{{#Wiki_filter:June 25, 2008 Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SUBJECT: KEWAUNEE POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000305/2008404(DRS)
{{#Wiki_filter:une 25, 2008
 
==SUBJECT:==
KEWAUNEE POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000305/2008404(DRS)


==Dear Mr. Christian:==
==Dear Mr. Christian:==
On May 16, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Kewaunee Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 16, 2008, with Mr. M. Wilson and other members of your staff.
On May 16, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Kewaunee Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 16, 2008, with Mr. M. Wilson and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.:
Document Control Desk, Washington DC 20555-0001; with copies to the Regional EXEMPT FROM PUBLIC DISCLOSURE  Enclosure Contains Safeguards May be exempt from public release under the Freedom of Information. Upon separation, this page is Information Act (5 U.S.C. 552)  decontrolled.


Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)
Exemption number: 5___________
Exemption number: 5___________
Nuclear Regulatory Commission review required before public release.
Nuclear Regulatory Commission review required before public release.
Line 32: Line 39:
Name and organization of person making determination.
Name and organization of person making determination.


Date of determination: 06/06/2008______
Date of determination: 06/06/2008______ Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Kewaunee Power Station.
EnclosureContains Safeguards Information. Upon separation, this page is decontrolled. Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Kewaunee Power Station.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Line 41: Line 49:
Sincerely,
Sincerely,
/RA by D. Funk for/
/RA by D. Funk for/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety  
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 Nonpublic Enclosure: Inspection Report 05000305/2008404(DRS)
 
w/Attachment: Supplemental Information ( )
Docket No. 50-305 License No. DPR-43 Nonpublic Enclosure: Inspection Report 05000305/2008404(DRS) w/Attachment: Supplemental Information ( )
cc w/encl ( ):
cc w/encl ( )
D. Riffle (NSIR/DSO/DDSO)
: D. Riffle (NSIR/DSO/DDSO)  
See Attached Distribution Enclosure Contains Safeguards Information. Upon separation, this page is decontrolled.
 
See Attached Distribution EnclosureContains Safeguards Information. Upon separation, this page is decontrolled.
}}
}}

Latest revision as of 16:20, 14 November 2019

IR 05000305-08-404, (Drs), on 05/12/2008 - 05/16/2008, for Kewaunee, Routine Security Baseline Inspection - Cover Letter
ML081820774
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/25/2008
From: Eric Duncan
Plant Support Branch II
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-404
Download: ML081820774 (5)


Text

une 25, 2008

SUBJECT:

KEWAUNEE POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000305/2008404(DRS)

Dear Mr. Christian:

On May 16, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Kewaunee Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 16, 2008, with Mr. M. Wilson and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.:

Document Control Desk, Washington DC 20555-0001; with copies to the Regional EXEMPT FROM PUBLIC DISCLOSURE Enclosure Contains Safeguards May be exempt from public release under the Freedom of Information. Upon separation, this page is Information Act (5 U.S.C. 552) decontrolled.

Exemption number: 5___________

Nuclear Regulatory Commission review required before public release.

Dale Lawver, RIII/DRS/PSB___________

Name and organization of person making determination.

Date of determination: 06/06/2008______ Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Kewaunee Power Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by D. Funk for/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 Nonpublic Enclosure: Inspection Report 05000305/2008404(DRS)

w/Attachment: Supplemental Information ( )

cc w/encl ( ):

D. Riffle (NSIR/DSO/DDSO)

See Attached Distribution Enclosure Contains Safeguards Information. Upon separation, this page is decontrolled.