Rev 8 to General Ofc Emergency Planning Procedure GEN-3, On-Shift Sys Power Controller. Approval Summary Encl
ML20091S236
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/09/1991
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
GEN-3, NUDOCS 9202060305
Download: ML20091S236 (9)


Text

_ _ _. _. _ _ _ _ _. -.

e e

Transmittal Date:

2/03/92 i

TO: 145 USNRC/ WASHINGTON /

PROCEDURE NUMBER: - GEN-3 TITLE: OH-SHIFT SYSTEM POWER CONTROLLER TRANSMITTAL NUMBER:

460352 TRANSMITTALt LISTED BELOW ARE NEW/ REVISED PROCEDURES WilICl! MUST BE IMMEDIATELY INSERTED INTO OR DISCARDED TROM YOUR PROCEDURE MANUAL.

Action Required Remove and Destroy GEN-3, R/7 Replace with GEN-3, R/8 SIGN, DATE AND RETURN Tile ACKNOWLEDGEMENT FORM WITilIN 10 DAYS TO THE PALISADES PLANT DOCUMENT CONTROL.

SIGNATURE OR INITIALS DATE i

I

(

f0003U f

qh8 l

9202060305 911209 11i I

l PDR ADOCK 05000255

\\

F PDR

A GENERAL OFFICE EMERGENCY PLANNING PROC NO GEN-3

(~'g Revision 8

/

APPROVAL

SUMMARY

i TITLE:

ON-SilIFT SYSTEM POWER CONTROLLER l

)

1

/

YA Qvi11ty Asstfrance Su;$ ort / Coricurrence Date i

e k

)')kk/

finefal Ticv'Emergenpf' Planning-Approval f

e Date r~'N

]

/t.[1/q l Nuclear OpeNdhna) Department - Approval Date 1

('J APPROVAL

SUMMARY

. - - ~ _ _ - -

=,

w w

CONSUMERS GENERAL OF"?

PROC NO GEN-3 POWER EMERGENCY P PAGE 1 0F 7 COMPANY PROCEP.

REV 8 DN-SHIFT SYSTEM POWER CONTROLLER 1.0 PURPOSE The purpose of this procedure is to describe and define the respon-sibility of the Corporate On-Shift Systen Power Controller during an emergency situation at a Consumers Power Company (CPCo) nuclear facility, or when a request for mutual assistance has been received from another nuclear utility.

2.0 ATTACRMENTS

., " Power Control Checklist". " Mutual Assistance Request Checklist" 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS y-sg N,,)

Palisades or Big Rock Point must be at an Unusual Event, Alert, Site Area Emergency, or General Emergency or a request for mutual assistance must be received from another utility before initiation of i

this procedure.

4.0 RESPONSIBILITIES Upon notification of an emergency situation at Palisades, Big Rock Point or another nuclear utility the On-Shift System Power Controller shall notify personnel as designated in Section 5.0 of this procedure using Appendix G, Augmentation List.

f~C

-(

GEN-3

,;.a--......-.

NSt'MERS GENERAL OFFICE PROC NO GEN-3

  • POWER EMERGENCY PLANNING PAGE 2 0F 7 COMPANY PROCEDURE REV b ON-SHIFT SYSTEM POWER CONTROLLER 5.0 REQUIREMENTS 5.1 ACTIONS (UNUSUAL EVENT AT PALISADES OR BIG ROCK PolNT) a.

Obtain all of the information required on Attachment I from the affected plant.

b.

Notify the General Office On-Call Director using the General Office On-Call Director Schedule and supply the information contained on Attachment 1.

c.

If the call is related to Palisades, notify the Palisades On-Call Director using the Palisades On-Call Director Schedule and supply the information contained on Attachment 1.

O 5.2 ACTIONS (ALERT, SITE AREA EMERGENCY, CENERAL EMEPGENCY AT PALISADES OR li1G ROCK POINT) a.

Obtain all information required on Attachment I from the affected plant, b.

Initiate the following call out.

Notify one individual from each group (telephone numbers are located on the General Office On-Call Director Schedule, the Palisades On-Call Director Schedule, and in Appendix G, Augmentation List), and provide the information from Attachment 1.

O GEN-3

CONSUMERS GENERAL OFFICE PROC No GEN-3

  • POWER EMERGENCY PLANNING PACE 3 0F 7 l

COMPANY PROCEDURE REV 8 v

ON-SHIFT SYSTEM POWER CONTROLLER Power Controller Notifies st ch j

call S

Call

    • General Office On-Call Director Radiological Advisor nd th 2

Call 6

Call Palisades On-Call Director Communication Services Representative rd f

3 Call 7"h Call Senior Building Services Management Representative th th 4

Call 8

Call

. Emergency Planning Control Room Representative Other Nuclear Plant (BRP-Hotline or 616-547-6537 Pal-Hotline or 616-764-8913)

NOTE:

1.

If the Alert is terminated prior to his being notified. the General Office On-Call Director may elect to stop notifications at this' point.

2.

Notify the Site Emergency Director at the plant if either On-Call Director cannot be notified.

i 5.3 ACTIONS (MUTUAL ASSISTANCE AGREEMENT) a.

Obtain all information required on Attachment 2 from the affected utility.

GEN-3 1

_____._________.______....___________.__.__..____.___.____________m___

CONSUMERS GENERAL OTTICE PROC NO GEN-3 POWER EMERGENCY PLANNING PAGE 4 0F 7 COMPANY PROCEDURE REV 8 ON-SHIFT SYSTEM POWER CONTROLLER b.

Notify the General Offico on-Call Director using the General Office On-Call Director Schedule and supply information from.

I k

6.0 RECORDS Forward :ompleted copies of Attachments 1 and 2 to General Office Emerger.cy Planning for filing in Document Control under Uniform File Index A200/22*06/L.

O l0 GEN,

i:

CONSUMERS GENERAL OFFICE PROC NO GEN-3

' POWER EMERGENCY PLAh'NING PAGE 5 0F 7 COMPANY PROCEDURE REV 8 ON-SHIFT SYSTEM POWER CONTROLLER ATTACHMENT 1 POWER CONTROL CHECKLIST Date:

Plantt BRP PAL 4

Time Drills Yes No Unusual Event

' Alert-Site Area Emergency

' General Emergency Other-Brief description of the event:

Notifications:

Available

_ Yes/No)

Location and Telephone No

(

_Name Time O

Forward completed form to GOEP, P-26-402 for filing in DCC A200/22*06/L.

GEN-3

'r i

CONSUMERS GU4ERAL OFFICE PROC NO GEN-3 POWER EMERGENCY PLANNING PAGE 6 0F 7 i

COMPANY PROCEDURE REV 8 l

i ON-SHIFT SYSTEM POWER CONTROLLER ATTACHMENT 1 (Continued) l Notifications (Continued):

Name Time

- (Yes/No)

Location and Telephone No I

I O

l L

1 m

O Forward complaced form to GOEP, P-26-402 for filing in DCC A200/22*06/L.

GEN-3

'm?

6

,e w'-esm 4p me-or

-ry*

t' k

"T w-wrW-1w"

--"t'-+=v 7vM'%d' y-Dy-wer,wg--ny Fry--^^-g--y*ew-9

  • err-M1-yvp

-g+s-y sus-y w--y-ew+=w--mw-sty wm-p g1yp y

t

)

CONSUMERS GENERAL OFFICE PROC NO GEN-3 POWER EMERCENCY PLANNING PACE 7 0F 7 COMPANY PROCEDURE REV 8 ON-SHIFT SYSTEM POWER CONTROLLER ATTACllMENT 2 MUTUAL ASSISTANCE REQUEST CHECKLIST Date:

Time:

Drill Yes No Utility:

Detroit Edison (Eurico Fermi 2)

The Indiana Michigan Power Company (D C Cock 162)

~

The Toledo Edison Cottpany (Davis Besse)

The Cleveland Electric Illuminating Company (Perry)

Caller Name/Titlet j

l

  • Call-back Number Unusual Event Alert Site Area Emergency General Emergency

. Description of Event:

Material / Personnel Requested:

General Office On-Call Director Notified:

Time:

  • Caller will be contacted by Consumers Power Company Director / Officer.

Forward completed form to GOEP, P-26-402 for filing in DCC A200/22*06/L.

GEN-3

~

.. ~. -

-