Interim Deficiency Rept Re Groove Weld Deficiencies on Main Control Panels.Comsip & Bechtel Will Perform Analysis by 801101.Repairs Conducted When Nonconformance & Weld Repair Procedures Established.Final Rept to Be Submitted by 801115
ML17296B028
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/15/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-16539-BSK, NUDOCS 8010290371
Download: ML17296B028 (8)


Text

REGUL'AT INFORMATION DISTRIBUTION STEM (RIDS)

NBR 801 0290371,DOC DATE! 80/1 0/15 NOT'ARIZED NO DO

~

li

'CCESSION FACIL:STN 50 528 Palo; Verde=- Nuclear Stations Unit" Arizona Publi STN 50 529 Palo: Verde,.Nuclear Stationi Unit 2g- Arizona.. Pub-li 05000529 AUTH ~ NAMKTST AUTHOR AFFIL'IATION, VAN BRUNT~K ~

REC IP ~ NAME E','r i zona>> Pubs i c: Ser vice Co.,

REC'IPIENT'FF ILiIATION, SPKNCERgG ~ . Region 5i San Francisco'eactor. Construct.ion' E'ngineer.

SUBJECT:

Interlim def icosi'ency t ept>> r e groove. weld def iciencies op main1 contr'o11'anels,Cbmsip 8 Bechtel wi l per.form analysis by 1 801101 ~ Repairs conducted. when>> nonconfor'merce 8 weld repair.

pr oce'du> es established.Final reptT to be1 submitted by, 801115;..

DISTR ISUTION CODE: SOIDS . COPIES RECEIYEDsLITR g< ENCIJ J 'IZE:

TITLE: Construct i opI D'af i ci ency Repor t (10CFRS0,'55K'OTES:Stands'rdizedIPlant;.

05000528'5000529 Stahdardized Plant;,

ACTION!

ID A/D LEEgJ ~

INTERNAL': AD/RC I'/IEl

'6 RECIPIENT" CODE'/NAME<

LI CENSNG 00 ASLBP/J',HARD 17-COPIES LITti'R. ENCL) 1 1

1 1

1 1

1 MIRAGI "I Ag FTsc KERRIGANi J' AEOD, D/DIR REC IPIEN'T<

ID CODE/NAMEl HUM FAC15 05" 07 18" COPIES LTTR ENCLl 1

1 l.

1 1

1 1

EDO 8 STAFF: 19 1, 1 EQUIP QUAL) BRii 1 1 HYD/GEO BR. 22 1. 1 I8 E) 09 1 1 LAIC- QUAL) BR 12 1 1- MPA 20 1. 1 NRC PDR 02. 1 1 OELD 2.1 1 REV 13 1. 1 QA BR 10 1. 1 EG; FOLK" 01. 1 1 RUTHERFORDpH,IEi 1- 1 S S DEV 21 1., 1 EXTERNAL: ACRS 16 16 16 LPDR 03 1. 1 NSICi 08 1 1 OCT 30 1980 TOTALS NUMBER OF( COPIES REQUIRED: LiTTR 39 ENCL'9

I t

I D

EPEJE30'(Q 1m KCezacm~m P. 0 BOX 2I666 PHOENIX'RIZONA 65036 October 15, 1980 ANPF-16539-BSK/JAR U. S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention: Mr. G. S. Spencer, Chief Reactor Construction and Engineering Support Branch

Subject:

,A 50.55(e) Potentially Reportable Deficiency Relating to Weld Deficiencies on the Hain Control Panels .

Interim Report Pile: 80-019-026

Reference:

Telephone Conversation'etween J. Eckhardt and B. S. Kaplan on September 16, 1980 (DER 80-26)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation.'t that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an interim report is attached. It is now expected that this information will be finalized by November 15, 1980, at which time a complete report will be submitted.

Very truly yours, C~I E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Manager EEVBJr/BSK:skc Attachment gc f'f 80x0Pg0 31 l ~/g

g a j

U. S. Nuclear Regulatory Commission Region V Attention: Mr.- G. S. Spencer, Chief ANPP-16539-BSK/JAR October 15, 1980 Page 2 .

cc: (Victor Etello ,Jr ,Directe Office of "inspection end Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr Snell & Wilmer R. L. Robb D. B. Pasnacht B. S. Kaplan W. E. Ide J. M. Allen A. C. Rogers W. H. Wilson W. G. Bingham W; J. Stubblefield J. E. Bashore R. W. Welcher R. M. Grant D. R. Hawkinson J. A. Brand

0 V

i,(

I I

INTERIM REPORT POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

  • - PVNGS UNITS f!1 AND 82 I. Potential Problem Bechtel's source inspector at Comsip, Incorporated, Customline Division, Linden, New Jersey, identified some groove welds on the Main Control Panels which were not full penetration welds.

'Further inspections have indicated the following potential conditions which may impact the seismic analysis as follows:

o Less than 100% penetration on various seam welds.

o Deviations from the specified welding require-ments for base angle brackets.

~ . Deviations from the specified welding require-ments at the end frame used for bolting panels together.

~ Deficiencies in the '1/4" fillet welds between the edges of 2" and 4" tubing to the panel skin.

The affected control panels are currently located at both the jobsite and Comsip's facility.

II. A roach To and Status'Of"Pro osed Resolution Comsip and Bechtel are undertaking a detailed analysis and review of each of these conditions. If any Control Panels delivered or at Comsip require repair, it will be accomplished

'ollowing established nonconformance and weld repair procedures.

The proposed disposition and 'technical justification for accepting the deviations has been submitted by Comsip and is currently being reviewed by Bechtel.

III. Pro'ected Com letion 'of Cor'rective 'Action 'and Submittal of Date of the Final Re ort The ComsiplBechtel analysis and review of these conditions is forecast to be completed by 'November 1, 1980.

The final report will be submitted by November 15, 1980.