ML18016A285: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 lIEGULATORY INPORI'1ATION DISTRIEUTIONCYSTEN
{{#Wiki_filter:CATEGORY 1 lIEGULATORY INPORI'1ATION DISTRIEUTIONCYSTEN <RIDS)
<RIDS)ACCESSION NBR: 9801210266 DOC.DATE: NOTARIZED:
ACCESSION NBR: 9801210266           DOC. DATE:               NOTARIZED: NO               DOCKET 0 FAG IL: 50-400   Shearon   Harris Nuclear Power Planti Unit           ii Carolina     05000400 AUTH. N*M'E     o     AUTHOR AFFILIATION ROGERSI S.             Carolina Power 5 Light Co.
NO FAG IL: 50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina AUTH.N*M'E o AUTHOR AFFILIATION ROGERSI S.Carolina Power 5 Light Co.DONAHUEI J.N.Carolina Power ltj: Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 0 05000400 l SUB JECT: Month 1 g op crating r ep t 97 for Shearon Harris Nuclear Planti Unit.W 8012%ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR~ENCL l SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: Application for permit renewal filed.05000eoOE RECIPIENT ID CODE/NAME PD2-1 PD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 FLANDERS.S COPIES LTTR ENCL 1 1 INTERNAL: LE ENTE RGN2 EXTERNAL: LITCO BRYCEI J H NRC PDR 1.1 1 1 1 1 1 1 1 1*EQD/SPD/RRAB QC/DBA/PAD NOAC 1 1 1 1 1 U N NOTE TO ALL"RIDS" RECZPIENTSI PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF CQP I ES REQUIRED: LTTR 20 ENCL 20 e sc 4 ,p Carolina Power 8 Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 JAN 14 1998 United States Nuclear Regulatory Commission ATTENTION:
DONAHUEI J. N.         Carolina Power ltj: Light Co.
Document Control Desk Washington, DC 20555 Serial: HNP-98-004 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT  
RECIP. NAME             RECIPIENT AFFILIATION l
SUB JECT:   Month 1 g op crating   r ep t             97 for Shearon Harris Nuclear Planti Unit         . W   8012% ltr.
DISTRIBUTION CODE:       IE24D   COPIES RECEIVED: LTR       ~ ENCL   l   SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES: Application for permit renewal filed.                                             05000eoOE RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL         ID CODE/NAME         LTTR ENCL PD2-1 PD                  1       1     FLANDERS. S               1     1 INTERNAL:                               1     . 1     *EQD/SPD/RRAB             1      1 LE    ENTE              1      1    QC/DBA/PAD               1 RGN2                      1      1 EXTERNAL: LITCO BRYCEI J H              1      1    NOAC                     1     1 NRC PDR                    1       1 U
N NOTE TO ALL "RIDS" RECZPIENTSI PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF CQP I ES REQUIRED: LTTR             20   ENCL   20
 
e sc 4
,p
 
Carolina Power 8 Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 JAN   14   1998 United States Nuclear Regulatory Commission                                             Serial: HNP-98-004 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power 0 Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of December 1997 is provided.Sincerely, J.W.Donahue Director of Site Operations Harris Plant MV Enclosure Mr.J.B.Brady-NRC Senior Resident Inspector Mr.L.A.Reyes-NRC Regional Administrator Mr.V.Rooney-NRC Project Manager 980i2i02bb 97i23i PDR ADOCK 05000400 R"'PDR II!IIIIIIIII!IIII!IIIIIIIIIIIIIIIIIIIIII State Road H3d New Hill NC  
 
*n 4 I Enclosure to Serial HNP-93-004 Sheet l of 2 CP&L CO.RUN DATE 01/07/98 RUN TIME 09:55:48 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: DECEMBER 97 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 S.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION XF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS XN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNZT SERVICE FACTOR 20.UNIT AVAXLABILXTY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 744.00 744.00.00 744.00.00 2057886.72 695296.00 653406.00 100.00 100.00 102.12 97.58.00 8760.00 7043.60.00 6935.88.00 18950443.92 6314552.00 5900566.00 79.18 79.18 78.32 74.84 4.11 93529.00 78309.71.00 77493.54.00 207834777.18 69181804.00 64525305.00 82.86 82.86 80.22 76.66 3.40 24~SHUTDOWNS SCHED~OVER NEXT 6 MONTHS (TYPEi DATEi AND DURATION OF EACH)25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
In accordance with Carolina Power 0 Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of December     1997 is provided.
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 S I,'  
Sincerely, J. W. Donahue Director of Site Operations Harris Plant MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. V. Rooney - NRC Project Manager 980i2i02bb 97i23i PDR     ADOCK 05000400 R                       'PDR II!IIIIIIIII!IIII!IIIIIIIIIIIIIIIIIIIIII State Road H3d     New Hill NC
~~Enclosure to Serial: HNP-98-004 Sheet 2 of2 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE Ol/07/98 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 09:55:47 HARRIS UNIT 1 PAGE 1 RPD39-000 DECEMBER 1997 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY SHE1LA ROGERS TELEPHONE (919)362"2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 15 16 876 881 878 874 880 849 880 880 881 879 879 881 881 882 880 880 17 18 19 20 21 22 23 25 26 27 28 29 30 31 879 880 878 877 879 879 879 877 877 880 880 882 882 878 878}}
 
n
 
4     I Enclosure to Serial HNP-93-004 Sheet l of 2 CP&L CO.                       PLANT PERFORMANCE DATA SYSTEM                  PAGE      1 RUN DATE   01/07/98               OPERATING DATA REPORT                      RPD36-000 RUN TIME   09:55:48                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS                                        TELEPHONE (919)362-2573
: 1. UNIT NAME:     HARRIS UNIT 1
: 2. REPORTING PERIOD: DECEMBER 97
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE): 950.9 S. DESIGN ELECTRICAL RATING (NET MWE): 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7 . MAX DEPENDABLE CAPACITY (NET MWE):       860.0
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU     7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED   IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION XF ANY:
THIS             YR TO                 CUMUL MONTH              DATE                 ATIVE
: 11. HOURS XN REPORTING PERIOD                     744.00            8760. 00            93529.00
: 12. NUMBER OF HOURS REACTOR CRITICAL             744.00            7043.60              78309.71
: 13. REACTOR RESERVE SHUTDOWN HRS                     .00                .00                  .00
: 14. HOURS GENERATOR ON LINE                       744.00            6935.88              77493.54
: 15. UNIT RESERVE SHUTDOWN HOURS                       .00                .00                  .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)         2057886.72        18950443.92        207834777.18
: 17. GROSS ELEC. ENERGY GEN (MWH)             695296.00          6314552.00          69181804.00
: 18. NET ELEC. ENERGY GENERATED (MWH)         653406.00          5900566.00          64525305.00
: 19. UNZT SERVICE FACTOR                           100. 00            79.18                82.86
: 20. UNIT AVAXLABILXTYFACTOR                      100. 00            79.18                82.86
: 21. UNIT CAP. FACTOR (USING MDC NET)             102.12              78.32                80.22
: 22. UNIT CAP. FACTOR (USING DER NET)               97.58              74.84                76. 66
: 23. UNIT FORCED OUTAGE RATE                           .00             4.11                 3.40 24 ~ SHUTDOWNS SCHED ~ OVER NEXT 6 MONTHS (TYPEi DATEi AND DURATION OF EACH)
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9
 
S I,'
 
~   ~
Enclosure to Serial: HNP-98-004 Sheet 2 of2 CP&L CO.                   PLANT PERFORMANCE DATA SYSTEM                 PAGE      1 RUN DATE Ol/07/98     APPENDIX B AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TIME 09:55:47                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHE1LA ROGERS TELEPHONE (919)362"2573 DECEMBER        1997 DAY   AVG. DAILY POWER LEVEL             DAY    AVG. DAILY POWER LEVEL (MWE-NET)                                (MWE-NET) 876                   17                879 881                   18                880 878                    19                878 874                   20                877 880                   21                879 849                   22                879 880                   23                 879 880                                       877 881                    25                877 10                879                   26                880 879                   27                880 12                881                    28                882 13                881                    29                882 882                   30                878 15                880                    31                878 16                880}}

Latest revision as of 20:42, 3 February 2020

Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1.W/980114 Ltr
ML18016A285
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1997
From: Donahue J, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-004, HNP-98-4, NUDOCS 9801210266
Download: ML18016A285 (7)


Text

CATEGORY 1 lIEGULATORY INPORI'1ATION DISTRIEUTIONCYSTEN <RIDS)

ACCESSION NBR: 9801210266 DOC. DATE: NOTARIZED: NO DOCKET 0 FAG IL: 50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 AUTH. N*M'E o AUTHOR AFFILIATION ROGERSI S. Carolina Power 5 Light Co.

DONAHUEI J. N. Carolina Power ltj: Light Co.

RECIP. NAME RECIPIENT AFFILIATION l

SUB JECT: Month 1 g op crating r ep t 97 for Shearon Harris Nuclear Planti Unit . W 8012% ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR ~ ENCL l SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: Application for permit renewal filed. 05000eoOE RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS. S 1 1 INTERNAL: 1 . 1 *EQD/SPD/RRAB 1 1 LE ENTE 1 1 QC/DBA/PAD 1 RGN2 1 1 EXTERNAL: LITCO BRYCEI J H 1 1 NOAC 1 1 NRC PDR 1 1 U

N NOTE TO ALL "RIDS" RECZPIENTSI PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF CQP I ES REQUIRED: LTTR 20 ENCL 20

e sc 4

,p

Carolina Power 8 Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 JAN 14 1998 United States Nuclear Regulatory Commission Serial: HNP-98-004 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power 0 Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of December 1997 is provided.

Sincerely, J. W. Donahue Director of Site Operations Harris Plant MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. V. Rooney - NRC Project Manager 980i2i02bb 97i23i PDR ADOCK 05000400 R 'PDR II!IIIIIIIII!IIII!IIIIIIIIIIIIIIIIIIIIII State Road H3d New Hill NC

n

4 I Enclosure to Serial HNP-93-004 Sheet l of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 01/07/98 OPERATING DATA REPORT RPD36-000 RUN TIME 09:55:48 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: DECEMBER 97
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9 S. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7 . MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION XF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS XN REPORTING PERIOD 744.00 8760. 00 93529.00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 7043.60 78309.71
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 744.00 6935.88 77493.54
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2057886.72 18950443.92 207834777.18
17. GROSS ELEC. ENERGY GEN (MWH) 695296.00 6314552.00 69181804.00
18. NET ELEC. ENERGY GENERATED (MWH) 653406.00 5900566.00 64525305.00
19. UNZT SERVICE FACTOR 100. 00 79.18 82.86
20. UNIT AVAXLABILXTYFACTOR 100. 00 79.18 82.86
21. UNIT CAP. FACTOR (USING MDC NET) 102.12 78.32 80.22
22. UNIT CAP. FACTOR (USING DER NET) 97.58 74.84 76. 66
23. UNIT FORCED OUTAGE RATE .00 4.11 3.40 24 ~ SHUTDOWNS SCHED ~ OVER NEXT 6 MONTHS (TYPEi DATEi AND DURATION OF EACH)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9

S I,'

~ ~

Enclosure to Serial: HNP-98-004 Sheet 2 of2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE Ol/07/98 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 09:55:47 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHE1LA ROGERS TELEPHONE (919)362"2573 DECEMBER 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 876 17 879 881 18 880 878 19 878 874 20 877 880 21 879 849 22 879 880 23 879 880 877 881 25 877 10 879 26 880 879 27 880 12 881 28 882 13 881 29 882 882 30 878 15 880 31 878 16 880