ML18057B022
| ML18057B022 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 05/10/1991 |
| From: | Oroz R, Schrader G, Toner K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18057B020 | List: |
| References | |
| EM-09-04, EM-9-4, NUDOCS 9107120204 | |
| Download: ML18057B022 (2) | |
Text
ATTACHMENT 3 Consumers Power Company Palisades Plant Docket 50-255
SUMMARY
OF CHANGES TO PLANT PROCEDURE EM-09-04 "INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS June 28, 1991 1 Page
ATTACHMENT 3 INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS REVISION
SUMMARY
The changes made to pump testing procedure EM-09-04 included various editorial changes, as well as the following:
I. The pump hydraulic test circuits for all pumps tested were added to the procedure to aid in IST program development.
- 2.
All but four Relief Requests in Attachment 3 of EM-09-04 were deleted due to modifications being implemented in the fall 1990 outage to enhance pump parameter measurements.
- 3. Attachment 2 Table 2 of EM-09-04 "Allowable Ranges of Test Quantities" was revised to reflect ASME Section. XI IWP rather than OM-6 limits.
- 4.
Basis Statements for all pumps in the IST Program were added to the procedure to provide a quick reference for pump function.
- 5.
Tables for each pump were added to the procedure delineating the parameters tested, and if applicable, the reference value and instrument number that measures the hydraulic parameter.
I Page