ML18059A554
| ML18059A554 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/19/1993 |
| From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| References | |
| REC-1, NUDOCS 9312090172 | |
| Download: ML18059A554 (2) | |
Text
. -"-
~*
TO: *145 USNRC/WASHINGTON/
PROCEDURE NUMBER: REC-1 TITLE: RECOVERY II TRANSMITTAL NUMBER:
Transmittal Date: 11/19/93 56558811-TRANSMITTAL:
LISTED BELOW ARE NEW/REVISED PROCEDURES WHICH MUST BE IMMEDIATELY INSERTED INTO OR DISCARDED FROM YOUR PROCEDURE MANUAL.
Action Required Remove and Destroy Replace with REC-1, R/4 ATTACHMENT 3 REC-1, R/4 ATTACHMENT 3 EDITORIAL CHANGE SIGN, DATE AND RETURN THE ACKNOWLEDGEMENT FORM WITHIN 10 DAYS TO THE PALISADES PLANT DOCUMENT CONTROL.
SIGNATURE OR INITIALS DATE 060104 931-2090172*931119 PDR ADOC.K 050~00255 '.:
F
.. P-DR- *-.- *
..r--
RECOVERY PLAN FORMAT Proc No REC-I Revision 4 Page 1 of 1 I.
PLANT STATUS Provide a general statement of the plant condition. Address issues such as reactor status, radiation fields and component condition.
Do not provide details. These will be addressed under Section V of the
('.
plan.
II.
RECOVERY
SUMMARY
Outline the steps required to return the plant to a long-term, stable condition and ultimately to operational condition.
III.
RECOVERY ORGANIZATION Provide a copy of the recovery organization with personnel assigned.
IV.
SCHEDULE v.
Develop a schedule of estimated repair times with recovery milestones.
SPECIFIC ISSUES Develop detailed plans to support and accomplish recovery tasks.
Examples include press releases, governmental liaison, component repair and damage assessment.
Each recovery group should follow this format for its specific issues which will I~
facilitate completion of a composite plan.