Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period
ML18066A184
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/10/1998
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18066A183 List:
References
NUDOCS 9806160126
Download: ML18066A184 (24)


Text

-~'

ATTACHMENT CONSUMERS ENERGY COMPANY

. PALISADES PLANT DOCKET 50-255 PALISADES SIMULA TOR FOUR-YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD JUNE 10, 1998 15 Pages i

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD TABLE OF CONTENTS 1.0 FOURYEARTESTRESULTS............................... 1 2.0 CHANGES TO THE TESTING PROGRAM..................... 7 3.0 PERFORMANCE TEST DISCREPANCIES..................... 8 4.0 PERFORMANCE TEST SCHEDULE.......................... 9 5.0 SIMULATOR HARDWARE UPGRADE........................ 14 6.0' SIMULATOR SOFTWARE UPGRADE........................ 14 7.0 SIMULATOR INPUT/OUTPUT (1/0) UPGRADE........... *...... 15

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD This report is submitted in accordance with the requirements of 10 CFR 55.45(b)(5),

"Certification of Simulation Facilities," as it applies to the Palisades simulator, which*

was first certified on June 11, 1990. It describes the simulator performance testing completed and the performance tests planned over the next four years. This report provides a list and brief description of each uncorrected deficiency associated with the simulator performance testing during the past four years and the date by which each deficiency will be corrected. Also provided is the schedule for the conduct of approximately 25% of the simulator performance tes~s per year for the third four-year period. In addition, the report describes upgrades to the hardware and software implemented at Palisades.

1.0 FOUR YEAR TEST RESULTS 1.1 1995 Testing Results c

The following scheduled tests were completed in 1995:

Simulator Real Time Tests RT01 - Control rod timing test RT05 - Timing test for various simulation programs Normal Operations Tests N001 - Plant start up from cold shut down to hot standby condition N008 - 25% Of Technical Specification Surveillance Tests as follows: _

Q01, Q06, MO?A-1, MO?A-2, R021, SH0-1 a*nd Q023 Steady State Test NOD? - Steady state condition for> one hour at 99.7% FP, 75% FP and at 50%

FP Transient Tests T001 - Manual reactor trip transient test T002 - Trip of all feed water pumps transient test T003 - Closure of all main steam isolation valves transient test 1

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR>iEAR PERIOD T004 - Trip of all reactor coolant pumps transient test T005 - Trip of any single reactor coolant pump transient test T006 - Main turbine trip transient test TOO? - Maximum rate power ramp transient test TOOB - Maximum size unisolable main steam line rupture transient test T009 - LOCA with loss of all off site power transient test T010 - Slow primary system depressurization due to stuck open pressurizer relief or safety valve transient test Malfunction Tests M001, M005, M009, M017, M021, M025, M029, M033, M037, M041, M045, M049, M053, M057, M060, M068, M072, M076, M080, M084, M092, M096, M100, M104, M108, M112,M116, M120, M124, M128, M132, M136, M140, M144, M148, M152, M160, M164, M167, M175, M179, M183, M187, M191, M195, M203, M207, M215, M219, M223, M227, M231, M23S, M240, M244, M248, M252 1.2 1996 Testing Results The following scheduled tests were completed in 1996:

Simulator Real Time Tests RT04 - Turbine generator load rate of change timing test RT05 - Timing test for various simulation programs Normal Operations Tests N004 - Hot standby operations test N005 - Load change test N006 - Fuil power to cold shutdown condition test N008 - 25% Of Technical Specification Surveillance Tests as follows:

M037, R0112, QOBB and DM/0~1.

Steady State Test N007 - Steady state condition for> one hour at 99.7% FP, 75% FP and at 50%

FP 2

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD Transient Tests T001 - Manual reactor trip transient test T002 - Trip of all feed water pumps transient test

M002, M006, M010, M017, M018, M022, M026, M046, MOSO, M054, M057.5 M061, M069, M073, M077, M081, MOBS, M089, M093, M097, M101, M105, M109, M113, M117, M125, M129, M133, M137, M141, M145, M149, M153, M161, M165, M168, M176, M180, M184, M188, M192, M196, M200, M204, M208, M212, M216, M220, M224, M225, M226, M227, M228, M229, M230, M231, M232, M233, M234, M235, M236, M237, M241, M242, M244, M245, M247, M249, M253,- M254, M255, M256, M258, M259, M260, M261, M262, M263, M264, M265

  • Note that the above list contains new tests added to the previous report's test schedule (M251 through M256 and M258 through M265).

Remote Function Tests Remote Function Tests have been added to the test schedule. (See Appendix A for a list of Remote Function Test numbers and descriptions.)

M400-001 through M400-005, M400-008' through M400-011, M400-015 through M400-049, M400-054 through M400-62, M400-064, M400-069 and M400-070, and M400-295 were performed.

3

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR.;.YEAR PERIOD 1.3 1997 Testing Results The following scheduled tests were completed in 1997:

Simulator Real Time Tests RT02 - Turbine acceleration time test RT03 - Mass/volume of PCS/CVCS change.timing test Normal Operations Tests N002 - Hot standby to full power operation test N008 - 2S% Of Technical Specification Surveillance Tests as follows:

001, OOS, M033, 0021 and R012 Steady State Test N007 - Steady state condition for> one hour at 99.7% FP, 7S% FP and at SO%

FP Transient Tests T001 - Manual reactor trip transient test T002 - Trip of all feed water pumps transient test T003 - Closure of all main steam isolation valves transient test T004 - Trip of all reactor coolant pumps transient test TOOS - Trip of any single reacto~ coolant pump transient test T006 - Main turbine trip transient test

  • TOO? - Maximum rate power ramp transient test T008 :- Maximum size unisolable main steam line rupture transient test T009 - LOCA with loss of all off site power transient test T010 - *slow primary system depressurization due to stuck open pressurizer relief or safety valve transient test Malfunction Tests M003, MOO?, M011, M019, M027, M031, M03S, M039, M043, M047, MOS1, MOSS, MOSS, M062, M066, M070, M078, M082, M090, M094, M098, M102, M106, M110, M114, M118, M122, M126, M130, M134, M138, M142, M146, 4

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD M150, M154, M158, M162, M166, M167, M169, M177, M181, M185, M189, M197, M201, M205, M213, M217, M221, M225, M229, M233, M237, M242, M246, M250, M251, M252, M253, M254, M255, M256, M258, M259, M260, M261,M262,M263,M264,M265 Remote Function Tests M400-071through133 and M400-138 through 157. M400-134 through 137 are "Feed Only Good Generator" (FOGG) remote functions. FOGG has been disabled at the Palisades plant.

Additional Tests The following tests were run to verify correct model response following replacement of the Component Cooling System (CCW).flow and. pressure calculations:

M017.-CC01 PCP Loss of Cooling M018-CC02 Loss of P52(A, 8 or C)

M019-CC03 CCW Leak M033-CV07 Letdown Heat Exchanger Tube Rupture M034-CV08 Letdown Heat Exchanger Loss of CCW M 194-SI 11 E60 Tube Leak (A or 8)

M239-CC04 CCW Leak Between CV-0910 and Containment M240-CC05 PCP Seal Heat Exchanger Leak M400-001 P52A Rackout M400-002 P528 Rackout M400-003 P52C Rackout M400-004 CCW to Evaporator Open/Close M400-005 CCW to Evaporator Open/Close M400-006 CC0713 (CCW to Containment) Open/Close

. 1.4 1998 Testing Results Simulator Real Time Tests RT01 - Control rod timing test RT05 - Timing test for various simulation programs 5

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD Normal Operations Tests N003 - Reactor trip recovery test N004 - Hot standby operations test N008 - 25% Of Technical Specification Surveillance Tests as follows:

001, 006, MO?A-1, MO?A-2, M029, R011, MOB and MC118 Steady State Test N007 - Steady state condition for> one hour at 99.7% FP, 75% FP and at 50%

FP Transient Tests T001 - Manual reactor trip transient test T002 - Trip of all feed water pumps transient test T003 - Closure of all main steam isolation valves transient test T004 - Trip of all reactor coolant pumps transient test T005 - Trip of any single reactor coolant pump transient test T006 "' Main turbine trip transient test TOO? - Maximum rate power ramp transient test T008 - Maximum size unisolable main steam line rupture transient test T009 - LOCA with loss of all off site power transient test T010 - Slow primary system depressurization due to stuck open pressurizer relief or safety valve transient test Malfunction Tests M004, MOOS, M012, M020, M024, M028, M032, M036, M044, M048, M052, M056, M059, M063, M071, M075, M079, M083, M091, M103, M107, M111, M115, M123, M127, M131, M135, M139, M143, M147, M151, M155, M156, M157, M159, M163, M164, M167, M170, M174, M178, M182, M186, M190, M194, M198, M202, M206, M210, M218, M222, M226, M230, M234, M238, M243,M244, M247,M251,M266,M267,M268.

Remote Function Tests M400-158 through 172, M400-174 through 178, M40.0-185 through 189, M400-195 through 200, M400-206, M400-211 through M400-213, M400-218, M400-219, M400-221 through 225 and M400-230 through 294.

6

PALISADES SIMULATOR FOUR YEAR TEST REPORT AND

. SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD Additional Tests Additional testing was done following the replacement of the simulator input/output (1/0) linkage in April 1998. Testing included; Verification of DORT performance Verification of each Analog Input response Verification of Override response for representative 1/0 from each subcontroller/panel section Comparison of panel instrumentation to plant process computer (PPC) instrumentation for eight initialization conditions (ICs) for steady state conditions, and during the_ following evolutions/transients:

Plant/reactor trip from power Safety injection from power Power level change Loss of power to 4160VAC, 2400VAC, 480VAC, 120VAC and 125VDC buses Main Steam Line Break Inside Containment Steam Generator Tube Rupture (50% severity) 2.0 CHANGES TO THE TESTING PROGRAM 2.1 Additions The following is a list of malfunction tests added since the last report submittal:

M253-CV62 fail letdown orifice CV2005 M254-MS 12 MSIV fail to close M255-RP17 NIOS meter miscalibration M256-RP18 NI01 meter miscalibration M258-PC04 fail PIP/SPl/CTCS/SOE M259-PC09 total failure of plant monitoring system (PMS)

M260-PC 10 CFMS multiplexor failure M261-FW20 P1A/B recirculation valve fail M262-IA 10 loss of N2 backup station 38 M263-IA 11 loss of N2 backup station 5 M264-IA 12 leak. in HP air system M265-RC24 inadvertent PORV opening 7

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD M266-ED77 breaker fail open (switchyard)

M267-SW09 SW 'piping rupture "A" critical header M268-TC21 failure of governor valve linear variable differential transmitter (LVDT) 253 Remote Function Tests have been added to the test program since 1995.

Refer to Appendix A for a list of test numbers and descriptions.

2.2 Deletions The following tests have been deleted due to associated malfunction deletion:

M015-AN17R Fail Power Supply to Annunciator Panel M040-CV14 Boronometer Failure M086-MS02 MSIV Fail Closed M171-RX02 PCS Temperature Indication Failure M172-RX03 PCS Temperature Indication Failure M173-RX04 PCS Temperature Control Failure M193-Sl10 SIS Status, Controls and Alarms M209-TC06 lnadvertant Turbine Runback M211-TC08 Main Turbine Generator Status M214-TC11 Load/Power Mismatch Additionally, test M121 is now M247 due to configuration of the Plant Process Computer (PPC). M087 has been deleted due to redundancy with transient test TOOB.

Three Technical Specification Surveillance tests have been deleted from the plant procedures, QOBC, 0013 and M025. These surveillances will no longer be performed as part of the test program on the simulator.

3.0 PERFORMANCE TEST DISCREPANCIES The following is a list of performance test related Simulator Deficiency Reports (SDRs) and the performance tests that had the deficiency. These SDRs will be corrected in future software load saves as prioritized in accordance with Simulator Configuration Control Procedures but no later than May 31, 1999.

8

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT. FOUR-YEAR PERIOD Deficiency SDR-97-106 SDR-98-007 SDR-98-009 SDR-98-010 SDR-98-023 Test Description M202 Service water pressure does not lower enough to signal standby service water pump start.

M400-176 This alternate power should power up HIC 0780A.

M400-267 Should have indication of service water header repressurization.

M400-288 This remote starts both fuel oil transfer pumps, may need to have separate remote for each P18 A and B..

N008/R065 This is a Technical Specification Surveillance test procedure (R065). There are pressure indications that differ from plant indications while conducting this surveillance.

4.0 PERFORMANCE TEST SCHEDULE, JUNE 1998 THROUGH MAY 2002 4.1 Tests to be conducted the ninth year following certification, June 1998 through May 1999 Simulator Real Time Tests RT01 - Control rod timing test RT05 - Timing test for various simulation programs Normal Operations Tests N001 - Plant start up from cold shut down to hot standby condition N008 - 25% Of Technical Specification Surveillance tests as follows:

001, 006, M07A-1, M07A-2, R021, SH0-1 and 0023 9

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD Steady State Test N007 - Steady state condition for> one hour at 99.7% FP, 75% FP and at 50%

FP Transient Tests T001 - Manual reactor trip transient test T002 - Trip of all feed water pumps transient test T003 - Closure of all main steam isolation valves transient test T004 - Trip of all reactor coolant pumps transient test T005 - Trip of any single reactor coolant pump transient test T006 - Main turbine trip transient test TOO? - Maximum rate power ramp transient test T008 - Maximum size unisolable main steam line rupture transient test T009 - LOCA with loss of all off site power transient test T010 - Slow primary system depressurization due to stuck open pressurizer relief or safety valve transient test Malfunction Tests M001, MOOS, M009, M017, M021, M025, M029, M033, M037, M041, M045, M049, M053, M057, M060, M068, M072, M076, M080, M084, M092, M096, M100, M104, M108, M112, M116, M120, M124, M128, M132, M136, M140, M144, M148, M152, M160, M164, M167, M175, M179, M183, M187, M191, M195, M203, M207, M215, M219, M223, M227, M231, M235, M240, M244, M248, M252 Remote Function Tests Remote Function Tests M400-001 through M400-075.

4.2 Tests to be conducted the tenth year following certification, June 1999 through May 2000 Simulator Real Time Tests RT04 - Turbine generator load rate of change timing test RT05 - Timing test for various simulation programs 10

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE.FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD Normal Operations Tests N004 - Hot standby operations test N005 - Load change test N006 - Full power to cold shutdown condition test N008 - 25% Of Technical Specification Surveillance Tests as follows:

M037, R0112, Q088 and DW/01 Steady State Test N007 - Steady state condition for> one hour at 99.7% FP, 75% FP and at 50%

FP Transient Tests T001 - Manual reactor trip transient test T002 - Trip of all feed water pumps transient test..

T003 - Closure of all. main steam isolation valves transient test

  • or safety valve transient test Malfunction Tests M002, M006, M010, M017, M018, M022, M026, M046, M050, M054, M057.5 M061, M069, M073, M077, M081, M085, M089. M093, M097, M101, M105, M109,"M113, M117, M125, M129, M133, M137, M141, M145, M149, M153, M161, M165, M168, M176, M180, M184, M188, M.192, M196, M200, M204, M208,. M212, M216, M220, M224, M225, M226; M227, M228, M229, M230, M231, M232, M233, M234, M235, M236, M237, M241, M242, M244, M245, M247, M249, M253, M254, M255, M256, M258, M259, M260, M261, M262, M263, M264, M265 11

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD Remote Function Tests M400-076 through M400-150 4.3 Tests to be conducted the eleventh year following certification, June 2000 through May 2001 Simulator Real Time Tests RT02 - Turbine acceleration time test RT03 - Mass/volume of PCS/CVCS change timing test Normal Operations Tests N002 :- Hot standby to full power operation test N008 - 25% Of Technical Specification Surveillance Tests as follows:

Q01, Q05, M033, 0021 and R012 Stead.Y $tate Test '

N007 - Steady state condition for> one hour at 99.7% FP, 75% FP arid at 50%

FP Transient Tests T001 - Manual reactor trip transient test T002 "'. Trip of all feed water pumps transient test T003 - Closure of all main steam isolation valves transient test T004 - Trip of all reactor coolant pumps transient test T005 - Trip of any single reactor coolant pump transient test T006 - Main turbine trip transient test T007 - Maximum rate power ramp transient test T008 - Maximum size unisolable main steam line rupture transient test T009 - LOCA with loss of all off site power transient test

.T010 - Slow primary system depressurization due to stuck open pressurizer relief or safety valve transient test 12

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD Malfunction Tests M003, M007, M011, M019, M027, M031, M035, M039, M043, M047, M051, M055, M058, M062, M066, M070, M078, M082, M090, M094, M098, M102, M106, M110, M114, M118, M122, M126, M130, M134, M138, M142, M146, M150, M154, M158, M162, M166, M167, M169, M177, M181, M185, M189, M197, M201, M205, M213, M217, M221, M225, M229, M233, M237, M242, M246, M250, M251, M252 Remote Function Tests

. M400-151 through M400-225 4.4 Tests to be conducted the twelfth year following certification, June 2001 through May 2002 Simulator Real Time Tests RT01 - Control rod timing test RT05 - Timing test for various simulation programs Normal Operations Tests N003 - Reactor trip recovery test N004 - Hot standby operations test N008 - 25% Of Technical Specification Surveillance Tests as follows:

Q01, Q06, M07A-1, M07A-2, M029, R011, MOB and MC11B Steady State Test N007 - Steady state condition for> one hour at 99.7% FP, 75% FP and at 50%

FP Transient Tests T001 - Manual reactor trip transient test T002 - Trip of all feed water pumps transient test T003 - Closure of all main steam isolation valves transient test T004 - Trip of all reactor coolant pumps transient test 13

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND SCHEDULE FOR PERFORMANCE TESTING FOR THE NEXT FOUR-YEAR PERIOD T005 - Trip of any single reactor coolant pump transient test T006 - Main turbine trip transient test T007 - Maximum rate power ramp transient test T008 - Maximum size unisolable main steam line rupture transient test T009 - LOCA with loss of all off site power transient test T010 - Slow primary system depressurization due to stuck open pressurizer relief or safety valve transient test Malfunction Tests M004, MOOS, M012, M020, M024, M028, M032, M036, M044, M048, M052, M056, M059, M063, M071, M075, M079, M083, M091, M103, M107, M111, M115, M123, M127, M131, M135, M139, M143, M147, M151, M155, M156, M157, M159, M163, M164, M167, M170, M174, M178, M182, M186, M190,.

M194, M198, M202, M206, M210, M218, M222, M226, M230, M234, M238, M243,M247,M251,M266,M267,M268 Remote Function Tests M400-226 through M400-295 5.0 SIMULA TOR SOFTWARE UPGRADES The Component Cooling Water System model flow and pressure calculations were upgraded in October 1997.

Thermohydraulic and Boron Density feedback were expanded to 2448 core nodes in place of feedback to 12 core regions in late 1994.

6.0 PLANT PROCESS COMPUTER UPGRADE The Plant Process. Computer (PPC) was replaced during REFOUT 95 in the plant. The PPC on the simulator.was replaced with a "stimulated" version ofthe plant PPC running the same software on DEC V AXStations. A V AXStation 4000 Model 90 serves as the PPC Host computer and communicates with the simulation computer via an Ethernet. A separate Ethernet is u_sed by the PPC Host to communicate with the four operator interface stations in the simulator

  • control room.

14

PALISADES SIMULA TOR FOUR YEAR TEST REPORT AND.

SCHEDULE FOR PERFORMANCE TESTING.

FOR THE NEXT FOUR-YEAR PERIOD 7.0 INPUT/OUTPUT (1/0) UPGRADE The original Unilink' 1/0 system was replaced with a TMI Corporation Sim2000' system in 1998. Software support was provided by North Coast Software, Inc. to modify the affected Encore modules.

15

APPENDIX A PALISADES SIMULA TOR REMOTE FUNCTION TESTS 6 Pages

M400-001 M400-002 M400-003 M400-004 M400-005 M400-008 M400-009 M400-010 M400-011 M400-014 M400-015 M400-016 M400-017 M400-018 M400-019 M400-020 M400-021 M400-022 M400-023 M400-024 M400-025 M400-026 M400-027 M400-028 M400-029 M400-030 M400-031 M400-032 M400-033 M400-034 M400-035

  • M400-036 M400-037 M400-038 M400-039 M400-040 M400-041 M400-042 M400-043 M400-044 M400-045 M400-046 M400-047 M400-048 M400-049

.APPENDIX A PALISADES SIMULA TOR REMOTE FUNCTION TESTS..

CC08 CC09 CC10 CC11 CC12 CR01 CR02 CR03.

CR04 CV21 CV22 CV23 CV24 CV25 CV26 CV27

. CV28 CV29 CV30 CV31 CV32 CV33 CV34 CV35 CV36 CV37 CV38 CV39 CV44 CV46

  • CV47 CV48 CV49 CV50 CV51 CV52 CV53 CV54 CV55 CV56 CV57 CV58 CV59 CV60 CV61 P52 A RACKOUT P52 B RACKOUT P52 C RACKOUT CCW TO M59A CC-706 CCW TO M59B CC-707 INCREASE/DECREASE EXCESS REACTIVITY REACTIVITY METER ON/OFF BUILD DECAY HEAT TO EQUILIBRIUM NUMBER DAYS AFTER SHUTDOWN DEMIN B10 CONCENTRATION T53A B10 CONCENTRATION T53B B10 CONCENTRATION T53A LEVEL CHANGE T53B LEVEL CHANGE DISTILLATE TO T-90 DEM H20 TO T939, T2 OR T81 SIRW TANK M/U FILL LINE V2157 SPOOL PIECE HOOKUP AND VALVE OPER H2 SUPPLY TO VCT N2 SUPPLY TO VCT P55A BREAKER RACKOUT P55B BREAKER RACKOUT P55C BREAKER RACKOUT P56A BREAKER RACKOUT P56B BREAKER RACKOUT CHG PP DIS.HOR V2195 OPERATE SERVICE OF DEBORA TE l/X T52
  • VCT T54 B10 CONCENTRATION DOMESTIC WATER USAGE P55B ALTERNATE POWER P55C ALTERNATE POWER P55B&C ALT. POWER FROM LCC13 ALT POWER FROM P55C TO P55B VCT OUT W M02087 MAN OPS VCT OUT W M02087 MAN. POS.

B10 M0-2140 MAN. OPS.

B10 M0-2140 MAN. POS.

SIRW TO CHG pp sue 2160 MAN. OPS SIRW TOCHGPPSUC 2160 MAN. POS.

B10 M0-2169 MAN. OPS B10 M0-2169 MAN. POS.

B10 M0-2170 MAN. OPS B10 M0-2170 MAN. POS.

MAN. W. CVC-2152 W. POS.

MAN. W, CVC-2194A W. POS.

1

M400-054 M400-055 M400-056 M400-057 M400-058 M400-059 M400-060 M400-061 M400-062 M400-063 M400-064 M400-069 M400-070 M400-071 M400-072 M400-073 M400-074 M400-075 M400-076 M400-077

. M400-078.

M400-079

. M400-080 M400-081 M400-082 M400-083 M400-084 M400-085 M400-086 M400-087 M400-088 M400-089 M400-090 M400-091 M400-092 M400-093 M400-094 M400-095 M400-096 M400-097 M400-098 M400-099 M400-100 M400-101 M400-102 M400-103 APPENDIX A PALISADES SIMULA TOR REMOTE FUNCTION TESTS CW09 CW10 CW11 CW12 CW13 CW14 CW15 CW16 CW17 CW18 CW19 ED15 ED16 ED17 ED18 ED19 ED20 ED21 ED22 ED23 ED24 ED25 ED26 ED27 ED28 ED29 ED30 ED31 ED32 ED33 ED34 ED46 ED47 ED48 ED49 ED50 ED51 ED53 ED54 ED55 ED56 ED57 ED58 ED59 ED60 ED61 P39A RACKOUT P39B RACKOUT P40A RACKOUT P40B RACKOUT EAST W/B VAC PRIME W LINE UP WESTW/B VAC PRIME W LINE UP LAKE WATER TEMP SET AMBIENT AIR TEMP. SET CIRC WATER PH CIRC WATER CONDUCTIVITY OIL WATER PP TIE W MV-735 CW XTIE BUS 77 THRU BUS 78 52-7804 XTIE ~us 78 THRU BUS 77 52-7804 XTIE BUS 90 THRU BUS 13 52-9007 OPEN/CLOSE 26H5MOD CHANGE GRID FREQ.1-50%=NEG.51-100%=POS.

CHANGE GRID VOLTAGE W CA-321 FWP.BLDG. BYPASS W XTIE BUS 91 THRU BUS 13 52-9107 XTIE BUS 11 THRU BUS 12 XTIE BUS 12 THRU BUS 11 XTIE BUS 13 THRU BUS 14 XTIE BUS 14 THRU BUS 13 DIG 1-1 TROUBLE ALARM CLEAR DIG 1-2 TROUBLE ALARM CLEAR DEFEAT UN RELAY LEFT CHAN.

DEFEAT UN RELAY RIGHT CHAN.

BATTERY CHG. #1 SERVICE IN/OUT BATTERY CHG. #2 SERVICE IN/OUT BATTERY CHG. #3 SERVICE IN/OUT BATTERY CHG. #4 SERVICE IN/OUT BYPASS REG TO Y10 BYPASS REG TO Y20 BYPASS REG TO Y 30 BYPASS REG TO Y40 MN GEN MOD OPEN/SHUT ALT POWER TO PZR HTR FROM BUS IC BRKR 25Z-101 RACKOUT BRKR 252-201 RACKOUT BRKR 152-105 RACKOUT BRKR 152-203 RACKOUT BRKR 152-302 RACKOUT BRKR 252-301 RACKOUT BRKR 252-401 RACKOUT BRKR 252-106 RACKOUT BRKR 252-102 RACKOUT.

2

M400-104 M400-105 M400-106 M400-107 M400-10B M400-109 M400-110 M400-111 M400-112 M400-113 M400-114 M400-115 M400-116 M400-117 M400-11B M400-119 M400-120 M400-121 M400-122 M400-123 M400-124 M400-125 M400-126 M400-127 M400-127 M400-12B M400-129 M400-130 M400-131 M400-132 M400-133 M400-134 M400-135 M400-136 M400-137 M400-13B M400-139 M400-140 M400-141 M400-142 M400-143 M400-144 M400-145 M400-146 M400-147 M400-14B APPENDIX A PALISADES SIMULA TOR REMOTE FUNCTION TESTS ED62 ED63 ED64 ED65 ED66 ED67.

ED6B ED69 ED70 ED71 ED72 ED73 ED74 FT06 FT07 FW24 FW25 FW26 FW27 FW2B fW29

-FW30 FW31 FW32 FW32 FW33 FW34 FW35 FW36 FW37 FW3B FW39 FW40 FW41 FW42 FW43 FW44 FW45 FW46 FW47 FW4B FW49 FW50 FW51 FW52 FW53 BRKR 252-202 RACKOUT BRKR 152-106 RACKOUT BRKR 152-202 RACKOUT BRKR 152-303 RACKOUT BRKR 252-302 RACKOUT BRKR 252-402 RACKOUT BRKR152-401 RACKOUT BRKR 152-402 RACKOUT BRKR 152-107 RACKOUT BRKR 152-213 RACKOUT L TOP A IND. ALT. POWER SUPPLY L TOP B IND. ALT. POWER SUPPLY RIGHT CHAN. SIAS ALIGNMENT TO Y40 K7 A RESET (VARIABLE)

K7B RESET (VARIABLE)

HOGGER INLET V106AE/CV0633 AIR EJECTOR INLET 640AE/104AE HEATER ISOUBYPASS 0720CD/0725CD HEATER ISOUBYPASS 0721CD/0726CD FEED REG. B/P 0705FW FEED REG. B/P 0707FW HEATER ISOUBYPASS E6A 115FW/0706FW HEATER ISOUBYPASS E6B 114FW/070BFW _

P2A/B DISCH W 102/103CD P2A/B DISCH W 102/103CD P2A BRKR RACKOUT P2B BRKR RACKOUT P1 QA BRKR RACKOUT P1 OB BRKR RACKOUT SUCTION SUPPLY TO AFW PP BA &B SUCTION SUPPLY TO AFW PP BC SIG D/P SENSOR CHAN. A SIG DIP SENSOR CHAN. B SIG A LEVEL SENSOR BYPASS SIG B LEVEL SENSOR BYPASS AFAS SUBSYSTEM ARMED/RESET FOGG SUBSYSTEM ARMED/RESET KB PCV-0521 BYPASS (150FW)

P910 VAC. PP POWER TO M0-0753&0760 CV-0736A W POS. (100%=AUTO)

CV-0737A W POS. (100%=AUTO)

POWER TO MOV-0743 POWER TO MOV-079B MANUAL MOV FROM PBA/B TO E50B POWER TO MOV-0753 3

M400-149 M400-150 M400-151 M400-152

. M400-153 M400-154 M400-155 M400-156 M400-157 M400-158 M400-159 M400-160 M400-161 M400-162 M400-163 M400-164 M400-165 M400-166 M400-167 M400-168 M400-169

- M400-170 M400-171 M400-172 M400-174 M400-175 M400-176

  • M400-177 M400-178 M400-185 M400-186 M400-187 M400-188 M400-189 M400-195 M400-196 M400-197 M400-198 M400-199 M400-200 M400-206 M400-211 M400-211 M400-212 M400-213 M400-218 APPENDIX A PALISADES SIMULA TOR REMOTE FUNCTION TESTS FW54 FW55 FW56 FW57 FW58.

FW59 FW60 FW61 IA09 MS16 MS17 MS18 MS19 MS20 MS21 MS22 MS23 MS24 MS25 MS26 MS_27 MS28 MS29

.MS30 MS32 MS33 MS34.

MS35

  • MS36 PC03

. PC05 PC06 PC07 PC08 RC27 RC28 RC30 RC31 RC32 RC33 RD15 RP35 RP36 RP38 RP39 SG06 POWER TO MOV-0760 MANUAL MOV FROM P8A/B TO E50A POWER TO MOV-0748 POWER TO MOV-0755 MANUAL MOV FROM P8C TO E50B POWER TO MOV-0754 POWER TO MOV-0759 MANUAL MOV FROM P8C TO E50A

  • W CA-1007 OPEN/CLOSE AUX. BLDG. ISOL.

TURB. W TEST WITH T4A &BID MSR OFF TURB. WTESTWT4B &A/C MSR OFF STEAM DUMP MAN. W. CA-0779 STEAM DUMP MAN. W. CA-0780 STEAM DUMP MAN. W. CA-0781 STEAM DUMP MAN. W. CA-0782 DRAINS CV0515, 17, 18, 19, 20, 23, 32 GLAND STEAM EX. C11A GLAND STEAM EXH. C11B MSIV SOLENOID LATCH CV0510 AUX. BOILER STEAM SUPPLY MSIV 0510 B/P W MAN. OPS MSIV 0510 Bf PW MAN POSITION MSIV 0501 B/P W MAN. OPERATION MSIV 0501 B/P W MAN. POSITION L.OCAL CONTROL OF CV 0522A (MAN. POSITION)

LOCAL CONTROL OF CV 0522B (MAN. POSITION}

ALT. POWER TO HIC-0780A Y30 ISOLATE AIR SUPPLY TO TBV CV0511 MSIV SOLENOID LATCH CV0501 SELECT ALT. POWER FOR PIP TMM BIAS ADJUST CHANNEL A TMM BIAS ADJUST CHANNEL B TMM BIAS ADJUST CHANNEL C TMM BIAS ADJUST CHANNEL D PCS B10 CONCENTRATION ADJUST/CHANGE PZR VENT LINE P50A BRKR RACKOUT P50B BRKR RACKOUT P50C BRKR RACKOUT

  • P50D BRKR RACKOUT CROM BUS POWER SELECTOR SWITCH CLUTCH BRKR RESET 42-1 CLUTCH BRKR RESET 42-2 NI 3 & 4 DECALIBRATION -50%T0+50%

NI 5 THRU 8 DECALIBRATION -50% T0+50%

FLASH TK HI LEVEL OVRD CV0738, 39, 70, 71 4

M400-219 M400-221 M400-222 M400-223 M400-224 M400-225 M400-230 M400-231 M400-232 M400-233 M400'-234 M400-235 M400-236 M400-237 M400-238

  • M400-239 M400-240 M400-241 M400-242 M400-243

. M400-244 M400-245 M400-246.

M400-247 M400-248 M400-249 M400-2~0 M400-251 M400-252 M400-253 M400-254 M400-255 M400-256 M400-257 M400-258 M400-259 M400-260 M400-261

  • M400-262 M400-263 M400-264 M400-265 M400-266 M400-267 M400-268 M400-269 APPENDIX A PALISADES SIMULA TOR REMOTE FUNCTION TESTS SG07 SG09 SG10 SG11 SG12 SG13 Sl16 Sl18 Sl19 Sl20 Sl21 Sl23 Sl24 Sl26 Sl27 Sl28 Sl29 8130 8131 Sl32.

Sl33 Sl34 Sl35 Sl36 Sl37 Sl38 Sl40 Sl41 Sl42 Sl43 Sl44 Sl45 Sl46 Sl47 Sl48 Sl51 Sl52 Sl53 Sl54 Sl55 Sl56 8157.

8W12 SW13 SW14 SW15 RIA0707 JUMPER-ISOL. BYPASS LOCAL CONT. M8-101 FOR CV-0782 LOCAL CONT. MS-102 FOR CV-0789 LOCAL CONT. MS-103 FOR CV-0781 LOCAL CONT. MS-104 FOR CV-0780 SIG BID TO COND. OR CST MV 3225 SID HX. TO SIRW TK.

MV 3231 P54A DISCH.

MV 3221 P54B DISCH.

MV 3203 P54C DISCH.

MV 3258,3259 CONTAINMENT SPRAY ISOL.

P66A BRKR RACKOUT P66B BRKR RACKOUT P67 A BRKR RACK OUT P67B BRKR RACKOUT P54A BRKR RACKOUT P54B BRKR RACKOUT P54C BRKR RACKOUT MV 3188 P66A RECIRC MV 3179 P66B RECIRC BRKR'S52-167 & 271 RACKOUT

  • Mv 3203 P67A RECIRC MV 3194 P67B RECIRC MV 3232 P54A RECIRC MV 3222 P54B RECIRC MV 3219 P54C RECIRC MV 3234 SI TK DRAIN TO SIRW MOV3041 BRKR RACKOUT MOV3045 BRKR RACKOUT MOV3049 BRKR RACKOUT MOV3052 BRKR RACKOUT T82A STEP CHANGE
  • T82B STEP CHANGE T82C STEP CHANGE T82D STEP CHANGE MV 3217 CONT. SPRAY TO SIRW MV 3237 SI TK DRAIN TO SIRW CV3025 MANUAL OVER RIDE CV 3055 MANUAL OVER RIDE*

CV 3006 W POSITION 100%=AUTO HOT LEG INJ. TO PRIMARY SYS ORN TK.

MV 3187 (P66ADISCH) THROTTTLE FIRE WATER TO SW HOR. A FIRE WATER TO SW HOR. B P7 A BRKR RACKOUT P7B BRKR RACKOUT 5

M400-270 M400-271 M400-272 M400-273 M400-274 M400-275 M400-276 M400-277

  • M400-278 M400-279 M400-280 M400-281 M400-282 M400-283 M400-284 M400-285 M400-286 M400-287 M400-288 M400-289 M400-290 M400-291 M400-292

'M400~293 M400-294 M400-295 APPENDIX A PALISADES SIMULATOR REMOTE FUNCTION TESTS SW16 SW17 SW18 SW19 SW20 TU10 WP01 WP02 AN01 AN02 AN03 CC06 CC07 CC14 CC15 CC16 CC17 ED76 ED78 FW66 FW67 Sl58 SW21 SW22 SW23

  • 'ED52 P7C BRKR RACKOUT FIRE WATER TO INST. AIR COMPRESSORS NON CRIT ISOL. VALVE BYPASS 101SW FIRE PP P9A STOP CV-0823/0826 VALVE POSITION 0-100%

LUBE OIL VAPOR EXTRACTOR ON/OFF P60A DIRTY WASTE ORN PP P60B DIRTY WASTE ORN PP C40 PANEL ACKNOWLEDGE C47AAND B LOCAL RESET AT C49 C47AAND B LOCAL SILENCE AT C49 MAN ISOL. VALVE CC0713 ISOL. AIR SUPPLY TO CV 0951 P50A CCW OUTLET VALVE POSITION P50B CCW OUTLET VALVE POSITION P50C CCW OUTLET VALVE POSITION P50D CCW OUTLET VALVE POSITION OPEN BREAKER FROM BUS (1C/1D)

DIG FUEL OIL PP 18B START CV 0736A MANUAL OPERATION CV 0737 A MANUAL OPERATION LINE UP BACK UP AIR TO CV 3018 ISOLATE AIR TO CV 0879 ISOLATE AIRTO CV 0880 TIC 0821 SETPOINT: 50 TO 150 DEG.F.

DC BREAKER CONTROL POWER