Issue date | Title | Topic | |
---|---|---|---|
ML18068A345 | 29 April 1998 | Rev 9 to EI-9, Offsite Radiological Monitoring. | |
ML18068A344 | 28 April 1998 | Rev 3 to EI-6.6, Gamma E Determination. | |
ML18065B227 | 21 April 1998 | Reactor Vessel Neutron Fluence Methodology. | |
ML18065B202 | 10 March 1998 | Rev 7 to Relocated TS Per GL 89-09. | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20197G385 | 17 December 1997 | Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan | Contraband |
ML18065B232 | 24 October 1997 | Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. | Grab sample Annual Radiological Environmental Operating Report |
ML18067A515 | 11 February 1997 | Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. | Grab sample Annual Radiological Environmental Operating Report |
ML18065B201 | 24 December 1996 | Rev 11 to Offsite Dose Calculation Manual. | Grab sample Offsite Dose Calculation Manual |
ML18065B086 | 27 November 1996 | Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. | Stroke time |
ML20134P407 | 19 November 1996 | Suitability,Training & Qualification Plan, Rev 16 | |
ML20137G387 | 29 October 1996 | Rev 6 to Relocated TS Per NRC GL 89-09 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML18065A766 | 10 June 1996 | Expired Temporary Change O-96-044 to Rev 17 to SOP-17A, Clean Radwaste Sys. | |
ML18065A765 | 10 June 1996 | Cancelled Tcn O-96-045 to Rev 17 to SOP-17B, Dirty Radwaste Sys. | |
ML18065A802 | 21 February 1996 | Rev 2 to EM-09-13, ISI Pressure Testing Program. | Boric Acid Hydrostatic VT-2 Zebra Mussel Biofouling Liquid penetrant Through-Wall Leak Scaffolding |
ML20137G363 | 16 February 1996 | Rev 10 to Offsite Dose Calculation Manual | Grab sample Offsite Dose Calculation Manual |
ML20137G358 | 15 February 1996 | Rev 6 to CPC Pnp Process Control Program | Boric Acid Offsite Dose Calculation Manual Process Control Program |
ML18064A814 | 29 June 1995 | Procedure EOF App B, INPO Emergency Response Assistance Agreement, Dtd 950426 | |
ML20100H262 | 18 June 1995 | Rev 2 to Reactor Vessel Exam Program Plan Interval 2,Period 3 & Interval 3,Period 1 | |
ML18064A888 | 16 March 1995 | Rev 0 to Palisades Nuclear Power Plant Third Interval ISI Program for Class 1,2 & 3 Components & Supports, Vols I & II | |
ML18064A630 | 3 March 1995 | Rev 7 to App H, Emergency Planning EOF Training Matrix. | |
ML18064A634 | 27 February 1995 | Project Plan,Alloy 600,Palisades Nuclear Plant, Rev 1,dtd 950227 | |
ML20072K774 | 15 July 1994 | Rev 0 to Palisades Performance Enhancement Plan | Stroke time Temporary Modification Systematic Assessment of Licensee Performance Grace period |
ML20072K764 | 6 July 1994 | Rev 1 to Palisades Plant Restart Plan from 1994 Forced Outage | Temporary Modification |
ML18059B048 | 3 June 1994 | Attachment 4 to Procedure EM-09-13,Rev 1, ISI Pressure Testing Program Procedure. | Hydrostatic |
ML20069D308 | 24 May 1994 | Suitability,Training & Qualification Plan | |
ML20069G251 | 20 May 1994 | Rev 30 to Procedure MO-7A-2, Emergency Diesel Generator 1-2 (K-6B) | Power change |
ML20069G239 | 20 May 1994 | Rev 30 to Procedure MO-7A-1, Emergency Diesel Generator 1-1 (K-6A) | Power change |
ML20064E483 | 6 March 1994 | ASME Section XI Repair Program, 0054-00101-001-100,rev 0 | Weld Overlay Nondestructive Examination |
ML20064E501 | 4 March 1994 | Procedure for Application & Exam of Weld Overlay Repairs to Austenitic Stainless Steel Piping Systems, 0054-00101-001-101,rev 0 | Weld Overlay Nondestructive Examination Liquid penetrant Scaffolding |
ML18059A698 | 23 February 1994 | Reactor Vessel Integrity Project Plan. | |
ML18059A688 | 15 February 1994 | Editorial Changes to Rev 6 to Emergency Implementing Procedure EI-6.13, Protective Action Recommendations for Offsite Populations. | |
ML18059B020 | 31 December 1993 | Methods of Alleviating Adverse Consequences of Fluctuating Water Levels in Great Lakes - St Lawrence River Basin, Rept to Govts of Canada & Us,Dtd 931231 | |
ML18059A554 | 19 November 1993 | Rev 4 to Attachment 3 to Procedure REC-1, Recovery Plan Format. | |
ML18059A478 | 27 October 1993 | Rev 5 to Administrative Procedure 9.11, Engineering Analysis. | Boric Acid Hydrostatic Nondestructive Examination VT-2 Foreign Material Exclusion Code Reconciliation Liquid penetrant Pressure boundary leak Scaffolding |
ML18059A423 | 7 October 1993 | Rev 0 to Palisades Plant Pressurizer Safe End Crack Repair Action Plan. | Nondestructive Examination |
ML20059A518 | 30 September 1993 | Public Version of Rev 36 to General Ofc Emergency Planning Procedure,App G, Emergency Telephone Numbers. W/931019 Release Memo | |
ML18058B787 | 15 December 1992 | Rev 3 to HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. | Grab sample Annual Radiological Environmental Operating Report |
ML18058B034 | 11 May 1992 | Rev 6 to Odcm. | Grab sample Offsite Dose Calculation Manual |
ML18058A433 | 7 May 1992 | Rev 5 to General Ofc Emergency Planning Procedure EOF-4, Communication Support Team, Page 3,reflecting Editorial Changes | |
ML20090A340 | 27 February 1992 | Rev 5 to ODCM | |
ML18058A146 | 27 January 1992 | Rev 45 to General Office Emergency Planning Gort/Eof Procedures Index | |
ML18058A147 | 9 December 1991 | Rev 5 to General Ofc Emergency Planning Procedure EOF-3, Emergency Operations Facility Administrator. Approval Summary Encl | Fitness for Duty |
ML18058A144 | 9 December 1991 | Rev 5 to General Ofc Emergency Planning Procedure EOF-4, Communication Support Team. Approval Summary Encl | |
ML18058A145 | 9 December 1991 | Rev 6 to General Ofc Emergency Planning Procedure EOF-2, Emergency Operations Facility Director. Approval Summary Encl | |
ML20091S236 | 9 December 1991 | Rev 8 to General Ofc Emergency Planning Procedure GEN-3, On-Shift Sys Power Controller. Approval Summary Encl | |
ML18058A142 | 9 December 1991 | Rev 7 General Office Emergency Planning Procedure GORT-1, General Office Response Team (Gort). Approval Summary Encl | |
ML18058A143 | 9 December 1991 | Rev 10 to General Ofc Emergency Planning Procedure GEN-1, Overview. Approval Summary Encl | Fitness for Duty |
ML18057B328 | 17 October 1991 | Rev 2 to Procedure EI-15.2, Quarterly Communications Test Telephone Number,Verifications. | |
ML20086T281 | 16 September 1991 | Rev 0 to Functional Description FC-888,covering Replacement of All Four Channels of Reactor Protection Sys Power Supply Assemblies,Trip Unit Assemblies,Interconnection Modules, Bistable Trip Units & Auxiliary Trip Units | |
ML18057B022 | 10 May 1991 | Rev 15 to EM-09-04, Inservice Testing of Selected Safety- Related Pumps, Reflecting Complete Rewrite of Procedure to Omit Vertical Lines |