IR 05000305/2018401

From kanterella
Jump to navigation Jump to search
(Permanently Shutdown) Independent Spent Fuel Storage Installation - Security Inspection Report 05000305/2018401; 07200064/2018401 (DRS-E.Bonano)
ML18130A916
Person / Time
Site: Kewaunee  Dominion icon.png
Issue date: 05/10/2018
From: Steven Orth
Plant Support Branch II
To: Stoddard D
Dominion Energy Kewaunee
References
IR 2018401
Download: ML18130A916 (7)


Text

May 10, 2018

SUBJECT:

KEWAUNEE POWER STATION (PERMANENTLY SHUTDOWN) INDEPENDENT SPENT FUEL STORAGE INSTALLATIONSECURITY INSPECTION REPORT 05000305/2018401; 07200064/2018401

Dear Mr. Stoddard:

On April 11, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the Physical Protection Program for the Independent Spent Fuel Storage Installation located at the permanently shutdown Kewaunee Power Station. The NRC inspectors discussed the results of this inspection with Mr. Yuen and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more-than-minor significance.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.htm and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 50-305;72-064 License Nos. DPR-43; General License (ISFSI)

Enclosure:

IR 05000305/2018401; 07200064/2018401

cc: Distribution via ListServ

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an inspection of the Physical Protection Program for the Independent Spent Fuel Storage Installation, in accordance with the Spent Fuel Storage Oversight Process. The Spent Fuel Storage Oversight Process is the NRCs program for overseeing the safe storage of spent nuclear fuel. Refer to https://www.nrc.gov/waste/spent-fuel-storage/oversight.html for more information.

List of Findings and Violations

No findings or violations were identified.

Additional Tracking Items

None

INSPECTION SCOPES

Inspection was conducted using the appropriate portions of the Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations. The procedure was declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations And for 10 CFR Part 71 Transportation Packagings. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

81311Physical Security Requirements for Independent Spent Fuel Storage Installations (Complete)

The inspectors evaluated the Physical Protection Program for the Independent Spent Fuel Storage Installation. The following elements were evaluated:

02.01 (a - f)

INSPECTION RESULTS

No findings or violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public disclosure. The inspectors verified no proprietary information was retained or documented in this report.

On April 11, 2018, the inspectors presented the security inspection results to Mr. Yuen and other members of the licensee staff.

DOCUMENTS REVIEWED

81311Physical Security Requirements for Independent Spent Fuel Storage Installations

- Kewaunee ISFSI Security Plan, Training and Qualification Plan, and Safeguards Contingency

Plan; Revision 3

- Dominion Energy Kewaunee, Inc., KPS, Revised Answer to Order EA-07-195 for Additional

Security Measures and Fingerprinting for Unescorted Access for Certain Spent Fuel Storage

Licensees Dated January 28, 2008; 12/07/2017

- LLEA MOU: Kewaunee County Sheriffs Department; 12/14/2017

- SY-KW-SS-101, Security and Access Control; Revision 1

- SY-KW-TR-SS-101, Nuclear Security Training Program; Revision 0

- SY-KW-TR-SS-102, Weapons Accountability, Testing and Maintenance; Revision 1

- SY-KW-TR-SS-103, Critical Task Qualification and Re-qualification Failure Actions;

Revision 0

- SY-KW-TR-SS-104, Task Performance Evaluation; Revision 0

- SIP-SS-40.04, Protective Strategy; Revision 1

- SIP-SS-40.07, LLEA Response Plan; Revision 0

- SIP-SS-30.04, Compensatory Measures and Reportability Consequences; Revision 1

- SIP-SS-30.03, Operation, Use and Testing of Communications Equipment; Revision 1

- SIP-SS-20.05, Lock, Key, Combination and Password Control; Revision 1

- SY-AA-UAA-101, Unescorted Access Authorization Program; Revision 3

- Access Authorization Program, Personnel Records: 16

- Rifle Lowlight Qualification Course; Approved 09/03/2015

- Rifle Daylight Qualification Course; Approved 09/03/2015

- KPS.917, OJT/TPE Guides; Revision 3

- Compensatory Post Order; 03/12/18

- Training files for security personnel

- CR 1590; 01/25/2018

- CR 1656; 03/20/2018

- CR 1657; 03/21/2018

- CR 1658; 03/21/2018

- KPS Vehicle Barrier System (VBS) Analysis (SGI document - NS100477-03)

- SIP-SS20.03, Admittance and Control of Personnel, Vehicle and Materials; Revision 0

- Event Log Reports; 2015-2018

- Monthly KPS Access Authorization Roster (31 day reviews); 2015-2018

- ISFSI-Only Emergency Action Level Basis Document; Revision 0

- Nuclear Oversight Audit Report:

1) Audit 18-12: Kewaunee Security Plan; 03/22/2018

2) Audit 17-01: Security; 03/20/2017

3) Audit 16-01: Security, FFD & UAA; 03/10/2016

May 10, 2018

Mr. Daniel G. Stoddard

Senior Vice President and Chief Nuclear Officer

Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: KEWAUNEE POWER STATION (PERMANENTLY SHUTDOWN) INDEPENDENT

SPENT FUEL STORAGE INSTALLATIONSECURITY INSPECTION REPORT

05000305/2018401; 07200064/2018401

Dear Mr. Stoddard:

On April 11, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of

the Physical Protection Program for the Independent Spent Fuel Storage Installation located at

the permanently shutdown Kewaunee Power Station. The NRC inspectors discussed the

results of this inspection with Mr. Yuen and other members of your staff. The results of this

inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more-than-minor significance.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.htm and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public

Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response that contains Security-Related Information, please mark

your entire response Security-Related Information-Withhold from public disclosure under

CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for

withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your

response in accordance with 10 CFR 2.390(b)(1)(ii).

D. Stoddard

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

/RA/

Steven

K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos. 50-305;72-064

License Nos. DPR-43; General License (ISFSI)

Enclosure:

IR 05000305/2018401; 07200064/2018401

cc: Distribution via ListServ

D. Stoddard

-3-

Letter to Daniel

G. Stoddard from Steven K. Orth dated May 10, 2018

SUBJECT: KEWAUNEE POWER STATION (PERMANENTLY SHUTDOWN) INDEPENDENT

SPENT FUEL STORAGE INSTALLATIONSECURITY INSPECTION REPORT

05000305/2018401; 07200064/2018401