ML18003B343: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:RE ATORY INFORNATION DISTRIBPi ION SYSTEt'1 (R IDS>%ACCESSION NBR: 8606160153 DOG.DATE: 86/06/06 NOTARIZED:
{{#Wiki_filter:RE     ATORY INFORNATION     DISTRIBPi ION     SYSTEt'1 (R IDS>
NQ DOCKET'ACIL: 50-400 Shearon Harris Nuclear Power Plant>Unit i~Carolina 05000400 AUTH.NAl'1E AUTHOR AFFILIATION KEESEi P....obsolete code..~RECIP.NAl'lE RECIPIENT AFFILIATION DENTQN, H.Office of Nuclear Reactor Regulation>
% ACCESSION NBR: 8606160153             DOG. DATE:   86/06/06     NOTARIZED: NQ           DOCKET
Director (post 851125'UBJECT: Opposes util exemption from requirement to conduct Full participation t est eithin i yr of full power license 1 s suan c e.DISTRIBUTION CODE: A045D COPIES RECEIVED: LTR ENCL SIZE: TITLE: QR Submittal Emergency Prep Correspondence NOTES: Application for permit renelIJal filed.05000400 RECIPIENT ID CODE/NANE PMR-A PD2 LA BUCNLEY.B Oi INTERNAL: IE/DEP/EPB 06 04 COPIES LTTR ENCL REC I P I ENT ID CODE/NANE PAR-A PD2 PD IE/DEPER/IRB 12 RQN2 COPIES LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 TOTAL NONBER OF COPIEB REQUIRED: LTTR I2 ENCL  
  'ACIL:50-400       Shearon     Harris Nuclear Power Plant>         Unit i~ Carolina     05000400 AUTH. NAl'1E             AUTHOR AFFILIATION KEESEi P.               ... obsolete code..   ~
'N H il L June 6, 1986 Mr.Harold Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 (301)492-7000  
RECIP. NAl'lE           RECIPIENT AFFILIATION DENTQN, H.               Office of Nuclear Reactor Regulation> Director (post             851125 Opposes util exemption from requirement to conduct Full                               'U participation t est eithin i yr of full power license 1 s suan c e.
DISTRIBUTION CODE: A045D COPIES RECEIVED: LTR                       ENCL       SIZE:
TITLE: QR     Submittal     Emergency Prep     Correspondence NOTES: Application for permit         renelIJal filed.                                 05000400 RECIPIENT           COPIES              REC I P I ENT          COPIES ID CODE/NANE          LTTR ENCL        ID CODE/NANE           LTTR ENCL PMR-A PD2 LA                             PAR-A PD2 PD BUCNLEY. B         Oi INTERNAL: IE/DEP         /EPB 06                       IE/DEPER/ IRB 12 04                    RQN2 EXTERNAL: 24X                                         LPDR              03 NRC PDR             02                   NSIC TOTAL NONBER OF COPIEB REQUIRED:           LTTR     I2   ENCL
 
  'N H
il
 
June 6, 1986 Mr. Harold Denton,     Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000


==Subject:==
==Subject:==
Shearon Harris Nuclear Plant Carolina Power 8 Light, Emergency Plan  
Shearon Harris Nuclear Plant Carolina Power 8 Light, Emergency Plan
 
==Dear Mr. Denton:==
 
Carolina Power    & Light Company has not conducted a full participation    test  of  the present emergency plan for the Shearon Harris    Nuclear    plant as required by federal regulation, 10 CFR  Part 50.
This is  most significant since Chatham County, by formal action of  the  Board of Commissioners, has withdrawn from the emergency plan. Thus, no plan which could actually be implemented    if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawin'g from the present emergency plan.
Clearly, any such action would further complicate this matter.
At least  until  such time as state and local governmental participation    in an emergency plan for Shearon Harris is fully resolved, no    exemption(s) from the requirement of a full participation    test within one year prior to the granting of any full power  license should    be considered  or approved.
PM:
Peter Keese Episcopal Chaplain Duke University Medical Center cc: Congressman Tim Valentine ggOb1601>~ ggOgOb l
P        AOOCK  O~OOPOOO o
i  PDR              pDR


==Dear Mr.Denton:==
S I}}
Carolina Power&Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris Nuclear plant as required by federal regulation, 10 CFR Part 50.This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.Thus, no plan which could actually be implemented if the plant were to operate has been tested.In addition, citizens and officials in other counties are considering withdrawin'g from the present emergency plan.Clearly, any such action would further complicate this matter.At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.cc: Congressman Tim Valentine PM: Peter Keese Episcopal Chaplain Duke University Medical Center P ggOb1601>~
O~OOPOOO ggOgOb l i PDR AOOCK o pDR S I}}

Latest revision as of 07:18, 22 October 2019

Opposes Util Exemption from Requirement to Conduct Full Participation Test within 1 Yr of Full Power License Issuance
ML18003B343
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/06/1986
From: Keese P
DUKE UNIV. MEDICAL CENTER, DURHAM, NC
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606160153
Download: ML18003B343 (4)


Text

RE ATORY INFORNATION DISTRIBPi ION SYSTEt'1 (R IDS>

% ACCESSION NBR: 8606160153 DOG. DATE: 86/06/06 NOTARIZED: NQ DOCKET

'ACIL:50-400 Shearon Harris Nuclear Power Plant> Unit i~ Carolina 05000400 AUTH. NAl'1E AUTHOR AFFILIATION KEESEi P. ... obsolete code.. ~

RECIP. NAl'lE RECIPIENT AFFILIATION DENTQN, H. Office of Nuclear Reactor Regulation> Director (post 851125 Opposes util exemption from requirement to conduct Full 'U participation t est eithin i yr of full power license 1 s suan c e.

DISTRIBUTION CODE: A045D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: QR Submittal Emergency Prep Correspondence NOTES: Application for permit renelIJal filed. 05000400 RECIPIENT COPIES REC I P I ENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL PMR-A PD2 LA PAR-A PD2 PD BUCNLEY. B Oi INTERNAL: IE/DEP /EPB 06 IE/DEPER/ IRB 12 04 RQN2 EXTERNAL: 24X LPDR 03 NRC PDR 02 NSIC TOTAL NONBER OF COPIEB REQUIRED: LTTR I2 ENCL

'N H

il

June 6, 1986 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000

Subject:

Shearon Harris Nuclear Plant Carolina Power 8 Light, Emergency Plan

Dear Mr. Denton:

Carolina Power & Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris Nuclear plant as required by federal regulation, 10 CFR Part 50.

This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan. Thus, no plan which could actually be implemented if the plant were to operate has been tested.

In addition, citizens and officials in other counties are considering withdrawin'g from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.

PM:

Peter Keese Episcopal Chaplain Duke University Medical Center cc: Congressman Tim Valentine ggOb1601>~ ggOgOb l

P AOOCK O~OOPOOO o

i PDR pDR

S I