptibility of the plant to a draindown event while in a shutdown condition. The inspectors reviewed ECCS flow diagrams and the applicant's conclusions to verify that design features and administrative controls were in place to prevent inadvertent RCS draindown, in the shutdown mode, caused by misoperation of va lves. The inspectors reviewed "Watts Bar Nuclear Plant Unit 2 - List of Design Differences," Rev. 1 (ADAMS Accession No. ML111010490) to verify that the ECCS design features between Unit 1 and Unit 2 do not have any appreciable differences. The inspectors reviewed general operating instruction GO-6, "Unit Shutdown From Hot Standby to Cold Shutdown," and GO-1, "Unit Startup From Cold Shutdown to Hot Standby," to verify that configuration controls are in place to prevent RCS draindown during shutdown. Specifically, when decreasing power, valve HCV-74-34, Refueling Water Return, has a hold order placed with specific release criteria before entry into Mode 4 and to remove the hold order before entry into Mode 3 when returning to power. The inspectors reviewed changes made to operating practices and procedures in response to GL 98-02 to verify that enhancements made following the WBN Unit 1 response were carried over into Unit 2 procedures. Additionally, the inspectors reviewed the operator training lesson plan to verify that training focused on draindown events is part of the continuous training program for licensed operators. Documents reviewed are listed in the Attachment.
Documents reviewed are listed in the Attachment.


====b. Observations and Findings====
====b. Observations and Findings====
Line 816: Line 779:


====a. Inspection Scope====
====a. Inspection Scope====
Background:
Background: Bulletin (BL) 76-02 documented an issue with relay coil failures associated with General Electric (GE) Type HFA, HGA, HKA, and HMA relays. A certain type on nylon coil spools (or bobbins), plus humid conditions, were determined to be the fundamental causes of corrosion and resulting coil failure. Bulletin 84-02 documented an issue with relay coil failures associated with GE Type HFA relays. Lexan coil spools were cracking due to the effects of aging, resulting in insulation failure, which caused shorted turns, increasing the coil temperature, and causing the eventual coil failure. The bulletins recommended replacing the affected relays.
Bulletin (BL) 76-02 documented an issue with relay coil failures associated with General Electric (GE) Type HFA, HGA, HKA, and HMA relays. A certain type on nylon coil spools (or bobbins), plus humid conditions, were determined to be the fundamental causes of corrosion and resulting coil failure. Bulletin 84-02 documented an issue with relay coil failures associated with GE Type HFA relays. Lexan coil spools were cracking due to the effects of aging, resulting in insulation failure, which caused shorted turns, increasing the coil temperature, and causing the eventual coil failure. The bulletins recommended replacing the affected relays.
 
In NRC IIR 05000391/2010603 (ADAMS Accession No. ML102170465), the inspectors reviewed the applicant's response letter and tracking letter associated with these bulletins. In NRC IIR 05000391/2011608 (ADAMS Accession No. ML11311A082), the inspectors reviewed a sample of relays that had been replaced and concluded that the activities performed at the time of the inspection to correct relay coil failures for GE type HFA, HGA, HKA, HMA relays were adequate. However, it was noted that additional inspection was needed for relays which did not yet have a unit identifier (ID) associated
 
with them.
 
Inspection Activities:  The inspectors reviewed the applicant's approach as detailed in the closure package. The inspectors interviewed engineers on the methodology for identification to determine whether the scope of potentially affected relays identified in the engineering complete closure package was adequate. Additionally, the inspectors reviewed two EDCRs, 59951-A and 58285-A, associated with issuing unit IDs for relays to determine whether the scope of potentially affected relays identified in the closure package was adequate.


The inspectors also chose two relays, WBN-2-RLY-057-SG4A and WBN-2-RLY-003-
In NRC IIR 05000391/2010603 (ADAMS Accession No. ML102170465), the inspectors reviewed the applicants response letter and tracking letter associated with these bulletins. In NRC IIR 05000391/2011608 (ADAMS Accession No. ML11311A082), the inspectors reviewed a sample of relays that had been replaced and concluded that the activities performed at the time of the inspection to correct relay coil failures for GE type HFA, HGA, HKA, HMA relays were adequate. However, it was noted that additional inspection was needed for relays which did not yet have a unit identifier (ID) associated with them.


SG4BR, which previously did not have unit IDs for Unit 2 and had been identified as not within the scope of these bulletins. The inspectors reviewed drawings, 45N26952-1 and 45N2688-1, to determine whether the relays were within the scope of these bulletins.
Inspection Activities: The inspectors reviewed the applicants approach as detailed in the closure package. The inspectors interviewed engineers on the methodology for identification to determine whether the scope of potentially affected relays identified in the engineering complete closure package was adequate. Additionally, the inspectors reviewed two EDCRs, 59951-A and 58285-A, associated with issuing unit IDs for relays to determine whether the scope of potentially affected relays identified in the closure package was adequate.


The inspectors chose two HFA relays associated with 6.9kV Shutdown Board 2A-A, WBN-2-RLY-074-0010C-A and 2-RLY-074-0010B-A, which were identified as potentially within the scope of the bulletins and did not have unit IDs at the time of the inspection in IIR 05000391/2011608. The results of the applicant's inspection of these relays to
The inspectors also chose two relays, WBN-2-RLY-057-SG4A and WBN-2-RLY-003-SG4BR, which previously did not have unit IDs for Unit 2 and had been identified as not within the scope of these bulletins. The inspectors reviewed drawings, 45N26952-1 and 45N2688-1, to determine whether the relays were within the scope of these bulletins.


determine if they needed replacement were documented in Work Order (WO) 112753729. The inspectors walked down the shutdown board and reviewed WO 112763729, PERs, and GE service advice notifications to verify that the applicant was correctly applying the information in the bulletins to existing HFA relays. Documents reviewed are listed in the Attachment.
The inspectors chose two HFA relays associated with 6.9kV Shutdown Board 2A-A, WBN-2-RLY-074-0010C-A and 2-RLY-074-0010B-A, which were identified as potentially within the scope of the bulletins and did not have unit IDs at the time of the inspection in IIR 05000391/2011608. The results of the applicants inspection of these relays to determine if they needed replacement were documented in Work Order (WO)112753729. The inspectors walked down the shutdown board and reviewed WO 112763729, PERs, and GE service advice notifications to verify that the applicant was correctly applying the information in the bulletins to existing HFA relays. Documents reviewed are listed in the Attachment.


====b. Observations and Findings====
====b. Observations and Findings====
No findings were identified. The inspectors noted that the engineering department used mark IDs, not unit IDs, from drawings in their evaluation of the relays at Watts Bar. In order to issue WOs associated with the relays, unit IDs needed to be issued for the  
No findings were identified. The inspectors noted that the engineering department used mark IDs, not unit IDs, from drawings in their evaluation of the relays at Watts Bar. In order to issue WOs associated with the relays, unit IDs needed to be issued for the relays.
 
relays.


====c. Conclusions====
====c. Conclusions====
Based on the above inspection activities, review of the engineering complete closure package, and the results of IIR 05000391/2011608, the inspectors concluded that the applicant has adequately captured the relevant relays in the scope of their evaluation and, for the sample selected, has adequately implemented the WO. While some WOs associated with these relays remain open, the NRC has reasonable assurance that the applicant is adequately addressing this issue. These items, BL 76-02 and 84-02, are closed.
Based on the above inspection activities, review of the engineering complete closure package, and the results of IIR 05000391/2011608, the inspectors concluded that the applicant has adequately captured the relevant relays in the scope of their evaluation and, for the sample selected, has adequately implemented the WO. While some WOs associated with these relays remain open, the NRC has reasonable assurance that the applicant is adequately addressing this issue. These items, BL 76-02 and 84-02, are closed.


OA.1.10 (Closed) NRC Bulletin 85-01 and Temporary Instruction 2515/069: Steam Binding of Auxiliary Feedwater Pumps (Inspection Procedure 92717 and Temporary  
OA.1.10 (Closed) NRC Bulletin 85-01 and Temporary Instruction 2515/069: Steam Binding of Auxiliary Feedwater Pumps (Inspection Procedure 92717 and Temporary Instruction 2515/069)
 
Instruction 2515/069)


====a. Inspection Scope====
====a. Inspection Scope====
Line 850: Line 802:
ML031200470) requested licensees to
ML031200470) requested licensees to
: (1) develop procedures for monitoring fluid conditions within the AFW system on a regular basis, and
: (1) develop procedures for monitoring fluid conditions within the AFW system on a regular basis, and
: (2) develop procedures for recognizing steam binding and for restoring the AFW system to operable status should steam binding occur. TI 2515/069 (ADAMS Accession No. ML091520286) was issued to define inspection, reporting, and eval uation responsibilities for NRC inspectors.
: (2) develop procedures for recognizing steam binding and for restoring the AFW system to operable status should steam binding occur. TI 2515/069 (ADAMS Accession No. ML091520286) was issued to define inspection, reporting, and evaluation responsibilities for NRC inspectors.
 
WBN Unit 1 & 2 historical commitment actions were initially accomplished thru procedure revision without the need for hardware modifications and were accepted and closed by the NRC in an NRC letter dated Sept 25, 1990 "Notice of Violation (Inspection Report Nos. 50-390/90-20 and 50-391/90-20)" (ADAMS Accession No. ML072610300).


A subsequent NRC inspection was performed in January and February of 1991 and documented in an NRC letter dated March 22, 1991 "Watts Bar Integrated Design Inspection (50-390/91-201)" (ADAMS Accession No. ML072970646). This inspection identified a deficiency in AFW temperature monitoring related to the commitment to GL 1988-03. TVA accepted the deficiency and identified the necessary modifications for Unit 1. TVA letter dated August 1, 1991 "Watts Bar Nuclear Plant (WBN) Unit 1-Response to NRC Integrated Design Inspection (IDI) Issues (50-390/91-201) at WBN" (ADAMS Accession No. ML072880150) documented TVA's commitments. Design
WBN Unit 1 & 2 historical commitment actions were initially accomplished thru procedure revision without the need for hardware modifications and were accepted and closed by the NRC in an NRC letter dated Sept 25, 1990 "Notice of Violation (Inspection Report Nos. 50-390/90-20 and 50-391/90-20) (ADAMS Accession No. ML072610300).


Change Notice (DCN) M-16269-A was issued to relocate the temperature elements (TE-3-143 & 151) identified in the deficiency. The requested change identified that two temperature elements were too far away to be accurate (Loops 2 & 3). However, the two temperature indicators for Loops 1 & 4 were too close to the heat source (Feedwater By-Pass piping). Since the four TE's were relocated, new numbers were assigned (1-TE-3-6381, 2, 3, 4) and the old numbers (1-TE-3-143, 151, 159, & 166) were deleted.
A subsequent NRC inspection was performed in January and February of 1991 and documented in an NRC letter dated March 22, 1991 "Watts Bar Integrated Design Inspection (50-390/91-201) (ADAMS Accession No. ML072970646). This inspection identified a deficiency in AFW temperature monitoring related to the commitment to GL 1988-03. TVA accepted the deficiency and identified the necessary modifications for Unit 1. TVA letter dated August 1, 1991 "Watts Bar Nuclear Plant (WBN) Unit 1-Response to NRC Integrated Design Inspection (IDI) Issues (50-390/91-201) at WBN (ADAMS Accession No. ML072880150) documented TVAs commitments. Design Change Notice (DCN) M-16269-A was issued to relocate the temperature elements (TE-3-143 & 151) identified in the deficiency. The requested change identified that two temperature elements were too far away to be accurate (Loops 2 & 3). However, the two temperature indicators for Loops 1 & 4 were too close to the heat source (Feedwater By-Pass piping). Since the four TE's were relocated, new numbers were assigned (1-TE-3-6381, 2, 3, 4) and the old numbers (1-TE-3-143, 151, 159, & 166) were deleted.


Deficiency 91-D-7 (found in TVA letter dated August 1, 1991 "Watts Bar Nuclear Plant (WBN) Unit 1-Response to NRC Integrated Design Inspection (IDI) Issues (50-390/91-201) at WBN) (ADAMS Accession No. ML072880150) was subsequently closed and documented in NRC letter dated June 29, 1993 "Integrated Design Inspection Follow-up at Watts Bar Unit 1 (NRC inspection Report No. 50-390/93-201)" (ADAMS Accession No. ML072690552). The monitoring of the Unit 1 AFW system temperatures is procedurally directed and included in the Operator Rounds.
Deficiency 91-D-7 (found in TVA letter dated August 1, 1991 "Watts Bar Nuclear Plant (WBN) Unit 1-Response to NRC Integrated Design Inspection (IDI) Issues (50-390/91-201) at WBN) (ADAMS Accession No. ML072880150) was subsequently closed and documented in NRC letter dated June 29, 1993 "Integrated Design Inspection Follow-up at Watts Bar Unit 1 (NRC inspection Report No. 50-390/93-201) (ADAMS Accession No. ML072690552). The monitoring of the Unit 1 AFW system temperatures is procedurally directed and included in the Operator Rounds.


Inspection Activities: The inspectors reviewed the procedures developed to monitor fluid conditions in the AFW system and to recognize and recover from a possible steam binding event. The procedure to monitor the AFW system temperature was reviewed to verify its adequacy in meeting both applicant commitments and NRC requirements by measuring discharge piping temperature once per shift on operator rounds. The inspectors reviewed the procedures for recognizing and recovering from a possible steam binding event to verify that they were adequate to perform both functions. The NRC inspectors reviewed the procedures to verify that they were properly approved by the applicant. The inspectors interviewed Main Control Room staff to verify that the procedures will be available for use in the appropriate Unit 2 work stations and included in operator rounds. Documents reviewed are in the Attachment
Inspection Activities: The inspectors reviewed the procedures developed to monitor fluid conditions in the AFW system and to recognize and recover from a possible steam binding event. The procedure to monitor the AFW system temperature was reviewed to verify its adequacy in meeting both applicant commitments and NRC requirements by measuring discharge piping temperature once per shift on operator rounds. The inspectors reviewed the procedures for recognizing and recovering from a possible steam binding event to verify that they were adequate to perform both functions. The NRC inspectors reviewed the procedures to verify that they were properly approved by the applicant. The inspectors interviewed Main Control Room staff to verify that the procedures will be available for use in the appropriate Unit 2 work stations and included in operator rounds. Documents reviewed are in the Attachment
Line 865: Line 815:
No findings were identified. The Unit 1 procedures, which are identical to those for Unit 2, were available in the main control room and in use by the operations staff. The Unit 2 procedures are approved but will not be issued or implemented until Unit 2 operations commence.
No findings were identified. The Unit 1 procedures, which are identical to those for Unit 2, were available in the main control room and in use by the operations staff. The Unit 2 procedures are approved but will not be issued or implemented until Unit 2 operations commence.


c. Conclusion
c. Conclusion Based on a review of the applicants engineering complete closure package and the aforementioned inspection activities, the inspectors determined that the applicant had implemented actions that are sufficient to address the requirements of BL 85-01.
 
Based on a review of the applicant's engineering complete closure package and the aforementioned inspection activities, the inspectors determined that the applicant had implemented actions that are sufficient to address the requirements of BL 85-01.


Therefore, BL 85-01 and TI 2515-69, are closed.
Therefore, BL 85-01 and TI 2515-69, are closed.


OA.1.11 (Closed) Construction Deficiency Report 391/85-37: Incorrect Use of AMP PIDG   Terminals (Inspection Procedure 35007)
OA.1.11 (Closed) Construction Deficiency Report 391/85-37: Incorrect Use of AMP PIDG Terminals (Inspection Procedure 35007)


====a. Inspection Scope====
====a. Inspection Scope====
Background: This CDR involved the discovery that AMP Products Corporation pre-insulated diamond grip (PIDG) terminals had been used on solid conductor component leads despite the fact that the vendor did not recommend using these terminals for solid copper wire applications. This use was identified on Class 1E discrete electrical components in Foxboro control loops and test points, relay racks, and local panels.
Background: This CDR involved the discovery that AMP Products Corporation pre-insulated diamond grip (PIDG) terminals had been used on solid conductor component leads despite the fact that the vendor did not recommend using these terminals for solid copper wire applications. This use was identified on Class 1E discrete electrical components in Foxboro control loops and test points, relay racks, and local panels.


Additional background information is provided in IIR 05000391/2013610 (ADAMS Accession No. ML14049A158).
Additional background information is provided in IIR 05000391/2013610 (ADAMS Accession No. ML14049A158).


Inspection Activities: The applicant's PP-19-2 Open Item/Commitment Completion Form (Engineering Complete closure package) tracking number PER 172698 R2, was reviewed and interviews with responsible engineering personnel were conducted.
Inspection Activities: The applicants PP-19-2 Open Item/Commitment Completion Form (Engineering Complete closure package) tracking number PER 172698 R2, was reviewed and interviews with responsible engineering personnel were conducted.


Legacy change documents were reviewed, to identify terminals in Unit 2 circuits that had  
Legacy change documents were reviewed, to identify terminals in Unit 2 circuits that had been excluded from the scope of work to address this CDR in Unit 1. The samples selected were design change notices affecting systems 3, 30, 43, 68, and 251. The inspectors then cross-referenced those areas that had been excluded from the scope of work, with Unit 2 design output documents, to verify that those Unit 2 areas have been included in the new scope of work to address the CDR in Unit 2. The inspectors reviewed a document titled Table cross-referencing work excluded from Unit 1 scope to Unit 2 EDCRs provided in Tab #8 of the PP-19-2 Engineering Complete package, to verify that the actions taken to address the CDR were inclusive of all the areas possibly affected in Unit 2. Documents reviewed are listed in the Attachment.
 
been excluded from the scope of work to address this CDR in Unit 1. The samples selected were design change notices affecting systems 3, 30, 43, 68, and 251. The inspectors then cross-referenced those areas that had been excluded from the scope of work, with Unit 2 design output documents, to verify that those Unit 2 areas have been  
 
included in the new scope of work to addr ess the CDR in Unit 2. The inspectors reviewed a document titled "Table cross-referencing work excluded from Unit 1 scope to Unit 2 EDCRs" provided in Tab #8 of the PP-19-2 Engineering Complete package, to verify that the actions taken to address the CDR were inclusive of all the areas possibly affected in Unit 2. Documents reviewed are listed in the Attachment.


====b. Observations and Findings====
====b. Observations and Findings====
Line 890: Line 834:


====c. Conclusions====
====c. Conclusions====
Based on the review of the engineering complete closure package, as well as previous NRC inspection reports, the inspectors determined that the applicant's proposed  
Based on the review of the engineering complete closure package, as well as previous NRC inspection reports, the inspectors determined that the applicants proposed corrective actions are adequate to address the concerns identified in CDR 391/85-37.


corrective actions are adequate to address the concerns identified in CDR 391/85-37. CDR 391/85-37 is closed.
CDR 391/85-37 is closed.


OA.1.12 (Closed) Construction Deficiency Report 86-14: Failure to Follow Procedures (Inspection Procedures 50073 and 50075)
OA.1.12 (Closed) Construction Deficiency Report 86-14: Failure to Follow Procedures (Inspection Procedures 50073 and 50075)


====a. Inspection Scope====
====a. Inspection Scope====
Background: A deficiency concerning improper installation of ASCO model 8316 solenoid valves was identified and reported to the NRC in accordance with 10 CFR 50.55(e). All thread bolts were used in place of the solenoid valves original bonnet screws and mounting brackets. Additionally, fiel d modifications to the mounting brackets were not performed in accordance with approved procedures. The modifications negated the seismic and environmental qualificati on of the solenoid valves. This item was previously inspected in IIR 05000391/2012608 (ADAMS Accession No.
Background: A deficiency concerning improper installation of ASCO model 8316 solenoid valves was identified and reported to the NRC in accordance with 10 CFR 50.55(e). All thread bolts were used in place of the solenoid valves original bonnet screws and mounting brackets. Additionally, field modifications to the mounting brackets were not performed in accordance with approved procedures. The modifications negated the seismic and environmental qualification of the solenoid valves. This item was previously inspected in IIR 05000391/2012608 (ADAMS Accession No.


ML12319A368).
ML12319A368).


Inspection Activities: The inspectors reviewed a sample of ASCO 8316 solenoid valves that were replaced as part of the refurbishment program. The inspectors reviewed completed WOs to verify that the corrective actions related to this item were included in the work instructions. The inspectors reviewed the corrective actions to verify the installation requirements contained in the vendor manual and Modification/Addition Instruction (MAI) 4.4B were referenced in the WOs, and that the WOs addressed the proper mounting of the valves in accordance with the work order processing procedure. The inspectors performed a walkdown of a sample of valves to verify that the valves were installed in accordance with procedures and design documents. Documents reviewed are listed in the Attachment.
Inspection Activities: The inspectors reviewed a sample of ASCO 8316 solenoid valves that were replaced as part of the refurbishment program. The inspectors reviewed completed WOs to verify that the corrective actions related to this item were included in the work instructions. The inspectors reviewed the corrective actions to verify the installation requirements contained in the vendor manual and Modification/Addition Instruction (MAI) 4.4B were referenced in the WOs, and that the WOs addressed the proper mounting of the valves in accordance with the work order processing procedure.
 
The inspectors performed a walkdown of a sample of valves to verify that the valves were installed in accordance with procedures and design documents. Documents reviewed are listed in the Attachment.


====b. Observations and Findings====
====b. Observations and Findings====
Line 907: Line 853:


====c. Conclusions====
====c. Conclusions====
Based on the review of the applicant's engineering closure report, completed work orders, and a walkdown of installed valves, CDR 86-14 is closed.
Based on the review of the applicants engineering closure report, completed work orders, and a walkdown of installed valves, CDR 86-14 is closed.
 
OA.1.13 (Closed) Three Mile Island Action Item I.C.8, Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants (Inspection


Procedure 92701)
OA.1.13 (Closed) Three Mile Island Action Item I.C.8, Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants (Inspection Procedure 92701)


====a. Inspection Scope====
====a. Inspection Scope====
Background: This TMI Action Item was intended to pilot monitor select emergency operating procedures (EOPs) at near-term operating license applicant plants. Action Item I.C.8 was originally made a license condition for Watts Bar Unit 1 and 2 as documented in NUREG-0847, dated June, 1982 (ADAMS Accession No. ML0720604900). NUREG-0737, Clarification of TMI Action Plan Requirements (ADAMS Accession No. ML102560051), provided clarification that the pilot monitoring would be discontinued following NRC approval of plant emergency procedures. Action Item I.C.8 was closed in NRC IRs 50-390/85-08 and 50-391/85-08 (ADAMS Accession No.
Background: This TMI Action Item was intended to pilot monitor select emergency operating procedures (EOPs) at near-term operating license applicant plants. Action Item I.C.8 was originally made a license condition for Watts Bar Unit 1 and 2 as documented in NUREG-0847, dated June, 1982 (ADAMS Accession No.


ML082190701). The inspectors documented that the applicant had implemented the Westinghouse Owner's Group generic procedures, which had been approved by NRC staff. The inspectors determined that action item I.C.8 was no longer applicable. Unit 1 actions were further explained in TVA letter to NRC dated July 27, 1992 (ADAMS Accession No. ML073520471). This letter explains that the WBN EOPs conform to the Westinghouse generic guidelines and that WBN no longer depends on EOPs developed by identifying differences between Sequoyah Nuclear Plant and WBN. In Supplement 10 to the Safety Evaluation Report for Watts Bar Nuclear Units 1 and 2 (ADAMS
ML0720604900). NUREG-0737, Clarification of TMI Action Plan Requirements (ADAMS Accession No. ML102560051), provided clarification that the pilot monitoring would be discontinued following NRC approval of plant emergency procedures. Action Item I.C.8 was closed in NRC IRs 50-390/85-08 and 50-391/85-08 (ADAMS Accession No.


Accession No. ML072060473), dated October, 1992, the NRC staff indicated that WBN procedures conformed to the Westinghouse Owner's Group guidelines and that the license condition was no longer necessary.
ML082190701). The inspectors documented that the applicant had implemented the Westinghouse Owners Group generic procedures, which had been approved by NRC staff. The inspectors determined that action item I.C.8 was no longer applicable. Unit 1 actions were further explained in TVA letter to NRC dated July 27, 1992 (ADAMS Accession No. ML073520471). This letter explains that the WBN EOPs conform to the Westinghouse generic guidelines and that WBN no longer depends on EOPs developed by identifying differences between Sequoyah Nuclear Plant and WBN. In Supplement 10 to the Safety Evaluation Report for Watts Bar Nuclear Units 1 and 2 (ADAMS Accession No. ML072060473), dated October, 1992, the NRC staff indicated that WBN procedures conformed to the Westinghouse Owners Group guidelines and that the license condition was no longer necessary.


For Unit 2, EOPs are mimicked from the Unit 1 procedures presently in use and are different only when hardware or other minor design features dictate that they be different. Unit 2 procedures are currently approved but not issued. Final issuance of Unit 2 procedures requires Plant Operations Review Committee approval and will happen just prior to Unit 2 licensing.
For Unit 2, EOPs are mimicked from the Unit 1 procedures presently in use and are different only when hardware or other minor design features dictate that they be different. Unit 2 procedures are currently approved but not issued. Final issuance of Unit 2 procedures requires Plant Operations Review Committee approval and will happen just prior to Unit 2 licensing.


Inspection Activities: The inspectors reviewed the applicant's engineering complete closure package, NCO820253100, to verify that the intent of TMI Action Item I.C.8 had been met for WBN Unit 2. The inspectors reviewed procedure 2-ECA-1.2, "LOCA Outside Containment" and compared it to 1-ECA-1.2, "LOCA Outside Containment," Rev. 5, to verify that that the Unit 2 procedure mirrored Unit 1 and performed the same functions.
Inspection Activities: The inspectors reviewed the applicants engineering complete closure package, NCO820253100, to verify that the intent of TMI Action Item I.C.8 had been met for WBN Unit 2. The inspectors reviewed procedure 2-ECA-1.2, LOCA Outside Containment and compared it to 1-ECA-1.2, LOCA Outside Containment, Rev. 5, to verify that that the Unit 2 procedure mirrored Unit 1 and performed the same functions.


====b. Observations and Findings====
====b. Observations and Findings====
Line 928: Line 872:


====c. Conclusions====
====c. Conclusions====
Based on the above inspection activities and review of the engineering complete closure package, the inspectors determined that TMI Action Item I.C.8 is no longer applicable to WBN Unit 2. The WBN EOPs conform to Westinghouse Owner's Group guidelines, which have been approved by the NRC. This item, TMI Action Item I.C.8, is closed.
Based on the above inspection activities and review of the engineering complete closure package, the inspectors determined that TMI Action Item I.C.8 is no longer applicable to WBN Unit 2. The WBN EOPs conform to Westinghouse Owners Group guidelines, which have been approved by the NRC. This item, TMI Action Item I.C.8, is closed.
 
OA.1.14 (Closed) Control Room Design Review Special Program and Three Mile Island Action Item I.D.1 (Temporary Instruction 2512/035 and Inspection Procedure


92701)
OA.1.14 (Closed) Control Room Design Review Special Program and Three Mile Island Action Item I.D.1 (Temporary Instruction 2512/035 and Inspection Procedure 92701)


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors continued inspection efforts initiated in NRC IIR 05000391/2010602 (ADAMS Accession No. ML101230144) Section C.1.18 and NRC IIR  
The inspectors continued inspection efforts initiated in NRC IIR 05000391/2010602 (ADAMS Accession No. ML101230144) Section C.1.18 and NRC IIR 05000391/2010605 (ADAMS Accession No. ML110410680) Section OA.1.3 regarding the applicants resolution of the main control room (MCR) design review. The inspectors focused on the actions supporting the remaining scope of the applicants control room design review (CRDR) special program (SP). Specifically, the inspectors performed the following actions:
 
05000391/2010605 (ADAMS Accession No. ML110410680) Section OA.1.3 regarding the applicant's resolution of the main control room (MCR) design review. The inspectors focused on the actions supporting the remaining scope of the applicant's control room design review (CRDR) special program (SP). Specifically, the inspectors performed the following actions:
* Reviewed 15 safety-related MCR components on panels 2-M-4, 2-M-5, and 2-M-6 to verify that the components satisfied panel design output spatial arrangement, scale, mimic bus arrangement, component identification, and alarm window arrangement.
* Reviewed 15 safety-related MCR components on panels 2-M-4, 2-M-5, and 2-M-6 to verify that the components satisfied panel design output spatial arrangement, scale, mimic bus arrangement, component identification, and alarm window arrangement.
* Reviewed self-assessment report 25402-SA-ENG-11-006 to verify critical aspects of the program were inspected and that any corrective actions were captured in the applicant's corrective action program.
* Reviewed self-assessment report 25402-SA-ENG-11-006 to verify critical aspects of the program were inspected and that any corrective actions were captured in the applicants corrective action program.
* Reviewed open commitments with a future closure date to ensure they were tracked by a controlled process.
* Reviewed open commitments with a future closure date to ensure they were tracked by a controlled process.
* Reviewed five completed CRDR human engineering deficiency (HED) closure packages, where no change was made from Unit 1 CRDR SP, to verify field implementation was performed and the scope of the modification was accurately implemented.
* Reviewed five completed CRDR human engineering deficiency (HED) closure packages, where no change was made from Unit 1 CRDR SP, to verify field implementation was performed and the scope of the modification was accurately implemented.
Line 961: Line 901:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors continued inspection efforts initiated in NRC IIR 05000391/2008010 (ADAMS Accession No. ML090291033) Section Q.1.3 and NRC IIR 05000391/2010602 (ADAMS Accession No. ML110800483) Section OA.1.7 regarding the applicant's identification and resolution of historic corrective action tracking documents (CATDs). Specifically, the inspectors utilized the guidance in TI 2512/015 to evaluate the applicant's implementation of procedure 25402-3DP-G04G-00501, Historical Document Review Process, Rev. 4. The inspection focused on reviewing the historical issue corrective actions to ensure that, for each CATD "applicable" to Unit 2, the assigned corrective actions were completed or transferred to a controlled program/process. The selected items for review represented a spectrum of construction and technical disciplines. The list of CATDs reviewed is listed in the Attachment to this report.
The inspectors continued inspection efforts initiated in NRC IIR 05000391/2008010 (ADAMS Accession No. ML090291033) Section Q.1.3 and NRC IIR 05000391/2010602 (ADAMS Accession No. ML110800483) Section OA.1.7 regarding the applicants identification and resolution of historic corrective action tracking documents (CATDs).
 
Specifically, the inspectors utilized the guidance in TI 2512/015 to evaluate the applicants implementation of procedure 25402-3DP-G04G-00501, Historical Document Review Process, Rev. 4. The inspection focused on reviewing the historical issue corrective actions to ensure that, for each CATD applicable to Unit 2, the assigned corrective actions were completed or transferred to a controlled program/process. The selected items for review represented a spectrum of construction and technical disciplines. The list of CATDs reviewed is listed in the Attachment to this report.


The following inspection requirements of TI 2512/015 were inspected:
The following inspection requirements of TI 2512/015 were inspected:
Line 971: Line 913:


====c. Conclusions====
====c. Conclusions====
The inspectors determined that the sample of documents reviewed complied with applicable requirements. Proper justification of corrective actions accompanied each CATD and planned corrective actions, when applicable, were appropriate. This inspection effort, coupled with previous inspections and conclusions, supports closure of this item. This item, TI 2512/015, Watts Bar Nuclear Plant Employee Concerns  
The inspectors determined that the sample of documents reviewed complied with applicable requirements. Proper justification of corrective actions accompanied each CATD and planned corrective actions, when applicable, were appropriate. This inspection effort, coupled with previous inspections and conclusions, supports closure of this item. This item, TI 2512/015, Watts Bar Nuclear Plant Employee Concerns Program, is closed.
 
Program, is closed.
 
OA 1.16 (Closed) Construction Deficiency Report 391/91-31: Use of Non-Dedicated Commercial Grade Electrical Devices in Safety-Related Applications (Inspection


Procedure 35007)
OA 1.16 (Closed) Construction Deficiency Report 391/91-31: Use of Non-Dedicated Commercial Grade Electrical Devices in Safety-Related Applications (Inspection Procedure 35007)


====a. Inspection Scope====
====a. Inspection Scope====
Background
Background: The deficiency was initially reported to the NRC on June 28, 1991, as significant corrective action report (SCAR) WBP890634SCA in accordance with 10 CFR 50.55(e). The issue was documented as CDR 390/91-31 for Unit 1 and CDR 391/91-31 for Unit 2.
: The deficiency was initially reported to the NRC on June 28, 1991, as significant corrective action report (SCAR) WBP890634SCA in accordance with 10 CFR 50.55(e). The issue was documented as CDR 390/91-31 for Unit 1 and CDR 391/91-31 for Unit 2.


The construction deficiency report concerned the seismic qualification program for instrumentation and electrical equipment at WBN based on the requirements of Institute of Electrical and Electronics Engineers (IEEE)-344, "IEEE Recommended Practice for Seismic Qualification for Class 1E Equipment for Nuclear Power Generating Stations."
The construction deficiency report concerned the seismic qualification program for instrumentation and electrical equipment at WBN based on the requirements of Institute of Electrical and Electronics Engineers (IEEE)-344, IEEE Recommended Practice for Seismic Qualification for Class 1E Equipment for Nuclear Power Generating Stations.


Specifically, seismic sensitive electrically active (SSEA) devices were released from inventory for safety-related applications and were not procured or qualified to IEEE-344.
Specifically, seismic sensitive electrically active (SSEA) devices were released from inventory for safety-related applications and were not procured or qualified to IEEE-344.
Line 991: Line 928:
The deficiency involved problems associated with replacement item procurement policies, procedures, and practices that did not adequately prescribe/control engineering involvement in the procurement process.
The deficiency involved problems associated with replacement item procurement policies, procedures, and practices that did not adequately prescribe/control engineering involvement in the procurement process.


The applicant implemented the replacement it ems program (RIP) CAP which committed, in part, to a review of inventory and installed SSEA commercial grade QA level II devices. The SSEA review consisted of 416 items in which 56 cases were determined as not satisfying IEEE-344 requirements. TVA corrective actions for Unit 1 included the replacement or an engineering disposition for the applicable installed equipment. After a review of the adequacy and effectiveness of root cause determination, extent of condition, corrective actions, recurrence controls, proper closure, and a review of the RIP CAP for Unit 1, the inspectors determined that CDR 390/91-31 was adequately resolved for Unit 1 as documented in NRC IRs 50-390/94-66 (ADAMS Accession No. ML072980640) and 50-390/94-201 (ADAMS Accession No. ML072750758).
The applicant implemented the replacement items program (RIP) CAP which committed, in part, to a review of inventory and installed SSEA commercial grade QA level II devices. The SSEA review consisted of 416 items in which 56 cases were determined as not satisfying IEEE-344 requirements. TVA corrective actions for Unit 1 included the replacement or an engineering disposition for the applicable installed equipment. After a review of the adequacy and effectiveness of root cause determination, extent of condition, corrective actions, recurrence controls, proper closure, and a review of the RIP CAP for Unit 1, the inspectors determined that CDR 390/91-31 was adequately resolved for Unit 1 as documented in NRC IRs 50-390/94-66 (ADAMS Accession No.


The SSEA review for Unit 1 included Unit 2 components. One component exception was noted during the review that did not meet the IEEE-344 requirements. The corrective actions for Unit 2 were documented in PER 144235. Unit 2 solid state protection system (SSPS) Train B, Midtex 156-14T300 relay K201 did not meet the
ML072980640) and 50-390/94-201 (ADAMS Accession No. ML072750758).


requirements of IEEE-344. After a review of the Unit 2 RIP CAP, the inspectors determined the CAP was adequately resolved for Unit 2 as documented in NRC IIR 05000391/2010605 (ADAMS Accession No. ML110410680). The inspectors reviewed the engineering completed documents to inst all the K201 relay as documented in NRC IIR 05000391/2013612 (ADAMS Accession No. ML13088A066).
The SSEA review for Unit 1 included Unit 2 components. One component exception was noted during the review that did not meet the IEEE-344 requirements. The corrective actions for Unit 2 were documented in PER 144235. Unit 2 solid state protection system (SSPS) Train B, Midtex 156-14T300 relay K201 did not meet the requirements of IEEE-344. After a review of the Unit 2 RIP CAP, the inspectors determined the CAP was adequately resolved for Unit 2 as documented in NRC IIR 05000391/2010605 (ADAMS Accession No. ML110410680). The inspectors reviewed the engineering completed documents to install the K201 relay as documented in NRC IIR 05000391/2013612 (ADAMS Accession No. ML13088A066).


Inspection Activities: To address Unit 2 actions the inspectors performed the following:
Inspection Activities: To address Unit 2 actions the inspectors performed the following:
* reviewed PER 144235 to verify the corrective actions were implemented for Unit 2;
* reviewed PER 144235 to verify the corrective actions were implemented for Unit 2;
* reviewed certificate of conformance for Westinghouse SSPS start-up kit, Train B, 4/6/10, to verify the relay was purchased by a qualified vendor;
* reviewed certificate of conformance for Westinghouse SSPS start-up kit, Train B, 4/6/10, to verify the relay was purchased by a qualified vendor;
* reviewed Westinghouse Technical Bulletin TB-04-2 for SSPS Relays, 1/6/04, and reviewed TVA WO 09-954267-001 Train B Master Relay Data Sheets, 6/21/10, to verify that the components noted in the technical bulletin were identified by the applicant;
* reviewed Westinghouse Technical Bulletin TB-04-2 for SSPS Relays, 1/6/04, and reviewed TVA WO 09-954267-001 Train B Master Relay Data Sheets, 6/21/10, to verify that the components noted in the technical bulletin were identified by the applicant;
* reviewed WO 113314474 and inspected the as-built installation of the K-201 relay to verify that the relay was installed in accordance with the approved procedures and drawings; and
* reviewed WO 113314474 and inspected the as-built installation of the K-201 relay to verify that the relay was installed in accordance with the approved procedures and drawings; and
* interviewed two engineers and reviewed the Westinghouse seismic testing qualifications for the K-201 relay. The review was conducted to verify that the seismic qualifications met the requirements of the Final Safety Analysis Report (FSAR) and IEEE-344, "Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations," 1975.
* interviewed two engineers and reviewed the Westinghouse seismic testing qualifications for the K-201 relay. The review was conducted to verify that the seismic qualifications met the requirements of the Final Safety Analysis Report (FSAR) and IEEE-344, Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, 1975.


Documents reviewed are listed in the Attachment
Documents reviewed are listed in the Attachment
Line 1,010: Line 947:


====c. Conclusions====
====c. Conclusions====
Based on the review of the final closure package, and other activities completed during this and previous inspections, the inspectors determined that the applicant's corrective actions were adequate. CDR 390/91-31 is closed.
Based on the review of the final closure package, and other activities completed during this and previous inspections, the inspectors determined that the applicants corrective actions were adequate. CDR 390/91-31 is closed.


OA.1.17 (Discussed) QA Records Corrective Action Program Plan (Temporary Instruction 2512/028 and Inspection Procedure 51055)
OA.1.17 (Discussed) QA Records Corrective Action Program Plan (Temporary Instruction 2512/028 and Inspection Procedure 51055)


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed a sample of QA records for electrical conduit and instrument subassemblies. The inspectors reviewed the applicant's sample assessment of the records to verify that the records specified the correct component type and location, that the functional specifications were met, that the required QA/QC inspections were performed, and that they were complete and legible. To verify that records were retrievable, the inspectors observed document control personnel locate independent samples of records from within the vault. Documents reviewed are listed in the  
The inspectors reviewed a sample of QA records for electrical conduit and instrument subassemblies. The inspectors reviewed the applicants sample assessment of the records to verify that the records specified the correct component type and location, that the functional specifications were met, that the required QA/QC inspections were performed, and that they were complete and legible. To verify that records were retrievable, the inspectors observed document control personnel locate independent samples of records from within the vault. Documents reviewed are listed in the
.
.


Line 1,027: Line 964:


====a. Inspection Scope====
====a. Inspection Scope====
Background: On June 1, 1984, the Commission approved publication of a final rule, 10 CFR 50.62, regarding the reduction of risk from Anticipated Transient Without Scram (ATWS) events for light water cooled nuclear power plants. At the same time, the Commission directed the staff to complete and issue (in the form of a generic letter) QA guidance for equipment that is not safety related, but is encompassed by the ATWS rule. The ATWS rule required that each licensee develop and submit (to the Director, Nuclear
Background: On June 1, 1984, the Commission approved publication of a final rule, 10 CFR 50.62, regarding the reduction of risk from Anticipated Transient Without Scram (ATWS) events for light water cooled nuclear power plants. At the same time, the Commission directed the staff to complete and issue (in the form of a generic letter) QA guidance for equipment that is not safety related, but is encompassed by the ATWS rule.
 
Reactor Regulation (NRR)) a proposed schedule for meeting the requirements of the rule within 180 days after the QA guidance is issued. On April 16, 1985, NRR issued GL 85-06. The enclosure to GL 85-06 provided the explicit QA guidance required by 10 CFR 50.62. The lesser safety significance of the equipment encompassed by 10 CFR 50.62, as compared to safety-related equipment, necessarily resulted in less stringent QA guidance. TI 2500/20 required an inspection focused on the implementation of the ATWS rule requirements, 10 CFR 50.62, and on the effectiveness of the QA controls applied to ATWS activities.
 
Inspection Activities:  The inspectors reviewed EDCR 52408, an ATWS specification, and setpoint documents to verify that the designs and specifications conform to the applicant's plan as endorsed through the NRR safety evaluation and the FSAR. This


included verifying that the systems do not compro mise the safety features of the existing safety-related protection system and that the applicant's design is being properly implemented. This also in cluded verifying that no open items exist in the SSER regarding ATWS. The inspectors also reviewed a purchase order for the dedicated pressure transmitters to verify they were meeting technical requirements. The
The ATWS rule required that each licensee develop and submit (to the Director, Nuclear Reactor Regulation (NRR)) a proposed schedule for meeting the requirements of the rule within 180 days after the QA guidance is issued. On April 16, 1985, NRR issued GL 85-06. The enclosure to GL 85-06 provided the explicit QA guidance required by 10 CFR 50.62. The lesser safety significance of the equipment encompassed by 10 CFR 50.62, as compared to safety-related equipment, necessarily resulted in less stringent QA guidance. TI 2500/20 required an inspection focused on the implementation of the ATWS rule requirements, 10 CFR 50.62, and on the effectiveness of the QA controls applied to ATWS activities.


inspectors reviewed a material receiving report for the dedicated pressure transmitters, which included a receipt inspection, to verify that the receipt inspection and identification controls were properly applied. The inspectors reviewed Bechtel's PNQAM to verify that there was a documented ATWS QA program plan.
Inspection Activities: The inspectors reviewed EDCR 52408, an ATWS specification, and setpoint documents to verify that the designs and specifications conform to the applicants plan as endorsed through the NRR safety evaluation and the FSAR. This included verifying that the systems do not compromise the safety features of the existing safety-related protection system and that the applicants design is being properly implemented. This also included verifying that no open items exist in the SSER regarding ATWS. The inspectors also reviewed a purchase order for the dedicated pressure transmitters to verify they were meeting technical requirements. The inspectors reviewed a material receiving report for the dedicated pressure transmitters, which included a receipt inspection, to verify that the receipt inspection and identification controls were properly applied. The inspectors reviewed Bechtels PNQAM to verify that there was a documented ATWS QA program plan.


The inspectors reviewed WOs 110809957 and 11211601 to verify that the latest installation standards and procedures were used for the installation of the dedicated pressure transmitters and that QA controls were implemented. The inspectors performed walk downs of the transmitters and wiring to verify that the equipment in place met the configuration specified, and that identification designations were being maintained. The inspectors also walked down the transmitters, inspected the terminations, and reviewed the WO to verify that the instrumentation was installed in the proper location, the installers used suitable equipment and tools, and the installation met the physical separation criteria. The inspectors reviewed the WOs to verify that applicant inspections were performed. The inspectors reviewed the test procedure and scoping document to verify they had adequate acceptance criteria. Documents reviewed are listed in the Attachment.
The inspectors reviewed WOs 110809957 and 11211601 to verify that the latest installation standards and procedures were used for the installation of the dedicated pressure transmitters and that QA controls were implemented. The inspectors performed walk downs of the transmitters and wiring to verify that the equipment in place met the configuration specified, and that identification designations were being maintained. The inspectors also walked down the transmitters, inspected the terminations, and reviewed the WO to verify that the instrumentation was installed in the proper location, the installers used suitable equipment and tools, and the installation met the physical separation criteria. The inspectors reviewed the WOs to verify that applicant inspections were performed. The inspectors reviewed the test procedure and scoping document to verify they had adequate acceptance criteria. Documents reviewed are listed in the Attachment.
Line 1,045: Line 978:


====c. Conclusions====
====c. Conclusions====
The inspectors concluded that the current design, purchasing requirements, and installation (for the sample observed) were in accordance with the approved design. The inspectors also concluded that the QA program was properly implemented for ATWS equipment. This TI will remain open pending completion of TI 2500/20 Section 04.05; Confirmation of Completed Work and verification of the instrument channel location, orientation, and support.
The inspectors concluded that the current design, purchasing requirements, and installation (for the sample observed) were in accordance with the approved design.
 
The inspectors also concluded that the QA program was properly implemented for ATWS equipment. This TI will remain open pending completion of TI 2500/20 Section 04.05; Confirmation of Completed Work and verification of the instrument channel location, orientation, and support.


OA.1.19 (Discussed) Construction Deficiency Report 391/85-19: Potential Interaction of Flux Mapping System and Seal Table (Temporary Instruction 2500/16 and Inspection Procedure 35007)
OA.1.19 (Discussed) Construction Deficiency Report 391/85-19: Potential Interaction of Flux Mapping System and Seal Table (Temporary Instruction 2500/16 and Inspection Procedure 35007)


====a. Inspection Scope====
====a. Inspection Scope====
Background: In 1985, Westinghouse identified a potential issue with the interaction between the non-safety related incore flux mapping system and the safety-related seal table and bottom mounted instrument tubing. Specifically, elevated non-seismically qualified portions of the incore flux mapping system could fall on the safety-related seal table during a seismic event. Watts Bar was notified of this potential condition in a Westinghouse letter, WAT-D-6590, to TVA. The NRC communicated this potential condition to all power reactor facilities in Information Notice (IN) 85-45 (ADAMS Accession No. ML082890914). The NRC issued TI 2500/16 (ADAMS Accession No.
Background: In 1985, Westinghouse identified a potential issue with the interaction between the non-safety related incore flux mapping system and the safety-related seal table and bottom mounted instrument tubing. Specifically, elevated non-seismically qualified portions of the incore flux mapping system could fall on the safety-related seal table during a seismic event. Watts Bar was notified of this potential condition in a Westinghouse letter, WAT-D-6590, to TVA. The NRC communicated this potential condition to all power reactor facilities in Information Notice (IN) 85-45 (ADAMS Accession No. ML082890914). The NRC issued TI 2500/16 (ADAMS Accession No.


ML091530077) to provide inspectors with inspection and reporting guidance for IN 85-45. TVA acknowledged this condition and communicated its planned corrective actions to the NRC in a final report dated July 15, 1985 (ADAMS Accession No. ML082410337). This condition was documented as CDR 390/85-20 for Unit 1 and CDR 391/85-19 for
ML091530077) to provide inspectors with inspection and reporting guidance for IN 85-45. TVA acknowledged this condition and communicated its planned corrective actions to the NRC in a final report dated July 15, 1985 (ADAMS Accession No. ML082410337).


Unit 2.
This condition was documented as CDR 390/85-20 for Unit 1 and CDR 391/85-19 for Unit 2.


For Unit 1, TVA performed a seismic analysis of the Movable Incore Detector Systems (MIDS). TVA determined that a portion of the MIDS, the movable frame assemble (MFA), mounted directly over the seal table, required modifications to meet the seismic design. TVA added additional anchor bolts, tie-down legs, and welds to the MFA to meet the seismic category 1L requirements. These modifications were accomplished through Engineering Change Notice (ECN) 5765. After review of ECN 5765 and associated documents, NRC inspectors closed CDR 390/85-20 for Unit 1 in NRC IR 50-390/90-20 and 50-391/90-20 (ADAMS Accession No. ML072610303).
For Unit 1, TVA performed a seismic analysis of the Movable Incore Detector Systems (MIDS). TVA determined that a portion of the MIDS, the movable frame assemble (MFA), mounted directly over the seal table, required modifications to meet the seismic design. TVA added additional anchor bolts, tie-down legs, and welds to the MFA to meet the seismic category 1L requirements. These modifications were accomplished through Engineering Change Notice (ECN) 5765. After review of ECN 5765 and associated documents, NRC inspectors closed CDR 390/85-20 for Unit 1 in NRC IR 50-390/90-20 and 50-391/90-20 (ADAMS Accession No. ML072610303).
Line 1,060: Line 995:
ECN 5766 was issued coincident with 5765 so that identical modifications could be performed on the Unit 2 MFA. Subsequently, TVA made the decision to utilize the Westinghouse In-Core Information Surveillance & Engineering (WINCISE) system in Unit 2, instead of the MIDS that is utilized in Unit 1. Although the Unit 2 MFA was supplied as a portion of the MIDS, TVA elected to utilize it to support portions of the new WINCISE system. Therefore, the Unit 2 MFA will also require modifications to meet the seismic category 1L requirements. The applicant issued Field Change Request (FCR)60311-A to EDCR 52815 to verify and upgrade the existing Unit 2 MFA.
ECN 5766 was issued coincident with 5765 so that identical modifications could be performed on the Unit 2 MFA. Subsequently, TVA made the decision to utilize the Westinghouse In-Core Information Surveillance & Engineering (WINCISE) system in Unit 2, instead of the MIDS that is utilized in Unit 1. Although the Unit 2 MFA was supplied as a portion of the MIDS, TVA elected to utilize it to support portions of the new WINCISE system. Therefore, the Unit 2 MFA will also require modifications to meet the seismic category 1L requirements. The applicant issued Field Change Request (FCR)60311-A to EDCR 52815 to verify and upgrade the existing Unit 2 MFA.


Inspection Activities: The inspectors reviewed the proposed modifications contained in EDCR 52815; but because the EDCR was undergoing revision at the time of the inspection, the inspectors were unable to verify the adequacy of the modifications.
Inspection Activities: The inspectors reviewed the proposed modifications contained in EDCR 52815; but because the EDCR was undergoing revision at the time of the inspection, the inspectors were unable to verify the adequacy of the modifications.


====b. Observations and Findings====
====b. Observations and Findings====
Line 1,067: Line 1,002:


====c. Conclusions====
====c. Conclusions====
The inspectors determined that further inspection of the applicant's design package will be required to verify resolution of the original construction deficiency.
The inspectors determined that further inspection of the applicants design package will be required to verify resolution of the original construction deficiency.
 
V. MANAGEMENT MEETINGS


X1  
V. MANAGEMENT MEETINGS X1  


=====Exit Meeting Summary=====
=====Exit Meeting Summary=====
Line 1,081: Line 1,014:


Applicant personnel
Applicant personnel
: [[contact::A. Bangalore]], Bechtel - Electrical Engineer  
: [[contact::A. Bangalore]], Bechtel - Electrical Engineer
: [[contact::R. Baron]], TVA - QA Manager, Unit 2  
: [[contact::R. Baron]], TVA - QA Manager, Unit 2
: [[contact::E. Brumfield]], Bechtel PQAM  
: [[contact::E. Brumfield]], Bechtel PQAM
: [[contact::D. Charlton]], TVA Regulatory Compliance  
: [[contact::D. Charlton]], TVA Regulatory Compliance
: [[contact::J. W. Clark]], TVA - QA Specialist, Unit 2  
: [[contact::J. W. Clark]], TVA - QA Specialist, Unit 2
: [[contact::R. Daniels]], TVA Regulatory Compliance  
: [[contact::R. Daniels]], TVA Regulatory Compliance
: [[contact::T. Das]], Bechtel - Civil Engineering  
: [[contact::T. Das]], Bechtel - Civil Engineering
: [[contact::B. Enis]], TVA Oversight  
: [[contact::B. Enis]], TVA Oversight
: [[contact::J. Hickman]], TVA QA Sr. Program Manager  
: [[contact::J. Hickman]], TVA QA Sr. Program Manager
: [[contact::R. Hruby]], TVA - General Manager Technical Services  
: [[contact::R. Hruby]], TVA - General Manager Technical Services
: [[contact::J. Iqbal]], Becthel Engineering  
: [[contact::J. Iqbal]], Becthel Engineering
: [[contact::G. Lee]], Bechtel - MOV Engineer  
: [[contact::G. Lee]], Bechtel - MOV Engineer
: [[contact::D. Morgan]], Bechtel Construction  
: [[contact::D. Morgan]], Bechtel Construction
: [[contact::T. Niessen]], TVA Audits & Assessment Manager  
: [[contact::T. Niessen]], TVA Audits & Assessment Manager
: [[contact::J. O'Dell]], TVA - Regulatory Compliance  
: [[contact::J. ODell]], TVA - Regulatory Compliance
: [[contact::K. Parker]], TVA Construction  
: [[contact::K. Parker]], TVA Construction
: [[contact::L. Peteron]], TVA CGD  
: [[contact::L. Peteron]], TVA CGD
: [[contact::T. Raley]], Betchel Engineering Manager  
: [[contact::T. Raley]], Betchel Engineering Manager
: [[contact::J. Robertson]], Bechtel Project Director  
: [[contact::J. Robertson]], Bechtel Project Director
: [[contact::G. Scott]], TVA - Licensing  
: [[contact::G. Scott]], TVA - Licensing
: [[contact::M. Skaggs]], TVA - Senior Vice President  
: [[contact::M. Skaggs]], TVA - Senior Vice President
: [[contact::N. Welch]], TVA - Properational Startup Manager  
: [[contact::N. Welch]], TVA - Properational Startup Manager
: [[contact::R. Yager]], Bechtel PEG  
: [[contact::R. Yager]], Bechtel PEG
: [[contact::O. J. Zeringue]], TVA - General Manager Engineering and Construction
: [[contact::O. J. Zeringue]], TVA - General Manager Engineering and Construction
INSPECTION PROCEDURES USED
INSPECTION PROCEDURES USED
IP 35007 Quality Assurance Program Implementation During Construction and Pre-Construction Activities IP 35020 Inspection of Applicant's Surveillance of Contractor Quality Assurance (QA) Activities IP 37051 Verification of As-Builts IP 37055 Onsite Design Activities IP 41301 Pre-Licensing Review of Training and Qualification Programs
IP 35007               Quality Assurance Program Implementation During Construction and Pre-
IP 48053 Structural Steel and Supports Observation
Construction Activities
IP 49063 Piping - Work Observation
IP 35020               Inspection of Applicants Surveillance of Contractor Quality Assurance
IP 50071   Safety Related Components - Procedure Review
                        (QA) Activities
IP 50073   Mechanical Components - Work Observation IP 50075   Safety Related Components - Record Review IP 51053   Electrical Components and Systems - Work Observation
IP 37051               Verification of As-Builts
IP 51055   Electrical Components and Systems - Record Review
IP 37055               Onsite Design Activities
IP 51063   Electrical Cable - Work Observation
IP 41301               Pre-Licensing Review of Training and Qualification Programs
IP 52055   Instrument Components and Systems - Record Review IP 70300   Preoperational Test Procedure Review IP 70302   Preoperational Test Program Implementation
IP 48053               Structural Steel and Supports Observation
IP 70311  Preoperational Testing Procedure Verification IP 70312  Preoperational Test Witnessing IP 70333  Chemical Control System Test - Preoperational Test Procedure Review IP 70400  Preoperational Test Review Evaluation
IP 49063               Piping - Work Observation
IP 71302  Preoperational Test Program Implementation Verification
IP 50071               Safety Related Components - Procedure Review
IP 92701  Follow-up
IP 50073               Mechanical Components - Work Observation
IP 92702 Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders IP 92717 IE Bulletins for Information and IE Information Notice Follow-up
IP 50075               Safety Related Components - Record Review
IP 51053               Electrical Components and Systems - Work Observation
IP 51055               Electrical Components and Systems - Record Review
IP 51063               Electrical Cable - Work Observation
IP 52055               Instrument Components and Systems - Record Review
IP 70300               Preoperational Test Procedure Review
IP 70302               Preoperational Test Program Implementation


TI 2500/16 Inspection to Determine if a Potential Seismic Interaction Exists Between the Movable In-Core Flux Mapping System and Seal Table at Westinghouse Designed Facilities or Facilities with Similar Designs TI 2500/20   Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62
IP 70311          Preoperational Testing Procedure Verification
TI 2512/015 Inspection of Watts Bar Nuclear Plant Employee Concerns Program
IP 70312          Preoperational Test Witnessing
TI 2512/028 Inspection of Watts Bar Nuclear Plant QA Records Corrective Action Program Plan TI 2512/035 Inspection of Watts Bar Nuclear Plant Control Room Design Review Special Program TI 2515/69 Inspection of Response to IE Bulletin 85-01
IP 70333          Chemical Control System Test - Preoperational Test Procedure Review
TI 2515/142 Draindown During Shutdown and Common-Mode Failure (NRC Generic
IP 70400          Preoperational Test Review Evaluation
Letter 98-02)  
IP 71302          Preoperational Test Program Implementation Verification
IP 92701          Follow-up
IP 92702          Follow-up on Traditional Enforcement Actions Including Violations,
Deviations, Confirmatory Action Letters, Confirmatory Orders, and
Alternative Dispute Resolution Confirmatory Orders
IP 92717          IE Bulletins for Information and IE Information Notice Follow-up
TI 2500/16         Inspection to Determine if a Potential Seismic Interaction Exists Between
the Movable In-Core Flux Mapping System and Seal Table at
Westinghouse Designed Facilities or Facilities with Similar Designs
TI 2500/20         Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62
TI 2512/015       Inspection of Watts Bar Nuclear Plant Employee Concerns Program
TI 2512/028       Inspection of Watts Bar Nuclear Plant QA Records Corrective Action
Program Plan
TI 2512/035       Inspection of Watts Bar Nuclear Plant Control Room Design Review
Special Program
TI 2515/69         Inspection of Response to IE Bulletin 85-01
TI 2515/142       Draindown During Shutdown and Common-Mode Failure (NRC Generic
Letter 98-02)


==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==


===Opened===
===Opened===
None  
 
None


===Opened and Closed===
===Opened and Closed===
: 05000391/2014602-01  
: 05000391/2014602-01               NCV        Inadequate Corrective Actions for Historical Issues (Section OA.1.2)


===Closed===
===Closed===


NCV   
35020                               IP       Inspection of Applicants Surveillance of Contractor Quality Assurance Activities (Section Q.1.2)
 
37055                              IP        Onsite Design Activities (E.1.1)
Inadequate Corrective Actions for Historical
48053                              IP        Structural Steel and Supports Observation (Section C.1.2)
Issues (Section OA.1.2)
10CFR21                          Other      Historical 10CFR21 Reviews (Section OA.1.2)
35020  
EA-13-019                  Severity Level    Commercial Grade Dedication III Problem
 
: 05000391/2013611-01                VIO        Commercial Grade Dedication Program Breakdown (Section OA.1.1)
37055
: 05000391/2013611-02     VIO     Failure to Make a Required 10 CFR 50.55(e)
 
Report (Section OA.1.1)
48053
: 05000391/2013611-03    VIO      Failure to Identify Significant Condition Adverse to Quality (Section OA.1.1)
 
EA-12-021           Confirmatory Completeness and Accuracy of Information Order    (Section OA.1.3)
10CFR21
Item 49                SSER      Training Requirements (Section OA.1.4)
EA-13-019
Appendix HH Item 51                SSER      Definition of Significant Cracks (Section Appendix HH  OA.1.5)
: 05000391/2013611-01
Item 64                SSER      Eagle 21 Rack 2 RTD Testing Results Review Appendix HH  (Section OA.1.6)
 
TMI I.C.8                AI      Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants (Section OA.1.13)
IP
TMI I.D.1                AI      Control Room Design Reviews (OA.1.14)
IP  IP
TMI II.K.1.10            AI      Operability Status (Section OA.1.7)
Other  Severity Level
1998-02                GL      Loss of Reactor Coolant Inventory and Associated Power Loss of Emergency Mitigation Functions While in Shutdown Conditions (Section OA.1.8)
III Problem
2512/035                TI      Control Room Design Review Special Program (OA.1.14)
VIO
2512/015                TI      Inspection of Watts Bar Nuclear Plant Employee Concerns Program (OA.1.15)
Inspection of Applicant's Surveillance of  
2515/069                TI      Inspection of Response to IE Bulletin 85-01 (Section OA.1.10)
 
2515/142                TI      Draindown During Shutdown and Common-
Contractor Quality Assurance Activities  
Mode Failure (Section OA.1.8)
(Section Q.1.2)
76-02                    BL      Relay Coil Failures (Section OA.1.9)
Onsite Design Activities (E.1.1)  
84-02                    BL      Failures of General Electric Type HFA Relays (Section OA.1.9)
 
85-01                    BL      Steam Binding of Auxiliary Feedwater Pumps (Section OA.1.10)
Structural Steel and Supports Observation  
391/85-37              CDR      Incorrect Use of AMP PIDG Terminals (Section OA.1.11)
(Section C.1.2)  
 
Historical 10CFR21 Reviews (Section OA.1.2)  
 
Commercial Grade Dedication  
 
Commercial Grade Dedication Program
Breakdown (Section OA.1.1)  
: 05000391/2013611-02  
: 05000391/2013611-03
 
VIO  VIO Failure to Make a Required 10 CFR 50.55(e)
Report (Section OA.1.1)  
 
Failure to Identify Significant Condition  
 
Adverse to Quality (Section OA.1.1)   EA-12-021  
 
Item 49
Item 51
 
Item 64
TMI I.C.8
 
TMI I.D.1
 
TMI II.K.1.10
 
1998-02 
 
2512/035
2512/015
 
2515/069 
 
2515/142
 
76-02
84-02
 
85-01 
 
391/85-37
 
Confirmatory
Order  SSER Appendix HH
SSER Appendix HH
SSER Appendix HH
AI
AI  AI  GL 
 
TI  TI
TI
TI
BL  BL
BL
CDR  Completeness and Accuracy of Information (Section OA.1.3)  
 
Training Requirements (Section OA.1.4)  
 
Definition of Significant Cracks (Section  
 
OA.1.5)  
 
Eagle 21 Rack 2 RTD Testing Results Review (Section OA.1.6)  
 
Pilot Monitoring of Selected Emergency
Procedures for Near-Term Operating License
Applicants (Section OA.1.13)
Control Room Design Reviews (OA.1.14)  
 
Operability Status (Section OA.1.7)  
 
Loss of Reactor Coolant Inventory and Associated Power Loss of Emergency Mitigation Functions While in Shutdown
Conditions (Section OA.1.8)  
 
Control Room Design Review Special Program (OA.1.14)  
 
Inspection of Watts Bar Nuclear Plant
Employee Concerns Program (OA.1.15)  
 
Inspection of Response to IE Bulletin 85-01 (Section OA.1.10)  
 
Draindown During Shutdown and Common-
 
Mode Failure (Section OA.1.8)  
 
Relay Coil Failures (Section OA.1.9)  
 
Failures of General Electric Type HFA Relays  
(Section OA.1.9)  
 
Steam Binding of Auxiliary Feedwater Pumps (Section OA.1.10)  
 
Incorrect Use of AMP PIDG Terminals (Section  


OA.1.11)
391/86-14                       CDR         Failure to Follow Procedures (Section OA.1.12)
391/86-14
391/91-31                       CDR        Use of Non-Dedicated Commercial Grade Electrical Devices in Safety-Related Applications (OA.1.16)
CDR Failure to Follow Procedures (Section
: 05000391/2013609-02             URI        Potential Inadequate Corrective Actions for Historical Issues
OA.1.12)
391/91-31  
: 05000391/2013609-02  


===Discussed===
===Discussed===
CDR
URI  Use of Non-Dedicated Commercial Grade
Electrical Devices in Safety-Related
Applications (OA.1.16)
Potential Inadequate Corrective Actions for
Historical Issues
2500/16 
2500/020 
2512/028
391/85-19
TI 
TI
TI
CDR Inspection to Determine is a Potential Seismic Interaction Exists Between Movable Incore Flux Mapping System and Seal Table at
Westinghouse Designed Facilities or Facilities
with Similar Designs (OA.1.19)
Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62 (Section OA.1.18)
Inspection of Watts Bar Nuclear Plant QA
Records Corrective Action Program Plan
(OA.1.17)
Potential Interaction of Flux Mapping System


and Seal Table (OA.1.19)  
2500/16                            TI        Inspection to Determine is a Potential Seismic Interaction Exists Between Movable Incore Flux Mapping System and Seal Table at Westinghouse Designed Facilities or Facilities with Similar Designs (OA.1.19)
2500/020                          TI        Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62 (Section OA.1.18)
2512/028                          TI        Inspection of Watts Bar Nuclear Plant QA Records Corrective Action Program Plan (OA.1.17)
391/85-19                        CDR        Potential Interaction of Flux Mapping System and Seal Table (OA.1.19)


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==


}}
}}

Latest revision as of 11:57, 20 December 2019

IR 05000391-14-602, 01/01/2014 - 02/15/2014, Watts Bar Nuclear Plant Unit 2
ML14086A063
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/27/2014
From: Haag R
NRC/RGN-II/DCP/CPB3
To: Skaggs M
Tennessee Valley Authority
Michelle Adams
References
EA-12-021, EA-13-019 IR-14-602
Download: ML14086A063 (71)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 27, 2014

SUBJECT:

WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION - NRC INTEGRATED INSPECTION REPORT 05000391/2014602

Dear Mr. Skaggs:

On February 15, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of construction activities at your Watts Bar Unit 2 reactor facility. The enclosed integrated inspection report documents the inspection results, which were discussed on February 20, 2014 with Mr. Hruby and other members of your staff.

This inspection examined activities conducted under your Unit 2 construction permit as they relate to safety and compliance with the Commissions rules and regulations, the conditions of your construction permit, and fulfillment of Unit 2 regulatory framework commitments. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, the enclosed report documents one NRC-identified finding which was determined to involve a violation of NRC requirements. However, because the finding was a Severity Level IV violation and was entered into your corrective action program, the NRC is treating the violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy. The enclosed report also documents the closure of three violations related to a Severity Level III issue that dealt with the commercial grade dedication program. Inspections were also completed for a Confirmatory Order involving falsification of records.

If you contest the non-cited violation in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTENTION: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Watts Bar Unit 2 Nuclear Plant. In accordance with 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have questions concerning this letter, please contact us.

Sincerely,

/RA/

Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects Docket No. 50-391 Construction Permit No: CPPR-92

Enclosure:

Inspection Report 05000391/2014602 w/Attachment

REGION II==

Docket No.: 50-391 Construction Permit No.: CPPR-92 Report No.: 05000391/2014602 Applicant: Tennessee Valley Authority (TVA)

Facility: Watts Bar Nuclear Plant, Unit 2 Location: Spring City, TN 37381 Dates: January 1-February 15, 2014 Inspectors: T. Nazario, Senior Resident Inspector, Construction Projects Branch (CPB) 3, Division of Construction Projects (DCP),

Region II (RII)

C. Jones, Resident Inspector, CPB3, DCP, RII E. Patterson, Resident Inspector, CPB3, DCP, RII S. Temple, Resident Inspector, CPB3, DCP, RII N. Karlovich, Resident Inspector, CPB3, DCP, RII R. Monk, Senior Resident Inspector, Projects Branch (PB) 6, Division of Reactor Projects (DRP), RII E. Michel, Senior Construction Inspector, Construction Inspection Branch (CIB) 3, Division of Construction Inspection (DCI), RII, Section OA.1.1 A. Matos, Construction Inspector, CIB1, DCI, RII, Sections C.1.3 and OA.1.11 T. Steadham, Senior Construction Inspector, CIB3, DCI, RII, Sections E.1.1 and E.1.2 L. Suggs, Senior Construction Project Inspector, CPB2, DCP, RII, Sections E.1.1 and E.1.2 K. Steddenbenz, Construction Inspector, CIB3, DCI, RII, Sections E.1.1 and E.1.2 J. Christensen, Construction Inspector, CIB3, DCI, RII, Section OA.1.10 J. Baptist, Senior Construction Project Inspector, CPB3, DCP, RII, Sections P.1.1, P.1.2, P.1.3, P.1.4, P.1.6, OA.1.2, OA.1.14, and OA.1.15, C. Even, Senior Construction Project Inspector, CPB3, DCP, RII, Sections Q.1.2, P.1.7, OA.1.12, and OA.1.17 J. Seat, Construction Project Inspector, CPB3, DCP, RII, Sections, E.1.1, E.1.2, and OA.1.19 A. Wilson, Construction Project Inspector, CPB3, DCP, RII, Sections P.1.5, OA.1.7, OA.1.8, and OA.1.13 Enclosure

Approved by: Robert C. Haag, Chief Construction Projects Branch 3 Division of Construction Projects

EXECUTIVE SUMMARY

Watts Bar Nuclear Plant, Unit 2

This integrated inspection included aspects of engineering and construction activities performed by TVA associated with the Watts Bar Nuclear (WBN) Plant Unit 2 construction project. This report covered a seven-week period of inspections in the areas of quality assurance (QA),

identification and resolution of construction problems, engineering and construction activities, pre-operational testing, and follow-up of other activities. The inspection program for Unit 2 construction activities is described in NRC Inspection Manual Chapter 2517, Watts Bar Unit 2 Construction Inspection Program. Information regarding the WBN Unit 2 Construction Project and NRC inspections can be found at http://www.nrc.gov/info-finder/reactor/wb/watts-bar.html.

Inspection Results

  • The inspectors determined that the causal analysis and corrective actions for the three violations related to Severity Level III issue EA-13-019, for commercial grade dedication (CDG), were adequate and fully implemented, and compliance with the associated regulatory requirements has been restored. These violations are closed. (Section OA.1.1)
  • The NRC identified a severity level (SL) IV non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50, Appendix B, Criterion XVI, Corrective Actions, for inadequate corrective actions associated with historical 10CFR21 issues. Specifically, the applicant failed to identify all historical WBN Unit 1 10CFR Part 21 issues with potential Unit 2 applicability, and was therefore unable to subsequently review for Unit 2 impact and resolution. The inspectors determined that the applicants inadequate corrective action was a performance deficiency. This performance deficiency was considered more than minor in accordance with Inspection Manual Chapter (IMC) 0613,

Appendix E because it represented an adverse condition that rendered the quality of structures, systems, or components (SSCs) indeterminate and required substantive corrective action to satisfy the original intent of the corrective action document. Based on the applicants assessment, it was determined that the population of historical items that were originally omitted for resolution did not require re-work of any equipment. The finding was determined to be of very low safety significance in accordance with Section 6.5 of the NRC Enforcement Policy because it does not represent a breakdown in the QA process. The applicant issued PER 806990 to address the identified conditions.

The inspectors reviewed this finding against cross-cutting area components as described in IMC 0310 Components Within the Cross-Cutting Areas and determined that no cross-cutting aspect applied. (Section OA.1.2)

  • The inspections of action items for Confirmatory Order EA-12-021 which dealt with falsification of records were completed. This order is closed. (Section OA.1.3)
  • The inspectors concluded that issues pertaining to several open items, including three Construction Deficiency Reports (CDRs), three Bulletins (BLs), one Generic Letter (GL),

four Temporary Instructions (TIs), three Three Mile Island (TMI) Action Items (AIs), three Appendix HH items, three Inspection Procedures (IPs), one Unresolved Item (URI), and one other open item have been appropriately addressed for WBN Unit 2. These items are closed.

  • Other areas inspected were adequate with no findings identified. These areas included QA; piping and supports; mechanical systems and components; electrical systems and components; engineering activities; pre-operational testing activities; operational readiness activities; and various NRC inspection procedures.

Table of Contents I. QUALITY ASSURANCE PROGRAM .................................................................................... 7 Q.1 Quality Assurance Oversight Activities ......................................................................... 7 Q.1.1 Identification and Resolution of Construction Problems (Inspection Procedure 35007) ................................................................................................................... 7 Q.1.2 (Closed) Audit of Applicants Surveillance of Contractor QA/QC Activities (Inspection Procedure 35020) ............................................................................... 7 II. MANAGEMENT OVERSIGHT AND CONTROLS ................................................................. 8 C.1 Construction Activities .................................................................................................... 8 C.1.1 Unit 1 and Unit 2 Construction Activity Interface Controls ..................................... 8 C.1.2 (Closed) Structural Steel and Supports Work Observation (Inspection Procedure 48053) ................................................................................................................... 9 C.1.3 Electric Cable - Work Observation (Inspection Procedure 51063) ...................... 11 E.1 Engineering Activities ................................................................................................... 12 E.1.1 (Closed) Onsite Design Activities (Inspection Procedures 37055, 49063, 50073, and 50075) .......................................................................................................... 12 E.1.2 Verification of As-Builts for safety-related piping systems (Inspection Procedures 37051, 49063, 50073, and 50075) ................................................... 16 P.1 Pre-Operational Activities ............................................................................................. 17 P.1.1 Pre-Operational Test Program Implementation Verification (Inspection Procedure 71302) ................................................................................................................. 17 P.1.2 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 18 P.1.3 Pre-Operational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 19 P.1.4 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311) ................................................................................................................. 20 P.1.5 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70333) ................................................................................................................. 21 P.1.6 Preoperational Test Witnessing (Inspection Procedures 70312 and 70302) ...... 22 P.1.7 Preoperational Test Results Evaluation (Inspection Procedure 70400) .............. 23 III. OPERATIONAL READINESS ACTIVITIES ....................................................................... 25 O.1 Operations ...................................................................................................................... 25 O.1.1 Pre-Licensing Review of Training and Qualification Programs (Inspection Procedure 41301) ................................................................................................ 25 IV. OTHER ACTIVITES ........................................................................................................... 26 OA.1.1 Review of Actions for Violations (VIOs) associated with EA-13-019 for Commercial Grade Dedication (Inspection Procedure 92702) ............................ 26

OA.1.2 (Closed) Historical 10CFR21 Reviews and Unresolved Item 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues (Inspection Procedure 92701) ................................................................................................ 27 OA.1.3 (Closed) Confirmatory Order EA-12-021, Completeness and Accuracy of Information (Inspection Procedure 35007) .......................................................... 29 OA.1.4 (Closed) SSER, Appendix HH, Item 49 Associated with Training Qualification Requirements (Inspection Procedure 92701) ..................................................... 31 OA.1.5 (Closed) SSER, Appendix HH, Item 51 Associated with the Definition of Significant Cracks (Inspection Procedure 92701) ............................................... 33 OA.1.6 (Closed) SSER, Appendix HH, Open Item 64, Eagle 21 Rack 2 RTD Testing Results Review (Inspection Procedure 52055) ................................................... 33 OA.1.7 (Closed) Three Mile Island Action Item II.K.1.10, Operability Status (Inspection Procedure 92701) ................................................................................................ 34 OA.1.8 (Closed) Generic Letter 1998-02, Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition, and Temporary Instruction 2515/142, Draindown During Shutdown and Common-Mode Failure (Temporary Instruction 2515/142 and Inspection Procedure 92701) .............................................................................. 35 OA.1.9 (Closed) NRC Bulletin 76-02 and 84-02, Relay Coil Failures (Inspection Procedures 51053 and 92717) ............................................................................ 37 OA.1.10 (Closed) NRC Bulletin 85-01 and Temporary Instruction 2515/069: Steam Binding of Auxiliary Feedwater Pumps (Inspection Procedure 92717 and Temporary Instruction 2515/069) ........................................................................ 38 OA.1.11 (Closed) Construction Deficiency Report 391/85-37: Incorrect Use of AMP PIDG Terminals (Inspection Procedure 35007) ............................................................ 39 OA.1.12 (Closed) Construction Deficiency Report 86-14: Failure to Follow Procedures (Inspection Procedures 50073 and 50075) ......................................................... 40 OA.1.13 (Closed) Three Mile Island Action Item I.C.8, Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants (Inspection Procedure 92701) ................................................................................................ 41 OA.1.14 (Closed) Control Room Design Review Special Program and Three Mile Island Action Item I.D.1 (Temporary Instruction 2512/035 and Inspection Procedure 92701) ................................................................................................................. 42 OA.1.15 (Closed) Inspection of Watts Bar Nuclear Plant Employee Concerns Program (Temporary Instruction 2512/015) ....................................................................... 43 OA 1.16 (Closed) Construction Deficiency Report 391/91-31: Use of Non-Dedicated Commercial Grade Electrical Devices in Safety-Related Applications (Inspection Procedure 35007) ................................................................................................ 44 OA.1.17 (Discussed) QA Records Corrective Action Program Plan (Temporary Instruction 2512/028 and Inspection Procedure 51055) ....................................................... 45 OA.1.18 (Discussed) Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62 (Temporary Instruction 2500/020) ............................................................. 46 OA.1.19 (Discussed) Construction Deficiency Report 391/85-19: Potential Interaction of Flux Mapping System and Seal Table (Temporary Instruction 2500/16 and Inspection Procedure 35007) .............................................................................. 47 V. MANAGEMENT MEETINGS .............................................................................................. 48 X1 Exit Meeting Summary ................................................................................................... 48

REPORT DETAILS

Summary of Plant Status

During the inspection period covered by this report, Tennessee Valley Authority (TVA)performed construction completion and pre-operational testing activities on safety-related systems and continued engineering design activities of the Watts Bar Nuclear (WBN) Plant, Unit 2.

I. QUALITY ASSURANCE PROGRAM Q.1 Quality Assurance Oversight Activities Q.1.1 Identification and Resolution of Construction Problems (Inspection Procedure 35007)

a. Inspection Scope

The inspectors continued to review problem evaluation reports (PERs), as part of the applicants corrective action program, to verify that issues being identified under the corrective action program were being properly identified, addressed, and resolved by the applicant.

The inspectors reviewed PER 818910 to verify that the corrective actions removed the foreign material in the section of pipe upstream of 2-CKV-062-0507, the pipe section was boroscoped, and the cleaning plan for the section of piping adequately described the flushing path and acceptance criteria to verify cleanliness of the piping.

Inspectors also reviewed PERs 832900 and 830670 associated with a gasket failure of the temporary 2A sidestream filter during the Component Cooling Water System (CCS)flush. The inspectors reviewed corrective actions including personnel response, engineering evaluations, extent of condition review, and protection of adjacent equipment.

b. Observations and Findings

No findings were identified.

c. Conclusions

The issues identified in the PERs reviewed were adequately identified, addressed, and resolved.

Q.1.2 (Closed) Audit of Applicants Surveillance of Contractor QA/QC Activities (Inspection Procedure 35020)

a. Inspection Scope

The inspectors reviewed the schedule for TVA projected oversight activities for 2014, dated November 4, 2013, to assess plans and aspects covered by the oversight team.

The inspectors reviewed Nuclear Assurance - Oversight Reports to assess the attainment of overall contractor surveillance objectives. The inspectors reviewed information on previously identified deficiencies, including a review of the planned and completed corrective actions, to determine corrective action effectiveness. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

Based on the review of the applicants planned activities and corrective actions for identified deficiencies, and because the NRC has not identified any substantive deficiencies or concerns about the adequacy of the applicants execution of contractor surveillance responsibilities, this inspection procedure (IP) is closed. However, if deficiencies are identified through observations of future activities, the inspectors will inspect them as necessary to satisfy the requirements of this inspection procedure.

II. MANAGEMENT OVERSIGHT AND CONTROLS C.1 Construction Activities C.1.1 Unit 1 and Unit 2 Construction Activity Interface Controls

a. Inspection Scope

The inspectors independently assessed applicant controls, associated with Unit 2 construction work activities, to prevent adverse impact on Unit 1 operational safety. The inspectors attended routine Unit 1/Unit 2 interface meetings to assess the exchange and sharing of information between the two site organizations. Periodic construction and planning meetings were observed, at least once per week, to assess the adequacy of the applicants efforts to identify those construction activities that could potentially impact the operating unit. This included the review of select work activities, which the applicant had screened as not affecting Unit 1, to verify the adequacy of that screening effort.

Additionally, the inspectors independently assessed select construction activities to verify that potential impacts on the operating unit had been identified and adequately characterized with appropriate management strategies planned for implementation.

Furthermore, the inspectors performed independent walkdowns of select construction work locations to verify that controls to protect the operating unit provided an adequate level of protection and had been properly implemented.

Specific work activity observed included work associated with:

  • Preoperational Test Instruction (PTI)-067-02-A, Essential Raw Cooling Water (ERCW) System Flow Balance Train A
  • 2-CP-070-01-2, CCS Miscellaneous and Reactor Building Header Cleanness Plan Specific work activities that the applicant had screened out as not affecting Unit 1 included, but were not limited to, electrical work activities and refurbishment activities as noted in this inspection report.

b. Observations and Findings

No findings were identified. Inspectors reviewed corrective actions associated with a gasket failure of the temporary 2A sidestream filter during the CCS Flush which occurred in the auxiliary building. The details are further discussed in Section Q.1.1 of this report.

c. Conclusions

Overall, adequate management oversight and controls were in place for observed construction activities that could potentially impact the operating.

C.1.2 (Closed) Structural Steel and Supports Work Observation (Inspection Procedure 48053)

a. Inspection Scope

Background: As described in Inspection Manual Chapter (IMC) 2517, TVA addressed WBN Unit 1 construction quality issues as part of the implementation of its nuclear performance plant (NPP). The results of the NRC inspection program were published in NUREG-1528, Reconstitution of the IMC 2512 Construction Inspection Program for Watts Bar Unit 1. In 1985, construction on Watts Bar Unit 1 and Watts Bar Unit 2 was stopped due to the identification of multiple construction QA issues. TVA completed Unit 1 in 1995 but had conducted very little Unit 2-specific work since 1985. In 2007, TVA decided to finish the Unit 2 plant. As part of confirming that all issues and inspection requirements will be completed for Unit 2, a review of all NRC inspection reports was initiated to determine the status of the required IPs, contained in NRC Manual Chapter 2512, in effect at the time construction was stopped. This effort was called the reconstitution process. The NRC used the results of the reconstitution process to identify areas which require additional inspections. Integrated Inspection Report (IIR)05000391/2009602 (ADAMS Accession No. ML091210420), Attachment 2, documented the reconstitution results for IP 48053 and determined that the requirements of the IP were met for Unit 2.

Inspection Activities: The purpose of this IP was to verify, by observation and independent evaluation of work performed and completed, that activities related to structural steel were accomplished in accordance with approved procedures and NRC requirements.

The following table lists the inspections that were previously performed under this IP.

IP Section Inspection Report 05000391/2009603 (ADAMS Accession No.

ML092120326)05000391/2009604 (ADAMS Accession No.

02.02 Review the specifications, drawings, ML093030479)and QA/QC and construction procedures 05000391/2012605 (ADAMS Accession No.

ML12220A536)05000391/2013604 (ADAMS Accession No.

ML13179A079)05000391/2009604 02.03a Receipt Inspection and Storage 05000391/2010605 (ADAMS Accession No.

ML110410680)05000391/2009604 02.03b Use of Specified Materials and 05000391/2010605 Components 05000391/2013604 05000391/2009603 05000391/2009604 05000391/2011602 (ADAMS Accession No.

02.03c Installation and Erection ML110800483)05000391/2012605 05000391/2013604 05000391/2011603 (ADAMS Accession No.

ML111370702)02.03d Inspection, Testing, NDE, and 05000391/2012608 (ADAMS Accession No.

Records ML12319A368)05000391/2013605 (ADAMS Accession No.

ML13220A640)05000391/2009603 02.04 Informal interviews with field craft and 05000391/2010605 inspection (QA/QC) personnel 05000391/2013605 Section 2.01 of this IP required the review of the results of the inspection performed under IP 48051. The results of inspection performed under this IP were discussed and this IP was closed in NRC Inspection Report 05000391/2010605 (ADAMS Accession No. ML110410680).

Section 02.05 allowed for an expansion of the sample size as appropriate. At this time the additional sampling sections are not required based on assessment of TVAs performance of construction for Watts Bar Unit 2. No new inspections were performed during this reporting period.

b. Observations and Findings

No findings were identified.

c. Conclusions

The structural steel supports previously observed met procedural, specification, and drawing requirements. IP 48053 is considered closed; however, if additional structural steel or supports activities are performed, inspections may be performed at the NRCs discretion.

C.1.3 Electric Cable - Work Observation (Inspection Procedure 51063)

a. Inspection Scope

The inspectors observed in-process work associated with cable terminations at the pressurizer heater elements to evaluate if the materials used were as specified, material was installed at the proper location by qualified craft personnel using suitable tools, adequate documentation of installation activities was completed in a timely manner, and required inspections were performed by qualified Quality Control (QC) personnel.

Additionally, the inspectors observed in-process work to verify if:

  • cables were properly identified;
  • crimping tools used were in proper working order;
  • terminations were of the correct type;
  • torqueing of connections was performed according to design;
  • unterminated cable ends were protected;
  • segregation was maintained;
  • non-conforming heater insulators were replaced; and
  • non-conformances of cables and associated materials were identified, controlled, and handled in accordance with the applicant procedures.

The inspectors reviewed work packages to determine whether the latest approved revision of applicable procedures and specifications were available and used by the craftsmen. Drawing revision authorization (DRA) 54179-065 was reviewed to evaluate if the final configuration of the equipment was in accordance with the DRA. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that adequate measures were in place to ensure that electrical cable work was performed in accordance with applicable procedures and drawings.

E.1 Engineering Activities E.1.1 (Closed) Onsite Design Activities (Inspection Procedures 37055, 49063, 50073, and 50075)

a. Inspection Scope

Background: The purpose of IP 37055 was to determine whether the applicants, architect engineers, and contractors onsite design activity, including controls for engineering and construction initiated field changes, was conducted in compliance with the technical and QA requirements described in the facility safety analysis report (SAR).

The 2009 readiness inspection, as documented in Attachment 3 of IIR 05000391/2009602 (ADAMS Accession No. ML091210420), determined that that the inspection requirements for IP 37055 were fully met for all sections except Section 02.06. For Section 02.06, it was determined that the inspection of two more design activities would completely fulfill the requirements of IP 37055. Inspections associated with this IP were previously documented in the following inspection reports:

ML091210420)

Inspection Activities: The inspectors reviewed documents, interviewed personnel, and performed walkdowns of as-built structures, systems, and components. The inspectors performed these activities to determine if:

  • Bechtels engineering and design controls complied with the technical and QA requirements described in the SAR;
  • as-built design and construction drawings and specifications correctly reflected the as-built condition of the plant; and
  • changes from the original design were properly reviewed and approved.

The inspectors performed these inspection activities on the following mechanical structures, systems, or components:

System 067 (ERCW):

  • flood mode return valves 0-ISV-067-0558B and 0-ISV-067-0559B including associated spool pieces 0-SPPC-067-0558B and 0-SPPC-067-0559B;
  • motor operated valve (MOV) 2-FCV-067-103, check valve 2-CKV-067-575B, and pipe supports 47A450-25-251 and 2-47A450-25-356 on drawing 2-47W450-237B;
  • pipe section from cooler nozzles 119, 125, 134, and 138 to tee 99 on drawing 2-47W450-256B including pipe supports 47A450-25-152 and 47A450-25-162;
  • pipe section from cooler 175 to tee 165 and from cooler 188 to elbow 182 on drawing 2-47W450-347 including pipe support 47A450-26-163;
  • pipe section between nodes 1 and 12 on drawing 2-47W450-369 including support H-450-1-21B-70; and
  • pipe section between nodes 64 and 81 on drawing 2-47W450-371 including support H-450-1-22B-72.

System 070 (CCS):

  • pipe section between nodes 143 and 136 on drawing 2-47W464-254 including valve 2-THV-070-0684C and pipe support 2-70-270;
  • pipe section between nodes C3E and C2B on drawing 2-47W464-255 including valves 2-FCV-070-133A and 2-FCV-070-134B;
  • pipe section between nodes 169 and 144 on drawing 2-47W464-267A including supports 47A464-4-124, 184, and 185; valve 2-ISV-070-673B; and thermal barrier booster pump B, 2-PMP-070-130B;
  • pipe section between nodes 119 and 94 on drawing 2-47W464-267 including supports 47A464-4-122, 123, and 183; valve 2-ISV-070-673A; and thermal barrier booster pump A, 2-PMP-070-131A;
  • pipe section between nodes M39 and M24 on drawing 0-47W464-213F including valve 2-THV-070-546B;
  • pipe section between nodes FL12 and C89 on drawing 0-47W464-208C including valve 2-ISV-070-545B and pipe supports 70-1CC-R630 and 70-1CC-V631;
  • pipe section between nodes 180 and 210 on drawing 2-47W464-268 including support 47A464-4-166.

For each of the above supports, the inspectors reviewed plant seismic calculations to determine if they were consistent with the as-built condition of the plant. Additionally, the inspectors reviewed valve manufacturer drawings and American Society of Mechanical Engineers (ASME) Form NV-1 valve data reports to determine if the valve materials, size, type, and ratings were consistent with the requirements in the purchase specification and the applicable valve data sheets. For each of the above MOVs, the inspectors reviewed the vendor drawings, design requirements, and valve data sheets to determine if the as-built conditions of the valves were consistent with the design inputs contained in the associated MOV calculation.

For both of the thermal barrier booster pumps, the inspectors reviewed the vendor test performance data on the replacement pumps to determine if the pump performance (head vs. capacity, net positive suction head required, and brake horse power) was similar to the original pumps.

The inspectors selected engineering and design control implementing procedures to determine the adequacy of their implementation for site design activities. The inspectors reviewed the following procedures:

  • preparation of design documents: 25402-3DP-G046-00081, Engineering Document Construction Release (EDCR), Revision (Rev.) 16;
  • design review/verification: 25402-3DP-G04G-00027, Design Verification, Rev. 4;
  • design and field initiated changes and revisions: 25402-3DP-G04-00062, Field Change Request, Rev. 20;
  • design and field initiated changes and revisions: 25402-000-GPP-0000-N3105, Field Change Requests, Rev. 16;
  • interface with the home office and applicant: 25402-3DP-G04G-00025, Design Interface Control, Rev. 4; and
  • interface with the home office and applicant: 25402-000-GPP-0000-N3112, ASME Section III Design Interface Control, Rev. 6.

The inspectors sampled 15 field changes initiated by the construction organization to determine whether the following aspects were adequate:

  • reason/need for the change was annotated;
  • change did not appear to compromise original design intent and was performed as described by the QA manual;
  • change was reviewed and approved subject to controls commensurate with the original design and approved by an independent reviewer/approver;
  • review and approval considered impact on overall design by review of the adequacy of the change, impact on other disciplines, and changes necessary to prior analysis;
  • design drawings were updated/revised to reflect new design changes and were available in the electronic document control system;
  • changes were processed as required by the quality assurance program for design conducted onsite;
  • design input and design change documentation was controlled.

Additionally, for each of the sampled field changes, the inspectors compared final detailed construction drawings and specification requirements with the actual installation by performing field walkdowns to determine if:

  • final design drawings and specifications reflected as-built conditions for supports (location, type, and configuration) and piping (location, size, configuration, component location, and valve/operator orientation);
  • materials of construction, configuration, and orientation conformed to the applicable design specifications;
  • an adequate process was in place to ensure that final as-built design documents (drawings, specifications, and calculations) would be readily available to site operations personnel at the initiation of commercial operation; and
  • design verification records were adequate by ensuring their consistency with the actual field configuration.

From the field changes sampled, the inspectors reviewed training records for a sample of three project quality assurance managers, six field change preparer/checkers, two approvers, one engineering group supervisor, and two 10CFR50.59 reviewers. The inspectors reviewed the training records to determine if the personnel were qualified to perform the applicable activity for which they signed.

The inspectors interviewed four engineering staff members who prepared, checked, reviewed, and/or approved field changes to determine if:

  • the staff was knowledgeable of the design control procedure requirements; and
  • design control procedures were available for the design activities being conducted.

The inspectors interviewed engineering staff to determine if the staff was knowledgeable on drawing control requirements. The inspectors reviewed the method used to control drawings in the applicants electronic document management system to determine if the drawings were sufficiently legible, retrievable, and protected from damage, loss, or unauthorized alteration.

The inspectors reviewed surveillances and audits, and interviewed staff to determine if:

  • the applicant had identified and verified the qualifications of all constructors who prepared or issued design documents for construction;
  • audits were scheduled and performed for design control, document control, and records;
  • the scope and depth of the audits were consistent with the stated purpose for each audit;
  • auditors were selected in accordance with the QA manual;
  • appropriate standards were referenced;
  • the audited organization received a copy of the audit report; and
  • adverse findings were entered into the corrective action program and effective corrective actions were taken.

The following samples were inspected during this inspection:

  • IP 37055 Section 02.03.b - 15 construction organization initiated samples
  • IP 37055 Section 02.06 - 15 samples Additionally, as part of the as-built review, inspectors covered applicable sections of the following IPs:
  • IP 49063 Section 02.04-two samples (two piping systems outside RCS)
  • IP 50073 Section 02.04-eight samples (eight drawings and thirteen safety-related mechanical components)
  • IP 50075 Section 02.03.d-eight records/samples (eight drawings and 13 safety-related mechanical components)

Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified. Below is a summary of each section of IP 37055:

  • Section 02.01 - Not required
  • Section 02.02 - Complete
  • Section 02.03 - Complete
  • Section 02.04 - Complete
  • Section 02.05.a - Complete
  • Section 02.05.b - Not required
  • Section 02.05.c - Complete
  • Section 02.06 - Complete c. Conclusion Based on the activities reviewed in this and previous inspections, the inspectors concluded that the applicants and contractor's onsite design activity, including controls for engineering and construction initiated field changes, was being conducted in compliance with the technical and QA requirements described in the facility SAR. Based on the historical NRC inspections and the recent inspection efforts, a sufficient number of samples have been reviewed and IP 37055 is closed.

E.1.2 Verification of As-Builts for safety-related piping systems (Inspection Procedures 37051, 49063, 50073, and 50075)

a. Inspection Scope

As discussed in Section E.1.1 of this report, the inspectors performed field walkdowns of selected portions of two safety-related piping systems to determine if:

  • as-built design and construction drawings and specifications correctly reflected the as-built condition of the plant (including supports, pipe welds, and piping);and
  • changes from the original design were properly reviewed and approved.

The following samples were inspected:

  • IP 37051 Section 02.01.b.1 - two samples
  • IP 37051 Section 02.02 - two samples Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusion Based on the limited sample of as-built inspections conducted during this inspection, no additional conclusion is warranted. Additional inspection samples are required to meet the requirements of this IP.

P.1 Pre-Operational Activities P.1.1 Pre-Operational Test Program Implementation Verification (Inspection Procedure 71302)

a. Inspection Scope

02.01 (Weekly Inspection Activities): The inspectors verified that the applicants management control system was effectively discharging its responsibilities over the preoperational testing program by direct observation of activities, tours of the facility, interviews and discussions with applicant personnel, and review of facility records.

Preoperational testing activities were limited during the inspection period and included the following systems or portions thereof:

As systems became available for preoperational testing, inspectors toured the accessible areas of the facility to make an independent assessment of equipment conditions, plant conditions, security, and adherence to regulatory requirements.

Inspectors also verified the following, as available and on a sampling basis during the tours:

  • general plant/equipment conditions;
  • activities in progress (e.g., maintenance, preoperational testing, etc.) were being conducted in accordance with applicants procedures; and
  • construction work force was authorized to perform activities on systems or equipment.

02.02 (Monthly Inspection Activities): During this inspection period, the inspectors reviewed the turnover package for the Unit 2 portion of the Safety Injection System (System 63) as part of Startup Manual Procedure (SMP) 4.0, System Completion and Turnover, Rev.9, to verify jurisdiction controls were appropriate and applicant procedures were followed. Additionally, the inspectors reviewed the turnover package to ensure required preventative maintenance was incorporated into a schedule for accomplishment.

The inspectors reviewed maintenance plans on safety-related equipment, to determine if the maintenance was scheduled in accordance with developed procedures and that these procedures were adequate for the maintenance being performed. The maintenance had not been performed but the methodology was discussed with the Refurbishment and Preventative Maintenance Manager to determine how systems with completed preoperational testing would be protected.

b. Observations and Findings

No findings were identified.

c. Conclusions

The applicants preoperational test program was implemented in accordance with procedures for those activities observed during the inspection period.

P.1.2 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311)

a. Inspection Scope

Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -

Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:

  • Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
  • Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.

IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.

Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-063-05-B, Safety Injection System Pump/Valve Logic Test - Train B, Rev.0001 to verify that the procedure contained the following administrative good practice attributes:

  • the title described the purpose of the procedure
  • the cover page had appropriate information and approval signatures
  • each page had appropriate identification information
  • the last page was clearly identifiable by markings
  • a clear statement of procedure purpose/objectives
  • planning information such as prerequisites, precautions, required tools, reference documents, and coordination requirements
  • signoff requirements including concurrent and independent verification steps established where appropriate
  • equipment alignment instructions are clear and concise
  • equipment identifiers are accurate
  • actions to be taken within the steps are specifically identified
  • instrumentation units consistent for data collection
  • graphs, charts, tables, data sheets, and work sheets are clearly usable
  • calculation sheets were technically accurate
  • clear coordination instructions for test activities involving multiple test personnel
  • clear instructions for system restoration
  • guidance for follow-up actions and points of contact
  • overall, clear concise steps for testing with action critical (acceptance criteria)steps identified
  • clear quantitative acceptance criteria with acceptability and contingencies
  • overall sequence of the procedure consistent with the obtaining the intended result The inspectors also reviewed the procedure to verify that precautions or explanations were placed immediately ahead of the steps to which they applied. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that the applicants test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions, Rev. 9.

P.1.3 Pre-Operational Test Procedure Review (Inspection Procedures 70300 and 70311)

a. Inspection Scope

Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -

Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:

  • Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
  • Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.

IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.

Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-063-05-A, Safety Injection System Pump/Valve Logic Test - Train A, Rev.0001 to verify that the procedure was written to the same standard as 2-PTI-063-05-B, Safety Injection System Pump/Valve Logic Test - Train B. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the

.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that the applicants test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions, Rev. 9.

P.1.4 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70311)

a. Inspection Scope

Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -

Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:

  • Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
  • Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.

IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.

Inspection Activities: The inspectors reviewed pre-operational test instruction 2-PTI-067-02-A, ERCW System Flow Balance - Train A, Rev. 0004 to verify that the procedure was written to the same standard as 2-PTI-067-02-A, ERCW System Flow Balance -

Train A, Rev. 0003. The inspectors had previously reviewed 2-PTI-067-02-A Rev. 0003 in IIR 05000391/2013610 (ADAMS Accession No. ML14049A158) but the applicant had made a revision to the test acceptance criteria. This change warranted additional inspection review of the procedure due to the importance of the revised acceptance criteria. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that the applicants test procedure was written in a manner consistent with NRC requirements and the guidance of applicant procedure SMP-8.0, Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions, Rev. 9.

P.1.5 Preoperational Test Procedure Review (Inspection Procedures 70300 and 70333)

a. Inspection Scope

Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -

Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:

  • Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
  • Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.

IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the procedural review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed in relation to satisfying the required procedural review.

Inspection Activities: The inspectors reviewed preoperational test instruction 2-PTI-062-01, Charging and Letdown Logic Test, Rev. 0000, to verify that the procedure contained the following administrative good practice attributes:

  • the title described the purpose of the procedure
  • the cover page had appropriate information and approval signatures
  • each page had appropriate identification information
  • the last page was clearly identifiable by markings
  • a clear statement of procedure purpose/objectives
  • planning information such as prerequisites, precautions, required tools, reference documents, and coordination requirements
  • signoff requirements including concurrent verification steps established where appropriate
  • equipment alignment instructions are clear and concise
  • equipment identifiers are accurate
  • actions to be taken within the steps are specifically identified
  • instrumentation units consistent for data collection
  • graphs, charts, tables, data sheets, and work sheets are clearly usable
  • clear coordination instructions for test activities involving multiple test personnel
  • clear instructions for system restoration
  • guidance for follow-up actions and points of contact
  • overall, clear concise steps for testing with action critical (acceptance criteria)steps identified
  • clear quantitative acceptance criteria with acceptability and contingencies
  • overall sequence of the procedure consistent with the obtaining the intended result The inspectors also reviewed the procedure to verify that precautions or explanations were placed immediately ahead of the steps to which they applied. The inspectors performed a detailed review which included a discussion with the responsible test engineer to verify that the acceptance criteria met design requirements. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that the applicants test procedure was written in a manner consistent with the guidance of procedure SMP-8.0, Watts Bar Nuclear Plant Unit 2 Administration of Preoperational Test Instructions, Rev. 9.

P.1.6 Preoperational Test Witnessing (Inspection Procedures 70312 and 70302)

a. Inspection Scope

Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -

Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:

  • Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
  • Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.

IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the pre-operational test witnessing of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed to in relation to satisfying the required pre-operational test witnessing.

Inspection Activities: The inspectors witnessed the performance of pre-operational test instruction 2-PTI-067-02A, ERCW System Flow Balance -Train A, Rev. 0003 and 0004 to verify that the testing was conducted in accordance with approved procedures and to verify the adequacy of test program records and preliminary evaluation of test results.

The inspectors assessed the following attributes associated with this test observation:

  • All test personnel were on station and had the latest revision of the procedure
  • Test prerequisites were performed
  • Plant systems were in service to support the test
  • Test equipment was installed and within calibration
  • Testing was performed in accordance with the approved procedure
  • Test interruptions and continuations were handled in accordance with approved procedures
  • Testing events and discrepancies were properly documented
  • Testing was executed and coordinated properly
  • Data was properly collected
  • Temporary equipment was installed and tracked appropriately
  • Administrative test controls were properly followed
  • Test personnel were using approved drawings and vendor manuals The inspectors observed the test to verify that the overall test acceptance was met. The inspectors conducted a review with the responsible test engineer to assure that the preliminary test evaluations were consistent with the inspectors observations. During the test inspectors observed important data gathering activities to ensure the data was properly gathered and recorded. A posttest cursory review of the test data was performed to verify legibility, traceability, and permanence of the data sheet entries.

The inspectors verified through direct questioning that the on-shift operations supervisor and test engineer were familiar with administrative controls covering the conduct of corrective and preventative maintenance during testing.

The inspectors reviewed four drawings used by test personnel to verify that they were the correct revisions as compared to master indices.

The inspectors conducted interviews and reviewed training records for two personnel involved in the above test to verify they had received appropriate training for performing the test. Documents reviewed are listed in the Attachment.

The following samples were inspected:

b. Observations and Findings

No findings were identified. This test was performed twice in its entirety due to a change of acceptance criteria after completion of the first test (Rev. 0003).

c. Conclusions

The inspectors determined that the applicants test procedure was performed in a manner consistent with the guidance of procedure SMP-9, Watts Bar Nuclear Plant Unit 2 Conduct of Test, Rev. 2.

P.1.7 Preoperational Test Results Evaluation (Inspection Procedure 70400)

a. Inspection Scope

Background: The purpose of IMC 2513, Light Water Reactor Inspection Program -

Preoperational Testing and Operational Preparedness Phase, issue date January 1, 1984, is to verify through direct observation, personnel interviews, and review of facility records that:

  • Systems and components important to the safety of the plant are fully tested to demonstrate that they satisfy their design requirements.
  • Management controls and procedures, including quality assurance programs, necessary for operation of the facility have been documented and implemented.

IMC 2513 defines the minimum inspection program for a finding of readiness for license issuance (IP 94300, Status of Plant Readiness for an Operating Licensee). IMC 2513 requires the pre-operational test results review of the mandatory tests defined in IMC 2513 and five of the primal tests defined in IMC 2513. The following inspection was performed to in relation to satisfying the required pre-operational test results review.

Inspection Activities: The inspectors performed a detailed review of the results for pre-operational test procedure 2-PTI-072-02, Containment Spray System Air Flow Test, Rev.

1 to verify that the applicants evaluation of the procedure performance and results was conducted in accordance with approved procedures. This review was performed to provide assurance that the test data was within the established acceptance criteria and the applicants methods for identifying and correcting deficiencies were adequate. The inspectors performed the following activities associated with this test results review:

  • Reviewed all changes made to the test procedure to verify they were properly annotated, did not affect the objective of the test, and were performed in accordance with administrative procedures.
  • Reviewed the test summary and evaluation to verify that the system was evaluated to meet design requirements and acceptance criteria.
  • Reviewed the original as-run copy of the test to verify completion of data sheets, calculations and signatures/initials.
  • QA inspection records were reviewed to verify they were completed as required by the test procedure.
  • The approval of the test results was reviewed for completeness with respect to the acceptance of the test results.

The inspectors reviewed the test results to verify that the overall test acceptance was met. The inspectors conducted a review with the responsible test engineer to assure that the test evaluation was performed in accordance with established procedures.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that the applicants test procedure was written in a manner consistent with the guidance of procedure SMP-10.0, Watts Bar Nuclear Plant Unit 2 Packaging and Processing Test Results, Rev. 1.

III. OPERATIONAL READINESS ACTIVITIES O.1 Operations O.1.1 Pre-Licensing Review of Training and Qualification Programs (Inspection Procedure 41301)

a. Inspection Scope

Inspectors attended one session of each of the five Licensed Operator Requalification training topics for Unit 1 and Unit 2 differences Cycle One. Training material for the following topics was reviewed to verify that specific elements of IP 41301 were met (as discussed below):

  • Knowledge and Abilities of NUREG 1122, Revision 2, The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Pressurized-Water Reactors,
  • 2.2.3 Knowledge of the design, procedural, and operational differences between units; and
  • 2.2.4 Ability to explain the variations in control board layouts, systems, instrumentation and procedural actions between units at a facility.

The specific training sessions observed were:

  • U1/U2 Power Distribution Monitoring System Differences (WINCISE)
  • U1/U2 RVLIS, CETs, SCM Differences (Common Q)
  • Common Systems Impacted by U2
  • U1/U2 Electrical & FP Differences
  • Other U1/U2 Differences Inspectors observed that the first three elements described in paragraph 03.01.b of IP 41301, as listed below, were met:
  • systematic analysis of the jobs to be performed
  • learning objectives derived from the analysis which describe desired performance after training
  • training design and implementation based on the learning objectives b . Observations and Findings.

No findings were identified.

c . Conclusion.

Instructors were well prepared and the lesson material was adequate. Students were attentive as the information was new.

IV. OTHER ACTIVITES OA.1.1 Review of Actions for Violations (VIOs) associated with EA-13-019 for Commercial Grade Dedication (Inspection Procedure 92702)

OA.1.1.1 (CLOSED) VIO 05000391/2013611-01, Commercial Grade Dedication Program Breakdown OA.1.1.2 (CLOSED) VIO 05000391/2013611-02, Failure to Make a Required 10 CFR 50.55(e) Report OA.1.1.3 (CLOSED) VIO 05000391/2013611-03, Failure to Identify Significant Condition Adverse to Quality

a. Inspection Scope

The inspectors reviewed the applicants response to the Severity Level III problem (EA-13-019) described in NRC inspection report 05000391/2013614 (ADAMS Accession No.

ML13169A030). This SL III problem consisted of three violations all related to the CGD program. The first violation involved a breakdown of the 10 CFR Part 50, Appendix B QA program in the single work area of CGD. Specifically, TVA failed to translate or include the 10 CFR Part 21 definition of critical characteristic in its procedure NEDP-8, Technical Evaluation for Procurement of Materials and Services. As such, TVA had not verified critical characteristics for an unknown number of safety-related items procured for the WB2 project starting from the resumption of construction activities in 2008. A second violation involved a failure to report the aforementioned breakdown in the QA program as required by 10 CFR 50.55(e)(4) and (5). The apparent cause of this violation was the failure of procedure NC-PP-13, Reporting Requirements, Rev. 0 to require a significant breakdown of the QA program to be reportable whether or not the breakdown actually resulted in a defect. The third violation involved the failure to identify a significant condition adverse to quality related to the previously mentioned breakdown in the QA program. The inspectors reviewed the applicants letter in response to EA-13-019 (ADAMS Accession No. ML13204A383), which addressed reasons for the violations, corrective steps, and the date when full compliance was achieved for all three violations.

With regard to the Criterion III violation, the inspectors reviewed the applicants root cause analysis reports, self-assessments, associated PER, verified that all corrective actions to prevent recurrence (CAPR) were completed, sampled completion of other corrective actions, and reviewed the available effectiveness reviews for those corrective actions. Corrective actions that were verified included ensuring that the TVA and Bechtel CGD procedures were revised to reflect current regulatory requirements, audits and surveillances of the CGD program were scheduled and being completed, and that training for Bechtel CGD personnel was accomplished and adequate. The inspectors also reviewed a sample of five sets of CGD procurement data sheets (PDS) and associated technical evaluations (TE) to ensure the revised CGD packages met current regulatory requirements. In addition, for any items procured under the original, unrevised PDSs within the sample, the inspectors also reviewed the results of testing to ensure those items met the new PDS and TE critical characteristic requirements.

With regard to the 10 CFR 50.55(e) violation, the inspectors reviewed the applicants causal analysis, extent of condition review, PER, and the revised reporting procedure to ensure it accurately reflected current regulatory requirements. Corrective actions for this violation also included a review of past PERs for reportability.

With regard to the Criterion XVI violation, the inspectors reviewed the applicants causal analysis, PER, and extent of condition review. The cause of this violation was related to the failure to present the results of PER 403095 Corrective Action #008 (conduct a full 100% CGD extent of condition review) to the Construction Completion Management Review Committee (CCMRC). The CCMRC was to consider whether the results of the extent of condition review indicated a significant condition adverse to quality, and therefore whether PER 403095 should be reassigned as a Level A PER. The requirement to conduct this review was adequately captured in procedure NC-PP-3, Watts Bar Unit 2 Corrective Action Program, Rev 15, and had been documented in the applicants corrective action program prior to the violation. Completed corrective actions taken for this violation included presenting the results of the 100% extent of condition review to the CCMRC; and briefing PER coordinators on this issue.

Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

The applicants causal analysis and corrective actions for the three violations related to EA-13-019 were adequate and fully implemented, and compliance with the associated regulatory requirements has been restored. These violations are closed.

OA.1.2 (Closed) Historical 10CFR21 Reviews and Unresolved Item 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues (Inspection Procedure 92701)

a. Inspection Scope

The applicant committed to perform a review of historical 10CFR21 (Part 21) issues that were applicable to WBN Unit 1 for applicability and potential resolution for WBN Unit 2.

The review process was captured in applicant procedure 25402-3DP-G04G-00501, Historical Document Review Process and subsequently expanded upon in applicant PER 494917. The procedural guidance utilizes a review of all issues documented in the applicants historical database (Watts Bar Nuclear Plant Unit 2 Startup Integration Task Equipment List (WITEL)) and PER 494917 outlined the methodology the applicant planned to use to quantify, qualify, and subsequently resolve issues identified from historical Part 21s. The inspectors reviewed the procedure, assessed the methodology of the review, and performed an independent verification of the applicants historical Part 21 results to ensure that the review encompassed all applicable historical issues.

Additionally, the inspectors held interviews with applicant staff to understand the rationale for screening historical Part 21s for applicability to WBN Unit 2.

b. Observations and Findings

The following SL IV NCV was identified.

Introduction:

The inspectors identified a SL IV NCV associated with the corrective actions of PER 49417 to identify and correct historical issues contained in the applicants WITEL database. This issue was previously identified as URI 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues.

Description:

The review of PER 494917 revealed that the applicants intention was to obtain a listing of all 10CFR Part 21 issues applicable to Unit 1, perform a review for Unit 2 applicability, and assign the Unit 2 applicable 10CFR21 issues to the appropriate Unit 2 design discipline. The applicants search returned 15 historical items, of which, 11 were identified as applicable to Unit 2. The inspectors performed an independent sample of historical items in the WITEL database and identified additional WBN Unit 1 Part 21s, which were not identified by the applicant, and WBN Unit 2 applicable Part 21s with inadequate justification for closure. The applicant subsequently dedicated additional efforts towards identifying the total population and concluded in PER 806990 that a total of 236 items existed. Of the 236 items identified, 49 were screened as applicable to WBN Unit 2 and required efforts to ensure that the Part 21 issue had been resolved for Unit 2. Along with this disparity in population was the rationale for closure of some items that were classified as applicable. The resolution of PER 806990 also corrected the issue of inaccurate closure rationale.

The inspectors determined that the applicants inadequate corrective action was a performance deficiency. This performance deficiency was considered more than minor in accordance with IMC 0613, Appendix E because it represented an adverse condition that rendered the quality of structures, systems, or components (SSCs) indeterminate and required substantive corrective action to satisfy the original intent of the corrective action document. Based on the applicants assessment, it was determined that the population of historical items that were originally omitted for resolution did not require re-work of any equipment. The finding was determined to be of very low safety significance in accordance with Section 6.5 of the NRC Enforcement Policy because it is does not represent a breakdown in the QA process. The applicant issued PER 806990 to address the identified conditions. The inspectors reviewed this finding against cross-cutting area components as described in IMC 0310 Components Within the Cross-Cutting Areas and determined that no cross-cutting aspect applied.

Enforcement:

10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires, in part, that, conditions adverse to quality are promptly identified and corrected. PER 494917 directed, in part, to obtain a listing of all 10CFR Part 21 issues applicable to Unit 1, perform a review for Unit 2 applicability, and assign the Unit 2 applicable 10CFR21 issues to the appropriate Unit 2 design discipline.

Contrary to the above, on November 8, 2013 the applicant failed to identify all potential 10CFR Part 21 issues and was therefore unable to subsequently review for Unit 2 applicability and potentially resolve. Specifically, the questioning from NRC led the applicant to identify that 221 potential conditions adverse to quality were omitted from the corrective action review.

Because this was a SL IV violation and it was entered into the applicants corrective action program as PER 806990, this violation is being treated as an NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy. This violation is identified as NCV 05000391/2014602-01, Inadequate Corrective Actions for Historical Issues.

c. Conclusion Based on a review of the applicants corrective actions outlined in PER 806990 and the aforementioned inspection activities, the inspectors determined that the applicant had implemented actions that would be sufficient to address the review of historical 10CFR21 reviews. This inspection item, historical 10CFR21 reviews, is closed.

Additionally, this closes URI 05000391/2013609-02, Potential Inadequate Corrective Actions for Historical Issues.

OA.1.3 (Closed) Confirmatory Order EA-12-021, Completeness and Accuracy of Information (Inspection Procedure 35007)

a. Inspection Scope

Background: In July 2012, the NRC issued a Confirmatory Order (ADAMS Accession No. ML12173A020) as the result of an agreement reached during an alternative dispute resolution (ADR) mediation session conducted on May 21, 2012, regarding falsification at WBN Unit 2. In early 2012, the NRC's Office of Investigations completed an investigation regarding activities at the Watts Bar Nuclear Plant. Based on the evidence developed during the investigation, the NRC staff concluded that, in August 2010, an electrician and foreman employed by a subcontractor at WBN Unit 2 deliberately falsified work order packages for primary containment penetrations and caused the applicant, TVA, to be in apparent violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, and 10 CFR 50.9, Completeness and Accuracy of Information.

At the ADR session, TVA discussed the corrective actions and enhancements taken shortly after its identification of the incident in August 2010. In addition, TVA agreed to a number of corrective actions to preclude recurrence of the violation.

The NRC reviewed actions taken in response to the order as documented in IIR 05000391/2013604 (ADAMS Accession No. ML13179A079) issued on June 27, 2013.

The inspection report documented that six of the nine actions specified in the Confirmatory Order for WBN Unit 2 had been implemented (actions V.3.a, V.3.b, V.3.c, V.3.d, V.3.f, and V.3.g).

On August 29, 2013 TVA issued a letter (ADAMS Accession No. ML13248A457) to the NRC providing a status update to the Confirmatory Order. In this letter, TVA documented confirmed completion of actions V.3.a, V.3.b, V.3.c, V.3.d, V.3.f, V.3.g, and V.3.h.

Inspection Activities: The inspectors reviewed and verified that actions to preclude recurrence were implemented. The actions are numbered by section as contained in Section V of the Confirmatory Order (ADAMS Accession No. ML12173A020). Review and inspection of most of these actions were previously documented in IIR 05000391/2013604.

The actions specified in the Confirmatory Order for Watts Bar Unit 2 were implemented with the exception of those noted below (Actions V.3.e and V.3.i).

Action Inspector Activities V.3.a Documented in inspection report 05000391/2013604 V.3.b Documented in inspection report 05000391/2013604 V.3.c Documented in inspection report 05000391/2013604 V.3.d Documented in inspection report 05000391/2013604.

Inspectors reviewed an updated list of individuals trained in 2013 and the list of those who did not receive training because of extended sick leave, assignments to other plants, or because they were part of an independent organization.

V.3.e Documented in inspection report 05000391/2013604.

The inspectors reviewed actions documented in PER 533342 and tracked by TVAs corrective action program. These actions specifically include 10 CFR 50.9 refresher training to be provided by November of 2014 and 2016.

V.3.f Documented in in inspection report 05000391/2013604 V.3.g Documented in inspection report 05000391/2013604.

Inspectors reviewed the results from the follow-up survey performed in 2013 and did not identify any significant adverse trends.

V.3.h Documented in inspection report 05000391/2013604.

The inspectors reviewed results from the effectiveness review performed in 2013 and documented in PER 533342 and did not identify any significant adverse trends.

Additionally, the inspectors reviewed SR 843165 which documented a review of the Employee Concerns Program (ECP) database and the Corrective Action Program (CAP) for any potential falsification issues between January 1, 2013 and February 5, 2014. The evaluation determined that actions taken as a result of the ADR remained effective.

V.3.i Documented in inspection report 05000391/2013604.

On August 29, 2013 TVA issued a letter (ADAMS Accession No.

ML13248A457) to the NRC providing a status update to the Confirmatory Order. The August 29, 2013 letter stated that upon completion, TVA will issue a letter to the NRC discussing its basis for concluding the Order action items are completed.

b. Observations and Findings

No findings were identified.

c. Conclusions

The actions specified in the Confirmatory Order for WBN Unit 2 have been fully implemented with the exception of actions V.3.e and V.3.i.

Action V.3.e is considered a continuing action tracked in TVAs corrective action program as PER 533342 and consists of refresher training which is to be provided every two years through 2016. Action V.3.i stated that TVA will provide a letter to the NRC discussing its basis for concluding the Order action items are completed.

Based on the review of actions completed to date, sufficient inspections of the Confirmatory Order implementation have been completed. Confirmatory Order EA-12-021 is closed.

OA.1.4 (Closed) SSER, Appendix HH, Item 49 Associated with Training Qualification Requirements (Inspection Procedure 92701)

a. Inspection Scope

Background: The subject item was initially captured in NRC letter to TVA dated July 2, 2010, Watts Bar Nuclear Plant, Unit 2 Program for Refurbishment (ADAMS Accession No. ML101720050) which identified an NRC inspection follow-up item. At the time of review by NRC staff, the reviewer was unable to determine how the training qualification requirements from American National Standards Institute (ANSI) 45.2-1971 and procedure TI-119, Maintenance Rule, were linked. This was deemed an item subject to future inspections.

As part of final closure, documentation associated with Item 49 was provided to NRC inspectors for review on December 17, 2013; the documentation included actions taken by Unit 1 and Unit 2 to address this item.

For Unit 1, TVA stated that the unit is an operating nuclear unit which complies with Regulatory Guide (RG) 1.33, Quality Assurance Program Requirements (Operations).

RG 1.33 endorses ANSI N18.7-1976/ American Nuclear Society (ANS) 3.2 which are found to be acceptable to the NRC staff and provide an adequate basis for complying with the quality assurance program requirements of 10CFR50 Appendix B for the operations phase. Additionally, TVA is committed to comply with requirements of ANSI N18.1-1971 and ANSI/ANS 3.1-1981 as endorsed by RG 1.8, Rev. 2, April 1987, Qualification and Training of Personnel for Nuclear Power Plants. Both standards provide criteria for the selection of training of personnel for nuclear power plants.

Implementation of these training requirements are outlined in procedure NPG-SPP-17.1, Rev. 9, Systematic Approach to Training (SAT) Overview, and MMDP-1, Rev 27, Maintenance Management System. As part of the closure documentation, the applicant stated that the [training] process is very similar to the process for Unit 2 where the use of a qualification matrix is utilized.

For Unit 2, TVA provided procedures 25402-000-GPP-0000-TI 216, WBN Unit 2 Completion Project Refurbishment Program and 25402-MGT-0002, Training, which reference back to Bechtels Project Nuclear Quality Assurance Plan (PNQAM). The PNQAM committed to ANSI 45.2-1971. In summary for Unit 2, TVA stated that implementing procedures define and/or contain qualification requirements.

Inspection Activities: The inspectors performed the following:

  • Reviewed TVAs final closure package for Appendix HH, Item 49 associated with training requirements to verify how TVA documented the relationship between ANSI 45.2-1971 and TI 119;
  • Reviewed TVAs Nuclear Quality Assurance Plan (NQAP), Rev. 28, specifically the following sections:
  • Section 11 which discusses the training program elements,
  • Appendix B contains a matrix of regulatory guides and standards which apply to quality assurance requirements,
  • Appendix F which delegates the WBN Unit 2 construction completion, construction phase tests and inspections, and related to QA activities to Bechtel and the Bechtel Quality Assurance Manual (QAM);
  • Reviewed Bechtels PNQAM, Rev 12 specifically Section 1.3 which outlines the requirements and responsibilities for indoctrination and training programs; and
  • Reviewed two qualifications (one for each unit) for Unit 1 and Unit 2 personnel performing NDE and two qualifications (one for each unit) for personnel performing civil related examinations to verify that established training requirements and experience were comparable Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified. Inspectors reviewed TVAs conclusion that there was no direct link between the training qualification requirements of ANSI 45.2 to TVA TI-119.

Additionally, the inspectors reviewed TVAs NQAP which outlined the training program elements for personnel performing quality-related activities for Unit 1 and Unit 2.

Even though Unit 1 and Unit 2 personnel receive unique qualification to perform their tasks, the implementing procedures for both Unit 1 (operations) and Unit 2 (construction)are governed by the NQAP and have been written to meet 10CFR50 Appendix B requirements and training standards established by ASME, ANSI, and American Nuclear Society (ANS).

The inspectors determined that the training and qualification programs for both Unit 1 and Unit 2 contain unique aspects applicable to the construction, testing, and operations phases; nevertheless, Appendix B requirements and guidance established in industry standards such as ANSI 45.2 are addressed throughout procedures for Unit 1 and Unit 2.

c. Conclusions

Based on the review of the final closure package, the inspectors determined that Appendix HH, Item 49 associated with training qualification requirements is closed.

OA.1.5 (Closed) SSER, Appendix HH, Item 51 Associated with the Definition of Significant Cracks (Inspection Procedure 92701)

a. Inspection Scope

Background: The subject item was initially captured in NRC letter to TVA dated July 2, 2010, Watts Bar Nuclear Plant, Unit 2 Program for Refurbishment which identified an NRC inspection follow-up item.

The NRC staff reviewed TVA's Maintenance Rule Programs Procedure TI-119 and found in Section 3.3, "Structural Monitoring Database, that the procedure provided the types of degradation for inspection (e.g., under Concrete and Masonry Walls). At the time of review by the NRC staff, the reviewer noted that the procedure specified actions for significant cracks; however, the term "significant crack" was not quantified. Therefore, the implementation of Procedure TI-119 was deemed as an inspection follow-up item to determine if the program requirements were adequately implemented.

Inspection Activities: The inspectors performed the following:

  • Reviewed 0-TI-445, Examination of Structures for Maintenance Rule, Rev. 0 and verified 0-TI-445 was consistent with American Concrete Institute (ACI) 349.3R-02

b. Observations and Findings

No findings were identified. TVA's Maintenance Rule Programs Procedure TI-119 was not revised to quantify cracks; instead, 0-TI-445, Examination of Structures for Maintenance Rule, Rev. 0 was revised. The programmatic requirements for the examinations of existing structures are contained in TI-119. Procedure 0-TI-445 provides the technical guidance for periodic examination of existing structures in support of the implementation and continued compliance with the Maintenance Rule.

2 of 0-TI-445 contains specific acceptance criteria to classify cracks as acceptable, acceptable with deficiency, or as a condition that requires further evaluation/remediation.

c. Conclusions

Based on the review of the final closure package, the inspectors determined that Appendix HH, Item 51 associated with the definition of significant cracks is closed.

OA.1.6 (Closed) SSER, Appendix HH, Open Item 64, Eagle 21 Rack 2 RTD Testing Results Review (Inspection Procedure 52055)

a. Inspection Scope

Background: This issue is documented in Supplemental Safety Evaluation Report (SSER) 23 to NUREG-0847 (ADAMS Accession No. ML11206A499) as Open Item 64 in Appendix HH. By letter dated June 18, 2010 (ADAMS Accession No. ML101940236),

TVA stated that the Eagle 21 system factory acceptance test of Rack 2 revealed that the temperature inputs to the narrow range resistance temperature detector (RTD) were consistently reading about 0.2 degrees Fahrenheit higher than expected. Westinghouse determined that it had incorrectly configured the inputs as a shared RTD in the loop calculation processor (LCP) software. Westinghouse initiated Corrective Action Item 10-140-M021 and performed an evaluation of a potential nuclear safety issue. It determined that this issue did not represent a substantial safety hazard even if it was left uncorrected. By letter dated October 29, 2010 (ADAMS Accession No. ML103120711),

TVA described the final resolution proposed by Westinghouse. In accordance with the proposed resolution, the spare input available on the RTD input board will be wired to the active channels. The spare input will provide the parallel resistance to resolve the problem. Jumpers will be installed at the Eagle 21 termination frame to provide a parallel connection from each existing narrow-range RTD input to an existing spare input, thus simulating the hardware connection for shared RTDs. Therefore, as configured, the LCP will provide the correct temperature calculation for the narrow-range RTDs. TVA stated that "Post modification testing will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD accuracy issue prior to WBN Unit 2 fuel load." The Open Item was to review the testing.

Inspection Activities: The inspectors reviewed the test in WO 11347100 and the change package to verify that the 0.2 degree Fahrenheit bias was corrected. The inspectors also reviewed the WO to verify that the test equipment was properly calibrated.

Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

Based on a review of the final closure package, this item is closed.

OA.1.7 (Closed) Three Mile Island Action Item II.K.1.10, Operability Status (Inspection Procedure 92701)

a. Inspection Scope

Background: This commitment was documented in TVA framework letter dated January 29, 2008, Watts Bar Nuclear Plant (WBN) Unit 2 - Regulatory Framework for the Completion of Construction and Licensing for Unit 2 (ADAMS Accession No.

ML080320443). The commitment was contained in Enclosure 2, Item 129, II.K.1.10, Operability Status - Confirm multi-unit operation will have no impact on administrative procedures with respect to operability status. Standard Department Procedure OPDP-8, Operability Determination Process and Limiting Conditions for Operation Tracking, Rev. 15, is the primary administrative procedure that controls operability status. This procedure is a common nuclear fleet corporate procedure that is presently in use on WBN Unit 1 and other TVA nuclear units.

Inspection Activities: The inspectors reviewed OPDP-8, and NPG-SPP-10.2, Clearance Procedure to Safely Control Energy, Rev. 6, to verify that the procedures require the following:

  • Each operating unit shall maintain an independent limiting condition for operation (LCO) tracking log.
  • Each LCO tracking log record shall be assigned a unique identification number.
  • Active LCOs shall be tracked and passed from shift to shift as part of the shift turnover.
  • Operations shall verify the operability of redundant safety-related systems prior to the removal of any safety-related system from service.
  • Operations shall have assurance that all work activities are complete before declaring any equipment affected by maintenance or surveillance activities operable.
  • A means of notifying Operations personnel whenever a safety-related system is removed from and returned to service is required.

Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

Based on the above activities and review of the final closure package, the inspectors determined that two-unit operation will have no impact on administrative procedures with respect to operability status. This item, TMI Action Item II.K.1.10, is closed.

OA.1.8 (Closed) Generic Letter 1998-02, Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition, and Temporary Instruction 2515/142, Draindown During Shutdown and Common-Mode Failure (Temporary Instruction 2515/142 and Inspection Procedure 92701)

a. Inspection Scope

Background: Generic Letter (GL) 98-02 was issued following several nuclear industry events involving the inadvertent loss of RCS inventory while in a shutdown condition.

The GL requested that licensees assess the susceptibility of their RHR and emergency core cooling systems (ECCS) to common-cause failure as a result of RCS draindown while in a shutdown condition.

Unit 1 Actions: WBN Unit 1 issued a response to GL 98-02, dated November 24, 1998 (ADAMS Accession No. ML082460081). The response identified susceptible RCS draindown pathways and vulnerabilities and described the Appendix B processes and controls in place that would prevent such an event from occurring. No corrective actions were identified, although several enhancements were documented. TVAs assessment was reviewed by the NRC using TI 2515/142, which was documented in NRC inspection report (IR) 50-390/99-11 and 50-391/99-11(ADAMS Accession No. ML003683323).

The inspectors concluded that TVA performed a thorough assessment of plant vulnerabilities. The inspectors also verified operational controls utilized, and found that TVA adequately implemented elements of the QA program described in the GL response at WBN.

Unit 2 Actions: The applicant submitted a supplemental response for GL 98-02, specific for Unit 2, on April 10, 2010 (ADAMS Accession No. ML100950044). This contained commitments for the applicant to document their review of ECCS designs to ensure they do not contain design features which can render them susceptible to common-cause failures. The NRCs Office of Nuclear Reactor Regulation found this approach acceptable as documented in the safety evaluation dated May 11, 2010 (ADAMS Accession No. ML101200155). WBN Unit 2 provided an endorsement of the Unit 1 GL 98-02 response in the document titled Endorsement of Unit 1 Report on Generic Letter 1998-02, Watts Bar Unit 2, dated May 11, 2011. The applicant did not identify any substantial design differences that could become affected by this issue. Enhancements made following the WBN Unit 1 response were intended to be carried over into Unit 2 procedures.

Inspection Activities: The inspectors reviewed the applicants conclusions to determine the adequacy of the applicants assessment of the susceptibility of the plant to a draindown event while in a shutdown condition. The inspectors reviewed ECCS flow diagrams and the applicants conclusions to verify that design features and administrative controls were in place to prevent inadvertent RCS draindown, in the shutdown mode, caused by misoperation of valves. The inspectors reviewed Watts Bar Nuclear Plant Unit 2 - List of Design Differences, Rev. 1 (ADAMS Accession No.

ML111010490) to verify that the ECCS design features between Unit 1 and Unit 2 do not have any appreciable differences. The inspectors reviewed general operating instruction GO-6, Unit Shutdown From Hot Standby to Cold Shutdown, and GO-1, Unit Startup From Cold Shutdown to Hot Standby, to verify that configuration controls are in place to prevent RCS draindown during shutdown. Specifically, when decreasing power, valve HCV-74-34, Refueling Water Return, has a hold order placed with specific release criteria before entry into Mode 4 and to remove the hold order before entry into Mode 3 when returning to power. The inspectors reviewed changes made to operating practices and procedures in response to GL 98-02 to verify that enhancements made following the WBN Unit 1 response were carried over into Unit 2 procedures. Additionally, the inspectors reviewed the operator training lesson plan to verify that training focused on draindown events is part of the continuous training program for licensed operators.

Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

Based on the above inspection activities and review of the engineering complete closure package, the inspectors determined that the applicant has performed an adequate assessment of plant vulnerabilities to RCS draindown events while in a shutdown condition. The applicant has adequately implemented QA program controls to prevent a similar event at WBN Unit 2. At the time of the inspection, the inspectors reviewed a copy of the corresponding Unit 2 procedures (2-GO-1 and 2-GO-6) that were approved but not issued. The procedures had received a qualified review, were sponsor approved, and contained the appropriate administrative controls with respect to the issues covered by GL 98-02. Therefore, GL 98-02 and TI 2515/142 are closed.

OA.1.9 (Closed) NRC Bulletin 76-02 and 84-02, Relay Coil Failures (Inspection Procedures 51053 and 92717)

a. Inspection Scope

Background: Bulletin (BL) 76-02 documented an issue with relay coil failures associated with General Electric (GE) Type HFA, HGA, HKA, and HMA relays. A certain type on nylon coil spools (or bobbins), plus humid conditions, were determined to be the fundamental causes of corrosion and resulting coil failure. Bulletin 84-02 documented an issue with relay coil failures associated with GE Type HFA relays. Lexan coil spools were cracking due to the effects of aging, resulting in insulation failure, which caused shorted turns, increasing the coil temperature, and causing the eventual coil failure. The bulletins recommended replacing the affected relays.

In NRC IIR 05000391/2010603 (ADAMS Accession No. ML102170465), the inspectors reviewed the applicants response letter and tracking letter associated with these bulletins. In NRC IIR 05000391/2011608 (ADAMS Accession No. ML11311A082), the inspectors reviewed a sample of relays that had been replaced and concluded that the activities performed at the time of the inspection to correct relay coil failures for GE type HFA, HGA, HKA, HMA relays were adequate. However, it was noted that additional inspection was needed for relays which did not yet have a unit identifier (ID) associated with them.

Inspection Activities: The inspectors reviewed the applicants approach as detailed in the closure package. The inspectors interviewed engineers on the methodology for identification to determine whether the scope of potentially affected relays identified in the engineering complete closure package was adequate. Additionally, the inspectors reviewed two EDCRs, 59951-A and 58285-A, associated with issuing unit IDs for relays to determine whether the scope of potentially affected relays identified in the closure package was adequate.

The inspectors also chose two relays, WBN-2-RLY-057-SG4A and WBN-2-RLY-003-SG4BR, which previously did not have unit IDs for Unit 2 and had been identified as not within the scope of these bulletins. The inspectors reviewed drawings, 45N26952-1 and 45N2688-1, to determine whether the relays were within the scope of these bulletins.

The inspectors chose two HFA relays associated with 6.9kV Shutdown Board 2A-A, WBN-2-RLY-074-0010C-A and 2-RLY-074-0010B-A, which were identified as potentially within the scope of the bulletins and did not have unit IDs at the time of the inspection in IIR 05000391/2011608. The results of the applicants inspection of these relays to determine if they needed replacement were documented in Work Order (WO)112753729. The inspectors walked down the shutdown board and reviewed WO 112763729, PERs, and GE service advice notifications to verify that the applicant was correctly applying the information in the bulletins to existing HFA relays. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified. The inspectors noted that the engineering department used mark IDs, not unit IDs, from drawings in their evaluation of the relays at Watts Bar. In order to issue WOs associated with the relays, unit IDs needed to be issued for the relays.

c. Conclusions

Based on the above inspection activities, review of the engineering complete closure package, and the results of IIR 05000391/2011608, the inspectors concluded that the applicant has adequately captured the relevant relays in the scope of their evaluation and, for the sample selected, has adequately implemented the WO. While some WOs associated with these relays remain open, the NRC has reasonable assurance that the applicant is adequately addressing this issue. These items, BL 76-02 and 84-02, are closed.

OA.1.10 (Closed) NRC Bulletin 85-01 and Temporary Instruction 2515/069: Steam Binding of Auxiliary Feedwater Pumps (Inspection Procedure 92717 and Temporary Instruction 2515/069)

a. Inspection Scope

Background: BL 85-01 (ADAMS Accession No. ML031210845) was written in response to a potentially serious safety problem that occurred at certain operating facilities involving the operability of auxiliary feedwater (AFW) pumps as a result of steam binding. Numerous events were reported where backleakage of hot water into AFW systems flashed to steam, disabling the AFW pumps. It was determined that this could occur in any pressurized water reactor (PWR) and that this issue could affect multiple trains of the AFW system. BL 85-01 and subsequent GL 88-03 (ADAMS Accession No.

ML031200470) requested licensees to

(1) develop procedures for monitoring fluid conditions within the AFW system on a regular basis, and
(2) develop procedures for recognizing steam binding and for restoring the AFW system to operable status should steam binding occur. TI 2515/069 (ADAMS Accession No. ML091520286) was issued to define inspection, reporting, and evaluation responsibilities for NRC inspectors.

WBN Unit 1 & 2 historical commitment actions were initially accomplished thru procedure revision without the need for hardware modifications and were accepted and closed by the NRC in an NRC letter dated Sept 25, 1990 "Notice of Violation (Inspection Report Nos. 50-390/90-20 and 50-391/90-20) (ADAMS Accession No. ML072610300).

A subsequent NRC inspection was performed in January and February of 1991 and documented in an NRC letter dated March 22, 1991 "Watts Bar Integrated Design Inspection (50-390/91-201) (ADAMS Accession No. ML072970646). This inspection identified a deficiency in AFW temperature monitoring related to the commitment to GL 1988-03. TVA accepted the deficiency and identified the necessary modifications for Unit 1. TVA letter dated August 1, 1991 "Watts Bar Nuclear Plant (WBN) Unit 1-Response to NRC Integrated Design Inspection (IDI) Issues (50-390/91-201) at WBN (ADAMS Accession No. ML072880150) documented TVAs commitments. Design Change Notice (DCN) M-16269-A was issued to relocate the temperature elements (TE-3-143 & 151) identified in the deficiency. The requested change identified that two temperature elements were too far away to be accurate (Loops 2 & 3). However, the two temperature indicators for Loops 1 & 4 were too close to the heat source (Feedwater By-Pass piping). Since the four TE's were relocated, new numbers were assigned (1-TE-3-6381, 2, 3, 4) and the old numbers (1-TE-3-143, 151, 159, & 166) were deleted.

Deficiency 91-D-7 (found in TVA letter dated August 1, 1991 "Watts Bar Nuclear Plant (WBN) Unit 1-Response to NRC Integrated Design Inspection (IDI) Issues (50-390/91-201) at WBN) (ADAMS Accession No. ML072880150) was subsequently closed and documented in NRC letter dated June 29, 1993 "Integrated Design Inspection Follow-up at Watts Bar Unit 1 (NRC inspection Report No. 50-390/93-201) (ADAMS Accession No. ML072690552). The monitoring of the Unit 1 AFW system temperatures is procedurally directed and included in the Operator Rounds.

Inspection Activities: The inspectors reviewed the procedures developed to monitor fluid conditions in the AFW system and to recognize and recover from a possible steam binding event. The procedure to monitor the AFW system temperature was reviewed to verify its adequacy in meeting both applicant commitments and NRC requirements by measuring discharge piping temperature once per shift on operator rounds. The inspectors reviewed the procedures for recognizing and recovering from a possible steam binding event to verify that they were adequate to perform both functions. The NRC inspectors reviewed the procedures to verify that they were properly approved by the applicant. The inspectors interviewed Main Control Room staff to verify that the procedures will be available for use in the appropriate Unit 2 work stations and included in operator rounds. Documents reviewed are in the Attachment

b. Observations and Findings

No findings were identified. The Unit 1 procedures, which are identical to those for Unit 2, were available in the main control room and in use by the operations staff. The Unit 2 procedures are approved but will not be issued or implemented until Unit 2 operations commence.

c. Conclusion Based on a review of the applicants engineering complete closure package and the aforementioned inspection activities, the inspectors determined that the applicant had implemented actions that are sufficient to address the requirements of BL 85-01.

Therefore, BL 85-01 and TI 2515-69, are closed.

OA.1.11 (Closed) Construction Deficiency Report 391/85-37: Incorrect Use of AMP PIDG Terminals (Inspection Procedure 35007)

a. Inspection Scope

Background: This CDR involved the discovery that AMP Products Corporation pre-insulated diamond grip (PIDG) terminals had been used on solid conductor component leads despite the fact that the vendor did not recommend using these terminals for solid copper wire applications. This use was identified on Class 1E discrete electrical components in Foxboro control loops and test points, relay racks, and local panels.

Additional background information is provided in IIR 05000391/2013610 (ADAMS Accession No. ML14049A158).

Inspection Activities: The applicants PP-19-2 Open Item/Commitment Completion Form (Engineering Complete closure package) tracking number PER 172698 R2, was reviewed and interviews with responsible engineering personnel were conducted.

Legacy change documents were reviewed, to identify terminals in Unit 2 circuits that had been excluded from the scope of work to address this CDR in Unit 1. The samples selected were design change notices affecting systems 3, 30, 43, 68, and 251. The inspectors then cross-referenced those areas that had been excluded from the scope of work, with Unit 2 design output documents, to verify that those Unit 2 areas have been included in the new scope of work to address the CDR in Unit 2. The inspectors reviewed a document titled Table cross-referencing work excluded from Unit 1 scope to Unit 2 EDCRs provided in Tab #8 of the PP-19-2 Engineering Complete package, to verify that the actions taken to address the CDR were inclusive of all the areas possibly affected in Unit 2. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

Based on the review of the engineering complete closure package, as well as previous NRC inspection reports, the inspectors determined that the applicants proposed corrective actions are adequate to address the concerns identified in CDR 391/85-37.

CDR 391/85-37 is closed.

OA.1.12 (Closed) Construction Deficiency Report 86-14: Failure to Follow Procedures (Inspection Procedures 50073 and 50075)

a. Inspection Scope

Background: A deficiency concerning improper installation of ASCO model 8316 solenoid valves was identified and reported to the NRC in accordance with 10 CFR 50.55(e). All thread bolts were used in place of the solenoid valves original bonnet screws and mounting brackets. Additionally, field modifications to the mounting brackets were not performed in accordance with approved procedures. The modifications negated the seismic and environmental qualification of the solenoid valves. This item was previously inspected in IIR 05000391/2012608 (ADAMS Accession No.

ML12319A368).

Inspection Activities: The inspectors reviewed a sample of ASCO 8316 solenoid valves that were replaced as part of the refurbishment program. The inspectors reviewed completed WOs to verify that the corrective actions related to this item were included in the work instructions. The inspectors reviewed the corrective actions to verify the installation requirements contained in the vendor manual and Modification/Addition Instruction (MAI) 4.4B were referenced in the WOs, and that the WOs addressed the proper mounting of the valves in accordance with the work order processing procedure.

The inspectors performed a walkdown of a sample of valves to verify that the valves were installed in accordance with procedures and design documents. Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

Based on the review of the applicants engineering closure report, completed work orders, and a walkdown of installed valves, CDR 86-14 is closed.

OA.1.13 (Closed) Three Mile Island Action Item I.C.8, Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants (Inspection Procedure 92701)

a. Inspection Scope

Background: This TMI Action Item was intended to pilot monitor select emergency operating procedures (EOPs) at near-term operating license applicant plants. Action Item I.C.8 was originally made a license condition for Watts Bar Unit 1 and 2 as documented in NUREG-0847, dated June, 1982 (ADAMS Accession No.

ML0720604900). NUREG-0737, Clarification of TMI Action Plan Requirements (ADAMS Accession No. ML102560051), provided clarification that the pilot monitoring would be discontinued following NRC approval of plant emergency procedures. Action Item I.C.8 was closed in NRC IRs 50-390/85-08 and 50-391/85-08 (ADAMS Accession No.

ML082190701). The inspectors documented that the applicant had implemented the Westinghouse Owners Group generic procedures, which had been approved by NRC staff. The inspectors determined that action item I.C.8 was no longer applicable. Unit 1 actions were further explained in TVA letter to NRC dated July 27, 1992 (ADAMS Accession No. ML073520471). This letter explains that the WBN EOPs conform to the Westinghouse generic guidelines and that WBN no longer depends on EOPs developed by identifying differences between Sequoyah Nuclear Plant and WBN. In Supplement 10 to the Safety Evaluation Report for Watts Bar Nuclear Units 1 and 2 (ADAMS Accession No. ML072060473), dated October, 1992, the NRC staff indicated that WBN procedures conformed to the Westinghouse Owners Group guidelines and that the license condition was no longer necessary.

For Unit 2, EOPs are mimicked from the Unit 1 procedures presently in use and are different only when hardware or other minor design features dictate that they be different. Unit 2 procedures are currently approved but not issued. Final issuance of Unit 2 procedures requires Plant Operations Review Committee approval and will happen just prior to Unit 2 licensing.

Inspection Activities: The inspectors reviewed the applicants engineering complete closure package, NCO820253100, to verify that the intent of TMI Action Item I.C.8 had been met for WBN Unit 2. The inspectors reviewed procedure 2-ECA-1.2, LOCA Outside Containment and compared it to 1-ECA-1.2, LOCA Outside Containment, Rev. 5, to verify that that the Unit 2 procedure mirrored Unit 1 and performed the same functions.

b. Observations and Findings

No findings were identified.

c. Conclusions

Based on the above inspection activities and review of the engineering complete closure package, the inspectors determined that TMI Action Item I.C.8 is no longer applicable to WBN Unit 2. The WBN EOPs conform to Westinghouse Owners Group guidelines, which have been approved by the NRC. This item, TMI Action Item I.C.8, is closed.

OA.1.14 (Closed) Control Room Design Review Special Program and Three Mile Island Action Item I.D.1 (Temporary Instruction 2512/035 and Inspection Procedure 92701)

a. Inspection Scope

The inspectors continued inspection efforts initiated in NRC IIR 05000391/2010602 (ADAMS Accession No. ML101230144) Section C.1.18 and NRC IIR 05000391/2010605 (ADAMS Accession No. ML110410680) Section OA.1.3 regarding the applicants resolution of the main control room (MCR) design review. The inspectors focused on the actions supporting the remaining scope of the applicants control room design review (CRDR) special program (SP). Specifically, the inspectors performed the following actions:

  • Reviewed 15 safety-related MCR components on panels 2-M-4, 2-M-5, and 2-M-6 to verify that the components satisfied panel design output spatial arrangement, scale, mimic bus arrangement, component identification, and alarm window arrangement.
  • Reviewed self-assessment report 25402-SA-ENG-11-006 to verify critical aspects of the program were inspected and that any corrective actions were captured in the applicants corrective action program.
  • Reviewed open commitments with a future closure date to ensure they were tracked by a controlled process.
  • Reviewed five completed CRDR human engineering deficiency (HED) closure packages, where no change was made from Unit 1 CRDR SP, to verify field implementation was performed and the scope of the modification was accurately implemented.
  • Reviewed five completed CRDR HED closure packages, where a change was made from the methodology used in Unit 1 CRDR SP, to verify that field implementation was performed and an evaluation was performed to ensure no new human factors were introduced.
  • Reviewed procedure 25402-3DP-G04G-00507, Closing Out Control Room Human Engineering Concerns and Discrepancies, Rev.000, to verify that HED closure packages adhered to established procedures.
  • Reviewed Unit 2 MCR mimic buses to verify they satisfied the intent of Appendix D of NUREG-0847, Safety Evaluation Report- WBN Unit 2, June 1982.
  • Observed operation of Unit 2 pumps and valves from the Unit 2 MCR to verify controls and indications properly responded.
  • Reviewed a sample of the corrective action database to verify no significant issues have been encountered when operating components from the Unit 2 MCR.
  • Reviewed WITEL punchlist, PL-11-4262, to verify outstanding HED design packages were tracked using a controlled program.
  • Reviewed Engineering Complete Closure Package.

Documents reviewed are listed in the Attachment.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that the documents reviewed and actions performed complied with applicable requirements. Proper justification of remaining actions accompanied each commitment and planned corrective actions, when applicable, were appropriate. This inspection effort, coupled with previous inspections and conclusions, supports closure of this item. These items TI 2512/035, Control Room Design Review Special Program, and TMI Action Item I.D.1, Control Room Design Reviews, are closed.

OA.1.15 (Closed) Inspection of Watts Bar Nuclear Plant Employee Concerns Program (Temporary Instruction 2512/015)

a. Inspection Scope

The inspectors continued inspection efforts initiated in NRC IIR 05000391/2008010 (ADAMS Accession No. ML090291033) Section Q.1.3 and NRC IIR 05000391/2010602 (ADAMS Accession No. ML110800483) Section OA.1.7 regarding the applicants identification and resolution of historic corrective action tracking documents (CATDs).

Specifically, the inspectors utilized the guidance in TI 2512/015 to evaluate the applicants implementation of procedure 25402-3DP-G04G-00501, Historical Document Review Process, Rev. 4. The inspection focused on reviewing the historical issue corrective actions to ensure that, for each CATD applicable to Unit 2, the assigned corrective actions were completed or transferred to a controlled program/process. The selected items for review represented a spectrum of construction and technical disciplines. The list of CATDs reviewed is listed in the Attachment to this report.

The following inspection requirements of TI 2512/015 were inspected:

  • Section 05.03.m - 22 samples
  • Section 05.07 - 1 sample

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that the sample of documents reviewed complied with applicable requirements. Proper justification of corrective actions accompanied each CATD and planned corrective actions, when applicable, were appropriate. This inspection effort, coupled with previous inspections and conclusions, supports closure of this item. This item, TI 2512/015, Watts Bar Nuclear Plant Employee Concerns Program, is closed.

OA 1.16 (Closed) Construction Deficiency Report 391/91-31: Use of Non-Dedicated Commercial Grade Electrical Devices in Safety-Related Applications (Inspection Procedure 35007)

a. Inspection Scope

Background: The deficiency was initially reported to the NRC on June 28, 1991, as significant corrective action report (SCAR) WBP890634SCA in accordance with 10 CFR 50.55(e). The issue was documented as CDR 390/91-31 for Unit 1 and CDR 391/91-31 for Unit 2.

The construction deficiency report concerned the seismic qualification program for instrumentation and electrical equipment at WBN based on the requirements of Institute of Electrical and Electronics Engineers (IEEE)-344, IEEE Recommended Practice for Seismic Qualification for Class 1E Equipment for Nuclear Power Generating Stations.

Specifically, seismic sensitive electrically active (SSEA) devices were released from inventory for safety-related applications and were not procured or qualified to IEEE-344.

These incidents occurred between February 1984 and January 1989.

The deficiency involved problems associated with replacement item procurement policies, procedures, and practices that did not adequately prescribe/control engineering involvement in the procurement process.

The applicant implemented the replacement items program (RIP) CAP which committed, in part, to a review of inventory and installed SSEA commercial grade QA level II devices. The SSEA review consisted of 416 items in which 56 cases were determined as not satisfying IEEE-344 requirements. TVA corrective actions for Unit 1 included the replacement or an engineering disposition for the applicable installed equipment. After a review of the adequacy and effectiveness of root cause determination, extent of condition, corrective actions, recurrence controls, proper closure, and a review of the RIP CAP for Unit 1, the inspectors determined that CDR 390/91-31 was adequately resolved for Unit 1 as documented in NRC IRs 50-390/94-66 (ADAMS Accession No.

ML072980640) and 50-390/94-201 (ADAMS Accession No. ML072750758).

The SSEA review for Unit 1 included Unit 2 components. One component exception was noted during the review that did not meet the IEEE-344 requirements. The corrective actions for Unit 2 were documented in PER 144235. Unit 2 solid state protection system (SSPS) Train B, Midtex 156-14T300 relay K201 did not meet the requirements of IEEE-344. After a review of the Unit 2 RIP CAP, the inspectors determined the CAP was adequately resolved for Unit 2 as documented in NRC IIR 05000391/2010605 (ADAMS Accession No. ML110410680). The inspectors reviewed the engineering completed documents to install the K201 relay as documented in NRC IIR 05000391/2013612 (ADAMS Accession No. ML13088A066).

Inspection Activities: To address Unit 2 actions the inspectors performed the following:

  • reviewed PER 144235 to verify the corrective actions were implemented for Unit 2;
  • reviewed certificate of conformance for Westinghouse SSPS start-up kit, Train B, 4/6/10, to verify the relay was purchased by a qualified vendor;
  • reviewed Westinghouse Technical Bulletin TB-04-2 for SSPS Relays, 1/6/04, and reviewed TVA WO 09-954267-001 Train B Master Relay Data Sheets, 6/21/10, to verify that the components noted in the technical bulletin were identified by the applicant;
  • reviewed WO 113314474 and inspected the as-built installation of the K-201 relay to verify that the relay was installed in accordance with the approved procedures and drawings; and
  • interviewed two engineers and reviewed the Westinghouse seismic testing qualifications for the K-201 relay. The review was conducted to verify that the seismic qualifications met the requirements of the Final Safety Analysis Report (FSAR) and IEEE-344, Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, 1975.

Documents reviewed are listed in the Attachment

b. Observations and Findings

No findings were identified.

c. Conclusions

Based on the review of the final closure package, and other activities completed during this and previous inspections, the inspectors determined that the applicants corrective actions were adequate. CDR 390/91-31 is closed.

OA.1.17 (Discussed) QA Records Corrective Action Program Plan (Temporary Instruction 2512/028 and Inspection Procedure 51055)

a. Inspection Scope

The inspectors reviewed a sample of QA records for electrical conduit and instrument subassemblies. The inspectors reviewed the applicants sample assessment of the records to verify that the records specified the correct component type and location, that the functional specifications were met, that the required QA/QC inspections were performed, and that they were complete and legible. To verify that records were retrievable, the inspectors observed document control personnel locate independent samples of records from within the vault. Documents reviewed are listed in the

.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspection results are too limited to support a conclusion on the QA Records CAP at this time.

OA.1.18 (Discussed) Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62 (Temporary Instruction 2500/020)

a. Inspection Scope

Background: On June 1, 1984, the Commission approved publication of a final rule, 10 CFR 50.62, regarding the reduction of risk from Anticipated Transient Without Scram (ATWS) events for light water cooled nuclear power plants. At the same time, the Commission directed the staff to complete and issue (in the form of a generic letter) QA guidance for equipment that is not safety related, but is encompassed by the ATWS rule.

The ATWS rule required that each licensee develop and submit (to the Director, Nuclear Reactor Regulation (NRR)) a proposed schedule for meeting the requirements of the rule within 180 days after the QA guidance is issued. On April 16, 1985, NRR issued GL 85-06. The enclosure to GL 85-06 provided the explicit QA guidance required by 10 CFR 50.62. The lesser safety significance of the equipment encompassed by 10 CFR 50.62, as compared to safety-related equipment, necessarily resulted in less stringent QA guidance. TI 2500/20 required an inspection focused on the implementation of the ATWS rule requirements, 10 CFR 50.62, and on the effectiveness of the QA controls applied to ATWS activities.

Inspection Activities: The inspectors reviewed EDCR 52408, an ATWS specification, and setpoint documents to verify that the designs and specifications conform to the applicants plan as endorsed through the NRR safety evaluation and the FSAR. This included verifying that the systems do not compromise the safety features of the existing safety-related protection system and that the applicants design is being properly implemented. This also included verifying that no open items exist in the SSER regarding ATWS. The inspectors also reviewed a purchase order for the dedicated pressure transmitters to verify they were meeting technical requirements. The inspectors reviewed a material receiving report for the dedicated pressure transmitters, which included a receipt inspection, to verify that the receipt inspection and identification controls were properly applied. The inspectors reviewed Bechtels PNQAM to verify that there was a documented ATWS QA program plan.

The inspectors reviewed WOs 110809957 and 11211601 to verify that the latest installation standards and procedures were used for the installation of the dedicated pressure transmitters and that QA controls were implemented. The inspectors performed walk downs of the transmitters and wiring to verify that the equipment in place met the configuration specified, and that identification designations were being maintained. The inspectors also walked down the transmitters, inspected the terminations, and reviewed the WO to verify that the instrumentation was installed in the proper location, the installers used suitable equipment and tools, and the installation met the physical separation criteria. The inspectors reviewed the WOs to verify that applicant inspections were performed. The inspectors reviewed the test procedure and scoping document to verify they had adequate acceptance criteria. Documents reviewed are listed in the Attachment.

b. Observations and Findings

.

No findings were identified.

c. Conclusions

The inspectors concluded that the current design, purchasing requirements, and installation (for the sample observed) were in accordance with the approved design.

The inspectors also concluded that the QA program was properly implemented for ATWS equipment. This TI will remain open pending completion of TI 2500/20 Section 04.05; Confirmation of Completed Work and verification of the instrument channel location, orientation, and support.

OA.1.19 (Discussed) Construction Deficiency Report 391/85-19: Potential Interaction of Flux Mapping System and Seal Table (Temporary Instruction 2500/16 and Inspection Procedure 35007)

a. Inspection Scope

Background: In 1985, Westinghouse identified a potential issue with the interaction between the non-safety related incore flux mapping system and the safety-related seal table and bottom mounted instrument tubing. Specifically, elevated non-seismically qualified portions of the incore flux mapping system could fall on the safety-related seal table during a seismic event. Watts Bar was notified of this potential condition in a Westinghouse letter, WAT-D-6590, to TVA. The NRC communicated this potential condition to all power reactor facilities in Information Notice (IN) 85-45 (ADAMS Accession No. ML082890914). The NRC issued TI 2500/16 (ADAMS Accession No.

ML091530077) to provide inspectors with inspection and reporting guidance for IN 85-45. TVA acknowledged this condition and communicated its planned corrective actions to the NRC in a final report dated July 15, 1985 (ADAMS Accession No. ML082410337).

This condition was documented as CDR 390/85-20 for Unit 1 and CDR 391/85-19 for Unit 2.

For Unit 1, TVA performed a seismic analysis of the Movable Incore Detector Systems (MIDS). TVA determined that a portion of the MIDS, the movable frame assemble (MFA), mounted directly over the seal table, required modifications to meet the seismic design. TVA added additional anchor bolts, tie-down legs, and welds to the MFA to meet the seismic category 1L requirements. These modifications were accomplished through Engineering Change Notice (ECN) 5765. After review of ECN 5765 and associated documents, NRC inspectors closed CDR 390/85-20 for Unit 1 in NRC IR 50-390/90-20 and 50-391/90-20 (ADAMS Accession No. ML072610303).

ECN 5766 was issued coincident with 5765 so that identical modifications could be performed on the Unit 2 MFA. Subsequently, TVA made the decision to utilize the Westinghouse In-Core Information Surveillance & Engineering (WINCISE) system in Unit 2, instead of the MIDS that is utilized in Unit 1. Although the Unit 2 MFA was supplied as a portion of the MIDS, TVA elected to utilize it to support portions of the new WINCISE system. Therefore, the Unit 2 MFA will also require modifications to meet the seismic category 1L requirements. The applicant issued Field Change Request (FCR)60311-A to EDCR 52815 to verify and upgrade the existing Unit 2 MFA.

Inspection Activities: The inspectors reviewed the proposed modifications contained in EDCR 52815; but because the EDCR was undergoing revision at the time of the inspection, the inspectors were unable to verify the adequacy of the modifications.

b. Observations and Findings

No findings were identified.

c. Conclusions

The inspectors determined that further inspection of the applicants design package will be required to verify resolution of the original construction deficiency.

V. MANAGEMENT MEETINGS X1

Exit Meeting Summary

An exit meeting was conducted on February 20, 2014, to present inspection results to Mr. Hruby and other members of his staff. The inspectors identified that no proprietary information had been received during the inspection and none would be used in the inspection report. The applicant acknowledged the observations and provided no dissenting comments.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Applicant personnel

A. Bangalore, Bechtel - Electrical Engineer
R. Baron, TVA - QA Manager, Unit 2
E. Brumfield, Bechtel PQAM
D. Charlton, TVA Regulatory Compliance
J. W. Clark, TVA - QA Specialist, Unit 2
R. Daniels, TVA Regulatory Compliance
T. Das, Bechtel - Civil Engineering
B. Enis, TVA Oversight
J. Hickman, TVA QA Sr. Program Manager
R. Hruby, TVA - General Manager Technical Services
J. Iqbal, Becthel Engineering
G. Lee, Bechtel - MOV Engineer
D. Morgan, Bechtel Construction
T. Niessen, TVA Audits & Assessment Manager
J. ODell, TVA - Regulatory Compliance
K. Parker, TVA Construction
L. Peteron, TVA CGD
T. Raley, Betchel Engineering Manager
J. Robertson, Bechtel Project Director
G. Scott, TVA - Licensing
M. Skaggs, TVA - Senior Vice President
N. Welch, TVA - Properational Startup Manager
R. Yager, Bechtel PEG
O. J. Zeringue, TVA - General Manager Engineering and Construction

INSPECTION PROCEDURES USED

IP 35007 Quality Assurance Program Implementation During Construction and Pre-

Construction Activities

IP 35020 Inspection of Applicants Surveillance of Contractor Quality Assurance

(QA) Activities

IP 37051 Verification of As-Builts

IP 37055 Onsite Design Activities

IP 41301 Pre-Licensing Review of Training and Qualification Programs

IP 48053 Structural Steel and Supports Observation

IP 49063 Piping - Work Observation

IP 50071 Safety Related Components - Procedure Review

IP 50073 Mechanical Components - Work Observation

IP 50075 Safety Related Components - Record Review

IP 51053 Electrical Components and Systems - Work Observation

IP 51055 Electrical Components and Systems - Record Review

IP 51063 Electrical Cable - Work Observation

IP 52055 Instrument Components and Systems - Record Review

IP 70300 Preoperational Test Procedure Review

IP 70302 Preoperational Test Program Implementation

IP 70311 Preoperational Testing Procedure Verification

IP 70312 Preoperational Test Witnessing

IP 70333 Chemical Control System Test - Preoperational Test Procedure Review

IP 70400 Preoperational Test Review Evaluation

IP 71302 Preoperational Test Program Implementation Verification

IP 92701 Follow-up

IP 92702 Follow-up on Traditional Enforcement Actions Including Violations,

Deviations, Confirmatory Action Letters, Confirmatory Orders, and

Alternative Dispute Resolution Confirmatory Orders

IP 92717 IE Bulletins for Information and IE Information Notice Follow-up

TI 2500/16 Inspection to Determine if a Potential Seismic Interaction Exists Between

the Movable In-Core Flux Mapping System and Seal Table at

Westinghouse Designed Facilities or Facilities with Similar Designs

TI 2500/20 Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62

TI 2512/015 Inspection of Watts Bar Nuclear Plant Employee Concerns Program

TI 2512/028 Inspection of Watts Bar Nuclear Plant QA Records Corrective Action

Program Plan

TI 2512/035 Inspection of Watts Bar Nuclear Plant Control Room Design Review

Special Program

TI 2515/69 Inspection of Response to IE Bulletin 85-01

TI 2515/142 Draindown During Shutdown and Common-Mode Failure (NRC Generic Letter 98-02)

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

None

Opened and Closed

05000391/2014602-01 NCV Inadequate Corrective Actions for Historical Issues (Section OA.1.2)

Closed

35020 IP Inspection of Applicants Surveillance of Contractor Quality Assurance Activities (Section Q.1.2)

37055 IP Onsite Design Activities (E.1.1)

48053 IP Structural Steel and Supports Observation (Section C.1.2)

10CFR21 Other Historical 10CFR21 Reviews (Section OA.1.2)

EA-13-019 Severity Level Commercial Grade Dedication III Problem

05000391/2013611-01 VIO Commercial Grade Dedication Program Breakdown (Section OA.1.1)
05000391/2013611-02 VIO Failure to Make a Required 10 CFR 50.55(e)

Report (Section OA.1.1)

05000391/2013611-03 VIO Failure to Identify Significant Condition Adverse to Quality (Section OA.1.1)

EA-12-021 Confirmatory Completeness and Accuracy of Information Order (Section OA.1.3)

Item 49 SSER Training Requirements (Section OA.1.4)

Appendix HH Item 51 SSER Definition of Significant Cracks (Section Appendix HH OA.1.5)

Item 64 SSER Eagle 21 Rack 2 RTD Testing Results Review Appendix HH (Section OA.1.6)

TMI I.C.8 AI Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants (Section OA.1.13)

TMI I.D.1 AI Control Room Design Reviews (OA.1.14)

TMI II.K.1.10 AI Operability Status (Section OA.1.7)

1998-02 GL Loss of Reactor Coolant Inventory and Associated Power Loss of Emergency Mitigation Functions While in Shutdown Conditions (Section OA.1.8)

2512/035 TI Control Room Design Review Special Program (OA.1.14)

2512/015 TI Inspection of Watts Bar Nuclear Plant Employee Concerns Program (OA.1.15)

2515/069 TI Inspection of Response to IE Bulletin 85-01 (Section OA.1.10)

2515/142 TI Draindown During Shutdown and Common-

Mode Failure (Section OA.1.8)

76-02 BL Relay Coil Failures (Section OA.1.9)

84-02 BL Failures of General Electric Type HFA Relays (Section OA.1.9)

85-01 BL Steam Binding of Auxiliary Feedwater Pumps (Section OA.1.10)

391/85-37 CDR Incorrect Use of AMP PIDG Terminals (Section OA.1.11)

391/86-14 CDR Failure to Follow Procedures (Section OA.1.12)

391/91-31 CDR Use of Non-Dedicated Commercial Grade Electrical Devices in Safety-Related Applications (OA.1.16)

05000391/2013609-02 URI Potential Inadequate Corrective Actions for Historical Issues

Discussed

2500/16 TI Inspection to Determine is a Potential Seismic Interaction Exists Between Movable Incore Flux Mapping System and Seal Table at Westinghouse Designed Facilities or Facilities with Similar Designs (OA.1.19)

2500/020 TI Inspection to Determine Compliance with ATWS Rule, 10 CFR 50.62 (Section OA.1.18)

2512/028 TI Inspection of Watts Bar Nuclear Plant QA Records Corrective Action Program Plan (OA.1.17)

391/85-19 CDR Potential Interaction of Flux Mapping System and Seal Table (OA.1.19)

LIST OF DOCUMENTS REVIEWED