ML20091S236

From kanterella
Jump to navigation Jump to search
Rev 8 to General Ofc Emergency Planning Procedure GEN-3, On-Shift Sys Power Controller. Approval Summary Encl
ML20091S236
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/09/1991
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
GEN-3, NUDOCS 9202060305
Download: ML20091S236 (9)


Text

_ _ _ . _ . _ _ _ _ _ . - . __ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ . . . _ _ __ _ _ . _ _ _ _ _ _ _ _ _ .

e e

  • Transmittal Date: 2/03/92 i TO: 145 USNRC/ WASHINGTON /

PROCEDURE NUMBER: - GEN-3 TITLE: OH-SHIFT SYSTEM POWER CONTROLLER TRANSMITTAL NUMBER: 460352 TRANSMITTALt LISTED BELOW ARE NEW/ REVISED PROCEDURES WilICl! MUST BE IMMEDIATELY INSERTED INTO OR DISCARDED TROM YOUR PROCEDURE MANUAL.

Action Required Remove and Destroy GEN-3, R/7 Replace with GEN-3, R/8 SIGN, DATE AND RETURN Tile ACKNOWLEDGEMENT FORM WITilIN 10 DAYS TO THE PALISADES PLANT DOCUMENT CONTROL.

SIGNATURE OR INITIALS DATE i

I

( f0003U f

l 9202060305 911209 qh8 11i I l

PDR ADOCK 05000255 \

F PDR

l A

.' GENERAL OFFICE EMERGENCY PLANNING PROC NO GEN-3 .

(~'g Revision 8

! / APPROVAL

SUMMARY

i l

TITLE: ON-SilIFT SYSTEM POWER CONTROLLER  !

l

)

l l

l 1

l

$ / YA Qvi11ty Asstfrance Su;$ ort / Coricurrence Date i

e

$ k )')kk/

finefal f Ticv'Emergenpf' Planning-Approval e Date r~'N

]

> -- /t.[1/q l Nuclear OpeNdhna) Department - Approval Date .

1

(

'J APPROVAL

SUMMARY

_ . - . _ _ . . - . - - - . . - - ~ _ _ - - - . . -- . - _ _ . . ,

=,

w w

, CONSUMERS GENERAL OF"? PROC NO GEN-3

. POWER EMERGENCY P PAGE 1 0F 7 COMPANY PROCEP. REV 8 DN-SHIFT SYSTEM POWER CONTROLLER 1.0 PURPOSE The purpose of this procedure is to describe and define the respon-  ;

sibility of the Corporate On-Shift Systen Power Controller during an emergency situation at a Consumers Power Company (CPCo) nuclear facility, or when a request for mutual assistance has been received from another nuclear utility.

2.0 ATTACRMENTS Attachment 1, " Power Control Checklist" Attachment 2. " Mutual Assistance Request Checklist" y-sg 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS N,,) '

Palisades or Big Rock Point must be at an Unusual Event, Alert, Site Area Emergency, or General Emergency or a request for mutual assistance must be received from another utility before initiation of i this procedure.

4.0 RESPONSIBILITIES Upon notification of an emergency situation at Palisades, Big Rock Point or another nuclear utility the On-Shift System Power Controller shall notify personnel as designated in Section 5.0 of this procedure using Appendix G, Augmentation List.

f~C

-( -

GEN-3

, . . - ,;.a--......-. .

. NSt'MERS GENERAL OFFICE PROC NO GEN-3

  • POWER EMERGENCY PLANNING PAGE 2 0F 7 COMPANY PROCEDURE REV b ON-SHIFT SYSTEM POWER CONTROLLER 5.0 REQUIREMENTS 5.1 ACTIONS (UNUSUAL EVENT AT PALISADES OR BIG ROCK PolNT)
a. Obtain all of the information required on Attachment I from the affected plant.
b. Notify the General Office On-Call Director using the General Office On-Call Director Schedule and supply the information contained on Attachment 1.
c. If the call is related to Palisades, notify the Palisades On-Call Director using the Palisades On-Call Director Schedule and supply the information contained on Attachment 1.

O 5.2 ACTIONS (ALERT, SITE AREA EMERGENCY, CENERAL EMEPGENCY AT PALISADES OR li1G ROCK POINT)

a. Obtain all information required on Attachment I from the affected plant,
b. Initiate the following call out. Notify one individual from each group (telephone numbers are located on the General Office On-Call Director Schedule, the Palisades On-Call Director Schedule, and in Appendix G, Augmentation List), and provide the information from Attachment 1.

O GEN-3

, CONSUMERS GENERAL OFFICE PROC No GEN-3

,

  • POWER EMERGENCY PLANNING PACE 3 0F 7 l COMPANY PROCEDURE REV 8 v

ON-SHIFT SYSTEM POWER CONTROLLER Power Controller Notifies j st call ch S Call

    • General Office On-Call Director Radiological Advisor 2

nd Call 6 th Call Palisades On-Call Director Communication Services Representative rd Call f 3 Senior 7"h Call Building Services Management Representative 4

th Call 8 th Call

. Emergency Planning Control Room Representative Other Nuclear Plant (BRP-Hotline or 616-547-6537 Pal-Hotline or

  • 616-764-8913)

NOTE: 1. If the Alert is terminated prior to his being notified. the General Office On-Call Director may elect to stop notifications at this' point.

2. Notify the Site Emergency Director at the plant if either On-Call Director cannot be notified. i 5.3 ACTIONS (MUTUAL ASSISTANCE AGREEMENT)
a. Obtain all information required on Attachment 2 from the affected utility.

GEN-3 1

_____._________.______....___________.__.__..____.___.____________m___

-. CONSUMERS GENERAL OTTICE PROC NO GEN-3 POWER EMERGENCY PLANNING PAGE 4 0F 7 COMPANY PROCEDURE REV 8 ON-SHIFT SYSTEM POWER CONTROLLER

b. Notify the General Offico on-Call Director using the General l Office On-Call Director Schedule and supply information from Attachment 2. I k

6.0 RECORDS Forward :ompleted copies of Attachments 1 and 2 to General Office Emerger.cy Planning for filing in Document Control under Uniform File Index A200/22*06/L. '

O l0 GEN ,

i: . . _ , , _ _ . _ - .. - - - . _ . _ - - - - _ . - - - - . . - . . . .- .

  • CONSUMERS GENERAL OFFICE PROC NO GEN-3

' POWER EMERGENCY PLAh'NING PAGE 5 0F 7 COMPANY PROCEDURE REV 8 ON-SHIFT SYSTEM POWER CONTROLLER ATTACHMENT 1 POWER CONTROL CHECKLIST Date: Plantt BRP PAL 4 Time Drills Yes No Unusual Event

' Alert-Site Area Emergency

' General Emergency Other-Brief description of the event:

Notifications:

Available

_Name Time _( Yes/No) Location and Telephone No O

Forward completed form to GOEP, P-26-402 for filing in DCC A200/22*06/L.

GEN-3

'r  !

i

. CONSUMERS GU4ERAL OFFICE PROC NO GEN-3  !

POWER EMERGENCY PLANNING PAGE 6 0F 7 i COMPANY PROCEDURE REV 8 l i

ON-SHIFT SYSTEM POWER CONTROLLER ATTACHMENT 1 (Continued) l Notifications (Continued):  ;

Name Time - (Yes/No) Location and Telephone No I

I O ,

l L

1 m

O Forward complaced form to GOEP, P-26-402 for filing in DCC A200/22*06/L.

GEN-3 sus- wm- p g1yp


'm?

- 6 --. - - _ - - ,e w'-esm 4p me-or -ry* t' k "T w-wrW-1w" --"t'-+=v y 7vM'%d' y- Dy-wer,wg--ny Fry--^^-g--y*ew-9

  • err-M1-yvp -g+s- y y w--y-ew+=w--mw-sty

. t

) . CONSUMERS GENERAL OFFICE PROC NO GEN-3

. . POWER EMERCENCY PLANNING PACE 7 0F 7 COMPANY PROCEDURE REV 8 ON-SHIFT SYSTEM POWER CONTROLLER ATTACllMENT 2 MUTUAL ASSISTANCE REQUEST CHECKLIST Date:

Time:

Drill Yes No Utility: Detroit Edison (Eurico Fermi 2)

The Indiana Michigan Power Company (D C Cock 162) ~

The Toledo Edison Cottpany (Davis Besse)

The Cleveland Electric Illuminating Company (Perry)

Caller Name/Titlet j l

  • Call-back Number Unusual Event Alert Site Area Emergency General Emergency

. Description of Event:

Material / Personnel Requested:

General Office On-Call Director Notified: Time:

  • Caller will be contacted by Consumers Power Company Director / Officer.

Forward completed form to GOEP, P-26-402 for filing in DCC A200/22*06/L.

GEN-3

_,, . .._._ __ . _ _ _ - . . . _ . _ . . . . . _ , . __ ~ . . ~ . - _ . . . .-_ . _ - _ _ _ _ _ -