{{#Wiki_filter:" " September 16, 2014  
{{#Wiki_filter:UNITED STATES ber 16, 2014


Mr. Edward D. Halpin, Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company
==SUBJECT:==
 
ERRATA FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 -
Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6
NRC INSPECTION REPORT 05000275/2014404 AND 05000323/2014404
 
Avila Beach, CA 93424 SUBJECT: ERRATA FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000275/2014404 AND 05000323/2014404


==Dear Mr. Halpin:==
==Dear Mr. Halpin:==
This Errata corrects an error to page 15 of the Enclosure and the first page of the Attachment, Supplemental Information, for NRC Inspection Report 05000275/2014404 and 05000323/2014404, dated August 27, 2014, by changing Unresolved Item (URI) number from URI 05000275, 323/2014404-01 to URI 05000275, 323/2014404-05.
This Errata corrects an error to page 15 of the Enclosure and the first page of the Attachment, Supplemental Information, for NRC Inspection Report 05000275/2014404 and 05000323/2014404, dated August 27, 2014, by changing Unresolved Item (URI)
number from URI 05000275, 323/2014404-01 to URI 05000275, 323/2014404-05.


Please replace the Enclosure, page 15, and the Attachment, first page, with the enclosed revised pages.
Please replace the Enclosure, page 15, and the Attachment, first page, with the enclosed revised pages.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will  
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) compon ent of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response as "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the


affidavit requirements for your response.
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of
" " NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response as Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,
Sincerely,
/RA/
/RA/
Mark S. Haire Branch Chief, Plant Support Branch 1 Division of Reactor Safety  
Mark S. Haire Branch Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Nonpublic Enclosure:
 
Errata for NRC Inspection Report 05000275/2014404 and 05000323/2014404 cc w/o enclosure:
Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Nonpublic Enclosure:
Electronic Distribution for Diablo Canyon Power Plant, Units 1 and 2 ML14260A101 Entire Report: Non-Sensitive Publicly Available Keyword:
Errata for NRC Inspection Report 05000275/2014404 and  
SUNSI Review Complete Sensitive Non-Publicly Available MD 3.47 Non-Public A.3 By: DHolman    NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword:
 
SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: DHolman    NRC-002 OFFICE PSI:PSB1 PSI:PSB1 NAME DHolman/dch MHaire SIGNATURE /RA/ /RA/
05000323/2014404 cc w/o enclosure: Electronic Distribution for Diablo Canyon Power Plant, Units 1 and 2  
DATE 9/16/2014 9/16/2014 Letter to Edward from Mark S. Haire, dated September 16, 2014 SUBJECT: ERRATA FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 -
 
NRC INSPECTION REPORT 05000275/2014404 AND 05000323/2014404 Distribution w/enclosure:
ML14260A101 Entire Re p o r t: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Key word: MD 3.47 Non-Public A.3 NRC-002 SUNSI Revie w Complete B y: DHolman Co v e r Lette r Onl y: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Key word: SUNSI Review Complete NRC-002 SUNSI Revie w Complete By: DHolman OFFICE PSI:PSB1 PSI:PSB1 NAME DHolman/dch MHaire SIGNATURE /RA/ /RA/ DATE 9/16/2014 9/16/2014 Letter to Edward from Mark S. Haire, dated September 16, 2014  
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
 
SUBJECT: ERRATA FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000275/2014404 AND 05000323/2014404 Distribution w/enclosure
: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)  
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
 
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)  
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
 
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Distribution w/o enclosure
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
: Regional Administrator (Marc.Dapas@nrc.gov)
Distribution w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)  
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
 
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov) Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
 
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Tony.Brown@nrc.gov)
Project Manager (Tony.Brown@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (John.Jandovitz@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (John.Jandovitz@nrc.gov)
ROReports
ROReports
}}
}}

Latest revision as of 00:10, 4 November 2019

Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Inspection Report 05000275/2014404 and 05000323/2014404
ML14260A101
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/16/2014
From: Mark Haire
Plant Support Branch-1
To: Halpin E
Pacific Gas & Electric Co
References
IR 2014404
Download: ML14260A101 (4)


Text

UNITED STATES ber 16, 2014

SUBJECT:

ERRATA FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 -

NRC INSPECTION REPORT 05000275/2014404 AND 05000323/2014404

Dear Mr. Halpin:

This Errata corrects an error to page 15 of the Enclosure and the first page of the Attachment, Supplemental Information, for NRC Inspection Report 05000275/2014404 and 05000323/2014404, dated August 27, 2014, by changing Unresolved Item (URI)

number from URI 05000275, 323/2014404-01 to URI 05000275, 323/2014404-05.

Please replace the Enclosure, page 15, and the Attachment, first page, with the enclosed revised pages.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of

" " NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response as Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire Branch Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Nonpublic Enclosure:

Errata for NRC Inspection Report 05000275/2014404 and 05000323/2014404 cc w/o enclosure:

Electronic Distribution for Diablo Canyon Power Plant, Units 1 and 2 ML14260A101 Entire Report: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available MD 3.47 Non-Public A.3 By: DHolman NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: DHolman NRC-002 OFFICE PSI:PSB1 PSI:PSB1 NAME DHolman/dch MHaire SIGNATURE /RA/ /RA/

DATE 9/16/2014 9/16/2014 Letter to Edward from Mark S. Haire, dated September 16, 2014 SUBJECT: ERRATA FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 -

NRC INSPECTION REPORT 05000275/2014404 AND 05000323/2014404 Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Distribution w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Tony.Brown@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (John.Jandovitz@nrc.gov)

ROReports