ML18012A782: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY 1 REGULRTC@INPORMATION DISTRIBUTION | {{#Wiki_filter:CATEGORY 1 REGULRTC@ INPORMATION DISTRIBUTION %STEM (RIDE) | ||
%STEM (RIDE)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,'S. | DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,'S. Carolina Power & Light Co. | ||
Carolina Power&Light Co.ROBINSON,W.R. | ROBINSON,W.R. Carolina Power 6 Light Co. | ||
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION | RECIP.NAME RECIPIENT AFFILIATION | ||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating rept r 1997 for Shearon Harris Nuclear Power Plant.970514 1 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR | Monthly operating rept r 1997 for Shearon Harris Nuclear Power Plant. 970514 1 r. | ||
.NRR/DRPM/PECB | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech 1 | ||
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL.1'1 1 , CP?QE Carolina Power&Light Company PO Box 165 New Hill NC 27562 | Specs) | ||
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50400/LICENSE NO.NPF-63 | ENCL ! SIZE: | ||
NOTES:Application for permit renewal filed. 05000400 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 ROONEYPV 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB . 1 1 Ol 1 1 NRR/DRPM/PECB 1 1 OC/DBA PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEIJ H 1 1 NOAC 1 1 NRC PDR 1 1 D | |||
N NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL .1'1 | |||
1 | |||
, CP?QE Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris NUclear Plant MAY 1 4 >997 United States Nuclear Regulatory Commission Serial: HNP-97-107 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
In accordance with Carolina Power 8c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of April 1997 is provided.Sincerely, MV Enclosure Mr.J.B.Brady-NRC Senior Resident Inspector Mr.L.A.Reyes-NRC Regional Administrator Mr.N.B.Le-NRC Project Manager 97052202bl 970430 PDR ADQCK 05000400 R PDR | |||
/Page 2 bc: Mr.T.C.Bell Mr.B.H.Clark Mr.G.W.Davis Ms.S.F.Flynn Mr.W.J.Hindman Ms.W.C.Langston (PE&RAS File)Mr.R.D.Martin Mr.W.S.Orser Mr.W.R.Robinson Mr.W.G.Wendland Nuclear Records File: HI/A-2D Enclosure to Serial HNP-97-107 Sheet 1 of 4 CP&L CO.RUN DATE 05/05/97 RUN TIME 19:04:56 DOCKET NO.050"400 COMPLETED BY: SHEILA ROGERS TELEPHONE (919)362-2573 OPERATING STATUS | In accordance with Carolina Power 8c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of April 1997 is provided. | ||
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 Enclosure to Serial: HNP-97-107 Sheet 2 of 4 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 05/05/97 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 19:04:56 HARRIS UNIT 1 | Sincerely, MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. N. B. Le - NRC Project Manager | ||
'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 97052202bl 970430 PDR ADQCK 05000400 R PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095 | |||
(919)362-2573 REPORT MONTH | |||
/II P J~~i t | United States Nuclear Regu atory Commission HNP-97-107 / Page 2 bc: Mr. T. C. Bell Mr. B. H. Clark Mr. G. W. Davis Ms. S. F. Flynn Mr. W. J. Hindman Ms. W. C. Langston (PE&RAS File) | ||
(919)362-2573 REPORT MONTH NUMBER DATE TYPE I | Mr. R. D. Martin Mr. W. S. Orser Mr. W. R. Robinson Mr. W. G. Wendland Nuclear Records File: HI/A-2D | ||
Enclosure to Serial HNP-97-107 Sheet 1 of 4 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/97 OPERATING DATA REPORT RPD36-000 RUN TIME 19:04:56 HARRXS UNIT 1 DOCKET NO. 050"400 COMPLETED BY: SHEILA ROGERS TELEPHONE (919)362-2573 OPERATING STATUS | |||
: 1. UNIT NAME: HARRIS UNIT 1 | |||
: 2. REPORTING PERIOD: APRIL 97 | |||
: 3. LICENSED THERMAL POWER (MWT): 2775 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 950.9 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 | |||
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 | |||
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): | |||
: 10. REASONS FOR RESTRICTION IF ANY: | |||
THIS YR TO CUMUL MONTH DATE ATIVE | |||
: 11. HOURS IN REPORTING PERIOD 719.00 2879.00 87648.00 | |||
: 12. NUMBER OF HOURS REACTOR CRITICAL 98.45 2223.79 73489.90 | |||
: 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 | |||
: 14. HOURS GENERATOR ON LXNE 98.37 2210.13 72767.79 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 | |||
: 16. GROSS THERMAL ENERGY GEN. (MWH) 266067.00 6099787.44 194984120.70 | |||
: 17. GROSS ELEC. ENERGY GEN (MWH) 89258.00 2050566.00 64917818.00 | |||
: 18. NET ELEC. ENERGY GENERATED (MWH) 75947.00 1919787.00 60544526.00 | |||
: 19. UNXT SERVICE FACTOR 13.68 76.77 83.02 | |||
: 20. UNIT AVAILABILITYFACTOR 13.68 76.77 83.02 | |||
: 21. UNIT CAP. FACTOR (USING MDC NET) 12.28 77.54 80.32 | |||
: 22. UNIT CAP. FACTOR (USING DER NET) 11.74 74.09 76.75 | |||
: 23. UNIT FORCED OUTAGE RATE .00 2.14 3.29 | |||
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): | |||
Unit started Refueling Outage 7 on 4/5/97, with an estimated duration of 40 days. | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: May 29, 1997 | |||
: 26. UNITS XN TEST STATUS (PRXOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 | |||
Enclosure to Serial: HNP-97-107 Sheet 2 of 4 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 19:04:56 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 APRIL 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 875 17 878 18 878 19 850 20 -12 | |||
-17 21 | |||
-30 22 | |||
-26 23 "15 25 10 -10 26 27 12 -10 28 13 29 | |||
-12 30 15 -12 16 -12 | |||
0 | |||
'I | |||
Enclosure to Serial: HNP-97-107 ~ | |||
,Sheet 3of< | |||
UNIT SHUTDOWNS AND POWER REDUCTION UNITNAME: Harris DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHU1TING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT g CODE 4 CODE 5 97-002 970404 0.0 N/A Unit commenced turbine load reduction at 2223 on 4/4/97 in preparation for refueling outage 7. | |||
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4<ontinued (NUREG4)161) | |||
E&perator Training & License Examination 5-Reduced Load F-Administrative 643thcr 5 G-Operational Error (Explain) Exhibit I - Same Source Hither (Explain) | |||
/ | |||
II P J | |||
~ | |||
~ | |||
i t | |||
r Enclosure <o, Serial: HNP-97-107. | |||
,Sheet 4 of@ | |||
UNITSHUTDOWNS AND POWER REDUCTION UNITNAME: Hams DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUITING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT II CODE4 CODE 5 97403 970405 620.63 N/A ZZZZZZ Unit shutdown and taken olf-line at 0222 on 4/5/97 for refueling outage 7. | |||
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4Mntinued (NUREG4161) | |||
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source Hither (Explain)}} |
Latest revision as of 04:52, 22 October 2019
ML18012A782 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 04/30/1997 |
From: | Robinson W, Shannon Rogers CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
HNP-97-107, NUDOCS 9705220261 | |
Download: ML18012A782 (9) | |
Text
CATEGORY 1 REGULRTC@ INPORMATION DISTRIBUTION %STEM (RIDE)
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,'S. Carolina Power & Light Co.
ROBINSON,W.R. Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept r 1997 for Shearon Harris Nuclear Power Plant. 970514 1 r.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech 1
Specs)
ENCL ! SIZE:
NOTES:Application for permit renewal filed. 05000400 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 ROONEYPV 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB . 1 1 Ol 1 1 NRR/DRPM/PECB 1 1 OC/DBA PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEIJ H 1 1 NOAC 1 1 NRC PDR 1 1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL .1'1
1
, CP?QE Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris NUclear Plant MAY 1 4 >997 United States Nuclear Regulatory Commission Serial: HNP-97-107 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power 8c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of April 1997 is provided.
Sincerely, MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. N. B. Le - NRC Project Manager
'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 97052202bl 970430 PDR ADQCK 05000400 R PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095
United States Nuclear Regu atory Commission HNP-97-107 / Page 2 bc: Mr. T. C. Bell Mr. B. H. Clark Mr. G. W. Davis Ms. S. F. Flynn Mr. W. J. Hindman Ms. W. C. Langston (PE&RAS File)
Mr. R. D. Martin Mr. W. S. Orser Mr. W. R. Robinson Mr. W. G. Wendland Nuclear Records File: HI/A-2D
Enclosure to Serial HNP-97-107 Sheet 1 of 4 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/97 OPERATING DATA REPORT RPD36-000 RUN TIME 19:04:56 HARRXS UNIT 1 DOCKET NO. 050"400 COMPLETED BY: SHEILA ROGERS TELEPHONE (919)362-2573 OPERATING STATUS
- 1. UNIT NAME: HARRIS UNIT 1
- 2. REPORTING PERIOD: APRIL 97
- 3. LICENSED THERMAL POWER (MWT): 2775
- 4. NAMEPLATE RATING (GROSS MWE): 950.9
- 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 719.00 2879.00 87648.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 98.45 2223.79 73489.90
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
- 14. HOURS GENERATOR ON LXNE 98.37 2210.13 72767.79
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 266067.00 6099787.44 194984120.70
- 17. GROSS ELEC. ENERGY GEN (MWH) 89258.00 2050566.00 64917818.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 75947.00 1919787.00 60544526.00
- 19. UNXT SERVICE FACTOR 13.68 76.77 83.02
- 20. UNIT AVAILABILITYFACTOR 13.68 76.77 83.02
- 22. UNIT CAP. FACTOR (USING DER NET) 11.74 74.09 76.75
- 23. UNIT FORCED OUTAGE RATE .00 2.14 3.29
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Unit started Refueling Outage 7 on 4/5/97, with an estimated duration of 40 days.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: May 29, 1997
- 26. UNITS XN TEST STATUS (PRXOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
Enclosure to Serial: HNP-97-107 Sheet 2 of 4 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 19:04:56 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 APRIL 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 875 17 878 18 878 19 850 20 -12
-17 21
-30 22
-26 23 "15 25 10 -10 26 27 12 -10 28 13 29
-12 30 15 -12 16 -12
0
'I
Enclosure to Serial: HNP-97-107 ~
,Sheet 3of<
UNIT SHUTDOWNS AND POWER REDUCTION UNITNAME: Harris DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHU1TING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT g CODE 4 CODE 5 97-002 970404 0.0 N/A Unit commenced turbine load reduction at 2223 on 4/4/97 in preparation for refueling outage 7.
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4<ontinued (NUREG4)161)
E&perator Training & License Examination 5-Reduced Load F-Administrative 643thcr 5 G-Operational Error (Explain) Exhibit I - Same Source Hither (Explain)
/
II P J
~
~
i t
r Enclosure <o, Serial: HNP-97-107.
,Sheet 4 of@
UNITSHUTDOWNS AND POWER REDUCTION UNITNAME: Hams DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUITING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT II CODE4 CODE 5 97403 970405 620.63 N/A ZZZZZZ Unit shutdown and taken olf-line at 0222 on 4/5/97 for refueling outage 7.
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4Mntinued (NUREG4161)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source Hither (Explain)