{{#Wiki_filter:" ' . PALI/ADE/  
{{#Wiki_filter:~ .
/CEnARIO 1982 Con1umer1 Power Company Jackson. mtchlqan Small-Scale  
PALI/ADE/ /CEnARIO 1982 Con1umer1 Power Company Jackson. mtchlqan Small-Scale
*Emergency Exerclse FEBRUARY 23, 1982 consumers Power company \':::!:,/
      *Emergency Exerclse FEBRUARY 23, 1982 EXERCISE ELEMENTS
GENERAL OFFICES EXERCISE ELEMENTS
* Plant Site Emergency Plan
* Plant Site Emergency Plan *Van Buren County Emergency Operation  
                                                        *Van Buren County Emergency Operation Pl~n
*  
* Allega*~ ..County Emergency Operatio~ 'Plan
.. County Emergency  
                                                        *Berrien County Emergency Operation Plan
'Plan *Berrien County Emergency Operation Plan *Michigan Emergency Preparedness Plan 212 West Michigan Avenue Jackson Ml 49201 . 8203050430 820225 PDR ADOCK 05000255 F PDR
                                                        *Michigan Emergency Preparedness Plan
-
        ~          consumers Power company
* Palisades Plant Emergency Exercise Scenario -February 23, 1982 An emergency exercise is planned for the Palisades Plant for February 23, 1982. The following action will be simulated:
        \':::!:,/        GENERAL OFFICES 212 West Michigan Avenue Jackson Ml 49201
At 0545 am Unusual Event will be declared due to high specific activity in the primary coolant system. Beginning the exercise before 0600 will fulfill the NUREG 0654 requirement of one exercise starting before 0600 every six years. At 0700 the Shift Supervisor will begin shift augmentation.
  . 8203050430 820225 PDR ADOCK 05000255 F                     PDR
Although whift augmentation is not required in our emergency plan at this level, this action will provide an opportunity to test our shift autmentation ability as per NUREG 0654, Table B-1. At 0800 specific activity in the primary coolant system will rise calling for an escalation to Alert be performed.
 
As soon as each assembly area leader has accounted for his area, personnel not directly involved in the exercise will report back to work. Personnel involved in the exercise will continue.
                                                          -*~ --**~*--.:~h,"''********-*
Staff.to continue will be identified in advance and consist of the Technical Support Center staff and a portion of the Operations Support Center staff consisting of approximately one Radiation Safety Supervisor, ten Chemistry/Radiation Safety technicians, one Maintenance Supervisor and four Maintenance workers. The Emergency Operations Facility staffing and operation has been coordinated with the General Office. At 0900 a turbine trip will occur. The main steam isolation valves will close and the atmospheric steam dump valves will open. One atmospheric dump valve will fail to seat after pressure lowers. At 0901 the reactor trips. At 0915, steam generator tubes will repture. Radioactivity will be released to the atmosphere through the steam dump. A General Emergency will be declared.
* Palisades Plant Emergency Exercise Scenario - February 23, 1982 An emergency exercise is planned for the Palisades Plant for February 23, 1982.
The release will be sufficient to require evacuation of the population out to three miles. A lated evacuation will take place for non-essential personnel at the site due to high radiation levels. At 1115 the release will end. At 1200 the exercise will end. The above scenario will test the following areas: 1. Notification and augmentation of the emergency organizations.  
The following action will be simulated:
: 2. Communications  
At 0545 am Unusual Event will be declared due to high specific activity in the primary coolant system. Beginning the exercise before 0600 will fulfill the NUREG 0654 requirement of one exercise starting before 0600 every six years.
: 3. Emergency classification  
At 0700 the Shift Supervisor will begin shift augmentation. Although whift augmentation is not required in our emergency plan at this level, this action will provide an opportunity to test our shift autmentation ability as per NUREG 0654, Table B-1.
: 4. Emergency actions 5. Protective action recommendations (1)
At 0800 specific activity in the primary coolant system will rise calling for an escalation to Alert be performed. As soon as each assembly area leader has accounted for his area, personnel not directly involved in the exercise will report back to work.
* 6. Decision making 7. Radiological monitoring, offsite and onsite. 8. Post accident sampling 9. Accountability Observer/Evaluators will be provided by General Physics, the General Office and the Midland Plant. A critique is scheduled for 1330 until 1600 on 2/23/82. This critique will be organized by General Physics. A final report, to be written by General Physics, is scheduled to be completed by 4/1/82. The background information for the drill is as follows: The plant has been operating at full power for the past month. No unusual conditions have been noted except as follows; the primary coolant activity has been slightly greater than 1.0 uCi/g dose equivalent I-131 for the past 72 hours. The meteorological conditions are as follows: wind direction wind speed stability class 240° blowing to 60° 4.7 m/s, 10.5 mph 6010 delt = -.16 E Stability Attached is an exercise chronology, list of messages, and instructions.  
Personnel involved in the exercise will continue. Staff.to continue will be identified in advance and consist of the Technical Support Center staff and a portion of the Operations Support Center staff consisting of approximately one Radiation Safety Supervisor, ten Chemistry/Radiation Safety technicians, one Maintenance Supervisor and four Maintenance workers. The Emergency Operations Facility staffing and operation has been coordinated with the General Office.
(2)
At 0900 a turbine trip will occur. The main steam isolation valves will close and the atmospheric steam dump valves will open. One atmospheric dump valve will fail to seat after pressure lowers. At 0901 the reactor trips.
' . Time 0706 0800 .....
At 0915, steam generator tubes will repture. Radioactivity will be released to the atmosphere through the steam dump. A General Emergency will be declared. The release will be sufficient to require evacuation of the population out to three miles. A simu-lated evacuation will take place for non-essential personnel at the site due to high radiation levels.
* EMERGENCY EXERCISE CHRONOLOGY WITH TSC MESSAGES Event/Message High activity in the Primary Coolant System Message to Shift Supervisor: "This is an Exercise -Sampling of primary coolant.indicates specific activity of 100 uCi/g dose equivalent I-131 has been greater than 1.0 uCi/g for the past 72 hours. Failed fuel itor (RIA-0202) has gone off scale. THIS IS AN EXERCISE" Shift Augmentation Message to Shift Supervisor: " -THIS IS AN EXERCISE" -You have not determined the cause of the high activity in the Primary Coolant System and have decided to begin shift tation to provide technical support. Augmentation calls will be made to personnel scheduled for "B" shift the day of the exercise.
At 1115 the release will end.
General Office personnel are provided to make these calls for the SS -THIS IS AN EXERCISE" Increased activity in the Primary Coolant System Message to SED: "THIS IS AN EXERCISE -Sampling of primary coolant system indicates fic activity of 350 uCi/g dose lent I-131. -THIS IS AN EXERCISE -" (3) Emergency Class/Expected ActionE Unusual Event 1. Notify Duty & Call Supt.
At 1200 the exercise will end.
* 2. Notify Power Controller
The above scenario will test the following areas:
: 3. Notify NRC ). Notify Vart Buren Sheriff 10. Notify Michigan State Police 17. Notify Chem/HP Supt 38. Notify Public Affairs Director Initiate plant shutdown due to Tech Spec specific activity limit. *Numbers refer to Attachment 2 of EI-2 Emergency Action Checklist Unusual Event continues Perform shift augmentation to test time required to meet NUREG 0654 Table B-1. Alert PCS activity indicates a severe loss of fuel cladding.
: 1. Notification and augmentation of the emergency organizations.
: 2. Notify Power Controller
: 2. Communications
: 3. Notify NRC 5. Notify Van Buren Sheriff 10. Notify Michigan State Police 17. Notify Chem/HP Supt 18. Notify Property Protection Su 19. Establish TSC 20. Establish DSC 22. Initiate on-site monitoring  
: 3. Emergency classification
: 24. Provide 15-minute updates 27. Meteorological data -obtain & analyze 32. Perform personnel accountabili  
: 4. Emergency actions
: 5. Protective action recommendations (1)
: 6. Decision making
: 7. Radiological monitoring, offsite and onsite.
: 8. Post accident sampling
: 9. Accountability Observer/Evaluators will be provided by General Physics, the General Office and the Midland Plant.
A critique is scheduled for 1330 until 1600 on 2/23/82. This critique will be organized by General Physics.
A final report, to be written by General Physics, is scheduled to be completed by 4/1/82.
The background information for the drill is as follows:
The plant has been operating at full power for the past month. No unusual conditions have been noted except as follows; the primary coolant activity has been slightly greater than 1.0 uCi/g dose equivalent I-131 for the past 72 hours.
The meteorological conditions are as follows:
wind direction         240° blowing to 60° wind speed            4.7 m/s, 10.5 mph stability class      6010 delt = -.16 E Stability Attached is an exercise chronology, list of messages, and instructions.
(2)
 
                              *EMERGENCY EXERCISE CHRONOLOGY WITH TSC MESSAGES Time                Event/Message                         Emergency Class/Expected ActionE High activity in the Primary Coolant               Unusual Event System
: 1. Notify Duty & Call Supt.
* Message to Shift Supervisor:
: 2. Notify  Power Controller "This is an Exercise - Sampling of
: 3. Notify  NRC primary coolant.indicates specific
                                                              ). Notify Vart Buren Sheriff activity of 100 uCi/g dose equivalent
: 10. Notify Michigan State Police I-131 has been greater than 1.0 uCi/g
: 17. Notify  Chem/HP Supt for the past 72 hours. Failed fuel mon-
: 38. Notify  Public Affairs Director itor (RIA-0202) has gone off scale.
THIS IS AN EXERCISE"                               Initiate plant shutdown due to Tech Spec specific activity limit.
                                                              *Numbers refer to Attachment 2 of EI-2 Emergency Action Checklist 0706    Shift Augmentation                                 Unusual Event continues Message to Shift Supervisor:                       Perform shift augmentation to test
            " - THIS IS AN EXERCISE" - You have               time required to meet NUREG 0654 not determined the cause of the high               Table B-1.
activity in the Primary Coolant System and have decided to begin shift augmen-tation to provide technical support.
Augmentation calls will be made to personnel scheduled for "B" shift the day of the exercise. General Office personnel are provided to make these calls for the SS - THIS IS AN EXERCISE" 0800    Increased activity in the Primary                 Alert Coolant System                                     PCS activity indicates a severe loss of fuel cladding.
Message to SED:
: 2. Notify Power Controller "THIS IS AN EXERCISE - Sampling of
: 3. Notify NRC primary coolant system indicates speci-
: 5. Notify Van Buren Sheriff fic activity of 350 uCi/g dose equiva-
: 10. Notify Michigan State Police lent I-131. -THIS IS AN EXERCISE - "
: 17. Notify Chem/HP Supt
: 18. Notify Property Protection Su
: 19. Establish TSC
: 20. Establish DSC
: 22. Initiate on-site monitoring
: 24. Provide 15-minute updates
: 27. Meteorological data - obtain &
analyze
: 32. Perform personnel accountabili
: 38. Notify Public Affairs Director
: 38. Notify Public Affairs Director
* Non-participating personnel will return to work after accountability check.
* Non-participating personnel will return to work after accountability check.
' . Time 0900 0901 0915 0925
(3)
* Event/Message Turbine & Reactor Trip. Message to SED from SS: "THIS IS AN EXERCISE -A turbine trip has occurred.
 
The Main Steam Isolation Valves (MSIV's) have isolated .. Atmospheric steam dump valves have opened -THIS IS AN EXERCISE". . Message to SED from SS: "THIS IS AN EXERCISE -The reactor has tripped. -THIS IS AN EXERCISE." Release begins. Message to SED from SS: "THIS IS AN EXERCISE -The high activity alarm on the steam generator blowdown monitor has sounded (RIA-0631).
                                                                  ' ..... -.. ,: ; .:.. ,,..*. ~~
THIS IS AN EXERCISE" Message to SED after the high range steam dump monitor is checked: "THIS IS AN EXERCISE .:.. High range steam dump monitor indicates a reading of 12 mrem/hr. High range stack monitor indicates a reading of l Mrem/hr -THIS IS AN EXERCISE." Message to SED from SS: "THIS IS AN EXERCISE -Containment pressure is normal. Containment tion monitors read normal levels -THIS IS AN EXERCISE -" Release continues.
Time     Event/Message                         Emergency Class/Expected Action 0900    Turbine & Reactor Trip.                 Alert continues
Message to SED from the SS: "THIS IS AN EXERCISE -An automatic atmospheric steam dump valve (POS 0780) has failed to seat. A manual atmospheric steam dump valve (l02 MS) has broken preventing us from stopping the release THIS IS AN EXERCISE-".  
: 22. On-site monitoring continues Message to SED from SS:                 24. l5-minute updates continue "THIS IS AN EXERCISE - A                 27. Analysis of met. data turbine trip has occurred. The                  continues.
(4) ' ..... -.. ,: ; .:.. ,, .. *. Emergency Class/Expected Action Alert continues
Main Steam Isolation Valves (MSIV's) have isolated . . Atmospheric steam dump valves have opened - THIS IS AN EXERCISE". .
: 22. On-site monitoring continues
0901    Message to SED from SS:
: 24. l5-minute updates continue 27. Analysis of met. data continues.
          "THIS IS AN EXERCISE - The reactor has tripped. - THIS IS AN EXERCISE."
General Emergency
0915    Release begins.                         General Emergency
: 2. Notify Power Controller
: 2. Notify Power Controller Message to SED from SS:
: 3. Notify NRC 4. Notify GO Control Center 5. Notify Van Buren Sheriff lO. Notify Michigan State Police ll. Notify Michigan Dept. of Reali l7. Notify Chem/HP Supt. 18. Notify Property Protection Su] 2l. Establish EOF 22. Continue on-site monitoring
: 3. Notify NRC "THIS IS AN EXERCISE - The high radio-    4. Notify GO Control Center activity alarm on the steam generator     5. Notify Van Buren Sheriff blowdown monitor has sounded (RIA-0631). lO. Notify Michigan State Police THIS IS AN EXERCISE"                     ll. Notify Michigan Dept. of Reali l7. Notify Chem/HP Supt.
: 23. Initiate off-site monitoring
Message to SED after the high range
: 24. Continue updates 25. Provide dose estimates.
: 18. Notify Property Protection Su]
: 27. Analyze met. data. 26. Analyze effluents
steam dump monitor is checked:
: 28. Provide release & dose projec-tions 33. Evacuation of non-essential personnel*
2l. Establish EOF "THIS IS AN EXERCISE .:.. High range     22. Continue on-site monitoring steam dump monitor indicates a reading   23. Initiate off-site monitoring of 12 mrem/hr. High range stack         24. Continue updates monitor indicates a reading of l         25. Provide dose estimates.
: 38. Notify Public Affairs Directo1 *Simulated Have maintenance initiate repair work.
Mrem/hr - THIS IS AN EXERCISE."         27. Analyze met. data.
Time 1115 1200 1130 1300 1330 I*,' i .. -----. **-* Event/Message Release ends. Message to TSC Maintenance from repair crew(given by TSC exercise controller): "THIS IS AN EXERCISE -The manual atmospheric steam dump valve has been paired. The valve has been closed -THIS IS AN EXERCISE.
Message to SED from SS:                 26. Analyze effluents
End of exercise for plant personnel.
: 28. Provide release & dose projec-
EOF (near site) staff arrive. Exercise Terminates.
          "THIS IS AN EXERCISE - Containment tions pressure is normal. Containment radia-
Critique of exercise.
: 33. Evacuation of non-essential tion monitors read normal levels - THIS personnel*
(5) Emergency Class/Expected Actions Consider downgrading of exercise .. Establish communications links with plant, GO, and offsite agencies.
IS AN EXERCISE - "                       38. Notify Public Affairs Directo1
Participate in recovery re-entry phase with offsite agencies.
                                                        *Simulated 0925    Release continues.                      Have maintenance initiate repair work.
*, .e Instructions to Monitoring and Security Teams -Instructions for offsite/onsite/habitability monitoring teams: Proceed to areas designated by your supervisor.
Message to SED from the SS:
Obtain survey results from the Exercise Controller.
          "THIS IS AN EXERCISE - An automatic atmospheric steam dump valve (POS 0780) has failed to seat. A manual atmospheric steam dump valve (l02 MS) has broken preventing us from stopping the release THIS IS AN EXERCISE-".
You are released to return to work when you have completed assigned surveys and communicated the results to your supervisor.  
(4)
-Instructions for monitor in Security trailer: Proceed as assigned by your supervisor.
 
Return to work after accountability has been performed in the parking lot. -Instructions for survey team at the end of the access road: Proceed as assigned by your supervisor.
Time    Event/Message                            Emergency Class/Expected Actions 1115    Release ends.                             Consider downgrading of exercise ..
Obtain survey results from the exercise controller.
Message to TSC Maintenance from repair crew(given by TSC exercise controller):
Return to work when released by the exercise controller.  
          "THIS IS AN EXERCISE - The manual atmospheric steam dump valve has been re-paired. The valve has been closed - THIS IS AN EXERCISE.
-Instructions for the Security team at the end of the access road: Proceed as assigned by your supervisor.
1200    End of exercise for plant personnel.
Return to work when released by the exercise controller. ( 6)
1130    EOF (near site) staff arrive.             Establish communications links with plant, GO, and offsite agencies. Participate in recovery re-entry phase with offsite agencies.
****--****" _, ...... *-Instructions for Exercise Controller Working with Maintenance Team Proceed with Maintenance team from the OSC. Check for Health Physics support and area survey. 625 1 level survey results are general field 1 rem/hr the wall and 10 rem/hr at the doorway. Iodine concentration  
1300    Exercise Terminates.
= 3.0 x 10 Ci/m3. No particulate.
1330    Critique of exercise.
Message to Maintenance team after inspection of manual atmospheric steam dump valve (104 MS): "THIS IS AN EXERCISE -The valve steam (104MS) has broken inside the wall. Repairs will take approximately 1-1/2 hours. THIS IS AN EXERCISE.
(5)
After this message has been relayed to the TSC, the Maintenance team and Health Physics survey team are released to return to work. (7)
 
.:_ .....  
                                                            .e Instructions to Monitoring and Security Teams
... : ... INSTRUCTIONS FOR EXERCISE CONTROLLER WORKING WITH THE MONITORING TEAM AT THE END OF THE ACCESS ROAD Proceed with technician assigned from the OSC. After the checkpoint has been established and one car has been monitored, release the technician and Security guards to return to work. (8)   
  - Instructions for offsite/onsite/habitability monitoring teams:
*-.** ... :.* . . ' ... :._ Instructions for Exercise Controller Working with Habitability Monitors Air samples in all accountability areas are background.
Proceed to areas designated by your supervisor. Obtain survey results from the Exercise Controller. You are released to return to work when you have completed assigned surveys and communicated the results to your supervisor.
General fields in all accountability areas read 5 mrem/hr. (9)
  - Instructions for monitor in Security trailer:
Proceed as assigned by your supervisor. Return to work after accountability has been performed in the parking lot.
  - Instructions for survey team at the end of the access road:
Proceed as assigned by your supervisor. Obtain survey results from the exercise controller. Return to work when released by the exercise controller.
    - Instructions for the Security team at the end of the access road:
Proceed as assigned by your supervisor. Return to work when released by the exercise controller.
( 6)
 
Instructions for Exercise Controller Working with Maintenance Team Proceed with Maintenance team from the OSC.
Check for Health Physics support and area survey. 625 1 level survey results are general field 1 rem/hr next_~o the wall and 10 rem/hr at the doorway.
Iodine concentration = 3.0 x 10   Ci/m3. No particulate. Message to Maintenance team after inspection of manual atmospheric steam dump valve (104 MS):
"THIS IS AN EXERCISE - The valve steam (104MS) has broken inside the wall.               Repairs will take approximately 1-1/2 hours. THIS IS AN EXERCISE.
After this message has been relayed to the TSC, the Maintenance team and Health Physics survey team are released to return to work.
(7)
 
                                                                        .:_ ..... ~..;** ... : ...
INSTRUCTIONS FOR EXERCISE CONTROLLER WORKING WITH THE MONITORING TEAM AT THE END OF THE ACCESS ROAD Proceed with technician assigned from the OSC. After the checkpoint has been established and one car has been monitored, release the technician and Security guards to return to work.
(8)
 
                                                                      ~ ~*.
Instructions for Exercise Controller Working with Habitability Monitors Air samples in all accountability areas are background.
General fields in all accountability areas read 5 mrem/hr.
(9)
 
                                                                      -****~* *d*_*
Instructions for Exercise Controller Assigned to Post-Accident Sampling Proceed with technicians assigned from the OSC. After sampling and analysis provide the team with the following message:
"THIS IS AN EXERCISE - The results of the containment air sample indicates background readings. The results of the primary coolant activity indicates 400 uCi/gm gross gamma.and 20 uCi/gm gross beta - THIS IS AN EXERCISE."
After the results have been communicated to the TSC, release the sampling team and return to work.
(10)
 
Instructions for Exercise Controller Working in tbe Security Trailer Proceed with technician assigned from tbe OSC. After accountability has been performed in the parking lot, release tbe technician to return to work.
(11)
 
Instructions for Exercb:;;e Controller Working With Onsite/Offsite Survey Teams Proceed with survey tea.ms asB1gned from the OSC. Provide Sampling results from the attached tables. Interpolate for results not listed. Release technician to return to work after they have communicated survey results to the TSC.
(l2)


*d*_* Instructions for Exercise Controller Assigned to Post-Accident Sampling Proceed with technicians assigned from the OSC. After sampling and analysis provide the team with the following message: "THIS IS AN EXERCISE -The results of the containment air sample indicates background readings.
Dose Rate and Iodine Concentrations at the Center of Plume (60°)
The results of the primary coolant activity indicates 400 uCi/gm gross gamma.and 20 uCi/gm gross beta -THIS IS AN EXERCISE." After the results have been communicated to the TSC, release the sampling team and return to work. (10) 
Distance from              Field Monitoring             Iodine Concentration Plant                      (mrem/hr)                       (Ci/m3)
. --. -* -< __ ,,;* ' :,:., __ ** .;. --** Instructions for Exercise Controller Working in tbe Security Trailer Proceed with technician assigned from tbe OSC. After accountability has been performed in the parking lot, release tbe technician to return to work. (11)
Site Boundary                5010                            9.5 x 10- 6 1 (miles)                    2410                            4.8 x 10- 6
Instructions for Exercb:;;e Controller Working With Onsite/Offsite Survey Teams Proceed with survey tea.ms asB1gned from the OSC. Provide Sampling results from the attached tables. Interpolate for results not listed. Release technician to return to work after they have communicated survey results to the TSC. (l2)
: 1. 5 x 10
Distance from Plant Site Boundary 1 (miles) 2 3 4 5 6 7 8 9 10 Dose Rate and Iodine Concentrations at the Center of Plume (60&deg;) Field Monitoring (mrem/hr) 5010 2410 831 465 311 227 -176 142 118 100 86 Iodine Concentration (Ci/m3) 9.5 x 10-6 4.8 x 10-6 10-6 1. 5 x 9.2 x 10-7 5.6 x 10-7 4.2 x 10-7 3.3 x 10-7 2.7 x 10-7 2.3 x 10-7 1.9 x 10-7 1.6 x 10-7 No particulate activity above background.  
                                                                        -6 2                            831 3                            465                            9.2 x 10-7 4                            311                              5.6 x 10- 7 227                              4.2 x 10- 7 5
6                            -176                              3.3 x 10- 7 142                              2.7 x 10- 7 7
8                            118                              2.3 x 10- 7 100                              1.9 x 10-7 9
86                            1.6 x 10- 7 10 No particulate activity above background.
(13)}}
(13)}}

Latest revision as of 17:31, 23 February 2020

Scenario,1982,Small-Scale Emergency Exercise.
ML18046B330
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/23/1982
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18046B329 List:
References
PROC-820223, NUDOCS 8203050430
Download: ML18046B330 (14)


Text

~ .

PALI/ADE/ /CEnARIO 1982 Con1umer1 Power Company Jackson. mtchlqan Small-Scale

  • Emergency Exerclse FEBRUARY 23, 1982 EXERCISE ELEMENTS
  • Van Buren County Emergency Operation Pl~n
  • Allega*~ ..County Emergency Operatio~ 'Plan
  • Berrien County Emergency Operation Plan

~ consumers Power company

\':::!:,/ GENERAL OFFICES 212 West Michigan Avenue Jackson Ml 49201

. 8203050430 820225 PDR ADOCK 05000255 F PDR

-*~ --**~*--.:~h,"********-*

  • Palisades Plant Emergency Exercise Scenario - February 23, 1982 An emergency exercise is planned for the Palisades Plant for February 23, 1982.

The following action will be simulated:

At 0545 am Unusual Event will be declared due to high specific activity in the primary coolant system. Beginning the exercise before 0600 will fulfill the NUREG 0654 requirement of one exercise starting before 0600 every six years.

At 0700 the Shift Supervisor will begin shift augmentation. Although whift augmentation is not required in our emergency plan at this level, this action will provide an opportunity to test our shift autmentation ability as per NUREG 0654, Table B-1.

At 0800 specific activity in the primary coolant system will rise calling for an escalation to Alert be performed. As soon as each assembly area leader has accounted for his area, personnel not directly involved in the exercise will report back to work.

Personnel involved in the exercise will continue. Staff.to continue will be identified in advance and consist of the Technical Support Center staff and a portion of the Operations Support Center staff consisting of approximately one Radiation Safety Supervisor, ten Chemistry/Radiation Safety technicians, one Maintenance Supervisor and four Maintenance workers. The Emergency Operations Facility staffing and operation has been coordinated with the General Office.

At 0900 a turbine trip will occur. The main steam isolation valves will close and the atmospheric steam dump valves will open. One atmospheric dump valve will fail to seat after pressure lowers. At 0901 the reactor trips.

At 0915, steam generator tubes will repture. Radioactivity will be released to the atmosphere through the steam dump. A General Emergency will be declared. The release will be sufficient to require evacuation of the population out to three miles. A simu-lated evacuation will take place for non-essential personnel at the site due to high radiation levels.

At 1115 the release will end.

At 1200 the exercise will end.

The above scenario will test the following areas:

1. Notification and augmentation of the emergency organizations.
2. Communications
3. Emergency classification
4. Emergency actions
5. Protective action recommendations (1)
6. Decision making
7. Radiological monitoring, offsite and onsite.
8. Post accident sampling
9. Accountability Observer/Evaluators will be provided by General Physics, the General Office and the Midland Plant.

A critique is scheduled for 1330 until 1600 on 2/23/82. This critique will be organized by General Physics.

A final report, to be written by General Physics, is scheduled to be completed by 4/1/82.

The background information for the drill is as follows:

The plant has been operating at full power for the past month. No unusual conditions have been noted except as follows; the primary coolant activity has been slightly greater than 1.0 uCi/g dose equivalent I-131 for the past 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The meteorological conditions are as follows:

wind direction 240° blowing to 60° wind speed 4.7 m/s, 10.5 mph stability class 6010 delt = -.16 E Stability Attached is an exercise chronology, list of messages, and instructions.

(2)

  • EMERGENCY EXERCISE CHRONOLOGY WITH TSC MESSAGES Time Event/Message Emergency Class/Expected ActionE High activity in the Primary Coolant Unusual Event System
1. Notify Duty & Call Supt.
  • Message to Shift Supervisor:
2. Notify Power Controller "This is an Exercise - Sampling of
3. Notify NRC primary coolant.indicates specific

). Notify Vart Buren Sheriff activity of 100 uCi/g dose equivalent

10. Notify Michigan State Police I-131 has been greater than 1.0 uCi/g
17. Notify Chem/HP Supt for the past 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Failed fuel mon-
38. Notify Public Affairs Director itor (RIA-0202) has gone off scale.

THIS IS AN EXERCISE" Initiate plant shutdown due to Tech Spec specific activity limit.

  • Numbers refer to Attachment 2 of EI-2 Emergency Action Checklist 0706 Shift Augmentation Unusual Event continues Message to Shift Supervisor: Perform shift augmentation to test

" - THIS IS AN EXERCISE" - You have time required to meet NUREG 0654 not determined the cause of the high Table B-1.

activity in the Primary Coolant System and have decided to begin shift augmen-tation to provide technical support.

Augmentation calls will be made to personnel scheduled for "B" shift the day of the exercise. General Office personnel are provided to make these calls for the SS - THIS IS AN EXERCISE" 0800 Increased activity in the Primary Alert Coolant System PCS activity indicates a severe loss of fuel cladding.

Message to SED:

2. Notify Power Controller "THIS IS AN EXERCISE - Sampling of
3. Notify NRC primary coolant system indicates speci-
5. Notify Van Buren Sheriff fic activity of 350 uCi/g dose equiva-
10. Notify Michigan State Police lent I-131. -THIS IS AN EXERCISE - "
17. Notify Chem/HP Supt
18. Notify Property Protection Su
19. Establish TSC
20. Establish DSC
22. Initiate on-site monitoring
24. Provide 15-minute updates
27. Meteorological data - obtain &

analyze

32. Perform personnel accountabili
38. Notify Public Affairs Director
  • Non-participating personnel will return to work after accountability check.

(3)

' ..... -.. ,: ; .:.. ,,..*. ~~

Time Event/Message Emergency Class/Expected Action 0900 Turbine & Reactor Trip. Alert continues

22. On-site monitoring continues Message to SED from SS: 24. l5-minute updates continue "THIS IS AN EXERCISE - A 27. Analysis of met. data turbine trip has occurred. The continues.

Main Steam Isolation Valves (MSIV's) have isolated . . Atmospheric steam dump valves have opened - THIS IS AN EXERCISE". .

0901 Message to SED from SS:

"THIS IS AN EXERCISE - The reactor has tripped. - THIS IS AN EXERCISE."

0915 Release begins. General Emergency

2. Notify Power Controller Message to SED from SS:
3. Notify NRC "THIS IS AN EXERCISE - The high radio- 4. Notify GO Control Center activity alarm on the steam generator 5. Notify Van Buren Sheriff blowdown monitor has sounded (RIA-0631). lO. Notify Michigan State Police THIS IS AN EXERCISE" ll. Notify Michigan Dept. of Reali l7. Notify Chem/HP Supt.

Message to SED after the high range

18. Notify Property Protection Su]

steam dump monitor is checked:

2l. Establish EOF "THIS IS AN EXERCISE .:.. High range 22. Continue on-site monitoring steam dump monitor indicates a reading 23. Initiate off-site monitoring of 12 mrem/hr. High range stack 24. Continue updates monitor indicates a reading of l 25. Provide dose estimates.

Mrem/hr - THIS IS AN EXERCISE." 27. Analyze met. data.

Message to SED from SS: 26. Analyze effluents

28. Provide release & dose projec-

"THIS IS AN EXERCISE - Containment tions pressure is normal. Containment radia-

33. Evacuation of non-essential tion monitors read normal levels - THIS personnel*

IS AN EXERCISE - " 38. Notify Public Affairs Directo1

  • Simulated 0925 Release continues. Have maintenance initiate repair work.

Message to SED from the SS:

"THIS IS AN EXERCISE - An automatic atmospheric steam dump valve (POS 0780) has failed to seat. A manual atmospheric steam dump valve (l02 MS) has broken preventing us from stopping the release THIS IS AN EXERCISE-".

(4)

Time Event/Message Emergency Class/Expected Actions 1115 Release ends. Consider downgrading of exercise ..

Message to TSC Maintenance from repair crew(given by TSC exercise controller):

"THIS IS AN EXERCISE - The manual atmospheric steam dump valve has been re-paired. The valve has been closed - THIS IS AN EXERCISE.

1200 End of exercise for plant personnel.

1130 EOF (near site) staff arrive. Establish communications links with plant, GO, and offsite agencies. Participate in recovery re-entry phase with offsite agencies.

1300 Exercise Terminates.

1330 Critique of exercise.

(5)

.e Instructions to Monitoring and Security Teams

- Instructions for offsite/onsite/habitability monitoring teams:

Proceed to areas designated by your supervisor. Obtain survey results from the Exercise Controller. You are released to return to work when you have completed assigned surveys and communicated the results to your supervisor.

- Instructions for monitor in Security trailer:

Proceed as assigned by your supervisor. Return to work after accountability has been performed in the parking lot.

- Instructions for survey team at the end of the access road:

Proceed as assigned by your supervisor. Obtain survey results from the exercise controller. Return to work when released by the exercise controller.

- Instructions for the Security team at the end of the access road:

Proceed as assigned by your supervisor. Return to work when released by the exercise controller.

( 6)

Instructions for Exercise Controller Working with Maintenance Team Proceed with Maintenance team from the OSC.

Check for Health Physics support and area survey. 625 1 level survey results are general field 1 rem/hr next_~o the wall and 10 rem/hr at the doorway.

Iodine concentration = 3.0 x 10 Ci/m3. No particulate. Message to Maintenance team after inspection of manual atmospheric steam dump valve (104 MS):

"THIS IS AN EXERCISE - The valve steam (104MS) has broken inside the wall. Repairs will take approximately 1-1/2 hours. THIS IS AN EXERCISE.

After this message has been relayed to the TSC, the Maintenance team and Health Physics survey team are released to return to work.

(7)

.:_ ..... ~..;** ... : ...

INSTRUCTIONS FOR EXERCISE CONTROLLER WORKING WITH THE MONITORING TEAM AT THE END OF THE ACCESS ROAD Proceed with technician assigned from the OSC. After the checkpoint has been established and one car has been monitored, release the technician and Security guards to return to work.

(8)

~ ~*.

Instructions for Exercise Controller Working with Habitability Monitors Air samples in all accountability areas are background.

General fields in all accountability areas read 5 mrem/hr.

(9)

-****~* *d*_*

Instructions for Exercise Controller Assigned to Post-Accident Sampling Proceed with technicians assigned from the OSC. After sampling and analysis provide the team with the following message:

"THIS IS AN EXERCISE - The results of the containment air sample indicates background readings. The results of the primary coolant activity indicates 400 uCi/gm gross gamma.and 20 uCi/gm gross beta - THIS IS AN EXERCISE."

After the results have been communicated to the TSC, release the sampling team and return to work.

(10)

Instructions for Exercise Controller Working in tbe Security Trailer Proceed with technician assigned from tbe OSC. After accountability has been performed in the parking lot, release tbe technician to return to work.

(11)

Instructions for Exercb:;;e Controller Working With Onsite/Offsite Survey Teams Proceed with survey tea.ms asB1gned from the OSC. Provide Sampling results from the attached tables. Interpolate for results not listed. Release technician to return to work after they have communicated survey results to the TSC.

(l2)

Dose Rate and Iodine Concentrations at the Center of Plume (60°)

Distance from Field Monitoring Iodine Concentration Plant (mrem/hr) (Ci/m3)

Site Boundary 5010 9.5 x 10- 6 1 (miles) 2410 4.8 x 10- 6

1. 5 x 10

-6 2 831 3 465 9.2 x 10-7 4 311 5.6 x 10- 7 227 4.2 x 10- 7 5

6 -176 3.3 x 10- 7 142 2.7 x 10- 7 7

8 118 2.3 x 10- 7 100 1.9 x 10-7 9

86 1.6 x 10- 7 10 No particulate activity above background.