ML17305A662: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISHUBUTION DEM(+MlMTION SYSIKM 05000529 REGULATORY XNFORMATION DISTRXBUTION SYSTEM (RIDS)ACCESSION NBR:9004180111 DOC.DATE: 90/04/02 NOTARIZED:
{{#Wiki_filter:ACCELERATED DISHUBUTION DEM(+MlMTION SYSIKM REGULATORY XNFORMATION DISTRXBUTION SYSTEM (RIDS)
NO DOCKET g FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFXLXATION LEVINE,J.M.
ACCESSION NBR:9004180111               DOC.DATE:   90/04/02     NOTARIZED: NO         DOCKET g FACIL:STN-50-529 Palo Verde Nuclear             Station, Unit 2, Arizona Publi 05000529 AUTH. NAME           AUTHOR AFFXLXATION LEVINE,J.M.         Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME           RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Special Rept 2-SR-88-009:on 881209,radiation monitoring unit inoperable for greater that 72 h.DISTRIBUTION CODE: XE22D COPIES RECEIVED:LTR ENCL I SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Xnciden%Rpt, etc.NOTES:Standardized plant.RECIPIENT XD CODE/NAME PD5 LA PETERSON,S.
Special Rept 2-SR-88-009:on 881209,radiation monitoring unit inoperable for greater that 72 h.
INTERNAL: ACNW AEOD/DOA AEOD/ROAB/DSP NRR/DET/ECMB 9H NRR/DET/ESGB 8D NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB 7E NRR/DST/SRXB 8E RES/DSXR/EIB EXTERNAL: EGGG STUART,V.A LPDR NSIC MAYS,G NUDOCS FULL TXT NOTES: COPIES LTTR ENCL 1 1 1 1 2 2 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 4 4 1 1 1 1 1 1 RECXPIENT XD CODE/NAME PD5 PD CHAN,T ACRS AEOD/DSP/TPAB DEDRO NRR/DET/EMEB9H3 NRR/DLPQ/LHFB11 NRR/DOEA/OEAB11 NRR/DST/SELB 8D DS9/PLB8Dl REG LE 02 FXLE Ol L ST LOBBY WARD NRC PDR NSIC MURPHYiG.A COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS; PLEASE HELP US TO REDUCE WARM CONI'ACI'HE DOCUMENI'ORBEL DESK, ROOM Pl-37 (EXl'.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION TOTAL NUMBER OF COPIES REQUIRED'TTR 39 ENCL 39  
DISTRIBUTION CODE: XE22D COPIES RECEIVED:LTR                     ENCL I   SIZE:
'I I p h I I Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX.ARIZONA 85072-2034 JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 192-00642-JML/TRB/RKR April 2, 1990 U.S.Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
TITLE: 50.73/50.9 Licensee Event Report (LER), Xnciden% Rpt, etc.
NOTES:Standardized plant.                                                           05000529 RECIPIENT               COPIES            RECXPIENT          COPIES XD CODE/NAME             LTTR ENCL        XD CODE/NAME        LTTR ENCL PD5 LA                       1    1      PD5 PD                1    1 PETERSON,S.                   1    1      CHAN,T                1    1 INTERNAL: ACNW                           2    2    ACRS                    2    2 AEOD/DOA                     1    1    AEOD/DSP/TPAB          1    1 AEOD/ROAB/DSP                 2    2      DEDRO                  1    1 NRR/DET/ECMB 9H               1    1    NRR/DET/EMEB9H3        1    1 NRR/DET/ESGB 8D               1    1    NRR/DLPQ/LHFB11        1    1 NRR/DLPQ/LPEB10               1    1    NRR/DOEA/OEAB11        1    1 NRR/DREP/PRPB11               2    2    NRR/DST/SELB 8D        1    1 NRR/DST/SICB 7E               1    1          DS9/ PLB8Dl      1    1 NRR/DST/SRXB 8E               1    1    REG    LE      02      1    1 RES/DSXR/EIB                 1    1              FXLE  Ol      1    1 EXTERNAL: EGGG STUART,V.A                 4     4     L ST LOBBY   WARD     1   1 LPDR                          1     1     NRC PDR                1   1 NSIC MAYS,G                  1     1     NSIC MURPHYiG.A        1   1 NUDOCS FULL TXT              1     1 NOTES:
NOTE TO ALL "RIDS" RECIPIENTS; PLEASE HELP US TO REDUCE WARM CONI'ACI'HE DOCUMENI'ORBEL DESK, ROOM Pl-37 (EXl'. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION TOTAL NUMBER OF COPIES       REQUIRED'TTR           39   ENCL   39


==Dear Sirs:==
'I I
p h
I I
 
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~  PHOENIX. ARIZONA 85072-2034 JAMES M. LEVINE                                                  192-00642- JML/TRB/RKR VICE PRESIDENT NUCLEAR PRODUCTION                                              April 2,      1990 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
 
==Dear   Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 (License No~NPF-51)Supplement to Special Report 2-SR-88-009 File: 90-020-404 Attached please find Supplement Number 2 to Special Report 2-SR-88-009 prepared and submitted pursuant to Technical Specifications 3.3.3.8'nd 6.9.2.This report is submitted to provide updated information and revise the modification schedule from the original report.If you have any questions, please contact T.R.Bradish, (Acting)Compliance Managei at (602)393-2521.Very truly yours, JML/TRB/RKR/kj Attachment cc: W.F.J.B.E.E.D.H.T.L.A.C.J.R.Conway Martin Van Brunt Coe Chan Gehr Newman (all with attachment) 9004180111 900402 F'DR ADOC}'I=000525'DC  
Palo Verde Nuclear Generating Station (PVNGS)
~S r,!L'i[I I PALO VERDE NUCLEAR GENERATING STATION Radiation Monitoring Unit Inoperable for Greater Than 72 Hours License No.NPP-51 Docket No.STN 50-520 Supplement Number 2 to Special Report 2-SR-88-009 This Special Report is submitted in accordance with Technical Specifications 3.3.3.8 ACTION 42(b)and 6.9.2 for an event in which the Condenser Vacuum Pump/Gland Seal Exhaust High Range Effluent Monitor (RU-142)and Plant Vent High Range Effluent Monitor (RU-144)were inoperable for greater than 72 hours.The 72-hour limit for operability was exceeded at approximately 0700 MST and 0630 MST respectively on December 9, 1988't approximately
Unit 2 Docket No. STN 50-529 (License No NPF-51)     ~
.0630 MST on December 6, 1988, with Palo Verde Unit 2 in Mode 1 (POWER OPERATION) at approximately 100 percent power, the Condenser Vacuum Pump/Gland Seal Exhaust low and high range monitors (RU-141 and RU-142)were declared inoperable to perform corrective maintenance on the low range monitor.At approximately 0700 MST on December 6, 1988 the Plant Vent Monitor (RU-143 and RU-144)were also declared inoperable to perform corrective maintenance on the low range monitor.Both low range monitors were exhibiting intermittent spiking;however, this condition did not*cause the monitors to be inoperable.
Supplement to Special Report 2-SR-88-009 File: 90-020-404 Attached please find Supplement Number 2 to Special Report 2-SR-88-009 prepared and submitted pursuant to Technical Specifications 3.3.3.8'nd 6.9.2.
In each case the monitors work as a pair with RU-141 and RU-143 as the low range monitors and RU-142 and RU-144 as the high range monitors.Normal configuration consists of the low range monitors operating with the high range monitors in standby.When the low range monitors reach a predetermined setpoint, the high range monitors start and the low range monitor goes to standby.The high range monitors are provided for tracking radioactive effluents during postulated accident scenarios.
This report is submitted to provide updated information and revise the modification schedule from the original report.
The high range monitors must be declared inoperable when the low range monitors are inoperable.
If   you have any questions, please contact T. R. Bradish,                 (Acting) Compliance Managei at (602) 393-2521.
Pursuant to Technical Specification 3.3.3.8 ACTION 37, the Preplanned Alternate Sampling Program (PASP)was initiated at approximately 0712 MST and 0645 MST respectively on December 6, 1988.The PASP continued until the radiation monitors were returned to service.RU-143 and RU-144 were returned to service at 1117 MST on March 22, 1989.RU-141 and RU-142 were returned to service at 0935 MST on June 23, 1989.The term"spiking" as used in this report is defined as an apparent rise in current level which is causing the radiation level to appear to increase although no actual rise in radiation exists.APS has been experiencing these spikes since licensing of the units.In each[previous case, actions were taken to troubleshoot and correct the problems as they occurred.Additionally, overall recommendations were made, and plant changes instituted on the basis of the spiking being caused by a grounding problem.When incorporated into the units, these plant changes have not fully resolved the spiking problem.
Very   truly yours, JML/TRB/RKR/kj Attachment cc:     W. F. Conway        (all with      attachment)
l l)rs~li Ij j I tt t j Special Report 2-SR-88-009-02 Page 2 On December 6, 1988, a decision was made to leave RU-141 and RU-143 inoperable for an extensive testing program to determine the root cause of the spiking.The testing program was initiated on December 20, 1988.The low range monitors use beta scintillation detectors to monitor the process and generate an electrical pulse that is proportional to the particular type of radiation being monitored, i.e.particulate, gas, or iodine.The detector's outer housing is metal and is connected to plant ground by its mounting arrangements.
J. B. Martin E. E. Van Brunt D. H. Coe T. L. Chan A. C. Gehr J. R. Newman 9004180111 900402 F'DR     ADOC}'I=000525'DC
The detectors's preamplifier is"referenced to an'ndependent Radiation Monitoring System (RMS)instrument ground bus rather than plant ground.Due to the potential differences between the detector preamplifiers'ignal ground and the detector's grounded outer housing, parasitic capacitance coupling exists between the preamplifier''s signal ground and the detector's grounded outer housing.Noise on the plant ground is able, to couple into the detector's preamplifier through these parasitic capacitance paths.These stray capacitances provide a feedback path from output to input of the preamplifier.
 
Thus, noise occasionally couples into the preamplifier and forces the preamplifier into oscillation due to the capacitative feedback path.This can result in the detector generating spurious output pulses of sufficient magnitude that the amp/discriminator circuit in the microcomputer treats them as valid signals resulting in the generation of spurious high readings.These spurious output pulses will be prevented by eliminating, the capacitive feedback path.This will be accomplished by isolating the detectors'ousing from plant ground and connecting it to the preamplifiers'ignal ground.This eliminates the capacitance feedback path.This modification has been implemented by temporary modification on radiation detectors RU-141, RU-143 and RU-145 in Unit 1, radiation detectors RU-141 and RU-143 in Unit 2, and radiation detectors RU-141 and RU-143 in Unit 3.The radiation detectors have not experienced any spiking since completion of the temporary modification.
    ~S r,
The temporary modification is expected to be completed for radiation detector RU-145 in Unit 2 and radiation detector RU-145 in Unit 3 by June 30, 1990.A plant change request has been initiated to make the temporary modification a permanent design change.This modification will be incorporated on Units 1, 2, and 3 radiation monitors RU-141, RU-143, and RU-145.Only these radiation monitors are being modified because beta scintillation detectors are significantly more sensitive than the detectors used in other radiation monitors.Development of this design change is expected to be completed by May 30, 1990.This design change is expected to be implemented in Units 1, 2, and 3 within 90 days of materials receipt.
L'i[
I I
 
PALO VERDE NUCLEAR GENERATING STATION Radiation Monitoring Unit Inoperable for Greater Than   72 Hours License No. NPP-51 Docket No. STN 50-520 Supplement Number 2 to Special Report 2-SR-88-009 This Special Report is submitted in accordance with Technical Specifications 3.3.3.8 ACTION 42(b) and 6.9.2 for an event in which the Condenser Vacuum Pump/Gland Seal Exhaust High Range Effluent Monitor (RU-142) and Plant Vent High Range Effluent Monitor (RU-144) were inoperable for greater than 72 hours. The 72-hour limit for operability was exceeded at approximately 0700 MST and 0630 MST   respectively on December 9, 1988
                                                      't approximately .0630 MST on December 6, 1988, with Palo Verde Unit 2 in Mode 1 (POWER OPERATION) at approximately 100 percent power, the Condenser Vacuum Pump/Gland Seal Exhaust low and high range monitors (RU-141 and RU-142) were declared inoperable to perform corrective maintenance on the low range monitor. At approximately 0700 MST on December 6, 1988 the Plant Vent Monitor (RU-143 and RU-144) were also declared inoperable to perform corrective maintenance on the low range monitor. Both low range monitors were exhibiting intermittent spiking; however, this condition did not* cause the monitors to be inoperable.
In each case the monitors work as a pair with RU-141 and RU-143 as the low range monitors and RU-142 and RU-144 as the high range monitors. Normal configuration consists of the low range monitors operating with the high range monitors in standby. When the low range monitors reach a predetermined setpoint, the high range monitors start and the low range monitor goes to standby. The high range monitors are provided for tracking radioactive effluents during postulated accident scenarios. The high range monitors must be declared inoperable when the low range monitors are inoperable.
Pursuant to Technical Specification 3.3.3.8 ACTION 37, the Preplanned Alternate Sampling Program (PASP) was initiated at approximately 0712 MST and 0645 MST respectively on December 6, 1988. The PASP continued until the radiation monitors were returned to service. RU-143 and RU-144 were returned to service at 1117 MST on March 22, 1989. RU-141 and RU-142 were returned to service at 0935 MST on June 23, 1989.
The term "spiking" as used in this report is defined as an apparent rise in current level which is causing the radiation level to appear to increase although no actual rise in radiation exists.
APS has been experiencing these spikes since licensing of the units. In each   [
previous case, actions were taken to troubleshoot and correct the problems as they occurred. Additionally, overall recommendations were made, and plant changes instituted on the basis of the spiking being caused by a grounding problem. When incorporated into the units, these plant changes have not fully resolved the spiking problem.
 
ll
          )
rs
~
li Ij jI tt t
j
 
Special Report 2-SR-88-009-02 Page 2 On December   6, 1988, a decision was made to leave RU-141 and RU-143 inoperable for an extensive testing program to determine the root cause of the spiking.
The testing program was initiated on December 20, 1988.
The low range monitors use beta scintillation detectors to monitor the process and generate an electrical pulse that is proportional to the particular type of radiation being monitored, i.e. particulate, gas, or iodine. The detector's outer housing is metal and is connected to plant ground by its mounting arrangements. The detectors's preamplifier is"referenced to an Radiation Monitoring System (RMS) instrument ground bus rather'ndependent than plant ground. Due to the potential differences between the detector preamplifiers'ignal ground and the detector's grounded outer housing, parasitic capacitance coupling exists between the preamplifier''s signal ground and the detector's grounded outer housing. Noise on the plant ground is able, to couple into the detector's preamplifier through these parasitic capacitance paths. These stray capacitances provide a feedback path from output to input of the preamplifier. Thus, noise occasionally couples into the preamplifier and forces the preamplifier into oscillation due to the capacitative feedback path. This can result in the detector generating spurious output pulses of sufficient magnitude that the amp/discriminator circuit in the microcomputer treats them as valid signals resulting in the generation of spurious high readings.
These spurious   output pulses will be prevented by eliminating, the capacitive feedback path. This will be accomplished by isolating the detectors'ousing from plant ground and connecting   it to the preamplifiers'ignal ground. This eliminates the capacitance feedback path.
This modification has been implemented by temporary modification on radiation detectors RU-141, RU-143 and RU-145 in Unit 1, radiation detectors RU-141 and RU-143 in Unit 2, and radiation detectors RU-141 and RU-143 in Unit 3. The radiation detectors have not experienced any spiking since completion of the temporary modification. The temporary modification is expected to be completed for radiation detector RU-145 in Unit 2 and radiation detector RU-145 in Unit 3 by June 30, 1990.
A plant change request has been initiated to make the temporary modification a permanent design change. This modification will be incorporated on Units 1, 2, and 3 radiation monitors RU-141, RU-143, and RU-145. Only these radiation monitors are being modified because beta scintillation detectors are significantly more sensitive than the detectors used in other radiation monitors. Development of this design change is expected to be completed by May 30, 1990. This design change is expected to be implemented in Units 1, 2, and 3 within 90 days of materials receipt.
 
h(}}
h(}}

Latest revision as of 05:01, 4 February 2020

Special Rept 2-SR-88-009:on 881209,radiation Monitoring Unit Inoperable for Greater That 72 H to Perform Corrective Maint on Low Range Monitor.Plant Change Request Initiated to Make Temporary Mod Permanent Design
ML17305A662
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/02/1990
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2-SR-88-009, 2-SR-88-9, NUDOCS 9004180111
Download: ML17305A662 (8)


Text

ACCELERATED DISHUBUTION DEM(+MlMTION SYSIKM REGULATORY XNFORMATION DISTRXBUTION SYSTEM (RIDS)

ACCESSION NBR:9004180111 DOC.DATE: 90/04/02 NOTARIZED: NO DOCKET g FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFXLXATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special Rept 2-SR-88-009:on 881209,radiation monitoring unit inoperable for greater that 72 h.

DISTRIBUTION CODE: XE22D COPIES RECEIVED:LTR ENCL I SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Xnciden% Rpt, etc.

NOTES:Standardized plant. 05000529 RECIPIENT COPIES RECXPIENT COPIES XD CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 PETERSON,S. 1 1 CHAN,T 1 1 INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 DEDRO 1 1 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB9H3 1 1 NRR/DET/ESGB 8D 1 1 NRR/DLPQ/LHFB11 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB11 1 1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 DS9/ PLB8Dl 1 1 NRR/DST/SRXB 8E 1 1 REG LE 02 1 1 RES/DSXR/EIB 1 1 FXLE Ol 1 1 EXTERNAL: EGGG STUART,V.A 4 4 L ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHYiG.A 1 1 NUDOCS FULL TXT 1 1 NOTES:

NOTE TO ALL "RIDS" RECIPIENTS; PLEASE HELP US TO REDUCE WARM CONI'ACI'HE DOCUMENI'ORBEL DESK, ROOM Pl-37 (EXl'. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION TOTAL NUMBER OF COPIES REQUIRED'TTR 39 ENCL 39

'I I

p h

I I

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX. ARIZONA 85072-2034 JAMES M. LEVINE 192-00642- JML/TRB/RKR VICE PRESIDENT NUCLEAR PRODUCTION April 2, 1990 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License No NPF-51) ~

Supplement to Special Report 2-SR-88-009 File: 90-020-404 Attached please find Supplement Number 2 to Special Report 2-SR-88-009 prepared and submitted pursuant to Technical Specifications 3.3.3.8'nd 6.9.2.

This report is submitted to provide updated information and revise the modification schedule from the original report.

If you have any questions, please contact T. R. Bradish, (Acting) Compliance Managei at (602) 393-2521.

Very truly yours, JML/TRB/RKR/kj Attachment cc: W. F. Conway (all with attachment)

J. B. Martin E. E. Van Brunt D. H. Coe T. L. Chan A. C. Gehr J. R. Newman 9004180111 900402 F'DR ADOC}'I=000525'DC

~S r,

L'i[

I I

PALO VERDE NUCLEAR GENERATING STATION Radiation Monitoring Unit Inoperable for Greater Than 72 Hours License No. NPP-51 Docket No. STN 50-520 Supplement Number 2 to Special Report 2-SR-88-009 This Special Report is submitted in accordance with Technical Specifications 3.3.3.8 ACTION 42(b) and 6.9.2 for an event in which the Condenser Vacuum Pump/Gland Seal Exhaust High Range Effluent Monitor (RU-142) and Plant Vent High Range Effluent Monitor (RU-144) were inoperable for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72-hour limit for operability was exceeded at approximately 0700 MST and 0630 MST respectively on December 9, 1988

't approximately .0630 MST on December 6, 1988, with Palo Verde Unit 2 in Mode 1 (POWER OPERATION) at approximately 100 percent power, the Condenser Vacuum Pump/Gland Seal Exhaust low and high range monitors (RU-141 and RU-142) were declared inoperable to perform corrective maintenance on the low range monitor. At approximately 0700 MST on December 6, 1988 the Plant Vent Monitor (RU-143 and RU-144) were also declared inoperable to perform corrective maintenance on the low range monitor. Both low range monitors were exhibiting intermittent spiking; however, this condition did not* cause the monitors to be inoperable.

In each case the monitors work as a pair with RU-141 and RU-143 as the low range monitors and RU-142 and RU-144 as the high range monitors. Normal configuration consists of the low range monitors operating with the high range monitors in standby. When the low range monitors reach a predetermined setpoint, the high range monitors start and the low range monitor goes to standby. The high range monitors are provided for tracking radioactive effluents during postulated accident scenarios. The high range monitors must be declared inoperable when the low range monitors are inoperable.

Pursuant to Technical Specification 3.3.3.8 ACTION 37, the Preplanned Alternate Sampling Program (PASP) was initiated at approximately 0712 MST and 0645 MST respectively on December 6, 1988. The PASP continued until the radiation monitors were returned to service. RU-143 and RU-144 were returned to service at 1117 MST on March 22, 1989. RU-141 and RU-142 were returned to service at 0935 MST on June 23, 1989.

The term "spiking" as used in this report is defined as an apparent rise in current level which is causing the radiation level to appear to increase although no actual rise in radiation exists.

APS has been experiencing these spikes since licensing of the units. In each [

previous case, actions were taken to troubleshoot and correct the problems as they occurred. Additionally, overall recommendations were made, and plant changes instituted on the basis of the spiking being caused by a grounding problem. When incorporated into the units, these plant changes have not fully resolved the spiking problem.

ll

)

rs

~

li Ij jI tt t

j

Special Report 2-SR-88-009-02 Page 2 On December 6, 1988, a decision was made to leave RU-141 and RU-143 inoperable for an extensive testing program to determine the root cause of the spiking.

The testing program was initiated on December 20, 1988.

The low range monitors use beta scintillation detectors to monitor the process and generate an electrical pulse that is proportional to the particular type of radiation being monitored, i.e. particulate, gas, or iodine. The detector's outer housing is metal and is connected to plant ground by its mounting arrangements. The detectors's preamplifier is"referenced to an Radiation Monitoring System (RMS) instrument ground bus rather'ndependent than plant ground. Due to the potential differences between the detector preamplifiers'ignal ground and the detector's grounded outer housing, parasitic capacitance coupling exists between the preamplifiers signal ground and the detector's grounded outer housing. Noise on the plant ground is able, to couple into the detector's preamplifier through these parasitic capacitance paths. These stray capacitances provide a feedback path from output to input of the preamplifier. Thus, noise occasionally couples into the preamplifier and forces the preamplifier into oscillation due to the capacitative feedback path. This can result in the detector generating spurious output pulses of sufficient magnitude that the amp/discriminator circuit in the microcomputer treats them as valid signals resulting in the generation of spurious high readings.

These spurious output pulses will be prevented by eliminating, the capacitive feedback path. This will be accomplished by isolating the detectors'ousing from plant ground and connecting it to the preamplifiers'ignal ground. This eliminates the capacitance feedback path.

This modification has been implemented by temporary modification on radiation detectors RU-141, RU-143 and RU-145 in Unit 1, radiation detectors RU-141 and RU-143 in Unit 2, and radiation detectors RU-141 and RU-143 in Unit 3. The radiation detectors have not experienced any spiking since completion of the temporary modification. The temporary modification is expected to be completed for radiation detector RU-145 in Unit 2 and radiation detector RU-145 in Unit 3 by June 30, 1990.

A plant change request has been initiated to make the temporary modification a permanent design change. This modification will be incorporated on Units 1, 2, and 3 radiation monitors RU-141, RU-143, and RU-145. Only these radiation monitors are being modified because beta scintillation detectors are significantly more sensitive than the detectors used in other radiation monitors. Development of this design change is expected to be completed by May 30, 1990. This design change is expected to be implemented in Units 1, 2, and 3 within 90 days of materials receipt.

h(