{{#Wiki_filter:REGUL'AT INFORMATION DISTRIBUTION STEM (RIDS)'CCESSION NBR 801 0290371,DOC
{{#Wiki_filter:REGUL'AT       INFORMATION DISTRIBUTION                                                   STEM (RIDS)
~DATE!80/1 0/15 NOT'ARIZED NO DO FACIL:STN 50 528 Palo;Verde=-Nuclear Stations Unit" li Arizona Publi STN 50 529 Palo: Verde,.Nuclear Stationi Unit 2g-Arizona..Pub-li 05000529 AUTH~NAMKT AUTHOR AFFIL'IATION, VAN BRUNT~K~E','r i zona>>Pubs i c: Ser vice Co., REC IP~NAME REC'IPIENT'FF ILiI ATION, SPKNCERgG~ST~.Region 5i San Francisco'eactor.
NBR 801   0290371,DOC           DATE! 80/1                                       0/15   NOT'ARIZED     NO                     DO
Construct.ion' E'ngineer.
                                              ~
li
                                                                                                                                'CCESSION FACIL:STN 50 528 Palo; Verde=- Nuclear Stations Unit"                                                           Arizona Publi STN 50 529 Palo: Verde,.Nuclear Stationi Unit 2g- Arizona.. Pub-li                                                                   05000529 AUTH ~ NAMKTST          AUTHOR AFFIL'IATION, VAN BRUNT~K ~
REC IP ~ NAME E','r     i zona>> Pubs i c: Ser vice Co.,
REC'IPIENT'FF ILiIATION, SPKNCERgG   ~   .           Region 5i San       Francisco'eactor. Construct.ion'                                                           E'ngineer.


==SUBJECT:==
==SUBJECT:==
Interlim def icosi'ency t ept>>r e groove.weld def iciencies op main1 contr'o11'anels,Cbmsip 8 Bechtel wi 1 l per.form analysis by 801101~Repairs conducted.
Interlim def icosi'ency t ept>> r e groove. weld def iciencies op main1 contr'o11'anels,Cbmsip 8 Bechtel wi l per.form analysis by                           1 801101 ~ Repairs conducted. when>> nonconfor'merce 8 weld repair.
when>>nonconfor'merce 8 weld repair.pr oce'du>es established.Final reptT to be1 submitted by, 801115;..DISTR ISUTION CODE: SOIDS.COPIES RECEIYEDsLITR g<ENCIJ J'IZE: TITLE: Construct i opI D'af i ci ency Repor t (10CFRS0,'55K'OTES:Stands'rdizedIPlant;.
pr oce'du> es established.Final         reptT to be1 submitted by, 801115;..
Stahdardized Plant;, 05000528'5000529 RECIPIENT" ID CODE'/NAME<
DISTR ISUTION CODE: SOIDS . COPIES RECEIYEDsLITR                                                     g< ENCIJ   J 'IZE:
ACTION!A/D LI CENSNG 00 LEEgJ~'6 INTERNAL':
TITLE: Construct i opI D'af i ci ency Repor t (10CFRS0,'55K'OTES:Stands'rdizedIPlant;.
AD/RC I'/IEl 17-ASLBP/J',HARD EDO 8 STAFF: 19 HYD/GEO BR.22 LAIC-QUAL)BR 12 NRC PDR 02.REV 13 EG;FOLK" 01.S S DEV 21 COPIES LITti'R.ENCL)1 1 1 1 1 1 1 1, 1 1.1 1 1-1 1 1.1 1 1 1., 1 REC IPIEN'T<ID CODE/NAMEl MIRAGI"I Ag FTsc 05" KERRIGANi J'.07 AEOD, 18" D/DIR HUM FAC15 EQUIP QUAL)BRii I8 E)09 MPA 20 OELD 2.1 QA BR 10 RUTHERFORDpH,IEi COPIES LTTR ENCLl 1 1 1 1 l.1 1 1 1 1 1 1.1 1 1.1 1-1 EXTERNAL: ACRS NSICi 16 08 16 16 1 1 LPDR 03 1.1 OCT 30 1980 TOTALS NUMBER OF(COPIES REQUIRED: LiTTR 39 ENCL'9 I t I D EPEJE30'(Q 1m KCezacm~m P.0 BOX 2I666 PHOENIX'RIZONA 65036 October 15, 1980 ANPF-16539-BSK/JAR U.S.Nuclear Regulatory Commission Region V Walnut Creek Plaza-Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:
05000528'5000529 Stahdardized       Plant;,
Mr.G.S.Spencer, Chief Reactor Construction and Engineering Support Branch  
ACTION!
ID A/D LEEgJ ~
INTERNAL': AD/RC I'/IEl
                      '6 RECIPIENT" CODE'/NAME<
LI CENSNG 00 ASLBP/J',HARD 17-COPIES LITti'R. ENCL) 1 1
1 1
1 1
1 MIRAGI "I Ag FTsc KERRIGANi J' AEOD, D/DIR REC IPIEN'T<
ID CODE/NAMEl HUM FAC15 05" 07 18" COPIES LTTR ENCLl 1
1 l.
1 1
1 1
EDO 8 STAFF: 19              1,      1                EQUIP QUAL)                             BRii       1    1 HYD/GEO BR.        22        1.      1                I8 E)                                       09       1    1 LAIC- QUAL) BR     12        1       1-              MPA                                          20      1. 1 NRC PDR            02.       1       1                 OELD                                        2.1           1 REV 13        1.      1                 QA BR                                        10      1. 1 EG; FOLK"        01.       1       1                 RUTHERFORDpH,IEi                                    1-    1 S          S  DEV 21        1.,    1 EXTERNAL: ACRS                 16     16       16                 LPDR                                       03       1. 1 NSICi              08        1      1 OCT 30           1980 TOTALS NUMBER OF( COPIES         REQUIRED: LiTTR                 39                             ENCL'9
 
I t
I D
 
EPEJE30'(Q                   1m KCezacm~m P. 0 BOX 2I666   PHOENIX'RIZONA 65036 October 15, 1980 ANPF-16539-BSK/JAR U. S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California   94596 Attention: Mr. G. S. Spencer, Chief Reactor Construction and Engineering Support Branch


==Subject:==
==Subject:==
,A 50.55(e)Potentially Reportable Deficiency Relating to Weld Deficiencies on the Hain Control Panels.Interim Report Pile: 80-019-026
    ,A 50.55(e) Potentially Reportable Deficiency Relating to Weld Deficiencies on the Hain Control Panels .
'
Interim Report Pile: 80-019-026


==Reference:==
==Reference:==
Telephone Conversation'etween J. Eckhardt and B. S. Kaplan on September 16, 1980 (DER 80-26)
==Dear  Sir:==
The NRC was  notified of a potentially reportable deficiency in the referenced telephone conversation.'t that time,        it was estimated that a determination of reportability would be made within thirty (30) days.
Due  to the extensive investigation and evaluation required, an interim report is attached. It is now expected that this information will be finalized by November 15, 1980, at which time a complete report will be submitted.
Very truly yours, C~I E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Manager EEVBJr/BSK:skc Attachment gc f'f 80x0Pg0      31 l                                  ~/g
g a j
U. S. Nuclear Regulatory Commission Region V Attention: Mr.- G. S. Spencer,  Chief ANPP-16539-BSK/JAR October 15, 1980 Page 2 .
cc: (Victor Etello    ,Jr  ,Directe Office of "inspection  end Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr Snell  & Wilmer R. L. Robb D. B. Pasnacht B. S. Kaplan W. E. Ide J. M. Allen A. C. Rogers W. H. Wilson W. G. Bingham W; J. Stubblefield J. E. Bashore R. W. Welcher R. M. Grant D. R. Hawkinson J. A. Brand
0 V
i,(
I I


Telephone Conversation'etween J.Eckhardt and B.S.Kaplan on September 16, 1980 (DER 80-26)
INTERIM REPORT POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
                    *-      PVNGS UNITS f!1 AND 82 I. Potential Problem Bechtel's source inspector at Comsip, Incorporated, Customline Division, Linden, New Jersey, identified some groove welds on the Main Control Panels which were not full penetration welds.
      'Further inspections have indicated the following potential conditions which may impact the seismic analysis as follows:
o    Less than 100% penetration on various seam welds.
o    Deviations from the specified welding require-ments for base angle brackets.
            ~  . Deviations from the specified welding require-ments at the end frame used for bolting panels together.
            ~    Deficiencies in the '1/4" fillet welds between the edges of 2" and 4" tubing to the panel skin.
The  affected control panels are currently located at both the jobsite    and Comsip's  facility.
II. A  roach To and Status'Of"Pro osed Resolution Comsip and    Bechtel are undertaking a detailed analysis and review of each of these conditions.         If any Control Panels delivered or at Comsip require repair,        it will be accomplished
    'ollowing established nonconformance and weld repair procedures.
The proposed      disposition  and 'technical justification for accepting the deviations has been submitted by Comsip and        is currently  being reviewed by Bechtel.
III. Pro'ected Com letion 'of Cor'rective 'Action 'and Submittal of Date of the Final Re ort The ComsiplBechtel analysis and review of these        conditions is forecast to be completed by 'November 1, 1980.
The  final report will be      submitted by November 15, 1980.


==Dear Sir:==
C
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation.'t that time, it was estimated that a determination of reportability would be made within thirty (30)days.Due to the extensive investigation and evaluation required, an interim report is attached.It is now expected that this information will be finalized by November 15, 1980, at which time a complete report will be submitted.
  ~ k l
EEVBJr/BSK:skc Attachment Very truly yours, C~I E.E.Van Brunt, Jr.APS Vice President Nuclear Projects ANPP Project Manager 80x0Pg0 31 l gc f'f~/g g a j U.S.Nuclear Regulatory Commission Region V Attention:
il[
Mr.-G.S.Spencer, Chief ANPP-16539-BSK/JAR October 15, 1980 Page 2.cc: (Victor Etello ,Jr ,Directe Office of"inspection end Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 A.C.Gehr Snell&Wilmer R.L.D.B.B.S.W.E.J.M.A.C.W.H.W.G.W;J.J.E.R.W.R.M.D.R.J.A.Robb Pasnacht Kaplan Ide Allen Rogers Wilson Bingham Stubblefield Bashore Welcher Grant Hawkinson Brand 0 V i,(I I INTERIM REPORT POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)*-PVNGS UNITS f!1 AND 82 I.Potential Problem Bechtel's source inspector at Comsip, Incorporated, Customline Division, Linden, New Jersey, identified some groove welds on the Main Control Panels which were not full penetration welds.'Further inspections have indicated the following potential conditions which may impact the seismic analysis as follows: o Less than 100%penetration on various seam welds.o Deviations from the specified welding require-ments for base angle brackets.~.Deviations from the specified welding require-ments at the end frame used for bolting panels together.~Deficiencies in the'1/4" fillet welds between the edges of 2" and 4" tubing to the panel skin.The affected control panels are currently located at both the jobsite and Comsip's facility.II.A roach To and Status'Of"Pro osed Resolution Comsip and Bechtel are undertaking a detailed analysis and review of each of these conditions.
l II I}}
If any Control Panels-delivered or at Comsip-require repair, it will be accomplished
'ollowing established nonconformance and weld repair procedures.
The proposed disposition and'technical justification for accepting the deviations has been submitted by Comsip and is currently being reviewed by Bechtel.III.Pro'ected Com letion'of Cor'rective
'Action'and Submittal of Date of the Final Re ort The ComsiplBechtel analysis and review of these conditions is forecast to be completed by'November 1, 1980.The final report will be submitted by November 15, 1980.
C~k l il[l II I}}

Latest revision as of 06:44, 4 February 2020

Interim Deficiency Rept Re Groove Weld Deficiencies on Main Control Panels.Comsip & Bechtel Will Perform Analysis by 801101.Repairs Conducted When Nonconformance & Weld Repair Procedures Established.Final Rept to Be Submitted by 801115
ML17296B028
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/15/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-16539-BSK, NUDOCS 8010290371
Download: ML17296B028 (8)


Text

REGUL'AT INFORMATION DISTRIBUTION STEM (RIDS)

NBR 801 0290371,DOC DATE! 80/1 0/15 NOT'ARIZED NO DO

~

li

'CCESSION FACIL:STN 50 528 Palo; Verde=- Nuclear Stations Unit" Arizona Publi STN 50 529 Palo: Verde,.Nuclear Stationi Unit 2g- Arizona.. Pub-li 05000529 AUTH ~ NAMKTST AUTHOR AFFIL'IATION, VAN BRUNT~K ~

REC IP ~ NAME E','r i zona>> Pubs i c: Ser vice Co.,

REC'IPIENT'FF ILiIATION, SPKNCERgG ~ . Region 5i San Francisco'eactor. Construct.ion' E'ngineer.

SUBJECT:

Interlim def icosi'ency t ept>> r e groove. weld def iciencies op main1 contr'o11'anels,Cbmsip 8 Bechtel wi l per.form analysis by 1 801101 ~ Repairs conducted. when>> nonconfor'merce 8 weld repair.

pr oce'du> es established.Final reptT to be1 submitted by, 801115;..

DISTR ISUTION CODE: SOIDS . COPIES RECEIYEDsLITR g< ENCIJ J 'IZE:

TITLE: Construct i opI D'af i ci ency Repor t (10CFRS0,'55K'OTES:Stands'rdizedIPlant;.

05000528'5000529 Stahdardized Plant;,

ACTION!

ID A/D LEEgJ ~

INTERNAL': AD/RC I'/IEl

'6 RECIPIENT" CODE'/NAME<

LI CENSNG 00 ASLBP/J',HARD 17-COPIES LITti'R. ENCL) 1 1

1 1

1 1

1 MIRAGI "I Ag FTsc KERRIGANi J' AEOD, D/DIR REC IPIEN'T<

ID CODE/NAMEl HUM FAC15 05" 07 18" COPIES LTTR ENCLl 1

1 l.

1 1

1 1

EDO 8 STAFF: 19 1, 1 EQUIP QUAL) BRii 1 1 HYD/GEO BR. 22 1. 1 I8 E) 09 1 1 LAIC- QUAL) BR 12 1 1- MPA 20 1. 1 NRC PDR 02. 1 1 OELD 2.1 1 REV 13 1. 1 QA BR 10 1. 1 EG; FOLK" 01. 1 1 RUTHERFORDpH,IEi 1- 1 S S DEV 21 1., 1 EXTERNAL: ACRS 16 16 16 LPDR 03 1. 1 NSICi 08 1 1 OCT 30 1980 TOTALS NUMBER OF( COPIES REQUIRED: LiTTR 39 ENCL'9

I t

I D

EPEJE30'(Q 1m KCezacm~m P. 0 BOX 2I666 PHOENIX'RIZONA 65036 October 15, 1980 ANPF-16539-BSK/JAR U. S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention: Mr. G. S. Spencer, Chief Reactor Construction and Engineering Support Branch

Subject:

,A 50.55(e) Potentially Reportable Deficiency Relating to Weld Deficiencies on the Hain Control Panels .

Interim Report Pile: 80-019-026

Reference:

Telephone Conversation'etween J. Eckhardt and B. S. Kaplan on September 16, 1980 (DER 80-26)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation.'t that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an interim report is attached. It is now expected that this information will be finalized by November 15, 1980, at which time a complete report will be submitted.

Very truly yours, C~I E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Manager EEVBJr/BSK:skc Attachment gc f'f 80x0Pg0 31 l ~/g

g a j

U. S. Nuclear Regulatory Commission Region V Attention: Mr.- G. S. Spencer, Chief ANPP-16539-BSK/JAR October 15, 1980 Page 2 .

cc: (Victor Etello ,Jr ,Directe Office of "inspection end Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr Snell & Wilmer R. L. Robb D. B. Pasnacht B. S. Kaplan W. E. Ide J. M. Allen A. C. Rogers W. H. Wilson W. G. Bingham W; J. Stubblefield J. E. Bashore R. W. Welcher R. M. Grant D. R. Hawkinson J. A. Brand

0 V

i,(

I I

INTERIM REPORT POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

  • - PVNGS UNITS f!1 AND 82 I. Potential Problem Bechtel's source inspector at Comsip, Incorporated, Customline Division, Linden, New Jersey, identified some groove welds on the Main Control Panels which were not full penetration welds.

'Further inspections have indicated the following potential conditions which may impact the seismic analysis as follows:

o Less than 100% penetration on various seam welds.

o Deviations from the specified welding require-ments for base angle brackets.

~ . Deviations from the specified welding require-ments at the end frame used for bolting panels together.

~ Deficiencies in the '1/4" fillet welds between the edges of 2" and 4" tubing to the panel skin.

The affected control panels are currently located at both the jobsite and Comsip's facility.

II. A roach To and Status'Of"Pro osed Resolution Comsip and Bechtel are undertaking a detailed analysis and review of each of these conditions. If any Control Panels delivered or at Comsip require repair, it will be accomplished

'ollowing established nonconformance and weld repair procedures.

The proposed disposition and 'technical justification for accepting the deviations has been submitted by Comsip and is currently being reviewed by Bechtel.

III. Pro'ected Com letion 'of Cor'rective 'Action 'and Submittal of Date of the Final Re ort The ComsiplBechtel analysis and review of these conditions is forecast to be completed by 'November 1, 1980.

The final report will be submitted by November 15, 1980.