IR 05000390/2021004
| ML22045A038 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar (NPF-090, NPF-096) |
| Issue date: | 02/10/2022 |
| From: | Tom Stephen NRC/RGN-II/DRP/RPB5 |
| To: | Jim Barstow Tennessee Valley Authority |
| References | |
| IR 2021004 | |
| Download: ML22045A038 (22) | |
Text
February 10, 2022
SUBJECT:
WATTS BAR NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000390/2021004 AND 05000391/2021004
Dear Mr. Barstow:
On December 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Watts Bar Nuclear Plant. On February 1, 2022, the NRC inspectors discussed the results of this inspection with Mr. Anthony Williams and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Thomas A. Stephen, Chief Reactor Projects Branch 5 Division of Reactor Projects
Docket Nos. 05000390 and 05000391 License Nos. NPF-90 and NPF-96
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000390 and 05000391
License Numbers:
Report Numbers:
05000390/2021004 and 05000391/2021004
Enterprise Identifier: I-2021-004-0020
Licensee:
Tennessee Valley Authority
Facility:
Watts Bar Nuclear Plant
Location:
Spring City, TN 37381
Inspection Dates:
October 01, 2021 to December 31, 2021
Inspectors:
W. Deschaine, Senior Resident Inspector
J. Diaz-Velez, Senior Health Physicist
C. Fontana, Emergency Preparedness Inspector
D. Lanyi, Senior Operations Engineer
M. Magyar, Reactor Inspector
K. Miller, Resident Inspector
A. Nielsen, Senior Health Physicist
W. Pursley, Health Physicist
S. Sanchez, Senior Emergency Preparedness Insp
D. Simpkins, Sr. Tech Training Program Specialist
J. Walker, Emergency Response Inspector
Approved By:
Thomas A. Stephen, Chief
Reactor Projects Branch 5
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Watts Bar Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near rated thermal power (RTP) from the beginning of the inspection period until October 29th, when it was shutdown for a planned refueling outage (U1R17). The unit remained in the outage until it was restarted on December 3rd. Unit 1 continued power ascension until December 9th, when the unit reached RTP, and remained there for the remainder of the inspection period.
Unit 2 began the inspection period shutdown for a mid-cycle outage (F214) until it was restarted on October 1st. Unit 2 continued power ascension until October 10th, when the unit reached 95 percent RTP, and remained there for the remainder of the inspection period due to steam generator degradation.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:
Unit 1 & 2 Refueling Water Storage Tanks and Unit 1 & 2 Main steam and Feedwater Lines that are exposed to the outside on December 23, 2021.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1 Residual Heat Removal (RHR) System during the first week of the refueling outage on November 3, 2021.
- (2) Spent Fuel Pool Cooling System during core empty period for U1R17, November 10-12, 2021.
- (3) Unit 2 A train Emergency Diesel Generator (EDG) on December 1, 2021.
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 Auxiliary Feedwater system on October 7, 2021.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) EDG Building Board Rooms, Exhaust Rooms, and Intake Rooms 2nd floor on October 5, 2021.
- (2) Auxiliary Building Elev. 757', Shutdown Board Rooms on October 6, 2021.
- (3) Auxiliary Building Corridor Elev. 713' on October 6, 2021.
- (4) Unit 2 Control Rod Drive Equipment Room, Pressurizer Heater Transformer Room, and Emergency Gas Treatment Filter Room on October 7, 2021.
- (5) Unit 1 Lower Containment on October 30, 2021.
- (6) Unit 1 Annulus on November 10, 2021.
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Unit 1 and 2 auxiliary building elev. 757', shutdown board rooms
71111.07A - Heat Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) Component Cooling System (CCS) Heat Exchanger C
===71111.08P - Inservice Inspection Activities (PWR)
PWR Inservice Inspection Activities Sample (IP Section 03.01)===
- (1) The inspectors evaluated pressurized water reactor non-destructive testing by reviewing the following examinations from November 1 - November 18, 2021:
1. Ultrasonic Testing (UT)
a. RCS-016, Pipe to Elbow, Class 1 (reviewed)b. MRP-146-CL-2, Pipe to Nozzle, Augmented (reviewed)c. MRP-146-DR-4, Socket Elbow to Pipe, Augmented (reviewed)
2. Penetrant Testing (PT)
a. SWHXH-1-IA, Welded Attachment, Class 2 (reviewed)
3. Visual Examination (VT)
a. Reactor Vessel Closure Head (RVCH), N-729-6 (reviewed)
The Inspectors evaluated the licensees boric acid corrosion control program performance.
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
- (1) Annual Review of Licensee Requalification Examination Results: The licensee completed the annual requalification operating examinations required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), "Requalification Requirements," of the NRC's "Operator's Licenses." During the week of December 13, 2021, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, "Licensed Operator Requalification Program." These results were compared to the thresholds established in Section 3.03, "Requalification Examination Results," of IP 71111.11.
The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam completed on August 27, 2021.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the Control Room during the Unit 1 refueling outage shutdown on October 29, 2021 and the Unit 1 B train Blackout testing on November 1, 2021.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a licensed operator requalification simulator scenario on October 14, 2021. Additionally, the inspectors observed and evaluated a licensed operator requalification simulator scenario on October 21, 2021. Both of these observations make up one sample.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (3 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) System 030-G Aux Bldg Gas Treatment System
- (2) System 074-B - RHR Emergency Core Cooling System (ECCS) (Unit 2)
- (3) System 003B-B Auxiliary Feedwater System (Unit 2 TDAFW)
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 1 Blackout testing & Mode 5 & 6 activities during the week of October 31, 2021.
- (2) Technical Specification (SR 3.0.3) required risk evaluation due to Unit 1 B train safety injection signal to F-B and H-B Essential Raw Cooling Water (ERCW) pumps not being tested during 0-SI-82-4 on November 11, 2021.
- (3) Risk assessment for (week of) December 6, 2021, with B Main Control Room Chiller Outage (planned) and the 1B EDG declared inoperable (emergent).
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Leakage of Kerotest globe valve stem inside Unit 2 containment; Condition Reports (CRs) 1725073, 1724851
- (4) The fouling factor of CCS Heat Exchanger C tested on 10/30/21 was greater than acceptance criteria; CR 1732724
- (5) Unit 1 Control Room Level Indicator, 1-LI-3-156 (Steam Generator #2 Auxiliary Feedwater Level Indicator), failed full-scale; CRs 1743606 and 1743845
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)
The inspectors evaluated the following temporary or permanent modifications:
- (1) WBN-18-126 - Unit 2 permanent modification involving rerouting/protecting cables for the solenoid valve that actuates Steam Generator (SG) Power Operated Relief Valve for SG 3 Main Steam Header Pressure.
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
- (1) Work Orders (WOs) 121880323 & 122346076, Unit 2 Pressurizer PORV (2-FCV-68-334-B) replacement on October 10 and 19, 2021.
- (2) WO 121491678, 1-SI-63-905, Boron Injection Check Valve Flow Test During Refueling Outages, following replacement of the 1B-B Charging Pump (CCP) Motor, on November 14, 2021
- (3) WO 121492608, Engineering Change Package WBN-19-760 Stage 2 Post Modification Testing for WBN-1-LCV-3-171
- (4) WO 121491970, 1-SI-3-902, Turbine Driven Auxiliary Feedwater Pump 1A-S Quarterly Performance Test, was completed on December 3, 2021 following the disassembly and inspection of the TDAFW Trip & Throttle Valve, 1-FCV-001-0051-S.
- (5) WO 121492548, 1-SI-74-905-B, Residual Heat Removal Pump 1B-B Comprehensive Test during refueling outages, following replacement of the 1B-B RHR Pump Motor, on November 15, 2021.
- (6) WO 121493637, 1-SI-3-923-B, Auxiliary Feedwater Pump 1B-B Comprehensive Pump Test, following replacement of the 1B-B Auxiliary Feedwater Pump Motor, on November 28, 2021.
- (7) WO 122503680, Unit 1 CVCS Normal Charging Check Valve, 1-CKV-62-659-S, NRC identified Boric Acid Leak, involved replacement of the valve bonnet to body gasket on November 7, 2021. A VT-2 examination was performed with the RCS at NOP/NOT on December 3, 2021 as the PMT, with no leakage observed.
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated refueling outage U1R17 activities from October 29 to December 4, 2021.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) WO 121491710, 1-SI-63-907, Residual Heat Removal Hot Leg and Cold Leg Injection Check Valve Testing during Refueling outages.
- (2) WO 121493053, 0-SI-82-4, Loss of Off-site Power with Safety Injection - 1B-B EDG.
- (3) WO 121491679, 1-SI-63-906, Safety Injection Check Valve Full-Flow Testing During Refueling outages.
Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)
- (1) WO 121493711, 1-SI-43-701-B, Containment Isolation Valve Leak Rate Test Sampling System (X-85B).
Ice Condenser Testing (IP Section 03.01) (1 Sample)
- (1) WO 121491641, 1-SI-61-5, 18 Month Ice Condenser Lower Inlet Doors Inspections.
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise during the week of October 18, 2021. The exercise scenario simulated a steam generator (SG) tube leak on SG#1, which after 15 minutes, met the criteria for declaration of an Unusual Event. As the leak continued to increase, a manual reactor trip and safety injection occurred, which met the conditions for declaration of an Alert on Unit 1. A short time later, a simulated trip of a reactor coolant pump caused reactor fuel damage due to introduction of foreign material (i.e., loose parts), which met the conditions for declaration of a Site Area Emergency. Finally, a power operated relief valve on SG#1 piping failed open, which met the conditions for declaration of a General Emergency, and allowed the Offsite Response Organizations to demonstrate their ability to implement emergency actions. This exercise scenario also included a beyond design basis demonstration related to loss of spent fuel pool water inventory.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of October 18, 2021. This evaluation does not constitute NRC approval.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated in-office, the proposed scenario for the biennial emergency plan exercise at least 30 days prior to the day of the exercise.
RADIATION SAFETY
71124.01 - Radiological Hazard Assessment and Exposure Controls
Radiological Hazard Assessment (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.
Instructions to Workers (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated how the licensee instructs workers on plant-related radiological hazards and the radiation protection requirements intended to protect workers from those hazards.
Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)
The inspectors observed/evaluated the following licensee processes for monitoring and controlling contamination and radioactive material:
- (1) Licensee surveys of potentially contaminated material leaving the radiologically controlled area,
- (2) Controls for non-fuel items stored in spent fuel pool.
Radiological Hazards Control and Work Coverage (IP Section 03.04) (4 Samples)
The inspectors evaluated the licensee's control of radiological hazards for the following radiological work:
- (1) Unit 1 reactor head modification work.
- (2) Unit 1 seal table eddy current.
- (3) Unit 1 reactor head detensioning.
- (4) Unit 1 refueling activities.
High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (2 Samples)
The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:
- (1) Unit 1 under-vessel access.
- (2) Tritiated drain collector tank.
Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
- (1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.
71124.02 - Occupational ALARA Planning and Controls
Radiological Work Planning (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensees radiological work planning for Unit 1 Refueling Outage 17 (U1R17).
- (1) U1R17 - As Low As Reasonably Achievable (ALARA) Plan #2021-125, Simplified Head Assembly Modification
- (2) U1R17 - ALARA Plan #2021-123, Rx Disassembly/Assembly
- (3) U1R17 - ALARA Plan #2021-116, Scaffolding
- (4) U1R17 - ALARA Plan #2021-128, Radiation Protection
- (5) U1R17 - ALARA Plan #2021-142, Maintenance Services
Verification of Dose Estimates and Exposure Tracking Systems (IP Section 03.02) (3 Samples)
The inspectors evaluated dose estimates and exposure tracking.
- (1) Radiological outcome evaluation for ALARA Plan #2020-218 (Unit 2 Refueling Outage 3 (U2R3) Valve Maintenance)
- (2) Radiological outcome evaluation for ALARA Plan #2020-219 (U2R3 Steam Generator Maintenance)
- (3) Radiological outcome evaluation for ALARA Plan #2020-223 (U2R3 Rx Disassembly/Assembly)
Implementation of ALARA and Radiological Work Controls (IP Section 03.03) (2 Samples)
The inspectors reviewed as low as reasonably achievable practices and radiological work controls for the following activities:
- (1) Total Effective Dose Equivalent ALARA evaluation for ALARA Plan #2021-144, U1R17 Refuel Floor Miscellaneous - Auxiliary Building Transfer Canal Entries
- (2) U1R17 reactor vessel re-assembly - upper internals movement
Radiation Worker Performance (IP Section 03.04) (1 Sample)
- (1) The inspectors evaluated radiation worker and radiation protection technician performance during work activities.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
Permanent Ventilation Systems (IP Section 03.01) (2 Samples)
The inspectors evaluated the configuration of the following permanently installed ventilation systems:
- (1) Tool decontamination fume hoods.
- (2) Main control room emergency ventilation system.
Temporary Ventilation Systems (IP Section 03.02) (1 Sample)
The inspectors evaluated the configuration of the following temporary ventilation systems:
- (1) High Efficiency Particulate Air (HEPA) units used to support seal table eddy current testing.
Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the licensees use of respiratory protection devices.
Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)
- (1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.
71124.04 - Occupational Dose Assessment
Source Term Characterization (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.
External Dosimetry (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated how the licensee processes, stores, and uses external dosimetry.
Internal Dosimetry (IP Section 03.03) (2 Samples)
The inspectors evaluated the following internal dose assessments:
- (1) Internal dosimetry evaluation related to condition report 1733322.
- (2) Ten in-vitro tritium bioassay results for the period from January 2020 through October 2021.
Special Dosimetric Situations (IP Section 03.04) (2 Samples)
The inspectors evaluated the following special dosimetric situations:
- (1) Five declared pregnant worker dosimetry records from May 2019 to October 2021.
- (2) One multi-Badge dosimetry record from May 2019 to October 2021.
71124.05 - Radiation Monitoring Instrumentation
Walkdowns and Observations (IP Section 03.01) (9 Samples)
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
- (1) Area radiation monitors in the auxiliary building and the Unit 1 and Unit 2 control room.
- (2) Geiger Mueller survey instruments ready for use in the radiation protection (RP)instrument lab
- (3) Portable ion chambers stored ready for use in the RP calibration lab and the RP control point on the refuel floor.
- (4) Continuous air monitors positioned at various locations in the auxiliary building and the control room
- (5) Portal monitors at the exit to the protected area.
- (6) Personnel contamination monitors at the auxiliary building radiological control area exit.
- (7) Benchtop Alpha/Beta Sample Counter in use on the refuel floor and RP instrument lab.
- (8) Portable survey instrument with alpha probe at the RP survey point on the refueling floor.
- (9) Observed source checks on a neutron survey meter, extendable gamma survey meter, ion chamber, benchtop alpha/beta smear counter, and portable alpha survey instrument.
Calibration and Testing Program (IP Section 03.02) (15 Samples)
The inspectors evaluated the calibration and testing of the following radiation detection instruments:
- (1) Unit 1 Upper Containment High Range Post Accident Radiation Monitor, 1-90-271 Train A, Work Order (W/O) 121162225 and W/O 11988754.
- (2) Unit 1 Lower Containment High Range Post Accident Radiation Monitor 1-LPR-90-273 Train A, W/O 1202413740 and W/O 119065041.
- (3) Unit 1 and 2 Control Room Area Monitor, 0-LPR-90-135, W/O 119759726.and W/O
===120981624.
- (5) TVA #848558, alpha/beta smear counter, 08/02/2021
- (6) TVA #848617, air sampler, 09/07/2021
- (7) TVA # 842470, continuous air monitor, 07/15/2021.
- (8) TVA # 860815, frisker, 01/27/2021
- (9) TVA #951279, alpha survey instrument, 07/12/2021
- (10) TVA #951234, Geiger/Mueller survey instrument, 07/12/2021
- (11) TVA #848513, portal monitor, 03/08/2021
- (12) TVA #848220, personnel contamination monitor, 04/19/2021
- (13) Auxiliary Building Gas Treatment System Filter Test Train A (W/O 120850600) and Train B (W/O 121360402)
- (14) TVA #848505, small article monitor, 06/24/2021
- (15) Whole body counter in Dosimetry office, 06/09/2020
Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03)===
The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:
- (1) Unit 1 Shield Building Vent Radiation Monitor, 1-LPR-090-0400, 06/25/2019, (W/O
===119541434) and on 02/13/2021 (W/O 119065041)
- (2) Waste Disposal System Liquid Disposal System Effluent Monitor, O-LPR-90-122 on 01/09/2020, (W/O 120498154) and on 07/20/2021, (W/O 121716468)
- (3) Calibration of the Unit 2 Shield Building Vent Flow Monitor Loop 2-LPF-90-400, W/O 120065944 and W/O
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
- (1) Unit 1 January 2020 - September 2020
- (2) Unit 2 January 2020 - September 2020
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)
- (1) Unit 1 January 2020 - September 2020
- (2) Unit 2 January 2020 - September 2020
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)
- (1) Unit 1 January 2020 - September 2020
- (2) Unit 2 January 2020 - September 2020
OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
- (1) August 15, 2020 through October 12, 2021
PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
- (1) August 15, 2020 through October 12, 2021
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)
- (1) Unit 1 (October 1, 2020, through June 30, 2021)
Unit 2 (October 1, 2020, through June 30, 2021)
EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) Unit 1 (October 1, 2020, through June 30, 2021)
Unit 2 (October 1, 2020, through June 30, 2021)
EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) Unit 1 (October 1, 2020, through June 30, 2021)
Unit 2 (October 1, 2020, through June 30, 2021)
71152 - Problem Identification and Resolution (PI&R)
Semiannual Trend Review (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in human performance errors that might be indicative of a more significant safety issue. None were identified during the past six months.
Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Steam Generator level control valve issues; CRs 1683845, 1687846, and 1709741.
- (2) Intake Pumping Station strainer room water intrusion issue; CR
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On February 1, 2022, the inspectors presented the integrated inspection results to Mr.
Anthony Williams and other members of the licensee staff.
- On October 22, 2021, the inspectors presented the Emergency Preparedness Exercise Inspection inspection results to Mr. Tony Williams and other members of the licensee staff.
- On November 18, 2021, the inspectors presented the Radiation protection inspection exit meeting inspection results to T. Williams and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Drawings
0-45W727
Wiring Diagram 6900V Diesel Generators Single Line
Revision 9
0-47W855-1
Mechanical Flow Diagram Fuel Pool Cooling and Cleaning
System
Revision 19
1-47W810-1
Flow Diagram Residual Heat Removal System - Unit 1
Revision 21
WBN Drawings
2-47W803-1 Rev. 36, 2-47W803-101, 2-47W803-1-ISI, 2-
Miscellaneous
10.4.9
SBN FSAR Section
3-OT-STG0821
Operations Student Training Guide for the Diesel Generator
Revision 10
SDD-N3-3B-4002
Auxiliary Feedwater System Description
SDD-N3-82-4002
System Description for the Standby Diesel Generator System Revision 26
WBN-N3-74-4001 Residual Heat Removal System Description
Revision 20
WBN-N3-78-4001 Spent Fuel Pool Cooling and Cleaning System System
Description
Revision 25
WBN-N3-79-4001 Fuel Handling and Storage System System Description
Revision 24
Procedures
0-AOI-45
Loss of Spent Fuel Pool Level or Cooling
Revision 9
0-SOI-78.01
Spent Fuel Pool Cooling and Cleaning System
Revision 36
0-SOI-78.01-1P
Spent Fuel Pool Cooling and Cleaning System - Power
Checklist
Revision 10
0-SOI-78.01-1V
Spent Fuel Pool Cooling and Cleaning System - Valve
Checklist
Revision 10
0-SOI-82.03
System Operating Procedure for the 2A-A Diesel Generator
(DG)
Revision 21
0-SOI-82.03 ATT
1P
Diesel Generator (DG) 2A-A Power Checklist 82.03-1P
Revision 0
0-SOI-82.03 ATT
1V
Diesel Generator (DG) 2A-A Valve Checklist 82.03-1V
Revision 15
1-AOI-14
Loss of RHR Shutdown Cooling
Revision 7
1-SOI-74.01
Residual Heat Removal System
Revision 19
1-SOI-74.01-
1,2,3P
Residual Heat Removal System - Power Checklist
Revision 0
1-SOI-74.01-
1,2,3V
Residual Heat Removal System - Valve Checklist
Revision 0
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
WBN-2-SOI-3.02
Auxiliary Feedwater System Operating Instruction
Corrective Action
Documents
1678126
Condition Report
Fire Plans
WBN Prefire
Plans
DGB-0-742-01 Rev. 4, DGB-0-760-01 Rev. 3/4, AUX-0-757-
Rev. 2, AUX-0-757-02 Rev. 6/4, AUX-0-757-03 Rev. 9/4,
AUX-0-757-04 Rev. 4
Miscellaneous
Fire Protection Reports
WBN FHAR Part
Introduction, Table I-1 Summary Compliance Fire Protection
WBN-02-2021-
031-002
Temporary Modifiction
Work Orders
21997042
Work Order
Miscellaneous
MDN-000-999-
2008-0146
WBN Probabilistic Risk Assessment - Internal Flooding
Analysis Notebook
Revision 3
WB-DC-40-31.51
Evaluating the Effects of Flooding due to Moderate Energy
Pipe Failures Inside and Outside Containment
MDN-000-999-2008-0146, Rev. 03 - WBN Probabilistic Risk
Assessment - Internal Flooding Analysis Notebook
Revision 5
71111.07A Work Orders
21492368
0-TI-79.703, Component Cooling System Heat Exchanger C
Performance Test
11/07/2021
Corrective Action
Documents
Condition Reports 1652081, 1654732, 1684512
Miscellaneous
Associated MRC Log Entries
23, 1734, 1743
Procedures
0-TI-119
Maintenance Rule Performance Indicator Monitoring,
Trending, and Reporting - 10CFR50.65
Revision 11
NPG-SPP-03.4
Maintenance Rule Performance Indicator Monitoring,
Trending and Reporting - 10CFR50.65
Revision 4
Work Orders
Work Orders
21761298, 121761309
Corrective Action
Documents
1736039
Condition Report
Miscellaneous
One RHR loop shall be OPERABLE and in operation.
Procedures
1-PI-OPS-1-PE
Protected Equipment
NPG-SPP-07.3
Work Activity Risk Management Process
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Condition Reports 1721374, 1722767, 1724851, 17250731743606, 1743845
Miscellaneous
10CFR Part 21
Report - 2006-23
Incorrect Identification of the Material Used to Manufacture
Y-Globe Valve
1988-012
NRC Information Notice
7839
IRS Report
Operability
Evaluations
Past Operability Evaluation Documentation for CR 1721374
10/06/2021
Prompt Determination of Operability Documentation for CR
1743845
Procedures
0-TRI-67-903-A
System Leakage Test, ERCW At Intake Pumping Station,
Train A
Work Orders
Work Orders
2409059, 122443321, 122607694
Corrective Action
Documents
Condition Report
1453939
Engineering
Changes
DEC 66688
Design Equivalent Change Package EDG Jacket Water Heat
Exchanger Replacement
Revision 4
WBN-18-126
Revision 1
Corrective Action
Documents
Condition Reports 1655007, 1632674, 1666144, 1663015, 1729956, 1732175,
1732178, 1736039
Miscellaneous
STS WO 122393586, 2-SI-68-904-B
Procedures
Procedures
2-MI-68.021 Rev. 6, 0-MI-57.107 Rev. 3, 0-MI-57-102 Rev.
6, 0-MI-57.042 Rev. 1
Work Orders
Work Orders
21492548, 121577666, 121366844, 121577582,
2035785, 121491970, 122503680
Corrective Action
Documents
Condition Report
29956, 1732412, 1732431, 1732694, 1732951, 1733448,
1734460, 1734889
Miscellaneous
Flow Diagram - Radiation Sampling Sys Aux & Reactor
Building
Procedures
1-SI-43-701-B
Containment Isolation Valve Leak Rate Test Sampling
System (X-85B)
Revision 16
1-SI-61-5
Month Ice Condenser Lower Inlet Doors Inspections
Revision 16
1-SI-63-906
Safety Injection Check Valve Full-Flow Testing During
Refueling outages
Revision 34
1-SI-63-907
Residual Heat Removal Hot Leg and Cold Leg Injection
Revision 34
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Check Valve Testing during Refueling outages
Work Orders
Work Orders
21493053 Rev. 76, 121492209 Rev. 8
Corrective Action
Documents
CR 1721499
CR 1734382
CR 1735549
Corrective Action
Documents
Resulting from
Inspection
CR 1733297
Procedures
NISP-RP-005
Access Control for High Radiation Areas
Revision 1
Radiation
Surveys
WBN-M-
211103-24
U1 Lower Containment Seal Table
11/3/21
Radiation Work
Permits (RWPs)
21150012
U1R17 - U1 Lower Containment High Radiation Areas
ALARA Plans
ALARA Plan
- 2020-218
Activities associated with mechanical (including PORVs &
Safeties), AOV, MOVAT valve maintenance during the
U2R3.
2/08/2020
Corrective Action
Documents
CR 1647220
CR 1647220
10/31/2020
CR 1650643
CR 1650643
11/16/2020
CR 1652218
CR 1652218
11/23/2020
CR 1652437
CR 1652437
01/26/2021
CR 1682399
CR 1682399
04/08/2021
CR 1721012
CR 1721012
09/17/2021
Procedures
NPG-SPP-05.1
Radiological Controls
Rev. 15
NPG-SPP-05.2
ALARA Program
Rev. 11
NPG-SPP-05.2.1
Operational ALARA Planning and Controls
Rev. 8
NPG-SPP-05.2.6
Radiological Risk Management
Rev. 5
Radiation Work
Permits (RWPs)
21140001
U1R17 OUTAGE - U1 AUX BLDG AND U1 ANNIJLUS
RADIATION AREAS (INCLUDING ALL RCAs) - All Work
Groups performing Outage Specific Activities.
Rev. 0
21140002
U1T17 OUTAGE - U1 AUX BLDG & U1 ANNULUS HIGH
RADIATION AREAS - All work groups performing outage
specific activities.
Rev. 0
21140003
U1T17 OUTAGE - U1 AUX BLDG & U1 ANNULUS LOCKED
Rev. 0
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
HIGH RADIATION AREAS - All work groups performing
outage specific activities.
21140011
U1R17 U1 AUX BUILDING, U1 ANNULUS, AND ALL
OTHER RCAs. - ALL WORK GROUPS PERFORMING
OUTAGE
ACTWITIES
Rev. 0
Engineering
Evaluations
Air Compressor
Serial Number
184372
Air Quality Analysis Report
06/25/21
Procedures
RCI-107
Respiratory Protection Equipment Inspection, Maintenance,
Issuance and Accountability
Revision 31
Corrective Action
Documents
CR 1524681
CR 1524681
06/13/2019
CR 1555061
CR 1555061
10/07/2019
CR 1555065
CR 1555065
10/07/2019
CR 1555375
CR 1555375
10/08/2019
CR 1621288
CR 1621288
07/07/2020
Procedures
RCDP-10
Personnel Contamination Event Documentation
Rev. 9
RCDP-13
Centralized Inprocessing Facility Activities
Rev. 7
RCDP-15
Dosimetry Operations
Rev. 5
RCDP-7
Bioassay and Internal Dose Program
Rev. 10
RCI-111
Special Exposure Monitoring
Rev. 17
RCI-130
Personnel Monitor Alarm Response and Nuclear
Pharmaceutical Treatments
Rev. 21
RCTP-105
Personnel In-processing and Dosimetry Administrative
Processes
Rev. 11
Corrective Action
Documents
Resulting from
Inspection
29939
Procedures
1-CM-13.12
Obtaining A Post-Accident Shield Building Vent Iodine And
Particulate Or Tritium Sample
Revision
0002
CM 9.83
ORTEC Gamma Detector Quality Control
Revision
0005
RCDP-8
Radiological Instrumentation/Equipment Controls
Revision
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
0009
71151
Calculations
Gas Status
Summary Report
01/01/21 -
10/12/21
Corrective Action
Documents
CR 1664315
CR 1708516
CR 1708516
07/17/2021
CR 1711837
CR 1711837
08/03/2021
CR 1724930
CR 1724930
09/30/2021
Corrective Action
Documents
Condition Reports 1721774, 1744223, 1744722, 1743980, 1743984, 1742821