ML18066A650

From kanterella
Jump to navigation Jump to search
Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8
ML18066A650
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/17/1999
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18066A649 List:
References
NUDOCS 9909230082
Download: ML18066A650 (261)


Text

ENCLOSURE 1 CONSUMERS ENERGY COMPANY .

PALISADES PLANT DOCKET 50-255 CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS IMPROVED TECHNICAL SPECIFICATIONS CLEAN PAGES

Definitions 1.1 1.0 USE AND APPLICATION 1.1 Definitions


NOTE---------------------------..,-------~--------------.--..,-----,:

The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.

Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.

ASSEMBLY RADIAL FRA shall be the maximum ratio of the individual.fuel PEAKING FACTOR assembly power to the core average fuel assembly power (FRA) i.ntegrated over the total core height, including tilt AVERAGE DISINTEGRATION E shall be the average (weighted in proportion to the ENERGY- E concentration of each radionuclide in the primary coolant at the time of sampling) of the sum of the average beta and

  • gamma energies per disintegration (in MeV) for isotopes,
  • other than iodines, with half lives > 15 minutes, making up at least 95% of the total noniodine activity in the coolant.

AXIAL OFFSET (AO) AO shall be the power generated in the lower half of the core less the power generated in the upper half of the core, divided by the sum of the power generated in the lower and upper halves of the core (determ'ined using the incore monitoring system).

AXIAL SHAPE INDEX (ASI) ASI shall be the power generated in the lower half of the core less the power generated in the upper half of the core, ' ' ,***:

divided by the sum of the power generated in the lower and upper halves of the core (determined using the excore monitoring system).

Palisades Nuclear Plant 1.1-1 Amendment No.

Definitions 1.1

  • 1.1 Definitions CHANNEL CALIBRATION A CHANNEL CALIBRATION shall be the adjustment, as .

necessary, of the channel output such that it responds within the necessary range and accuracy to known values of the parameter that the channel monitors. The CHANNEL.

CALIBRATION shall encompass all devices in the channel required for channel OPERABILITY and the CHANNEL FUNCTIONAL TEST.

Calibration of instrument channels with Resistance Temperature Detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor .

behavior and normal calibration of the remaining adjustable devices in the channel.

Whenever a RTD*or thermocouple sensing element is replaced, the next required CHANNEL CALIBRATION shall include an inplace cross calibration that compares the other sensing elements with the recently installed sensing element.

The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping, or total channel steps.

  • CHANNEL CHECK A CHANNEL CHECK shall be the qualitative assessment, by observation, of channel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications or status derived from independent instrument channels measuring the same parameter.

CHANNEL FUNCTIONAL TEST A CHANNEL FUNCTIONAL TEST shall be:

a. Analog and bistable channels - the injection of a simulated or actual signal into the channel as close to the sensor as practicable to verify OPERABILITY, of all devices in the channel required for channel OPERABILITY;
  • Palisades Nuclear Plant 1.1-2 Amendment No.

Definitions 1.1

  • 1.1 Definitions CHANNEL FUNCTIONAL TEST b.

(continued)

Digital channels - the use of diagnostic programs to test digital hardware and the injection of simulated process .

data into the channel to verify OPERABILITY, of all devices in the channel required for channel OPERABILITY.

The CHANNEL FUNCTIONAL .TEST may be performed by means of any series of sequential, overlapping, or total channel steps so that the entire channel is tested.

CORE ALTERATION CORE ALTERATION shall be the movement of any fuel, sources, or control rods within the reactor vessel with the vessel head removed and fuel in the vessel. Suspension of CORE AL TERATIONS shall not preclude completion of movement of a component to a safe position.

CORE OPERATING LIMITS The COLR is the plant specific document that provides cycle REPORT (COLR) specific parameter limits for the current reload cycle. These cycle specific parameter limits shall be determined for each reload cycle in accordance with Specification 5.6.5. Plant operation within these limits is addressed in individual

  • Specifications.

DOSE EQUIVALENT 1-131 DOSE EQUIVALENT 1-131 shall be that concentration of 1-131 (microcuries/gram) that alone would produce the same thyroid dose as the quantity and isotopic mixture of 1-131, 1-132, 1-133, 1-134, and 1-135 actually present. The thyroid dose conversion factors used for this calculation shall be those listed in Table Ill of TID-14844, AEC, 1962, "Calculation of Distance Factors for Power and Test Reactor Sites."

LEAKAGE LEAKAGE shall be:

a. Identified LEAKAGE
1. LEAKAGE, such as that from pump seals or valve packing (except Primary Coolant Pump seal water leakoff), that is captured and conducted to collection systems or a sump or collecting tank;
  • Palisades Nuclear Plant 1.1-3 Amendment No.

Definitions 1.1

  • 1.1 Definitions LEAKAGE a. Identified LEAKAGE (continued)
2. LEAKAGE into the containment atmosphere from sources that are both specifically located and known not to interfere with the operation of leakage detection systems and not to be pressure boundary LEAKAGE; and
3. Primary Coolant System (PCS) LEAKAGE through a Steam Generator (SG) to the Secondary System.
b. Unidentified LEAKAGE All LEAKAGE (e?<cept Primary Coolant Pump seal leakoff) that is not identified LEAKAGE;
c. Pressure Boundary LEAKAGE LEAKAGE (except SG LEAKAGE) through a nonisolable fault in an PCS component body, pipe wall, or vessel wall.
  • MODE A MODE shall correspond to any one inclusive combination of core reactivity condition, power level, average primary coolant temperature, I

and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel.

OPERABLE - OPERABILITY A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its specified safety function(s) are also capable of performing their related support function(s) .

  • Palisades Nuclear Plant 1.1-4 Amendment No.

Definitions 1.1

  • 1.1 Definitions PHYSICS TESTS PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation. These tests are:
a. Described in Chapter 13, Initial Tests and Operation, of the FSAR;
b. Authorized under the provisions of 10 CFR 50.59; or
c. Otherwise approved by the Nuclear Regulatory Commission.

QUADRANT POWER TILT Tq shall be the maximum positive ratio of the power (Tq) generated in any quadrant minus the average quadrant power, to the average quadrant power.

RATED THERMAL POWER RTP shall be a total reactor core heat transfer rate to the (RTP) primary coolant of 2530 Mwt.

    • REFUELING BORON CONCENTRATION REFUELING BORON CONCENTRATION shall be a Primary Coolant System boron concentration of ~ 1720 ppm and sufficient to assure the reactor is subcriti.cal by ~ 5% t.P with all control rods withdrawn. * **

SHUTDOWN MARGIN (SOM) SOM shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:

a. All full length control rods (shutdown and regulating) are fully inserted except for the single rod of highest reactivity worth, which is assumed to be fully withdrawn.

However, with all full length control rods verified fully inserted by two independent means, it is not necessary to account for a stuck rod in the SOM calculation. With any full length control rods not capable of being fully inserted, the reactivity worth of these rods must be accounted for in the determination of SOM; and

b. There is no change in part length rod position .
  • Palisades Nuclear Plant 1.1-5 Amendment No.

Definitions 1.1 1.1 Definitions STAGGERED TEST BASIS A STAGGERED TEST BASIS shall consist of the testing of one of the systems, subsystems, channels, or other designated components during the interval specified by the Surveillance Frequency, so that all systems, subsystems; channels, or other designated components are tested during n Surveillance Frequency intervals, where n is the total number of systems, subsystems, channels, or other designated components in the associated function.

THERMAL POWER THERMAL POWER shall be the total reactor core heat transfer rate to the primary coolant.

TOTAL RADIAL FRT shall be the maximum product of the ratio of the individual PEAKING FACTOR fuel pin power to the core average pin power integrated over (FRT) the total core height, including tilt.

  • Palisades Nuclear Plant 1.1-6 Amendment No.

Definitions 1.1

  • Table 1.1-1(page1of1)

MODES

% RATED AVERAGE PRIMARY REACTIVITY THERMAL COOLANT MODE TITLE CONDITION POWER(a) TEMPERATURE

{keff) (oF) 1 Power Operation 2 0.99 >5 NA 2 Startup 2 0.99 ~ 5 NA 3 Hot Standby < 0.99 NA 2 300 4 Hot Shutdown'bJ < 0.99 NA 300 >Tave> 200 5 Cold Shutdown'bl < 0.99 NA ~ 200 6 Refueling<cJ NA NA NA

  • (a)

(b)

Excluding decay heat.

All reactor vessel head closure bolts fully tensioned.

(c) One or more reactor vessel head closure bolts less than fully tensioned .

  • Palisades Nuclear Plant 1.1-7 Amendment No.

Logical Connectors 1.2 1.0 USE AND APPLICATION

  • 1.2 Logical Connectors PURPOSE The purpose of this section is to explain the meaning of logical connectors.
  • Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of the.se connectors. constitutes logical conventions with specific meanings.

BACKGROUND Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required. Action).

The successive levels of logic are identified by additional digits of the Required Action n.umber and by successive indentions of the logical connectors .

  • When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.

i I

  • Palisades Nuclear Plant 1.2-1 Amendment No.

Logical Connectors 1.2

  • 1.2 Logical Connectors EXAMPLES The following examples illustrate the use of logical connectors.

EXAMPLE 1.2-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met. A.1 Verify ...

A.2 Restore ...

In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed .

  • Palisades Nuclear Plant 1.2-2 Amendment No.

Logical Connectors 1.2

  • 1.2 Logical Connectors EXAMPLES EXAMPLE 1.2-2 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met. A.1 Trip ...

A.2.1 Verify ...

A.2.2.1 Reduce ...

A.2.2.2 Perform ...

  • OR A.3 Align ...

This example represents a more complicated use of logical connectors.'

Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement. Any one of these three Actions may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed .

  • Palisades Nuclear Plant 1.2-3 Amendment No.

Completion Times 1.3

  • 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the plant. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the arnount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the plant is in a MODE or specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and

  • the Required Actions apply until the Condition no longer exists or the
  • plant is not within the LCO Applicability.

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the.

Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the time of discovery of the situation that required entry into the Condition.

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition .

  • Palisades Nuclear Plant 1.3-1 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times DESCRIPTION (continued)

However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability; and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Compietion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery ... " Example 1.3-3 illustrates one use of this type of Completion Time. The 1O day Completion Time specified for Conditions A and B in Example 1.3-3 may not be extended .

  • Palisades Nuclear Plant 1.3-2 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required 8: 1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and associated AND Completion Time not met. B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered. *

  • The Required Actions of Condition B are to be in MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. A total of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is allowed for reaching MODE 3 and a total of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (not 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br />) is allowed for reaching MODE 5 from the time that Condition B was entered. If MODE 3 is reached within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />,* the time allowed for reaching MODE 5 is the next 33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> because the total time allowed for reaching MODE 5 is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
  • _If Condition B is entered while in MODE 3, the time allowed for reaching MODE 5 is the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> .
  • Palisades Nuclear Plant 1.3-3 Amendment No.

I i Completion Times I 1.3

1. 1.3 Completion Times EXAMPLES EXAMPLE 1.3-2 I (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One pump A.1 Restore pump to 7 days inoperable. OPERABLE status.

B. Required B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and associated .AND*

Completion Time not met. B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> When a pump is declared inoperable, Condition A is entered. If the pump is not restored to OPERABLE status within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the inoperable pump is restored to OPERABLE status after Condition B is entered, Condition A and B are exited, and therefore, the Required Actions of Condition B may be terminated.

When a second pump is declared inoperable while the first pump is still inoperable, Condition A is not re-entered for the second pump.

LCO 3.0.3 is entered, since the ACTIONS do not include a Condition for more than one inoperable pump. The Completion Time *clock for Condition A does not stop after LCO 3.0.3 is entered, but continues to be tracked from the time Condition A was initially entered.

While in LCO .3.0.3, if one of the inoperable pumps is restored to OPERABLE status and the Completion Time for Condition A has not expired, LCO 3.0.3 may be exited and operation continued in accordance with Condition A.

While in LCO 3.0.3, if one of the inoperable pumps is restored to OPERABLE status and the Completion Time for Condition A has expired, LCO 3.0.3 may be exited and operation continued in accordance with Condition B.

  • Palisades Nuclear Plant 1.3-4 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times EXAMPLES EXAMPLE 1.3-2 (continued)

The Completion Time for Condition B is tracked from the time the Condition A Completion Time expired.

On restoring one of the pumps to OPERABLE status, the Condition A Completion Time is not reset, but continues from the time the first pump was declared inoperable. This Completion Time may be extended if the pump restored to OPERABLE status was the first inoperable pump. A 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> extension to the stated 7 days is allowed, provided this does not result in the second pump being inoperable for > 7 days .

  • Palisades Nuclear Plant 1.3-5 Amendment No.

Completion Times 1.3

    • 1.3 Completion Times EXAMPLES (continued)

EXAMPLE 1.3-3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One A.1 Restore Function X 7 days Function X train to OPERABLE train status. AND inoperable.

10 days from discovery of failure to meet the LCO B. One B.1 Restore Function Y 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Function Y train to OPERABLE train status. AND inoperable.

1O days from .

discovery of failure to meet the LCO C. One C.1 Restore Function X 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Function X train to OPERABLE train status.

inoperable.

  • OR AND C.2 Restore Function Y One* train to OPERABLE 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Function Y status.

train inoperable .

  • Palisades Nuclear Plant 1.3-6 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times EXAMPLES EXAMPLE 1.3-3 (continued)

When one Function X train and one Function Y train are inoperable, Condition A and Condition B are concurrently applicable. The Completion Times for Condition A and Condition B are tracked separately for each train starting from the time each train was declared inoperable and the Condition was entered. A separate Completion Time is established for Condition C and tracked from the time the second train was declared inoperable (i.e., the time the situation described in Condition C was discovered).

If Required Action C.2 is completed within the specified Completion Time, Conditions B and C are exited. If the Completion Time for Required Action A.1 has not expired, operation may* continue in accordance with ..

Condition A. The remaining Completion Time in Condition A is measured from the time the affected train was declared inoperable (i.e., initial entry into Condition A).

The Completion Times of Conditions A and B are modified by a logical connector, with a separate 1O day Completion Time measured from the time it was discovered the LCO was not met. In this example, without the separate Completion Time, it would be possible to alternate between Condition$ A, B, and C in such a manner that operation could continue indefinitely without ever restoring systems to meet the LCO. The separate Completion Time modified by the phrase "from discovery of failure to meet the LCO" is designed to prevent indefinite continued operation while not meeting the LCO. This Completion Time allows for an exception to the normal "time zero" for beginning the Completion Time "clock." In this instance, the Completion Time "time zero" is specified as commencing at the time the LCO was initially not met, instead of at the time the associated Condition was entered .

  • Palisades Nuclear Plant 1.3-7 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times EXAMPLES (continued)

EXAMPLE 1.3-4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Restore valve(s) to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> valves OPERABLE status.

inoperable.

B. Required B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and associated AND Completion Time not met. B.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> A single Completion Time is used for any number of valves inoperable at the same time. The c'ompletion Time associated with Condition A is based on the initial entry into Condition A and is not tracked on a per valve basis. Declaring subsequent valves inoperable; while Condition A is still in effect, does not trigger the tracking of separate Completion Times.

Once one of the valves has been restored to OPERABLE status, the Condition A Completion Time is not reset, but continues from the time the first valve was declared inoperable. The Completion Time may be extended if the valve restored to OPERABLE status was the first inoperable valve. The Condition A Completion Time may be extended for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> provided this does not result in any subsequent valve being inoperable for > 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

If the Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (including the extension) expires while one or more valves are still inoperable, Condition B is entered .

  • Palisades Nuclear Plant 1.3-8 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times EXAMPLES (continued)

EXAMPLE 1.3-5 ACTIONS


NOTE--------------------------------------------

Separate Condition entry is allowed for each inoperable valve.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Restore valve to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> valves OPERABLE inoperable. status.

B. Required B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action C1nd associated AND Completion Time not met. B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

  • The Note above the ACTIONS Table is a method of modifying how the Completion Time is tracked. If this method of modifying how the

. Completion Time is tracked was applicable.only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.

The Note allows Condition A to be entered separately for each inoperable valve, and Completion Times tracked on a per valve basis. When a valve is declared inoperable, Condition A is entered and its Completion Time starts. If subsequent valves are declared inoperable, Condition A is entered for each valve and separate Completion Times start and are tracked for each valve.

If the Completion Time associated with a valve in Condition A expires, Condition B is entered for that valve. If the Completion Times associated with subsequent valves in Condition A expire, Condition B is entered separately for each valve and separate Completion Times start and are tracked for each valve. If a valve that caused entry into Condition B is restored to OPERABLE status, Condition B is exited for that valv~.

Since the Note in this example allows multiple Condition entry and tracking of separate Completion Times, Completion Time extensions do not apply .

Palisades Nuclear Plant 1.3-9 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times EXAMPLE EXAMPLE 1.3-6 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One channel A.1 Perform SR 3.x.x.x. Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable.

OR A.2 Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to

~ 50% RTP.

B. Required 8.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and associated l Completion

  • Time not met.

Entry into Condition A offers a choice between Required Action A.1 or A.2. Required Action A.1 has.a "once per" Completion Time, which qualifies for the 25% extension, per SR 3.'0.2, to each performance after the initial performance. The initial 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval of Required Action A.1 begins when Condition A is entered and the initial performance of Required Action A.1 must be complete within the first 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval. If Required Action A.1 is followed and the Required Action is not met within the Completion Time (plus the extension allowed by SR 3.0.2),

Condition B is entered. If Required Action A.2 is followed and the Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is not met, Condition B is entered.

If after entry into Condition B, Required Action A.1 or A.2 is met, Condition B is exited and operation may then continue in Condition A.

  • Palisades Nuclear Plant 1.3-10 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times EXAMPLES (continued)

EXAMPLE 1.3-7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One A.1 Verify affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> subsystem subsystem inoperable. isolated. AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> A.2 Restore subsystem to OPERABLE status .

  • B. Required Action and associated Completion B.1 Be in MODE 3.

AND 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Time not met. B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Required Action A.1 has two Completion Times. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time begins at the time the Condition is entered and each "Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter" interval begins upon performance of Required Action A.1.

If after Condition A is entered, Required Action A.1 is not met within either the initial 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or any subsequent 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval from the previous performance (plus the extension allowed by SR 3.0.2),

Condition B is entered .

  • Palisades Nuclear Plant 1.3-11 Amendment No.

Completion Times 1.3

  • 1.3 Completion Times EXAMPLES EXAMPLE 1.3-7 (continued)

The Completion Time clock for Condition A does not stop after Condition B is entered, but continues from the time Condition A was initially entered. If Required Action A.1 is met after Condition B is entered, Condition B is exited and operation may continue in accordance with Condition A, provided the Completion Time for Required Action A.2 has not expired.

IMMEDIATE When "Immediately" is used as a Completion Time, the Required Actioni COMPLETION TIME should be pursued without delay and in a controlled manner.

  • Palisades Nuclear Plant 1.3-12 Amendment No.

Frequency 1.4

  • 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.

DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the Surveilfance must be met in order to meet the associated LCO. An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.

The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR)

Applicability. The "specified Frequency" consists of the requirements of the Frequency column of eacli SR, as well as certain Notes in the Surveillance column that modify performance requirements.

Situations where a Surveillance could be required (i.e.; its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.

EXAMPLES The following examples illustrate the various ways that Frequencies are specified. In these examples, the Applicability of the LCO (LCO not shown) is MODES 1, 2, and 3.

  • Palisades Nuclear Plant 1.4-1 Amendment No.

Frequency 1.4

  • 1.4 Frequency EXAMPLES (continued)

EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the stated Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the plant is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the plant is in a MODE or other specified condition in the Applicability of the LCO, and the performance of the Surveillance is not otherwise modified (refer to Example 1.4-3), then SR 3.0.3 becomes applicable.

If the interval as specified by SR 3.0.2 is exceeded while the plant is not in a MODE or other specified condition in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the MODE or other specified condition. Failure to do so would result in a violation of SR 3.0.4 .

  • Palisades Nuclear Plant 1.4-2 Amendment No.

Frequency 1.4

  • 1.4. Frequency EXAMPLES (continued)

EXAMPLE 1.4-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify flow is within limits. Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after

~ 25% RTP 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time reactor power is increased from a power level

< 25% RTP to~ 25% RTP, the Surveillance must be performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").

This type of Frequency does not qualify for the extension allowed by SR 3.0.2. "Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If reactor power decreases to< 25% RTP, the measurement of both intervals stops. New intervals start upon reactor power reaching 25% RTP .

  • Palisades Nuclear Plant 1.4-3 Amendment No.

Frequency 1.4

  • 1.4 Frequency EXAMPLES (continued)

EXAMPLE 1.4-3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY


N()TE----------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after

<: 25% RTP.

Perform channel adjustment. 7 days As the Note modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches <: 25% RTP to perform the Surveillance.

The Surveillance is still considered to be performed within the "specified Frequency." The interval continues, whether or not the plant operation is

< 25% RTP between performances. Therefore, if the Surveillance were not performed within the 7 day (plus the extension allowed by SR 3.0.2) interval, but operation was< 25% RTP, it would not constitute a failure of the SR or failure to meet the LC(). Also, no violation of SR 3.0.4 occurs when changing M()DES, even with the 7 day Frequency not met,

  • provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with power<: 25% RTP.

()nee the plant reaches 25% RTP, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval, there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply .

  • Palisades Nuclear Plant 1.4-4 Amendment No.

SLs 2.0

  • 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 In MODES 1 and 2, the Departure from Nucleate Boiling Ratio (DNBR) shall be maintained at or above the following DNB correlation safety limits:

Correlation Safety Limit XNB 1.17 ANFP 1.154 HTP 1.141 2.1.1.2 In MODES 1 and 2, the peak Linear Heat Rate (LHR) (adjusted for fuel rod dynamics) shall be maintained at s: 21.0 kW/ft.

2.1.2 Primary Coolant System (PCS) Pressure SL In MODES 1, 2, 3, 4, 5, and 6, the PCS pressure shall be maintained at s: 2750 psia .

  • 2.2 SL Violations 2.2.1 If SL 2.1.1.1 or SL 2.1.1.2 is violated, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2 If SL 2.1.2 is violated:

2.2.2.1 In MODE 1 or 2, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2.2 In MODE 3, 4, 5, or 6, restore compliance within 5 minutes.

  • Palisades Nuclear Plant 2.0-1 Amendment No.

LCO Applicability 3.0

  • 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.

LCO* 3.0.3 When an LCO is not met and the associated ACTIONS are not m~t. an associated ACTION is not provided, or if directed by the associated ACTIONS, the plant shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the plant, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
  • b.

c.

MODE 4 within 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br />; and*

MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS.

Exceptions to this Specification are stated in the individual Specifications .

  • Palisades Nuclear Plant 3.0-1 Amendment No.

LCO Applicability 3.0

  • 3.0 LCO APPLICABILITY LCO 3:0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with

  • this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.13, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered. When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.Q.2 .

LCO 3.0.7 Special Test Exception (STE) LCOs in each applicable LCO section allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with STE LCOs is optional. When an STE LCO is desired to be met but is not met, the ACTIONS of the STE LCO shall be met. When an* STE LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications .

  • Palisades Nuclear Plant 3.0-2 Amendment No.

SR Applicability 3.0

  • 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during tht? performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per ... "

basis, the above Frequency extension applies to each performance after

Exceptions to this Specification are stated in the individual Specifications.

If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered .

  • Palisades Nuclear Plant 3.0-3 Amendment No.

SR Applicability 3.0

  • 3.0 SR APPLICABILITY SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency. This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS .
  • Palisades Nuclear Plant 3.0-4 Amendment No.

SOM 3.1.1

LCO 3.1.1

  • SOM shall be within the limits specified in the COLR.

APPLICABILITY: MODE 3, 4, and 5.

ACTIONS CONDITION. REQUIRED ACTION COMPLETION TIME A. SOM not within limit. , A.1 Initiate boration to 15 minutes restore SOM to within limit.

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 . Verify SOM to be within limits. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Palisades Nuclear Plant 3.1.1-1 Amendment No.

Reactivity Balance 3.1.2

  • 3.1 REACTIVITY CONTROL SYSTEMS 3.1.2 Reactivity Balance LCO 3.1.2 The core reactivity balance shall be within +/- 1% L'lp of predicted values.

APPLICABILITY: MODE 1.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Core reactivity balance not A.1 Re-evaluate core design 7 days within limit. and safety analysis and determine that the reactor core is acceptable for continued operation .

  • AND A.2 Establish appropriate operating restrictions and SRs.

7 days B. Required Action and 8.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

  • Palisades Nuclear Plant 3.1.2-1 Amendment No.

Reactivity Balance 3.1.2

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2.1 ------------------------------1\J()TE----------------------------

The predicted reactivity values may be adjusted (normalized) to correspond to the measured core reactivity prior to exceeding a fuel burn up of 60 Effective Full Power Days (EFPD) after each fuel loading.

Verify overall core reactivity balance is within Prior to entering

+/- 1% Llp of predicted values. M()DE 1 after each fuel loading


N()TE---------

()nly required after initial 60 EFPD 31 EFPD

  • Palisades l'Juclear Plant 3.1.2-2 Amendment No.

MTC 3.1.3

  • 3.1 REACTIVITY CONTROL SYSTEMS 3.1.3 Moderator Temperature Coefficient (MTC)

LCO 3.1.3 The MTC shall be maintained less positive than 0.5 E-4 ~p/°F at:::: 2%

RATED THERMAL POWER (RTP).

APPLICABILITY: . MODES 1 and 2 .

. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. MTC not within limits. A.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE REQUIREMENTS

  • SR 3.1.3.1 SURVEILLANCE Verify MTC is less positive than 0.5 E-4
2% RTP.

I

~pl°F at FREQUENCY Prior to exceeding .

2% RTP after each fuel loading

  • Palisades Nuclear Plant 3.1.3-1 Amendment No.

Control Rod Alignment 3.1.4

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One channel of rod position A.1 Perform SR 3.1.4.1 Once within indication inoperable for (rod position 15 minutes following one or more control rods. verification). any rod motion in that group

    • B. Rod position deviation .

alarm inoperable.

B.1 Perform SR 3.1.4.1 (rod position verification).

Once within 15 minutes of movement of any control rod C. One control rod misaligned C. 1 Perform SR 3.2.2.1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> by > 8 inches. (peaking factor verification).

OR C.2 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to::; 75% RTP.

D. One full-length control rod D. 1 'Restore control rod to Prior to entering immovable, but trippable. OPERABLE status. MODE 2 following next MODE 3 entry

  • Palisades Nuclear Plant 3.1.4-1 Amendment No.

. Control Rod Alignment 3.1.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

One or more control rods inoperable for reasons other than Condition D.

. OR Two or more control rods misaligned by > 8 inches.

Both rod position indication channels inoperable for one or more control rods .

  • Palisades Nuclear Plant 3.1.4-2 Amendment No.

Control Rod Alignment 3.1.4

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify the position of each control rod to be within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 8 inches of all other control rods in its group.

SR 3.1.4.2 Perform a CHANNEL CHECK of the control rod 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> position indication channels.

SR 3.1.4.3 Verify control rod freedom of movement by moving 92 days each individual full-length control rod that is not fully inserted into the reactor core ~ 6 inches in either direction.

(

Perform a CHANNEL CALIBRATION of the control 18 months 18 months rod position indication channels.

SR 3.1.4.6 Verify each full-length control rod drop time is Prior to reactor

o;; 2.5 seconds. criticality, after each reinstallation of the reactor head
  • Palisades Nuclear Plant 3.1.4-3 Amendment No.

Shutdown and Part-Length Rod Group Insertion Limits 3.1.5

  • 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown and Part-Length Control Rod Group Insertion Limits LCO 3.1.5 All shutdown and part-length rod groups shall be withdrawn to

~ 128 inches.

APPLICABILITY: MODE 1, MODE 2 with any regulating rod withdrawn above 5 inches.


NOTE--------------------------------------------

Th is LCO is not applicable while performing SR 3.1.4.3 (rod exercise test).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more shutdown or A.1 Declare affected control Immediately part-length rods not within rod(s) inoperable and limit. enter the applicable Conditions and Required Actions of LCO 3.1.4.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each shu~down and part-length rod group is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> withdrawn ~ 128 inches .

  • Palisades Nuclear Plant 3.1.5-1 Amendment No.

Regulating Rod Group Position Limits 3.1.6

  • 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Regulating Rod Group Position Limits LCO 3.1.6 The Power Dependent Insertion Limit (PDIL) alarm circuit and the Control Rod Out Of Sequence (CROOS) alarm circuit shall be OPERABLE, and the regulating rod groups shall be limited to the withdrawal sequence, overlap, and insertion limits specified in the COLR.

APPLICABILITY: MODES 1 and 2.


NOTE------------~-------------------------------

This LCO is not applicable while performing SR 3.1.4.3 (rod exercise test).

ACTIONS

  • CONDITION REQUIRED ACTION COMPLETION TIME
  • A. Regulating rod groups inserted beyond the insertion limit.

A.1 Restore regulating rod groups to within limits.

  • 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> A.2 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to less than or equal to the fraction of RTP allowed by the regulating rod group position and insertion limits specified in the COLR.
  • Palisades Nuclear Plant 3.1.6-1 Amendment No.

Regulating Rod Group Position Limits 3.1.6

  • ACTIONS B.

CONDITION Regulating rod groups not B.1 REQUIRED ACTION Restore regulating rod COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> within sequence or overlap groups to within limits. appropriate sequence and overlap limits.

.c. . PDIL or GROOS alarm C.1 Perform SR 3.1.6.1 Once within circuit inoperable. (group position 15 minutes following verification). any rod motion D. Required Action and D. 1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

    • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify each regulating rod group is within its 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> withdrawal sequence, overlap, and insertion limits.

SR 3.1.6.2 Verify PDIL alarm circuit is OPERABLE. 31 days SR 3.1.6.3 Verify GROOS alarm circuit is OPERABLE. 31 days

  • Palisades Nuclear Plant . 3.1.6-2 Amendment No .

Special Test Exceptions (STE) 3.1.7

  • 3.1 REACTIVITY CONTROL SYSTEMS 3.1. 7 Special Test Exceptions (STE)

LCO 3.1.7 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.4, "Control Rod Alignment";

LCO 3.1.5, "Shutdown and Part-Length Rod Group Insertion Limits";

LCO 3.1.6, "Regulating Rod Group Position Limits"; and

.LCO 3.4.2, "PCS Minimum Temperature for Criticality" may be suspended, provided:

a. THERMAL POWER is ~ 2% RTP;
b. ~ 1% shutdown reactivity, based on predicted control rod worth, is available for trip insertion; and
c. Tave is ~ 500°F.

APPLICABILITY: MODE 2 during PHYSICS TESTS.

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. THERMAL POWER not A.1 Reduce THERMAL 15 minutes within limit. POWER to within limit.
8. Shutdown reactivity not 8.1 Initiate boration to 15 minutes within limit. restore shutdown reactivity to within limit.

C. Tave not within limit. C.1 Restore Tave to within 15 minutes limit.

  • Palisades Nuclear Plant 3.1.7-1 Amendment No.

Special Test Exceptions (STE) 3.1.7

  • ACTIONS D.

CONDITION Required Action and D. 1 REQUIRED ACTION Suspend PHYSICS COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated Completion TESTS.

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 Verify THERMAL POWER is~ 2% RTP. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SR 3.1.7.2 Verify Tave is :?: 500°F. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

  • SR 3.1.7.3 Verify :?: 1% shutdown reactivity is available for trip insertion .

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

  • Palisades Nuclear Plant 3.1.7-2 Amendment No.

LHR 3.2.1

  • 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Linear Heat Rate (LHR)

LCO 3.2.1 LHR shall be within the limits specified in the COLR, and the lncore Alarm System or Excore Monitoring System shall be OPERABLE to monitor LHR.

APPLICABILITY: MODE 1 with THERMAL POWER> 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LHR, as determined by the A.1 Restore LHR to within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> automatic lncore Alarm limits.

System, not within limits specified in the COLR, as indicated by four or more coincident incore channels.

LHR, as determined by the Excore Monitoring System, not within limits specified in the COLR.

LHR, as determined by manual incore detector readings, not within limits specified in the COLR.

Palisades Nuclear Plant 3.2.1-1 Amendment No.

LHR 3.2.1

  • ACTIONS 8.

CONDITION lncore Alarm and Excore 8.1 REQUIRED ACTIO N Reduce THERM AL COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Monitoring Systems POWER to~ 85 %RTP.

inoperable for monitoring LHR.

8.2 Verify LHR is wit hin 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> limits using man ual incore readings. AND Once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thereafter C. Required Action and C. 1 Reduce THERM AL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to~ 25 %RTP.

Time not met.

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.1 -------------------------------NOTE---------------------------

Only required to be met when the lncore A Iarm System is being used to monitor LHR.

Verify LHR is within the limits specified in th e 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> COLR.

  • Palisades Nuclear Plant 3.2.1-2 Amendment No.

LHR 3.2.1


N()TE----------------------------

FREQUENCY Only required to be met when the lncore Alarm System is being used to monitor LHR.

Adjust incore alarm setpoints based on a Prior to operation measured power distribution. > 50% RTP after each fuel loading 31 EFPD thereafter SR 3.2.1.3 -------------------------------N()TE---------------------------

()nly required to be met when the Excore Monitoring System is being used to monitor LHR.

  • Verify measured ASI has been within 0.05 of target ASI for last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Prior to each initial use of Excore Monitoring System to monitor LHR SR 3.2.1.4 -------------------------------N()TE---------------------------

Only required to be met when the Excore Monitoring System is being used to monitor LHR.

Verify THERMAL P()WER is less than the APL. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

  • Palisades Nuclear Plant 3.2.1-3 Amendment No.

LHR 3.2.1


N()TE---------------------------

FREQUENCY On ly required to be met when the Excore Monitoring System is being used to monitor LHR.

Verify measured ASI is within 0.05 of target ASI. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SR 3.2.1.6 -------------------------------N()TE---------------------------

()nly required to be met when the Excore Monitoring System is being used to monitor LHR.

Verify Tq :s; 0.03. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

  • Palisades Nuclear Plant 3.2.1-4 Amendment No.

Radial Peaking 3.2.2

  • 3.2 POWER DISTRIBUTION LIMITS 3.2.2 Radial Peaking Factors LCO 3.2.2 The Assembly Radial Peaking Factor, FRA* and Total Radial Peaking Factor, FRT' shall be within the limits specified in the COLR.

APPLICABILITY: MODE 1 with THERMAL POWER > 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or. more Radial A.1 Restore Radial Peaking 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Peaking Factors not within Factor(s) to within limits.

limits specified in the COLR.

  • B. Required Action and associated Completion Time not met.

8.1 I

Reduce THERMAL POWER to~ 25% RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.2.1 Verify Fl and FRT are within limits specified in the Prior to operation COLR. > 50% RTP after each fuel loading 31 EFPD thereafter

  • Palisades Nuclear Plant 3.2.2-1 Amendment No.

Tq 3.2.3

  • 3.2 POWER DISTRIBUTION LIMITS 3.2.3 QUADRANT POWER TILT (Tq)

LCO 3.2.3 Tq shall bes 0.05.

APPLICABILITY: MODE 1 with THERMAL POWER> 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Tq > 0.05. A.1 Verify FRA and FRT are 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> within the limits of LCO 3.2.2, "Radial AND Peaking Factors."

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter

  • B. Tq > 0.10. 8.1 Reduce THERMAL POWER to < 50% RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C. Required Action and C.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to s 25% RTP.

Time not met.

OR Tq>0.15. I SURVEILLANCE REQUIREMENTS

  • SURVEILLANCE FREQUENCY SR 3.2.3.1 Verify Tq is s 0.05. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
  • Palisades Nuclear Plant 3.2.3-1 Amendment No.

ASI 3.2.4

  • 3.2 POWER DISTRIBUTION LIMITS 3.2.4 AXIAL SHAPE INDEX (ASI)

LCO 3.2.4 The ASI shall be within the limits specified in the COLR.

APPLICABILITY: MODE 1 with THERMAL POWER> 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. ASI not within limits A.1 Restore ASI to within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> specified in COLR. limits.

B. Required Action and B.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to ~ 25% RTP .

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.4.1 Verify ASI is within limits specified in the COLR. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

  • Palisades Nuclear Plant 3.2.4-1 Amendment No.

RPS Instrumentation 3.3.1

  • 3.3 INSTRUMENTATION 3.3.1 Reactor Protective System (RPS) Instrumentation LCO 3.3.1 Four RPS trip units, associated instrument ctiannels, and associated Zero Power Mode (ZPM) Bypass removal channels for each Function in Table 3.3.1-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.1-1.

ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each Funqtion.

CONDITION REQUIRED ACTION COMPLETION TIME .

A. -------------NOTE-------------- A.1 Place affected trip unit 7 days Not applicable to High in trip.

Startup Rate, Loss of Load, or ZPM Bypass Removal Functions.

One or more Functions with one RPS trip unit or associated instrument channel inoperable.

B. One High Startup Rate trip B.1 Restore trip unit and Prior to entering unit or associated associated instrument MODE 2 from instrument channel channel to OPERABLE MODE3 inoperable. status .

  • Palisades Nuclear Plant 3.3.1-1 Amendment No.

RPS Instrumentation 3.3.1

  • ACTIONS c.

CONDITION One Loss of Load trip unit c. 1 REQUIRED ACTION Restore trip unit and COMPLETION TIME Prior to increasing or associated instrument associated instrument THERMAL POWER channel inoperable. channel to OPERABLE to~ 17% RTP status. following entry into MODE3 D. One or more ZPM Bypass D. 1 Remove the affected Immediately Removal channels ZPM Bypasses.

inoperable.

OR D.2 Declare affected trip Immediately units inoperable.

E. -------------r'JOTE.-------------- ------------------NOTE.------------------

Not applicable to LCO 3.0.4 is not applicable.

. ZPM Bypass Removal ---------------------------------------------

Function.


E.1 Place one trip unit in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> trip.

One or more Functions with two RPS trip units or AND associated instrument channels inoperable. -----------------NOTE.-------------------

Not applicable to High Startup Rate or Loss of Load Functions.

E.2 Restore one trip unit 7 days and associated instrument channel to OPERABLE. status.

F. Two power range channels F.1 Restrict THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable . POWER to ~ 70% RTP.

  • Palisades Nuclear Plant 3.3.1-2 Amendment No.

RPS Instrumentation 3.3.1

  • ACTIONS G.

CONDITION Required Action and G.1 REQUIRED ACTION Be in MODE 3.

COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR G.2.1 Verify no more than one 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> full-length control rod is Control room ambient air capable of being temperature > 90°F. withdrawn.

OR G.2.2 Verify* PCS boron 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> concentration is at REFUELING BORON CONCENTRATION .

    • SURVEILLANCE REQUIREMENTS

NOTE----------------------------------------------------------

Refer to Table 3.3.1-1 to determine which SR shall be performed for each Function.

SURVEILLANCE FREQUENCY SR 3.3.1.1 Perform a CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.1.2 Verify control room temperature is ::; 90°F. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

  • Palisades Nuclear Plant 3.3.1-3 Amendment No.

RPS Instrumentation 3.3.1


N()TE-----------------------------

FREQUENCY Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL P()WER is ~ 15% RTP.

Perform calibration (heat balance only) and adjust 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the power range excore and b.T power channels to agree with calorimetric calculation if the absolute difference is~ 1.5%.

SR 3.3.1.4 -----------------------------N()TE-----------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL P()WER is ~ 25% RTP.

Calibrate the power range excore channels using 31 days the incore detectors.

  • SR 3.3.1.5 Perform a CHANNEL FUNCTl()NAL TEST and 92 days verify the Thermal Margin Monitor Constants.

SR 3.3.1.6 Perform a calibration check of the power range 92 days excore channels with a test signal.

SR 3.3.1.7 Perform a CHANNEL FUNCTl()NAL TEST of High ()nee within 7 days Startup Rate and Loss of Load Functions. prior to each reactor startup

  • Palisades Nuclear Plant 3.3.1-4 Amendment No.

RPS Instrumentation 3.3.1


N()TE-----------------------------

FREQUENCY Neutron detectors are excluded from the CHANNEL CALIBRATl()N.

Perform a CHANNEL CALIBRATION. 18 months

  • Palisades Nuclear Plant 3.3, 1-5 Amendment No.

RPS Instrumentation 3.3.1

  • FUNCTION MODES Table 3.3.1-1 (page 1 of 2)

Reactor Protective System Instrumentation APPLICABLE SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE

1. Variable High Power Trip 1,2,3(a),4(a),5(a) SR 3.3.1.1 s 15% RTP above SR 3.3.1.2 current THERMAL SR 3.3.1.3 POWER with a SR 3.3.1.4 minimum of s 30%

SR 3.3.1.5 RTP and a SR 3.3.1.6 maximum of SR 3.3.1.8 s 106.5% RTP

2. High Startup Rate Trip(b) 1,2 SR 3.3.1.1 NA

.SR 3.3.1.7

3. Low Primary Coolant System Flow Trip(c) 1,2,3(a),4(a),5(a) SR 3.3.1.1 ~ 95%

SR 3.3.1.5 SR 3.3.1.8

4. Low Steam Generator A
5. Low Steam Generator B Level Trip 1 2 3(a) 4(a) 5(a)

I I I I SR 3.3.1.1 ~ 25.9% narrow SR 3.3.1.5 range SR 3.3.1.8

6. Low Steam Generator A Pressure Trip(c) 1,2,3(a),4(a),5(a) SR 3.3.1.1 ~ 500 psia SR 3.3.1.5 SR 3.3.1.8
7. Low Steam Generator B Pressure Trip(c) 1,2,3(a),4(a),5(a) SR 3.3.1.1 ~ 500 psia SR 3.3.1.5 SR 3.3.1.8
8. High Pressurizer Pressure Trip 1,2,3(a),4(a),5(a) SR 3.3.1.1 s 2255 psia SR 3.3.1.5 SR 3.3.1.8 (a) With more than one full-length control rod capable of being withdrawn and PCS boron concentration less than REFUELING BORON CONCENTRATION.

(b) Trip may be bypassed when Wide Range Power is < 1 E-4% RTP or when THERMAL POWER is > 13% RTP.

(c) Trips may be bypassed when Wide Range Power is < 1 E-4% RTP. Bypass shall be automatically removed when Wide Range Power is ~ 1E-4% RTP.

  • Palisades Nuclear Plant 3.3.1-6 Amendment No.

RPS Instrumentation 3.3.1

  • FUNCTION MODES Table 3.3.1-1 (page 2 of 2)

Reactor Protective System Instrumentation APPLICABLE SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE

9. Thermal Margin/

Low Pressure Trip<cl 1 2 3(a) 4(a) 5(a) SR 3.3.1.1 Table 3.3.1-2 I t I 1 SR 3.3.1.2 SR 3.3.1.3 SR 3.3.1.4 -

SR 3.3.1.5 SR 3.3.1.6 SR 3.3.1.8

10. Loss of Load Trip 1(d) SR 3.3.1.7 NA SR 3.3.1.8
11. Containment High Pressure Trip 1 2 3(a) 4(a) 5(a) SR 3.3.1.5 ~ 3.70 psig I I I I SR 3.3.1.8 1.2. Zero Power Mode Bypass Automatic Removal 1 2 3(a) 4(a) 5(a) SR 3.3.1.8 NA I I I I
  • (a)

(c)

(d)

With more than one full-length control rod capable of being withdrawn and PCS boron concentration less than REFUELING BORON CONCENTRATION.

  • Trips may be bypassed when Wide Range Power is < 1E-4% RTP. Bypass shall be automatically removed when Wide Range Power is~ 1E-4% RTP.

When THERMAL POWER is~ 17% RTP .

  • Palisades Nuclear Plant 3.3.1-7 Amendment No.

RPS Instrumentation 3.3.1

  • Table 3.3.1-2 (page 1of1)

Thermal Margin/Low Pressure Trip Function Allowable Value The Allowable Value for th~ Th~rmal Margin/Low Pressure Trip, Ptrip* is the higher of two values, Pmin and Pvar* both m ps1a:

Pmin = 1750 Pvar = 2012(QA)(QR1) + 17.0(Tin) - 9493 Where:

QA = - 0. 720(ASI) + 1.028; when - 0.628 s ASI < - 0.100 QA = - 0.333(ASI) + 1.067; when - 0.100 s ASI < + 0.200 QA = + 0.375(ASI) + 0.925; when + 0.200 s ASI s + 0.565 ASI = Measured ASI when Q ~ 0.0625 ASI = 0.0 when Q < 0.0625 QR 1 = 0.412(Q) + 0.588; when Q s 1.0 QR 1 = Q; when Q > 1.0 Q =THERMAL POWER/RATED THERMAL POWER Tin= Maximum primary coolant inlet temperature, in_ °F ASI, Tin and Qare the existing values as measured by the associated instrument channel.

  • Palisades Nuclear Plant 3.3.1-8 Amendment No.

RPS Logic and Trip Initiation 3.3.2 3.3 INSTRUMENTATION 3.3.2 Reactor Proteqtive System (RPS) Logic and Trip Initiation LCO 3.3.2 Six channels of RPS Matrix Logic, four channels of RPS Trip Initiation Logic, and two channels of RPS Manual Trip shall be OPERABLE.

APPLICABILITY: MODES 1 and 2, MODES 3, 4, and 5, with more than one full-length control rod capable of being withdrawn and Primary Coolant System (PCS) boron concentration less than REFUELING BORON CONCENTRATION.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One Matrix Logic channel A.1 Restore channel to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable . OPERABLE status.

B. One channel of Trip B.1 De-energize the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Initiation Logic inoperable. affected clutch power supplies.

C. One channel of Manual C.1 Restore channel to Prior to entering Trip inoperable. OPERABLE status. MODE 2 from MODE3 D. Two channels of Trip D.1 De-energize the Immediately Initiation Logic affecting affected clutch power the same trip leg supplies.

inoperable .

  • Palisades Nuclear Plant 3.3.2-1 Amendment No.

RPS Logic and Trip Initiation 3.3.2

  • ACTIONS CONDITION E.* Required Action and E.1 REQUIRED ACTION Be in MODE 3.

COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR E.2.1 Verify no more than one 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> One or more Functions full-length control rod is with two or more Manual capable of being Trip, Matrix Logic or Trip withdrawn.

Initiation Logic channels inoperable for reasons OR other than Condition D.

E.2.2 Verify PCS boron 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> concentration is at REFUELING BORON CONCENTRATION .

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform a CHANNEL FUNCTIONAL TEST on 92 days each RPS Matrix Logic channel and each RPS Trip Initiation Logic channel.

SR 3.3.2.2 Perform a CHANNEL FUNCTIONAL TEST on Once within 7 days each RPS Manual Trip channel. prior to each reactor startup

  • Palisades Nuclear Plant 3.3.2-2 Amendment No.

ESF Instrumentation 3.3.3

  • 3.3 INSTRUMENTATION 3.3.3 Engineered Safety Features (ESF) Instrumentation LCO 3.3.3 Four ESF bistables and associated instrument channels for each Function in Table 3.3.3'..1 shall be OPERABLE.

APPLICABILITY: As specified in Table 3.3.3-1.

ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed. for each Function.


~-------------------------------------------------------------------------------------------------

CONDITION REQUIRED ACTION COMPLETION TIME A. ---------------NOTE--------------- A.1 Place affected bistable 7 days Not applicable to RAS . in trip.

One or more Functions with one ESF bistable or associated instrument channel inoperable.

8. ---------------NOTE--------------- -----------------NOTE-----------------

Not applicable to RAS. LCO 3.0.4 is not applicable.

One or more Functions with B.1 Place one bistable in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> two ESF bistables or trip.

associated instrument

. channels inoperable. AND B.2 Restore one bistable 7 days and associated instrument channel to OPERABLE status .

  • Palisades Nuclear Plant 3.3.3-1 Amendment No.

ESF Instrumentation 3.3.3

  • ACTIONS C.

CONDITION One RAS bistable or C.1 REQUIRED ACTION Bypass affected COMPLETION TIME 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> associated instrument bistable.

channel inoperable.

AND C.2 Restore bistable and 7 days associated instrument channel to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met for Functions 1, 2, 3, AND 4, or 7.

D.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />

  • E.
  • Required Action and associated Completion Time not met for Functions 5 or 6.

E.1 AND Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades Nuclear Plant 3.3.3-2 Amendment No.

ESF Instrumentation 3.3.3

  • SURVEILLANCE REQUIREMENTS

N()TE----------------------------------------------------------

Refer to Table 3.3.3-1 to determine which SR shall be performed for each Function.

SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform a CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.3.2 Perform a CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.3.3 Perform a CHANNEL CALIBRATl()N. 18 months

  • Palisades Nuclear Plant 3.3.3-3 Amendment No.

I.

ESF Instrumentation 3.3.3 .

  • FUNCTION Table 3.3.3-1 (page 1 of 2)

Engineered Safety Features Instrumentation APPLICABLE MODES SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE

1. Safety Injection Signal (SIS)
a. Pressurizer Low Pressure 1,2,3 SR 3.3.3.1  :<>: 1593 psia SR 3.3.3.2 SR 3.3.3.3
2. Steam Generator Low Pressure Signal (SGLP)
a. Steam Generator A Low 1 2(a) 3(a) SR 3.3.3.1  :<>: 500 psia Pressure SR 3.3.3.2 SR 3.3.3.3
b. Steam Generator B Low 1 2(a) 3(a) SR 3.3.3.1  :<>: 500 psia Pressure SR 3.3.3.2 SR 3.3.3.3
  • 3. Recirculation Actuation Signal (RAS)*
a. SIRWT Low Level 1,2,3 SR 3.3.3.3  :<>: 21 inches and
27 inches above tank bottom
4. Auxiliary Feedwater Actuation Signal (AFAS)
a. Steam Generator A Low 1~2,3 SR 3.3.3.1  ::?: 25.9%

Level SR 3.3.3.2 narrow range SR 3.3.3.3

b. Steam Generator B Low 1,2,3 SR 3.3.3.1  ::?: 25.9%

Level SR 3.3.3.2 narrow range SR 3.3.3.3 (a) Not required to be OPERABLE when all Main Steam Isolation Valves (MSIVs) are closed and deactivated, and all Main Feedwater Regulating Valves (MFRVs) and MFRV bypass valves are either closed and deactivated, or isolated by closed manual valves.

Palisades Nuclear Plant 3.3.3-4. Amendment No.

ESF Instrumentation 3.3.3

  • FUNCTION Table 3.3.3-1 (page 2 of 2)

Engineered Safety Features Instrumentation APPLICABLE MODES SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE

5. Containment High Pressure (CHP)
a. Containment High Pressure

- Left Train 1,2,3,4 SR 3.3.3.2 ~ 3.7 psig SR 3.3.3.3 and

~ 4.3 psig

b. Containment High Pressure

- Right Train 1,2,3,4 SR 3.3.3.2 ~ 3.7 psig SR 3.3.3.3 and

~ 4.3 psig

6. Containment High Radiation Signal (CHR)
a. Containment High Radiation 1,2,3,4 SR 3.3.3.1 ~ 20 R/hour SR 3.3.3.2 SR 3.3.3.3
7. Automatic Bypass Removals
a. Pressurizer Low Pressure 1,2,3 SR 3.3.3.3 ~ 1700 psia Bypass
b. Steam Generator A Low 1 2(a) 3(a) SR 3.3.3.3 ~ 565 psia Pressure Bypass
c. Steam Generator B Low 1 2(a) 3(a) SR 3.3.3.3 ~ 565 psia Pressure Bypass (a) Not required to be OPERABLE when all Main Steam Isolation Valves (MSIVs) are closed and deactivated, and all Main Feedwater Regulating Valves (MFRVs) and MFRV bypass valves are either closed and deactivated, or isolated by closed manual valves .
  • Palisades Nuclear Plant 3.3.3-5 Amendment No.

ESF Logic and Manual Initiation 3.3.4

  • 3.3 INSTRUMENTATION 3.3.4 Engineered Safety Features (ESF) Logic and Manual Initiation LCO 3.3.4 Two ESF Manual Initiation and two ESF Actuation Logic channels and associated bypass removal channels shall be OPERABLE for each ESF Function specified in Table 3.3.4-1.

APPLICABILITY: According to Table 3.3.4-1.

ACTIONS


1\JOTE-----------------------------------------------------------

Separate Condition entry is allowed for each Function.

COl\JDITIOl\J REQUIRED ACTIOl\J COMPLETIOl\J TIME A. One or more Functions with A.1 Restore channel to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> one Manual Initiation, Bypass OPERABLE status .

Removal, or Actuation Logic channel inoperable.

B. One or more Functions with B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> two Manual Initiation, Bypass Removal, or Actuation Logic Al\JD channels inoperable for Functions 1, 2, 3, or 4.

OR B.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> Required Action and associated Completion Time of Condition A not met for Functions 1, 2, 3, or 4 .

  • Palisades l\Juclear Plant 3.3.4-1 Amendment l\Jo.

ESF Logic and Manual Initiation 3.3.4

  • ACTIONS C.

CONDITION One or more Functions with C.1 REQUIRED ACTION Be in MODE 3.

COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> two Manual Initiation, or Actuation Logic channels AND inoperable for Functions 5 or 6.

OR C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Required Action and associated Completion Time of Condition A not met for Functions 5 or 6.

SURVEILLANCE REQUIREMENTS

  • SR 3.3.4.1 SURVEILLANCE Perform functional test of each SIS actuation channel normal and standby power functions.

FREQUENCY 92 days SR 3.3.4.2 Perform a CHANNEL FUNCTIONAL TEST of each 92 days AFAS actuation logic channel.

SR 3.3.4.3 Perform a CHANNEL FUNCTIONAL TEST. 18 months

  • Palisades Nuclear Plant 3.3.4-2 Amendment No.

ESF Logic and Manual Initiation 3.3.4

  • FUNCTION Table 3.3.4-1 (page 1 of 1)

Engineered Safety Features Actuation Logic and Manual Initiation APPLICABLE MODES

1. Safety Injection Signal (SIS)(a) 1,2,3
2. Steam Generator Low Pressure Signal 1 2(d) 3(d)

I I (SGLP)(b)(c)

3. Recirculation Actuation Signal (RAS) 1,2,3
4. Auxiliary Feedwater Actuation Signal (AFAS) 1,2,3
5. Containment High Pressure.Signal (CHP)(c) 1,2,3,4
6. Containment High Radiation Signal (CHR). 1,2,3,4 (a) SIS actuation by Pressurizer Low Pressure may be manually bypassed when pressurizer
      • (b) pressure is ~ 1700 psia. The bypass shall be automatically removed whenever pressurizer pressure is > 1700 psia.
  • SGLP actuation may be manually bypassed when SG pressure is~ 565 psia. The bypass shall be automatically removed whenever steam generator pressure is

> 565 psia.

(c) Manual Initiation may be achieved by individual component controls.

(d) Not required to be OPERABLE when all Main Steam Isolation Valves (MSIVs) are closed and deactivated, and all Main Feedwater Regulating Valves (MFRVs) and MFRV bypass valves are either closed and deactivated, or isolated by closed manual valves .

  • Palisades Nuclear Plant 3.3.4-3 Amendment No.

DG,. UV Start 3.3.5

  • 3.3 INSTRUMENTATION 3.3.5 Diesel Generator (DG) - Undervoltage Start (UV Start)

LCO 3.3.5 Three channels of Loss of Voltage Function and three channels of Degraded Voltage Function auto-initiation instrumentation and associated logic channels for each DG shall be OPERABLE. .

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS CONDITION . REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Enter applicable Immediately with one channel per DG Conditions and inoperable. Required Actions for the associated.DG made inoperable .DY DG - UV Start instrumentation .

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.5.1 Perform a CHANNEL FUNCTIONAL TEST on 18 months each DG-UV start logic channel.

  • Palisades Nuclear Plant 3.3.5-1 Amendment No.

DG - UV Start 3.3.5

  • SURVEILLANCE REQUIREMENTS SR 3.3.5.2 SURVEILLANCE Perform CHANNEL CALIBRATION on each Loss FREQUENCY 18 months of Voltage and Degraded Voltage channel with setpoints as follows:
a. Degraded Voltage Function ~ 2187 V and

~ 2264 v Time delay: ~ 0.5 seconds and

~ 0.8 seconds; and

b. Loss of Voltage Function ~ 1780 V and

~ 1940 v Time delay: ~ 5.45 seconds and

~ 8.15 seconds at 1400 V .

  • Palisades Nuclear Plant 3.3.5-2 Amendment No.

Refueling CHR Instrumentation 3.3.6

  • 3.3 INSTRUMENTATION 3.3.6 Refueling Containment High Radiation (CHR) Instrumentation LCO 3.3.6 Two Refueling CHR Automatic Actuation Function channels and two CHR Manual Actuation Function channels shall be OPERABLE.

APPLICABILITY: During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Place* the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with one channel channel in trip.

inoperable.

OR A.2.1 Suspend CORE 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> AL TERATIONS .

  • A.2.2 AND Suspend movement of irradiated fuel assemblies within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> containment.

B. One or more Functions B.1 Suspend CORE Immediately with two channels ALTERATIONS.

inoperable.

AND B.2 Suspend movement of Irrimediately irradiated fuel assemblies within containment.

  • Palisades Nuclear Plant 3.3.6-1 Amendment No.

Refueling CHR Instrumentation 3.3.6

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.6.1 Perform a CHANNEL CHECK of each refueling 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> CHR monitor channel.

SR 3:3.6.2 Perform a CHANNEL FUNCTIONAL TEST of each 31 days refueling CHR monitor channel.

SR 3.3.6.3 Perform a CHANNEL FUNCTIONAL TEST of each 18 months CHR Manual Initiation channel.

SR 3.3.6.4 Perform a CHANNEL CALIBRATION of each 18 months refueling CHR monitor channel.

  • Palisades Nuclear Plant 3.3.6-2 Amendment No.

l PAM Instrumentation 3.3.7

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS .


~----~----------------------------~------NOTES--------------------------------------------------------

1. LCO 3.0.4 is not applicable.
2. Separate Condition entry is allowed for each Ftmction.'

CONDITION REQUIRED ACTION *COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel channel to .OPERABLE inoperable. status.

\

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.6.

met.

C. --------------NOl"E-------------

Not applicable to hydrogen monitor channels.

' C. 1 Resfore one channel to 7 days One or more Functions OPERABLE status.

with two required channels inoperable .

  • Palisades Nuclear Plant 3.3.7-1 Amendment No.

PAM Instrumentation 3.3.7

  • ACTIONS D.

CONDITION Two hydrogen monitor channels inoperable. D. 1 REQUIRED ACTION Restore one hydrogen COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> monitor channel to OPERABLE status.

E. Required Action and E.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C or D Table 3.3.7-1 for the not met. channel.

F. As required by Required F.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action E.1 and referenced in Table 3.3.7-1. AND F.2 Be _in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />

  • G. As required by Required Action E.1 and referenced in Table 3.3.7-1 .

G.1 Initiate action in accordance with Specification 5.6.6.

Immediately

  • Palisades Nuclear Plant 3.3.7-2 Amendment No.

PAM Instrumentation 3.3.7

  • SURVEILLANCE REQUIREMENTS

l'll()TE------------------------------------------------------------

These SRs apply to each PAM instrumentation Function in Table 3.3.7-1.

SURVEILLAl'llCE FREQUEl'llCY SR 3.3.7.1 Perform CHAl'lll'llEL CHECK for each required 31 days instrumentation channel that is normally energized.

SR 3.3.7.2 -----------------------------!'ll()TE------------------------------

l'lleutron detectors are excluded from the CHAl'lll'llEL CALIBRATIOl'll.

Perform CHAl'lll'llEL CALIBRATl()l'll . 18 months

  • Palisades l'lluclear Plant 3.3.7-3 Amendment No.

PAM Instrumentation 3.3.7

  • Table 3.3.7-1 (page 1 of 1)

Post Accident Monitoring Instrumentation REQUIRED CONDITIONS REFERENCED FROM REQUIRED FUNCTION CHANNELS ACTION E.1

1. Primary Coolant System Hot Leg Temperature (wide range) 2 F -
2. Primary Coolant System Cold Leg 2 F Temperature (wide range)
3. Wide Range Neutron Flux 2 F
4. Containment Floor Water Level 2 F (wide range)
5. Subcooled Margin Monitor 2 F
6. Pressurizer Level (wide range) 2 F
7. Containment Hydrogen Monitors 2 F
8. Condensate Storage Tank Level 2 F cg: Primary Coolant System Pressure 2 F (wide range)
  • 10.

11.

12.

Containment Pressure (wide range)

Steam Generator A Water Level (wide range)

Steam Generator B Water Level (wide range) 2 2

2 F

F F

13. Steam Generator A Pressure *2 F
14. Steam Generator B Pressure 2 F I
15. Containment Isolation Valve Position 1 per valve<a) F
16. Core Exit Temperature - Quadrant 1 4 F
17. Core Exit Temperature - Quadrant 2 4 F
18. Core Exit Temperature - Quadrant 3 4 F
19. Core Exit Temperature - Quadrant 4 4 F
20. Reactor Vessel Water Level 2 G
21. Containment Area Radiation 2 G (high range)

(a) Not required for isolation valves whose associated penetration is isolated by at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

Palisades Nuclear Plant 3.3.7-4 Amendment No.

Alternate Shutdown System

3. 3.8
  • 3.3 INSTRUMENTATION 3.3.8 Alternate Shutdown System LCO 3.3.8 The Alternate Shutdown System Functions in Table 3.3.8-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


~------------NOTES-------------------------------------------------------

1. LCO 3.0.4 is not applicable.
2. Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIM E A. One or more required A.1 Restore required 30 days Functions inoperable. Functions to OPERABLE status.

B. . Required Action and B.1 Be in MODE 3 . 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 1 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />

  • Palisades Nuclear Plant 3.3.8-1 Amendment No.

Alternate Shutdown System 3.3.8

  • SURVEILLANCE REQUIREMENTS SR 3.3.8.1 SURVEILLANCE Perform CHANNEL FUNCTIONAL TEST of the FREQUENCY Once within 7 days Source Range Neutron Flux Function.
  • prior to each reactor startup SR 3.3.8.2 Verify each required control circuit and transfer 18 months switch is capable of performing the intended function.

SR 3.3.8.3 -----------------------------NOTES---~-----------------------

1. Not required for Functions 16, 17, and 18.
2. Neutron detectors are excluded from the CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION for each 18 months required instrumentation channel.

-* Palisades Nuclear Plant 3.3.8-2 Amendment No.

Alternate Shutdown System 3.3.8

  • FUNCTION, INSTRUMENT OR CONTROL PARAMETER Table 3.3.8-1 (page 1 of 1)

Alternate Shutdown System Instrumentation and Controls REQUIRED CHANNELS

1. Source Range Neutron Flux ,' 1
2. Pressurizer Pressure 1
3. Pressurizer Level 1
4. Primary Coolant System (PCS) #1 Hot Leg Temperature 1
5. PCS #2 Hot Leg Temperature 1
6. PCS #1 Cold Leg Temperature 1
7. PCS #2 Cold Leg Temperature 1
8. Steam Generator (SG) A Pressure 1
9. SG 8 Pressure 1
10. SG A Wide Range ,Level 1

. 11 . SG 8 Wide Range Level 1

12. Safety Injection Refueling Water (SIRW) Tank Level 1
13. Auxiliary Feedwater (AFW) Flow Indication to SG A 1
14. AFW Flow Indication to SG 8 1
15. AFW Low Suction Pressure Alarm (P-88) 1
16. AFW Pump P-88 Steam Supply Valve Control 1
17. AFW Flow Control to SG A 1 18 . AFW Flow Control to SG 8 1
  • Palisades Nuclear Plant 3.3.8-3 Amendment No.

Neutron Flux Monitoring Channels 3.3.9

  • 3.3 INSTRUMENTATION 3.3.9 Neutron Flux Monitoring Channels LCO 3.3.9 Two channels of neutron flux monitoring instrumentation shall be OPERABLE.

APPLICABILITY: MODES 3, 4, and 5.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Suspend all operations Immediately channel(s) inoperable. involving positive reactivity additions .

  • A.2 Perform SOM verification in accordance with SR 3.1.1.1.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter

  • Palisades Nuclear Plant 3.3.9-1 Amendment No.

Neutron Flux Monitoring Channels 3.3.9

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.9.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.9.2 -----------------------------N()TE------------------------------

Neutron detectors are excluded from the CHANNEL CALIBRATl()N.

Perform CHANNEL CALIBRATl()N . 18 months

  • Palisades Nuclear Plant 3.3.9-2 Amendment No.

ESRV Instrumentation 3.3.10

APPLICABILITY: . MODES 1, 2, 3, and 4.

  • ACTIONS

NOTE----------------------------------------------------------

Separate Condition entry is aliowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Initiate action to isolate Immediately inoperable. the associated ESRV System .

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.10.1 Perform a CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.10.2 Perform a CHANNEL FUNCTIONAL TEST. 31 days SR 3.3.10.3 Perform a CHANNEL CALIBRATION. 18 months Verify high radiation setpoint on each ESRV Instrumentation radiation monitoring channel is
.: ; 2.2E+5 cpm .
  • Palisades Nuclear Plant 3.3.10-1 Amendment No.

PCS Pressure, Temperature, and Flow DNB Limits 3.4.1

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.1 PCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO 3.4.1 PCS DNB parameters for pressurizer pressure, cold leg temperature, and PCS total flow rate shall be within the limits specified below:
a. Pressurizer pressure ~ 2010 psia and =s; 2100 psia;
b. The PCS cold leg temperature (Tc) shall not exceed the value given by the following equation:

Tc =s; 542.99 + 0.0580(P-2060) + 0.00001 (P-2060) 2 +

1.125(W-138)-0.0205(W-138)2 Where: Tc = PCS cold leg temperature in °F P = nominal operation pressure in psia W = total recirculating mass flow in 1E6 lb/hr corrected to the operating temperature conditions.


NOTE--------------------------------------------

lf the measured primary coolant system flow is greater than 150. O E6 lbm/hr, the maximum Tc shall be less than or equal to the Tc derived at 150.0 E6 lbm/hr.

c. PCS total flow rate~ 352,000 gpm.

APPLICABILITY: MODE 1.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Pressurizer pressure, PCS A.1 Restore parameter( s) to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> cold leg temperature, or within limit.

PCS total flow rate not within limits.

B. Required Action and B.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

  • Palisades Nuclear Plant 3.4.1-1 Amendment No:

PCS Pressure, Temperature, and Flow DNB Limits 3.4.1

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 Verify pressurizer pressure  :::>: 2010 psia and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

~ 2100 psia.

SR 3.4.1.2 Verify PCS cold leg temperature 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

~ 542.99 + 0.0580(P-2060)+ 0.00001 (P-2060) 2 +

1.125(W-138)-0.0205(W-138)2

  • SR 3.4.1.3 ------------------------------N()TE----------------------------

Not required to be performed until 31 EFPD after THERMAL P()WER is;:: 90% RTP.

Verify PCS total flow rate is  :::>: 352,000 gpm. 18 months After each plugging of 10 or more steam generator tubes Palisades Nuclear Plant 3.4.1-2 Amendment No.

PCS Minimum Temperature for Criticality 3.4.2

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.2 PCS Minimum Temperature for Criticality LCO ~.4.2 Each PCS loop average temperature (Tave) shall be~ 525°F.

APPLICABILITY: MODE 1 MODE 2 with Kett ~ 1.0.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Tave in one or more PCS A.1 Be in MODE 2 with Kett 30 minutes loops not within limit. < 1.0.

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.2.1 Verify PCS Tave in each loop~ 525°F. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
  • Palisades Nuclear Plant 3.4.2-1 Amendment No.

I I

PCS PIT Limits 3.4.3

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.3 PCS Pressure and Temperature (PIT) Limits LCO 3.4.3 PCS pressure, PCS temperature, and PCS heatup and cooldown rates shall be maintained within the limits of Figure 3.4.3-1 and Figure 3.4.3-2.

APPLICABILITY: At all times.

ACTIONS CONDITION REQUIR!=D ACTION COMPLETION TIME A. -------------NOTE-------------- A.1 Restore parameter(s) to 30 minutes Required Action A.2 shall within limits.

be completed whenever this Condition is entered. AND A.2 Determine* PCS is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Requirements of LCO not acceptable for met in MODE 1, 2, 3, or 4. continued operation.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.

B.2 Be in MODE 5 with 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> PCS pressure

< 270 psia .

  • Palisades Nuclear Plant 3.4.3-1
  • Amendment No.

PCS PIT Limits 3.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. --------------NOTE------------- C.1 Initiate action to restore Immediately Required Action C.2 shall parameter(s) to within be completed whenever limits.

this Condition is entered.


AND Requirements of LCO not C.2 Determine PCS is Prior to entering met any time in other than acceptable for MODE4 MODE 1, 2, 3, or 4. continued operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

-* SR 3.4.3.1 -------------------------------NOl"E---------------------------

Only required to be performed during PCS heatup and cooldown operations.

Verify PCS pressure, PCS temperature, and PCS 30 minutes heatup and cooldown rates are within the limits of Figure 3.4.3-1 and Figure 3.4.3-2 .

  • Palisades Nuclear Plant 3.4.3-2 Amendment No.

PCS PIT Limits 3.4.3

  • 2500------------------

2250-+---------+---+----+----1---1--1

~ 8 F/tr

- 28 F/tr

([ 1750 ......_ 48 F/tr

(/)

a.. 68 F/tr a)

L -+-Bl F/tr

J Ill 1500 Ill ~ 191 F/tr Q)

L a..

L Q) 1250 N

L

J Ill Ill Q)

L 1000 a..

RV Inlet Avg. Hrly.

Temperature H/U L1m1"t T ~ 170.F 20.F /Hr.

250 ~ T > 170.F 41/J*F /Hr.

350 > T > 250.F 60.F /Hr.*

T ~ 350.F 100.F /Hr.

  • When shutdown cooling_ 1solet1on valves M0-3015 end M0-3016 ere open. PCS hee~ rete shell be me1nte1ned S 4!ll*F /Hr.

0 ............__......................,,_.,..,........,,____,_._,.......,........i-,...............+-............--.f.-................-l 50 100 150 200 250 300 350 400 450 RV Inlet Tempereture, F Figure 3.4.3-1 (page 1 of 1)

Pressure - Temperature Limits for Heatups Palisades Nuclear Plant 3.4.3-3 Amendment No.

PCS P!T Limits

,.. 3.4.3 2000

_....... l!J F/H.-

- 20 F/H.-

170"F 40"F /Hr.

35121 > T > 250"F 60"F/Hr.

250 T ~ 350"F 100"F/Hr.

0 ..........,...,,...,.............,....,.............,....,...,._,.......,,...,.............................................._...--t-,,...........................,....,....,.....f 50 100 150 200 250 300 350 400 450 RV Inlet Tempereture, F Figure 3.4.3-2 (page 1 of 1)

  • Palisades Nuclear Plant Pressure - Temperature Limits for Cooldown 3.4.3-4 Amendment No.

PCS Loops - MODES 1 and 2 3.4.4

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of LCO not A.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> met.

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify each PCS loop is in operation. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
  • Palisades Nuclear Plant 3.4.4-1 Amendment No.

PCS Loops - MODE 3 3.4.5


NOTES------------.------------------------------

1. All primary coolant pumps may not be in operation for s; 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided:
a. No operations are permitted that would cause reduction of the PCS boron concentration; and
b. Core outlet temperature is maintained at least 10°F below saturation temperature.
2. Forced circulation (starting the first primary coolant pump) shall not be initiated unless one of the following conditions is met:
a. PCS cold leg temperature (Tc) is> 430°f=;
      • b.

c.

Steam Generator (SG) secondary temperature is equal to or less than the reactor inlet temperature (Tc);

SG secondary temperature is< 100°F above Tc, and shutdown cooling is isolated from the PCS, and PCS heatup/cooldown rate is s: 10°F/hour; or

d. SG secondary temperature is < 100°F above Tc, and shutdown cooling is isolated from the PCS, and pressurizer level is s; 57%.

APPLICABILITY: MODE 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required PCS loop A.1 Restore required PCS 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. loop to OPERABLE status .

  • Palisades Nuclear Plant 3.4.5-1 Amendment No.

PCS Loops - MODE 3 3.4.5

  • ACTIONS B.

CONDITION Required Action and B.1 REQUIRED ACTION Be in MODE 4.

COMPLETION TIME 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time of Condition A not met.

C. No PCS loop OPERABLE. C.1* Suspend all operations Immediately involving a reduction of OR PCS boron concentration.

No PCS loop in operation.

AND C.2 Initiate action to restore Immediately one PCS loop to OPERABLE status and op.eration .

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify required PCS loop is in operation. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.4.5.2 Verify secondary side water level in each steam 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> generator~ -84%.

SR 3.4.5.3 Verify correct breaker alignment and indicated 7 days power available to the required primary coolant pump that is not in operation.

Palisades Nuclear Plant 3.4.5-2 Amendment No.

PCS Loops - MODE 4 3.4.6

a. One PCS loop shall be in operation; or
b. One SDC train shall be in operation with  :?: 2810 gpm flow through the reactor core.

NOTE:S-------------------------------------------

1. All Primary Coolant Pumps (PCPs) and SDC pumps may not be in operation for ~ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided:
a. No operations are permitted that would cause reduction of the PCS boron concentration; and
b. Core outlet temperature is maintained at least 10°F below saturation temperature .
  • 2. Forced circulation (starting the first PCP) shall not be initiated unless one of the following conditions is met:
a. Steam Generator (SG) secondary temperature is equal to or less than the reactor inlet temperature (Tc),
b. SG secondary temperature is< 100°F above Tc, and shutdown cooling is isolated from the PCS, and PCS heatup/cooldown rate is ~ 10°F/hour,
c. SG secondary temperature is < 100°F above Tc, and shutdown cooling is isolated from the PCS, and pressurizer level is ~ _57%.
3. Primary coolant pumps P-50A and P-50B shall not be operated simultaneously.

APPLICABILITY: MODE4.

  • Palisades Nuclear Plant 3.4.6-1 n

Amendment No.

PCS Loops - MODE 4 3.4.6

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One PCS loop inoperable. A.1 Initiate action to restore Immediately a second PCS loop or AND one SOC train to OPERABLE status.

Two SOC trains inoperable.

B.

  • Be in MODE 5. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND

C. No PCS loops or SOC C.1 Suspend all operations Immediately trains OPERABLE. involving reduction of PCS boron OR concentration.

No PCS loop in operation AND with SOC flow through the reactor core not within C.2.1 Initiate action to restore Immediately limits. one PCS loop to OPERABLE status and operation.

OR C.2.2 Initiate action to restore Immediately one SDC train to OPERABLE status and operation with ~ 281 O gpm flow through the reactor core.

Palisades Nuclear Plant 3.4.6-2 Amendment No.

PCS Loops - MODE 4 3.4.6

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.6.1 Verify one SOC train is in operation with 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
2: 2810 gpm flow through the reactor core, or one PCS loop is in operation.

SR 3.4.6.2 Verify secondary side water level in required SG(s) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is :2: -84%.

SR 3.4.6.3 Verify correct breaker alignment and indicated 7 days power available to the required pump that is not in operation .

  • Palisades Nuclear Plant 3.4.6-3 Amendment No.

PCS Loops - MODE 5, Loops Filled 3.4.7 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4. 7 PCS Loops - MODE 5, Loops Filled LCO 3.4.7 One Shutdown Cooling (SOC) train shall be OPERABLE and in operation with ~ 281 O gpm flow through the reactor core, and either:

a. One additional SOC train shall be OPERABLE; or
b. The secondary side water level of each Steam Generator (SG) shall be ~ -84%.

NOTES-------------------------------------------

1. The SOC pump of the train in operation may not be in operation for ~ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:
a. No operations are permitted that would cause reduction of the PCS boron concentration; and
b. Core outlet temperature is maintained at least 10°F below saturation temperature.
2. Both SOC trains may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing or maintenance provided:
a. One SOC train is providing the required flow through the
    • b.

c.

reactor core; Core outlet temperature is maintained at least 10°F below.

saturation temperature; and Each SG secondary side water level is~ -84%.

3. Forced circulation (starting the first primary coolant pump) shall not be initiated unless one of the following conditions is met:
a. SG secondary temperature is equal to or less than the reactor inlet temperature (Tc);
b. SG secondary temperature is < 100°F above Tc, and shutdown cooling is isolated from the PCS, and PCS heatup/cooldown rate is ~ 10°F/hour; or
c. SG secondary temperature is< 100°F above Tc, and shutdown cooling is isolated from the PCS, and pressurizer level is~ 57%.
4. Primary coolant pumps P-50A and P-50B shall not be operated simultaneously.
5. All SOC trains may not be in operation during planned heatup to MODE 4 when at least one PCS loop is in operation.
  • APPLICABILITY: MODE 5 with PCS loops filled.

Palisades Nuclear Plant 3.4.7-1 Amendment No.

PCS Loops - MODE 5, Loops Filled 3.4.1

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.. One SOC train inoperable. A.1 Initiate action to restore Immediately a second SOC train to AND OPERABLE status.

. Any SG with secondary OR side water level not within limit. A.2 Initiate action to restore Immediately SG secondary side water levels to within limits.

B. Two SOC trains B.1 Suspend all operations Immediately inoperable. involving reduction _in PCS boron OR concentration.

  • SOC flow through the reactor core not within limits.

AND B.2 Initiate action to restore one SOC train to OPERABLE status and Immediately operation with ~ 281 0 gpm flow through the reactor core .

  • Palisades Nuclear Plant 3.4.7-2 Amendment No.

PCS Loops - MODE 5, Loops Filled 3.4.7

  • SURVEILLANCE REQUIREMENTS SR 3.4.7.1 SURVEILLANCE Verify one SDC train is in operation with FREQUENCY 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

~ 2810 gpm flow through the reactor core.

SR 3.4.7.2 Verify required SG secondary side water level is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

~ - 84%.

SR 3.4.7.3 Verify correct breaker alignment and indicated 7 days power available to the required SDC pump that is not in operation .

  • Palisades Nuclear Plant 3.4.7-3 Amendment No.

PCS Loops - MODE 5, Loops Not Filled 3.4.8

a. One SOC train in operation with ~ 2810 gpm flow through the reactor core; or
b. One SOC train in operation with ~ 650 gpm flow through the reactor core with two of the three charging pumps incapable of reducing the boron concentration in the PCS below the minimum value necessary to m~intain the required SHUTDOWN MARGIN.

.....-----NOTES-----------------------------------------

1. All SOC pumps may not be in operation for s: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided:

. a. No operations are permitted that would cause a reduction of the PCS boron concentration;

b. Core outlet temperature is maintained> 10°F below saturation temperature; and *
c. No draining operations to further reduce the PCS water volume are permitted.
2. One SOC train may be inoperable for s: 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other SOC train is OPERABLE and in operation. -

APPLICABILITY: MODE 5 with PCS loops not filled.

  • Palisades Nuclear Plant 3.4.8-1 Amendment No.

PCS Loops - MODE 5, Loops Not Filled 3.4.8

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SOC train inoperable. A.1 Initiate action to restore Immediately SOC train to OPERABLE status.

B. Two SOC trains B.1 Suspend all operations Immediately inoperable. involving reduction of PCS boron OR concentration.

SOC flow through the AND reactor core not within limits. B.2 Initiate action to restore Immediately one SOC train to OPERABLE status and operation with SOC flow I

through the reactor core within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 -------------------------------NOTE---------------------------

On ly required to be met when complying with LCO 3.4.8.a.

Verify one SOC train is in operation with 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

~ 2810 gpm flow through the reactor core .

  • Palisades Nuclear Plant 3.4.8-2 Amendment No.

PCS Loops - MODE 5, Loops Not Filled 3.4.8

  • -------------------------------NOTE-----------~---------------

FREQUENCY Only required to be met when complying with LCO 3.4.8.b.

Verify one SOC train is in operation with 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

~ 650 gpm flow through the reactor core.

SR 3.4.8.3 --------------------------------NOTE--------------------------

Only required to be met when complying with LCO 3.4.8.b.

Verify two of three charging pumps are incapable 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of reducing the boron concentration in the PCS below the minimum value necessary to maintain

Verify correct breaker alignment and indicated power available to the SOC pump that is not in 7 days operation .

  • Palisades Nuclear Plant 3.4.8-3 Amendment No.

Pressurizer 3.4.9

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with:
a. Pressurizer water level < 62.8%;

NOTE:-------------------------------------------

The pressurizer water level limit does not apply in MODE: 3 until after a bubble has been established in the pressurizer and the pressurizer water level has been lowered to within its normal operating band.

b. ~ 375 kW of pressurizer heater capacity available from electrical bus 1D, and
c. ~ 375 kW of pressurizer heater capacity available from electrical bus 1E: with the capability of being powered from an emergency power supply .
  • APPLICABILITY:

ACTIONS CONDITION MODE:S 1, 2, and 3.

RE:QUIRE:D ACTION COMPLE:TION TIME:

A. Pressurizer water level not A.1 Be in MODE: 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> within limit. reactor tripped.

A.2 Be in MODE: 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />

  • Palisades Nuclear Plant 3.4.9-1 Amendment No.

Pressurizer 3.4.9

  • ACTIONS B.

CONDITION

< 375 kW pressurizer B.1 REQUIRED ACTION Restore required COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> heater capacity available pressurizer heaters to from electrical bus 1D, or OPERABLE status.

electrical bus 1E, OR Required pressurizer heater capacity from electrical bus 1E not capable of being powered from an emergency power supply.

C. Required Action and C. 1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not AND met.

C.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY i

,j I SR 3.4.9.1 ---------------:..---------------NOTE---------------------------

Not required to be met until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after establishing a bubble in the pressurizer and the pressurizer water level has been lowered to within its normal operating band.

Verify pressurizer water level is < 62.8% . 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

  • Palisades Nuclear Plant 3.4.9-2 Amendment No.

Pressurizer 3.4.9

  • SURVEILLANCE Verify the capacity of pressurizer heaters from FREQUENCY electrical bus 1D, and electrical bus 1Eis 18 months
375 kW.
  • 18 months SR 3.4.9.3 Verify the required pressurizer heater capacity from electrical bus 1Eis capable of being powered from an emergency power supply .
  • Palisades Nuclear Plant 3.4.9-3 Amendment No.

Pressurizer Safety Valves 3.4.10

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4. 1O Pressurizer Safety Valves LCO 3.4.10 Three pressurizer safety valves shall be OPERABLE with lift settings as specified in Table 3.4.10-1.

APPLICABILITY: MODES 1 and 2, MODE 3 with all PCS cold leg temperatures~ 430°F.

ACTIONS CONDITION REQUIR~D ACTION COMPLETION TIME A. One pressurizer safety A.1 Restore valve to

\

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

. associated Completion Time not met. AND OR B.2 Reduce any PCS cold 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Two or more pressurizer leg temperature safety valves inoperable. < 430°F.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify each pressurizer safety valve is OPERABLE In accordance with in accordance with the lnservice Testing Program. the lnservice Testing Following testing, lift settings shall be within +/- 1% Program of required setpoint.

  • Palisades Nuclear Plant 3.4.10-1 Amendment No.

Pressurizer Safety Valves 3.4.10

  • Table 3.4.10-1 (page 1 of 1)

Pressurizer Safety Valve Lift Settings VALVE NUMBER LIFT SETTING (psia +/- 3%)

RV-1039 2580 RV-1040 2540 RV-1041 2500

  • Palisades Nuclear Plant 3.4.10-2 Amendment No.

Pressurizer PORVs 3.4.11

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.11 Pressurizer Power Operated Relief Valves (PO RVs)

LCO 3.4.11 Each PORV and associated block valve shall be OPERABLE.

APPLICABILITY: MODES 1 and 2, MODE 3 with all PCS cold leg temperatures;:: 430°F.

ACTIONS


NOTES--------------------------------------------------------

1. Separate Condition entry is allowed for each PORV.
2. LCO 3.0.4 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.2 Restore PORV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

B. One block valve 8.1 Place associated PORV 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. in manual control.

AND B.2 Restore block valve to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status .

  • Palisades Nuclear Plant 3.4.11-1 Amendment No.

Pressurizer PORVs 3.4.11

  • ACTIONS C.

CONDITION Two PORVs inoperable. C. 1 REQUIRED ACTION Close associated block COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> valves.

AND C.2 Restore at least one 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> PORV to OPERABLE status.

D. Two block valves D. 1 Place- associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. PORVs in manual control.

(

AND D.2 Restore at least one 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> block valve to OPERABLE status.

E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

  • Palisades Nuclear Plant 3.4.11-2 Amendment No.

Pressurizer PORVs 3.4.11

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.1 Perform a complete cycle of each block valve. Once prior to entering MODE 4 from MODE 5 if not performed within previous 92 days SR 3.4.11.2 Perform a complete cycle of each PORV with PCS 18 months average temperature> 200°F .
  • Palisades Nuclear Plant 3.4.11-3 Amendment No.

LTOP System 3.4.12

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.12 Low Temperature Overpressure Protection (LTOP) System LCO 3.4:12 An LTOP System shall be OPERABLE with:
a. Both High Pressure Safety Injection (HPSI) pumps incapable of injecting into the PCS, and

NOTES-------------------------------------------- .

1. LCO 3.4.12.a is only required when any PCS cold leg temperature is< 300°F.
2. LCO 3.4.12.a does not prohibit the use of the HPSI pumps for emergency addition of makeup to the PCS.
b. One of the following pressure relief capabilities:
1. Two Power Operated Relief Valves (PORVs) with lift settings as specified in Figure 3.4.12-1; or
2. The PCS depressurized and a PCS vent capable of relieving~ 167 gpm at a pressure of 315 psia.

APPLICABILITY: MODE 3 when any PCS cold leg temperature is< 430°F, MODES 4 and 5, MODE 6 when the reactor vessel head is on.

ACTIONS


~----------------------NOTE----------------------------------------------------------

LCO 3.0.4 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two HPSI pumps A.1 Initiate action to verify Immediately capable of injecting into no HPSI pump is the PCS. capable of injecting into the PCS .

  • Palisades Nuclear Plant 3.4.12-1 Amendment No.

LTOP System 3.4.12

  • ACTIONS B.

CONDITION One required PORV B.1 REQUIRED ACTION Restore required PORV COMPLETION TIME 7 days inoperable and pressurizer to OPERABLE status.

water level :o; 57%.

C. One required PORV C. 1 Restore required PORV 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable and pressurizer to OPERABLE status.

water level> 57%.

D. Two required PORVs D.1 Depressurize PCS and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable. /

establish PCS vent capable of relieving OR ~ 167 gpm at a PCS pressur:e of 315 psia.

Required Action and associated Completion Time not met.

OR LTOP System inoperable for any reason other than Condition A, B, or C.

\

  • Palisades Nuclear Plant 3.4.12-2 Amendment No.

LTOP System 3.4.12

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.12.1 -------------------------------NOTE---------------------------

Only required to be met when complying with LCO 3.4.12.a.

Verify both HPSI pumps are incapable of injecting 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> into the PCS.

SR 3.4.12.2 Verify required PCS vent, capable of relieving 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for

~ 167 gpm at a PCS pressure of 315 psia, is open. unlocked open vent valve(s) 31 days for locked open vent valve( s)

SR 3.4.12.3 Verify PORV block valve is open for each required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> PORV.

SR 3.4.12.4 -------------------------------NOTE---------~-----------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after decreasing any PCS cold leg temperature to

< 430°F.

Perform CHANNEL FUNCTIONAL TEST on each 31 days required PORV, excluding actuation.

SR 3.4.12.5 Perform CHANNEL CALIBRATION on each 18 months required PORV actuation channel.

Palisades Nuclear Plant 3.4.12-3 Amendment No.

LTOP System 3.4.12

<C C J) 1750 CL.

L

J Cit 1500 Cit L

a..

L 1250 Q)

~

L

J L 1000 a..

750 0+-i'""'""'.--i-...-...-....+.................................;.......'""'""'...+-....-...-+-w-.........-+--._..~

50 100 150 200 250 300 350 400 450 RV Inlet. Tempe,.otu,.e, F Figure 3.4.12-1 (page 1 of 1)

LTOP Setpoint Limit

  • Palisades Nuclear Plant 3.4.12-4 Amendment No.

PCS Operational LEAKAGE 3.4.13

a. No pressure boundary LEAKAGE;
b. 1 gpm unidentified LEAKAGE;
c. 10 gpm identified LEAKAGE; and
d. 432 gallons per day primary to secondary LEAKAGE through any one SG.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS

  • A.

CONDITION PCS LEAKAGE not within limits for reasons other than pressure boundary A.1 REQUIRED ACTION Reduce LEAKAGE to within limits.

COMPLETION TIME 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> LEAKAGE.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Pressure boundary -

LEAKAGE exists .

  • Palisades Nuclear Plant 3.4.13-1 Amendment No.

PCS Operational LEAKAGE 3.4.13

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.13.1 -------------------------------N()TE--------------------------- ----------NOTE---------

Not required to be performed in MODE 3 or 4 until Only required to be 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of steady state operation. performed during steady state operation Verify PCS operational LEAKAGE is within limits 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> by performance of PCS water inventory balance.

SR 3.4.13.2 Verify SG tube integrity is in accordance with the In accordance with Steam Generator Tube Surveillance Program. the Steam Generator Tube Surveillance Program

  • Palisades Nuclear Plant 3.4.13-2 Amendment No.

PCS PIV Leakage 3.4.14

APPLICABILITY: fv,'IODES 1, 2, and 3, MODE 4, except during the SOC mode of operation, or transition to or from, the SOC mode of operation.

ACTIONS


NOTES---------------------------------------------------------

1. Separate Condition entry is allowed for each flow path.
2. Enter applicable Conditions and Required Actions for systems made inoperable by an inoperable PIV.
  • A.

CONDITION One or more flow paths with leakage from one or REQUIRED ACTION


NOTE------------------

Each valve used to satisfy COMPLETION TIME more PCS PIVs not within Required Action A.1 must have limit. been verified to meet SR 3.4.14.1 and be on the PCS pressure boundary or the high pressure portion of the system.

(continued)

  • Palisades Nuclear Plant 3.4.14-1 Amendment No.

PCS PIV Leakage 3.4.14

  • ACTIONS A.

CONDITION (continued) A.1 REQUIRED ACTION Isolate the high COMPLETION TIME 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> pressure portion of the affected system from the low pressure portion by use of one closed manual, deactivated automatic, or check valve.

AND A.2 Restore PCS PIV 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to within limits.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A not AND .

met.

B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C. One or both SOC suction C. 1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> valve interlocks penetration by use of inoperable. one closed deactivated valve .

  • Palisades Nuclear Plant 3.4.14-2 Amendment No.

PCS PIV Leakage 3.4.14

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.14.1 -------------------------------N()TES--------------------------
1. Only required to be performed in M()DES 1 and 2.
2. Leakage rates ::;; 5.0 gpm are unacceptable if the latest measured rate exceeded the rate determined by the previous test by an amount that reduces the margin between measured leakage rate and the maximum permissible leakage rate of 5.0 gpm by 50%

or greater.

3. Minimum test differential pressure shall not be less than 150 psid.

Verify leakage from each PCS PIV is equivalent to 18 months

5 gpm at a PCS pressure of 2060 psia .

Once prior to entering MODE 2 whenever the plant has been in MODE 5 for 7 days or more, if leakage

  • testing has not been performed in the*

previous 9 months SR 3.4.14.2 Verify each SDC suction valve interlock prevents its 18 months associated valve from being opened with a simulated or actual PCS pressure signal

~ 280 psia. *

  • Palisades Nuclear Plant 3.4.14-3 Amendment No.

PCS PIV Leakage 3.4.14


N()TE----------------------------

FREQUENCY

()nly required to be performed in M()DES 1 and 2.

Verify each of the four Low Pressure Safety Prior to entering Injection (LPSI) check valves are closed. M()DE 2 after each use of the LPSI check valves for soc

    • Palisades Nuclear Plant 3.4.14-4 Amendment No.

PCS Leakage Detection Instrumentation 3.4.15

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.15 PCS Leakage Detection Instrumentation LCO 3.4.15 Three of the following PCS leakage detection instrumentation channels shall be OPERABLE:
a. One containment sump level indicating channel;
b. One containment atmosphere gaseous activity monitoring channel;
c. One containment air cooler condensate level switch channel;
d. One containment atm9sphere humidity monitoring channel.

APPLICABILITI: MODES 1, 2, 3, and 4.

ACTIONS


NOTE----------------------------------------------------------

LCO 3.0.4 is not applicable .

  • A.

CONDITION One or two required leak A.1 REQUIRED ACTION Perform SR 3.4.13.1 COMPLETION TIME Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> detection instrument (PCS water inventory channels inoperable. balance).

AND A.2 Restore inoperable 30 days channel(s) to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades Nuclear Plant 3.4.15-1 Amendment No.

PCS Leakage Detection Instrumentation 3.4.15

  • ACTIONS C.

CONDITION All required channels C.1 REQUIRED ACTION Enter LCO 3.0.3.

COMPLETION TIME Immediately inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.15.1 Perform CHANNEL CHECK of the required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment sump level indicator.

SR 3.4.15.2 Perform CHANNEL CHECK of the required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment atmosphere gaseous activity monitor.

SR 3.4.15.3 Perform CHANNEL CHECK of the required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment atmosphere humidity monitor.

SR 3.4.15.4 Perform CHANNEL FUNCTIONAL TEST of the 18 months required containment air cooler condensate level switch.

SR 3.4.15.5 Perform CHANNEL CALIBRATION of the required 18 months containment sump level indicator.

  • Palisades Nuclear Plant 3.4.15-2 Amendment No.

PCS Leakage Detection Instrumentation 3.4.15 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.15.6 Perform CHANNEL CALIBRATION of the required 18 months containment atmosphere gaseous activity monitor.

SR 3.4.15.7 Perform CHANNEL CALIBRATION of the required 18 months containment atmosphere humidity monitor.

  • Palisades Nuclear Plant 3.4.15-3 Amendment No.

PCS Specific Acti.vity 3.4.16

  • 3.4 PRIMARY COOLANT SYSTEM (PCS) 3.4.16 PCS Specific Activity LCO 3.4.16 The specific activity of the primary coolant shall be within limits.

APPLICABILITY: MODES 1 and 2, MODE 3 with PCS average temperature (Tave) ~ 500°F.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT 1-131 -----------------NOTE-------------------

> 1.0 µCi/gm. LCO 3.0.4 is not applicable.

A.1 Verify DOSE . Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131

< 40 µCi/gm.

A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limit.

  • Palisades Nuclear Plant 3.4.16-1 Amendment No.

PCS Specific Activity 3.4.16

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and 8.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Tave < 500°F.

Time of Condition A not met.

  • DOSE EQUIVALENT 1-131

~ 40 µCi/gm.

OR Gross specific activity of the primary coolant not within limit.

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY.

SR 3.4.16.1 *Verify primary coolant gross specific activity 7 days

.::; 100/E µCi/gm.

Palisades Nuclear Plant 3.4.16-2 Amendment No.

PCS Specific Activity 3.4.16 I

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.16.2 -------------------------------1\J()TE--------------~------------

Only required to be performed in M()DE 1.

Verify primary coolant D()SE EQUIVALENT 1-131 specific activity s 1.0 µCi/gm. 14 days Once between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after *

.THERMAL POWER change of

~ 15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period SR 3.4.16.3 -------------------------------1\J()TE---------------------------

l\J ot required to be performed* until 31 days after a minimum of 2 EFPD and 20 days of MODE 1 operation have elapsed sinc.e the reactor was last subcritical for ~ 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ..

Determine E from a sample taken in MODE 1 after 184 days a minimum of 2 EFPD and 20 days of MODE 1 operation have elapsed since the reactor was last subcritical for ~ 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> .

  • Palisades l\Juclear Plant 3.4.16-3 Amendment l\Jo.

SI Ts 3.5.1

LCO 3.5.1 Four SITs shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SIT inoperable due to A.1 Restore boron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> boron concentration not concentration to within within limits . limits.

B.1 Restore SIT to OPERABLE status.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B not met.

D. Two or more SITs D.1 Enter LCO 3.0.3. Immediately inoperable .

  • Palisades Nuclear Plant 3.5.1-1 Amendment No.

SI Ts 3.5.1

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify each SIT isolation valve is fully open. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5.1.2 Verify borated water volume in each SIT is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 3 3
>
1040ft and
s: 1176ft .

SR 3.5.1.3 Verify nitrogen cover pressure in each SIT is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

>
200 ps
ig.

SR 3.5.1.4 Verify boron concentration in each SIT is 31 days

>
1720 ppm and
s: 2500 ppm .
  • SR 3.5.1.5 Verify power is removed from each SIT isolation valve operator.

31 days

  • Palisades Nuclear Plant 3.5.1-2 Amendment No.

ECCS - Operating 3.5.2

APPLICABILITY: MODES 1 and 2, MODE 3 with Primary Coolant System (PCS) temperature 2: 325°F.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more ECCS trains A.1 Restore train(s) to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status.

At least 100% of the required ECCS flow available.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Reduce PCS 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> temperature to< 325°F .

  • Palisades Nuclear Plant 3.5.2-1 Amendment No.

ECCS - Operating 3.5.2

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify the following valves and hand switches are 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in the open position.

Valve/Hand Switch Number Function CV-3027 SIRWT Recirc Valve HS-3027A Hand Switch For CV-3027 HS-30278 Hand Switch For CV-3027 CV-3056 SIRWT Recirc Valve HS-3056A Hand Switch For CV-3056 HS-30568 Hand Switch For CV-3056 SR 3.5.2.2 Verify each ECCS manual, power operated, and 31 days automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.5.2.3 Verify CV-3006, "SOC Flow Control Valve," is open 31 days and its air supply is isolated.

SR 3.5.2.4 Verify each ECCS pump's developed head at the In accordance with test flow point is greater than or equal to the the lnservice Testing required developed head. Program SR 3.5.2.5 Verify each ECCS automatic valve that is not 18 months locked, sealed, or otherwise secured in position, in the flow path actuates to the correct position on an actual or simulated actuation signal.

  • Palisades Nuclear Plant 3.5.2-2 Amendment No.

ECCS - Operating 3.5.2

  • SURVEILLANCE REQUIREMENTS SR 3.5.2.6 SURVEILLANCE Verify each ECCS pump starts automatically on an FREQUENCY 18 months actual or simulated actuation signal.

18 months SR 3.5.2.7 Verify each LPSI pump stops on an actual or simulated actuation signal.

SR 3.5.2.8 Verify, for each ECCS throttle valve listed below, 18 months each position stop is in the correct position.

Valve Number Function M0-3008 LPSI to Cold leg 1A M0-3010 LPSI to Cold leg 1B M0-3012 LPSI to Cold leg 2A M0-3014 LPSI to Cold leg 28 M0-3082 HPSI to Hot leg 1 M0-3083 HPSI to Hot leg 1 SR 3.5.2.9 Verify, by visual inspection, each ECCS train 18 months containment sump suction inlet is not restricted by debris and the suction inlet screens show no evidence of structural distress or abnormal corrosion .

  • Palisades Nuclear Plant 3.5.2-3 Amendment No.

ECCS - Shutdown 3.5.3


NOTE----------------------------------------------

A LPSI train may be considered OPERABLE during alignment and operation for shutdown cooling if capable of being manually realigned to the ECCS mode of operation.

  • APPLICABILITY: MODE 3 with Primary Coolant System (PCS) temperature,< 325°F, MODE 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

A.1 Initiate action to restore one LPSI train to OPERABLE status.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 The following SRs of Specification 3.5.2, "ECCS - In accordance with Operating," are applicable: applicable SRs SR 3.5.2.2 SR 3.5.2.9 SR 3.5.2.4

    • Palisades Nuclear Plant 3.5.2-4 Amendment No.

SIRWT 3.5.4

LCO 3.5.4 The SIRWT shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SIRWT boron A.1 Restore SIRWT to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> concentration not within OPERABLE status.

limits.

OR SIRWT borated water temperature not within limits.

8. SIRWT inoperable for B.1 Restore SIRWT to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reasons other than OPERABLE status.

Condition A.

C. Required Action and C. 1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades Nuclear Plant 3.5.4-1 Amendment No.

SIRWT 3.5.4

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.4.1 Verify SIRWT borated water temperature is 2 40°F 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and::;; 100°F.

SR 3.5.4.2 --------------------------------N()TE--------------------------

()nly required to be met in M()DES 1, 2, and 3.

Verify SIRWT borated water volume is 7 days 2 250,000 gallons.

SR 3.5.4.3 --------------------------------N()TE--------------------------

()nly required to be met in M()DE 4 .

  • Verify SIRWT borated water volume is 2 200,000 gallons.

7 days SR 3.5.4.4 Verify SIRWT boron concentration is 2 1720 ppm 31 days and ::;; 2500 ppm .

  • Palisades Nuclear Plant 3.5.4-2 Amendment No.

TSP 3.5.5

LCO 3.5.5 The TSP baskets shall contain~ 8,300 lbs and~ 11,000 lbs of active TSP.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A. TSP not within limits. A.1 Restore TSP to within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limits .

  • B. Required Action and associated Completion Time not met.

B.1 AND B.2 Be in MODE 3.

Be in MODE 4.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 30 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.5.1 Verify the TSP baskets contain  ;;>: 8,300 lbs and 18 months

~ 11,000 lbs of TSP.

SR 3.5.5.2 Verify that a sample from the TSP baskets provides 18 months adequate pH adjustment of borated water .

  • Palisades Nuclear Plant 3.5.5-1 Amendment No.

Containment 3.6.1

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Containment inoperable. A.1 Restore containment to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND 8.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1 Perform required visual examinations and Type A In accordance with leakage *rate testing in accordance with the the Containment Containment Leak Rate Testing Program. Leak Rate Testing Program*

  • Palisades Nuclear Plant 3.6.1-1 Amendment No.

Containment 3.6.1

-* SURVEILLANCE REQUIREMENTS SR 3.6.1.2 SURVEILLANCE Verify containment structural integrity in FREQUENCY In accordance with accordance with the Containment Structural the Containment Integrity Surveillance Program. Structural Integrity Surveillance Program SR 3.6.1.3 ------------------------------N()"fE---------------------------- -----------N ()TE--------

Local leak rate tests shall be performed at SR 3.0.2 is not

~ 55 psig. applicable.

Perform required Type B and C leakage rate In accordance with testing, except for containment air lock testing, in 10 CFR 50, accordance with 10 CFR 50, Appendix J, Option Appendix J, Option A, as modified by approved exemptions. A, as modified by approved

    • "fhe leakage rate acceptance criterion is s 1.0 La.

However, during the first unit startup following testing performed in accordance with 10 CFR 50, Appendix J, ()ption A, as modified by approved exemptions, the leakage rate acceptance criteria are < 0.6 La for the Type B and Type C tests .

exemptions

  • Palisades Nuclear Plant 3.6.1-2 Amendment No.

Containment Air Locks 3.6.2

  • 3.6 CONTAINMENT SYSTEMS 3.6.2 Containment Air Locks LCO 3.6.2 Two containment air locks shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS


NOTE~--------------------------------------------------------

1. Entry and exit is permissible through a "locked" air lock door to perform repairs on the affected air lock components.
2. Separate Condition entry is allowed for each air lock.
3. Enter applicable Conditions and Required Actions of LCO 3.6.1, "Containment," when leakage results in exceeding the overall containment leakage rate acceptance criteria.

COMPLETION CONDITION REQUIRED ACTION TIME

  • A. .One or more containment air locks with one containment air lock door inoperable.

NOTES----------------

1. Required Actions A.1, A.2, and A.3 are not applicable if both doors in the same air lock are inoperable and .

Condition C is entered.

2. Entry and exit is permissible for 7 days under administrative controls if both air locks are inoperable.

A.1 Verify the OPE.RABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed in the affected air lock.

(continued)

  • Palisades Nuclear Plant 3.6.2-1 Amendment No.

Containment Air Locks 3.6.2

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A (continued) A.2 Lock the OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> door closed in the affected air lock.

AND


NOTE------------------

Air lock doors in high radiation areas may be verified locked closed by administrative means.

A.3 Verify the OPERABLE Once per 31 days door is locked closed in the affected air lock.

  • B. One or more containment air locks with containment air lock interlock mechanism inoperable.

~----------NOTES-------~---------

1.
  • Required Actions B.1, B.2, and B.3 are not applicable if both doors in the same air lock are inoperable and Condition C is entered.
2. Entry and exit of containment is permissible under the control of a dedicated in.dividual.

8.1 Verify an OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed in the affected air lock.

AND (continued)

  • Palisades Nuclear Plant 3.6.2-2 Amendment No.

Containment Air Locks 3.6.2

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Lock an OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> door closed in the affected air lock.

AND


NOTE------------------

Air lock doors in high radiation areas may be verified locked closed by administrative means.

B.3 Verify an OPERABLE Once per 31 days door is locked closed in the affected air lock.

  • C. One or more containment air locks inoperable for reasons other than Condition A or B.

C. 1 Initiate action to evaluate overall containment.

leakage rate per LCO 3.6.1.

Immediately AND C.2 Verify a door is closed in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the affected air lock.

AND C.3 Restore air lock to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.

D. Required Action and D. 1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND D.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades Nuclear Plant 3.6.2-3 Amendment No.

Containment Air Locks 3.6.2

  • Palisades Nuclear Plant 3.6.2-4 Amendment* No.

Containment Air Locks 3.6.2

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.1 ----------------------------N()TES-------~-------------------
1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
2. Results shall be evaluated against acceptance criteria of SR 3.6.1.3 in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions.
3. A seal contact check shall be performed on the emergency escape air lock following each full pressure test. Emergency escape air lock door opening, solely for the purpose of strongback removal and performance of the seal contact check, does not necessitate additional pressure testing.

NOTE----------

4. Local leak rate tests, other than personnel SR 3.0.2 is not air lock doors between the seals test, shall applicable be performed at ~ 55 psig.
  • Perform required air lock leakage rate testing in In accordance with accordance with 10 CFR 50, Appendix J, 10 CFR 50, Option A, as modified by approved exemptions. Appendix J, Option A, as modified by The acceptar:ice criteria for air lock testing are: approved exemptions
a. Overall air lock leakage rate is ~ 1.0 L2 when tested at ~ Pa and combined with all penetrations and valves subjected to Type B and C tests. However, during the first unit startup following testing performed in accordance with 10 CFR 50, Appendix J, Option A, as modified by approved (continued) exemptions, the leakage rate acceptance criteria is < 0.6 La when combined with all penetrations and valves subjected to Type B and C tests .
  • Palisades Nuclear Plant 3.6.2-5 Amendment No.

Containment Air Locks 3.6.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.1 (continued)

b. For each personnel air lock door between the seals test, leakage rate is :s; 0.023 La when tested at ~ 10.0 psig.
c. An acceptable emergency escape air lock door seal contact check consists of a verification of continuous contact between the seals and the sealing surfaces.

SR 3.6.2.2 Verify only one door in the air lock can be opened 18 months at a time .

  • Palisades Nuclear Plant 3.6.2-6 Amendment No.

Containment Isolation Valves 3.6.3

  • 3.6 CONTAINMENT SYSTEMS 3.6.3 Containment Isolation Valves LCO 3.6.3 Each containment isolation valve shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS


NOTES--------------------------------------------------------

1. Penetration flow paths, except for 8 inch purge exhaust valves and 12 inch air room supply valves penetration flow paths, may be unisolated intermittently under administrative controls.
2. Separate Condition entry is allowed for each penetration flow path.
3. Enter applicable Conditions and Required Actions for system(s) made inoperable by containment isolation valves.
4. Enter applicable Conditions and Required Actions of LC() 3.6.1, "Containment," when leakage results in exceeding the overall containment leakage rate acceptance criteria.

CONDITION REQUIRED AC"fl()N COMPLETION TIME A. --------------NO"T"E------------- A.1 Isolate the.affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Only applicable to penetration flow path by penetration flow paths with use of at least one two containment isolation closed and de-activated valves. automatic valve, closed manual valve, blind flange, or check valve One or more penetration with flow through the flow paths with one valve secured.

containment isolation valve inoperable (except for AND purge exhaust valve or air room supply valve not locked closed) .

  • Palisades Nuclear Plant 3.6.3-1 (continued)

Amendment No.

Containment Isolation Valves 3.6.3

  • ACTIONS A.

CONDITION (continued)

REQUIRED ACTION


*---------NOTE----------------

COMPLETION TIME Isolation devices in high radiation areas may be verified by use of administrative means.

A.2 Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment

  • 8. --------------NOTE-------------

Only applicable to penetration flow paths with 8.1 Isolate the affected penetration flow path by use of at least one 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> two containment isolation closed and de-activated valves. automatic valve, closed


manual valve, or blind flange.

One or more penetration flow paths with two containment isolation valves inoperable (except for purge exhaust valve or air room supply valve not locked closed) .

  • Palisades Nuclear Plant 3.6.3-2 Amendment No.

Containment Isolation Valves 3.6.3

  • ACTIONS CONDITION C. 1 REQUIRED ACTION Isolate the affected COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> C. --------------NOTE------------- penetration flow path by Only applicable to use of at least one penetration flow paths with closed and de-activated only one containment automatic valve, closed isolation valve and a manual valve, or blind closed system. flange.

AND One or more penetration flow paths with one -------------------1\!0TE-----------------

containment isolation valve Isolation devices in high radiation inoperable. areas may be verified by use of administrative means.

C.2 Verify the affected Once per 31 days penetration flow path is isolated .

D. One or more purge D.1 Lock closed the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> exhaust or air room supply valves.

valves not locked closed.

E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. Al\ID E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades l\luclear Plant 3.6.3-3 Amendment !\lo.

Containment Isolation Valves 3.6.3

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.1 Verify each 8 inch purge valve and 12 inch air 31 days room supply valve is locked closed.

SR *3.6.3.2 -----~-----------------------N()TE----------------------------

Valves and blind flanges in high radiation areas may be verified by use of administrative means.

Verify each manual containment isolation valve 31 days and blind flange that is located outside containment and not locked, sealed, or otherwise secured in position, and is required to be closed during accident conditions, is closed, except for

  • containment isolation valves that are open under administrative controls .
  • SR 3.6.3.3 ----------------------------N()TE-----------------------------

Valves and blind flanges in high radiation areas may be verified by use of administrative means.

Verify each manual containment isolation valve Prior to entering arid blind flange that is located inside containment MODE 4from and not locked, sealed, or otherwise secured in MODE 5 if not position, and required to be closed during performed within the accident conditions, is closed, except for previous 92 days containment isolation valves that are open under administrative controls .

  • Palisades Nuclear Plant 3.6.3-4 Amendment No.

Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.4

  • Verify the isolation time of each automatic power In accordance with -

operated containment isolation valve is within the lnservice Testing limits. Program SR 3.6.3.5 Verify each containment 8 inch purge exhaust and 184 days 12 inch air room supply valve is closed by performance of a leakage rate test.

SR 3.6.3.6 Verify each automatic containment isolation valve 18 months that is not locked, sealed, o*r otherwise secured in position, actuates to the isolation position on an actual or simulated actuation signal.

  • Palisades Nuclear Plant 3.6.3-5 Amendment No.

Containment Pressure 3.6.4

  • 3.6 CONTAINMENT SYSTEMS 3.6.4 Containment Pressure LCO 3.6.4 Containment pressure shall be :s: 1.0 psig in MODES 1 and 2 and
s: 1.5 psig in MODES 3 and 4.

APPLICABILITY: MODES 1, 2, 3, and 4.

/

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Containment pressure not A.1 Restore containment 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within limit. pressure to within limit.

B. Required Action and . B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND

,/- B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1 Verify containment pressure is within limit. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Palisades Nuclear Plant 3.6.4-1 Amendment No.

Containment Air Temperature 3.6.5

  • 3.6 CONTAINMENT SYSTEMS 3.6.5 Containment Air Temperature LCO 3.6.5 Containment average air temperature shall be~ 140°F.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Containment average air A.1 Restore containment 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> temperature not within average air temperature limit. to within limit.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.5.1 Verify containment average air temperature is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> within limit.

  • Palisades Nuclear Plant 3.6.5-1 Amendment No.

Containment Cooling Systems 3.6.6

  • 3.6 CONTAINMENT SYSTEMS 3.6.6 *Containment Cooling Systems LCO 3.6.6 Two containment cooling trains shall be OPERABLE.
  • APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more containment A.1 Restore train(s) to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> cooling trains inoperable. OPERABLE status.

AND At least 100% of the

    • required post accident containment cooling capability available.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />

  • Palisades Nuclear Plant 3.6.6-1 Amendment No.

Containment Cooling Systems 3.6.6

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.6.1 Verify each containment spray manual, power 31 days operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.

SR 3.6.6.2 Operate each Containment Air Cooler Fan Unit for 31 days

~ 15 minutes. I

\

SR 3.6.6.3 Verify the containment spray piping is full of water 31 days to the 735 ft elevation in the containment spray header.

  • SR 3.6.6.4 Verify total service - water flow rate, when - aligned for accident conditions, is ~ 4800 gpm to Containment Air Coolers VHX-1, VHX-2, and VHX-3.

18 months SR 3.6.6.5 Verify each containment spray pump's developed In accordance with head at the flow test point is greater than or equal the lnservice Testing to the required developed head. , Program I

(

SR 3.6.6.6 Verify each automatic containment spray valve in 18 months the flow path that is not locked, sealed, or otherwise secured in position, actuates to its correct position on an actual or simulated actuation signal.

  • Palisades Nuclear Plant 3.6.6-2 Amendment No.

Containment Cooling Systems 3.6.6

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.6.7 Verify each containment spray pump starts 18 months automatically on an actual or simulated actuation signal.

SR 3.6.6.8 Verify each containment cooling fan starts 18 months automatically on an actual or simulated actuation signal.

  • SR 3.6.6.9 Verify each spray nozzle is unobstructed. 10 years

.\.'

  • Palisades Nuclear Plant 3.6.6-3 Amendment No.

Hydrogen Recombiners 3.6.7

APPLICABILITY: MODES 1 and 2.

ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A. One hydrogen recombiner ---------------------NOTE------------------

inoperable. LCO 3.0.4 is not applicable.

A.1 Restore hydrogen 30 days recombiner to

  • B. Required Action and associated Completion B.1 OPERABLE status .

Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Time not met.

  • Palisades Nuclear Plant 3.6.7-1 Amendment No.

Hydrogen Recombiners 3.6.7

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.7.1 Perform a system functional test for each hydrogen 18 months recombiner.

SR 3.6.7.2 Visually examine each hydrogen recombiner 18 months enclosure and verify there is no evidence of abnormal conditions.

SR 3.6.7.3 Perform continuity and a resistance to ground test 18 months for each heater phase .

  • Palisades Nuclear Plant 3.6.7-2 Amendment No.

MSSVs 3.7.1

LCO 3.7.1 Twenty-three MSSVs shall be OPERABLE as specified in Table 3.7.1-1.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 '

Restore required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> MSSVs inoperable. MSSVs to OPERABLE status .

  • B. Required Action and associated Completion

. Time not met.

B.1 AND B.2 Be in MODE 3.

Be in MODE4.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 30 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE . FREQUENCY .

SR 3.7 . 1.1 Verify each required MSSV lift setting is within the In accordance with limits of Table 3.7.1-1 in accordance with the the lnservice Testing lnservice Testing Program. Following testing, lift Program settings shall be within +/- 1% .

  • *Palisades Nuclear Plant 3.7.1-1 Amendment No.

MSSVs 3.7.1

  • Table 3.7.1-1(page1of1)

Main Steam Safety Valve Lift Settings VALVE NUMBER LIFT SETTIN G Steam Generator A Steam Generator B (psig +/- 3%)

RV-0703 RV-0701 RV-0704 RV-0702 1025 RV-0705 RV-0707 RV-0706 RV-0708 RV-0713 RV-0709 RV-0714 RV-0710 1005 RV-0715 RV-0711 RV-0716 RV-0712

  • RV-0717 RV-0718 RV-0719 RV-0720 RV-0721 985 RV-0723 RV-0724 RV-0722
  • Palisades Nuclear Plant 3.7.1-2 Am endment No.

MS IVs 3.7.2

LCO 3.7.2 . Two MSIVs shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3 except when both MSIVs are closed and de-activated.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One MSIV inoperable in A.1 Restore MSIV to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> MODE 1. OPERABLE status.

B. Required Action and B.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

    • Associated Completion Time of Condition A not met.

C. --------------NOTE------------- C.1 Close MSIV. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Separate Condition entry is allowed for each MSIV. AND C.2 Verify MSIV is closed. Once per 7 days One or more MSIVs inoperable in MODE 2 or 3.

D. Required Action and D.1 Be in MODE 3. . 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition C not AND met.

D.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />

  • Palisades Nuclear Plant 3.7.2-1 Amendment No.

MS IVs 3.7.2

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 Verify closure time of each MSIV is ~ 5 seconds 18 months on an actual or simulated actuation signal from each train under no flow conditions .
  • Palisades Nuclear Plant 3.7.2-2 Amendment No.

MFRVs and MFRV Bypass Valves 3.7.3

  • 3.7 PLANT SYSTEMS 3.7.3

APPLICABILITY: MODES 1, 2, and 3 except when both MFRVs and both MFRV bypass valves are either closed and de-activated, or isolated by closed manually actuated valves.

ACTIONS


NOTE:---------------------------------------------------------

Separate Condition entry is allowed for each valve.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more MFRVs or A.1 Close or isolate 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> MFRV bypass valves inoperable MFRV(s) or inoperable. MFRV bypass valve(s).

AND A.2 Verify inoperable Once per 7 days MFRV(s) or MFRV bypass valve(s) is closed or isolated.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />

  • Palisades Nuclear Plant 3. 7.3-1 Amendment No.

MFRVs and MFRV Bypass Valves 3.7.3

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify the closure time of each MFRV and MFRV 18 months bypass valve is ~ 22 seconds on a actual or simulated actuation signal.
  • Palisades Nuclear Plant 3.7.3-2 Amendment No.

ADVs 3.7.4

  • 3.7 PLANT SYSTEMS 3.7.4 Atmospheric Dump Valves (ADVs)

LCO 3.7.4 One ADV per steam generator shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is being relied upon for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required ADV -------------------1\!0TE-----------------

inoperable. LCO 3.0.4 is not applicable.

A.1 Hestore ADV to 7 days OPERABLE status .

B.1 Restore one ADV to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C. Required Action and C. 1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

  • AND C.2 Be in MODE 4 without 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> reliance upon steam generator for heat removal.
  • Palisades Nuclear Plant 3.7.4-1 Amendment No.

AD Vs 3.7.4

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.4.1 Verify one complete cycle of each ADV. 18 months
  • Palisades Nuclear Plant 3.7.4-2 Amendment No.

AFW System 3.7.5

.* 3. 7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Two AFW trains shall be OPERABLE.


~-------------------------------N()TES------------------------------------------

1. Only one AFW train, which includes a motor driven pump, is required to be OPERABLE in M()DE 4.
2. . The turbine driven AFW pump is only required to be ()PERABLE in MODES 1 and 2.
3. Two AFW pumps may* be placed in manual for testing, for a period of up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

APPLICABILITY: M()DES 1, 2, and 3, M()DE 4 when steam generator is relied upon for heat removal.

  • ACTl()NS C()NDITl()N REQUIRED ACTION C()MPLETl()N TIME A. ()ne steam supply to A. 1 Restore steam supply to 7 days turbine driven AFW pump OPERABLE status.

inoperable in M()DE 1 or 2.

10 days from discovery of failure to meet the LC()

  • Palisades Nuclear Plant 3.7.5-1 Amendment No.

~~~~~~~~~~~~~~~~~~~~~~~~~--,

I AFW System 3.7.5

  • ACTIONS B.

CONDITION One or more AFW trains B.1 REQUIRED ACTION Restore train(s) to COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons OPERABLE status.

other than Condition A in AND MODE 1,- 2, or 3.

10 days from AND discovery of failure to meet the LCO At least 100% of required AFW fl.ow available to both steam generators.

AND At least two AFW pumps OPERABLE.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND not met.

C.2 Be in MODE 4. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> OR One or more AFW trains inoperable with at least 100% of the required AFW flow available to only one steam generator in MODE 1, 2, or 3.

OR_

Only one AFW pump OPERABLE in MODE 1, 2, or 3 .

  • Palisades Nuclear Plant 3.7.5-2 Amendment No.

AFW System 3.7.5

  • ACTIONS D.

CONDITION Two AFW trains inoperable REQUIRED ACTION


NOTE------------------

COMPLETION TIME with less than 100% of the LCO 3.0.3 and all other LCO required AFW flow. Required Actions requiring MODE available to each steam changes or power reductions are generator, in MODE 1, 2, suspended until at least 100% of or 3. the required AFW flow is available to at least one steam generator.

Required AFW train D.1 Initiate action to restore inoperable in MODE 4. one AFW train to OPERABLE status. Immediately SURVEILLANCE REQUIREMENTS

  • SR 3.7.5.1 SURVEILLANCE Verify each required AFW manual, power operated, and automatic valve in each water flow FREQUENCY 31 days path and in both steam supply flow paths to the steam turbine driven pump, that is not locked, sealed, or otherwise secured in position, is in the correct position:

SR 3.7.5.2 Verify the developed head of each required AFW In accordance with pump at the flow test point is greater than or equal the lnservice Testing to the required developed head . Program

  • Palisades Nuclear Plant 3.7.5-3 Amendment No.

AFW System 3.7.5


~-------N()TE--------------------~-------

FREQUENCY Only required to be met in M()DES 1, 2 or 3 when AFW is not in operation.

Verify each AFW automatic valve that is not 18 months locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

  • SR 3.7.5.4 ------------------------------N()TE----------------------------

Only required to be met in M()DES 1, 2, and 3.

Verify each required AFW pump starts

  • 18 months automatically on an actual or simulated actuation signal.

,. Palisades Nuclear Plant 3.7.5-4 Amendment No.

Condensate Storage and Supply 3.7.6

  • 3. 7 PLANT SYSTEMS
3. 7.6 Condensate Storage and Supply LCO 3.7.6 The combined useable volume of the Condensate Storage Tank (CST) and Primary Makeup Storage Tank (T-81) shall be ~ 100,000 gallons.

APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Condensate volume not A.1 Verify OPERABILITY of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> within limit. backup water supplies.

AND

  • AND A.2 Restore condensate Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter 7 days volume to within limit.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4 without 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> reliance on steam generator for heat removal.

  • Palisades Nuclear Plant 3.7.6-1 Amendment No.

Condensate Storage and Supply 3.7.6

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify condensate useable volume is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

~ 100,000 gallons .

  • Palisades Nuclear Plant 3.7.6-2 Amendment No.

CCW System 3.7.7

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more CCW trains A.1 Restore train(s) to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status.

AND At least 100% of the

  • required CCW post accident cooling capability available.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades Nuclear Plant 3.7.7-1 Amendment No.

CCW System 3.7.7

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.7.1 ------------------------------l'J()TE----------------------------

1solation of CCW flow to individual components does not render the CCW System inoperable.

Verify each CCW manual, power operated, and 31 days automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.7.2 -----------------------------N()TE-----------------------------

()nly required to be met in M()OES 1, 2, and 3.

Verify each CCW automatic valve in the flow path 18 months that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.7.7.3 -----------------------------f\l()TE-----------------------------

Only required to be met in M()OES 1, 2, and 3.

Verify each CCW pump starts automatically on an 18 months actual or simulated actuation signal in the "with standby power available" mode .

  • Palisades f\luclear Plant 3.7.7-2 Amendment fl.lo.

sws 3.7.8

LCO 3.7.8 Two SWS trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SWS trains A.1 Resto.re train(s) to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status.

AND At least 100% of the required SWS post

  • B.

accident cooling capability available.

Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades Nuclear Plant 3.7.8-1 Amendment No.

sws 3.7.8

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 -----------------------------N()TE-----------------------------

1solation of SWS flow to individual components does not render SWS inop~rable.

Verify each SWS manual, power operated, and 31 days automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.*

SR 3.7.8.2 ----------------------------N()TE------------------------------

Only required to be met in M()DES 1, 2, and 3.

Verify each SWS automatic valve in the flow path 18 months

  • that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.7.8.3 -----.------------------------N()TE--------------.:.--------------

Only required to be met in M()DES 1, 2, and 3.

Verify each SWS pump starts automatically on an 18 months actual or simulated actuation signal in the "with standby power available" mode .

  • Palisades Nuclear Plant 3.7.8-2 Amendment No.

UHS 3.7.9

LCO 3.7.9 The UHS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. UHS inoperable. A.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND A.2 Be in MODE 5 . 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Verify water level of UHS is ~ 568.25 ft above 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> mean sea level.

SR 3.7.9.2 Verify water temperature of UHS is :.: ; 81.5°F. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

  • Palisades Nuclear Plant 3.7.9-1 Amendment No.

CRV Filtration 3.7.10

  • 3. 7 PLANT SYSTEMS
3. 7.1 O Control Room Ventilation (CRV) Filtration LCO 3. 7 .10 Two CRV Filtration trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, 4, During CORE ALTERATIONS,

  • During movement of irradiated fuel assemblies, During movement of a fuel cask in or over the Spent Fuel Pool (SFP).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME .

A. One CRV Filtration train A.1 Restore CRV Filtration *?days inoperable. train to OPERABLE status .

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met in MODE 1, 2, 3, or 4.

B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades Nuclear Plant 3.7.10-1 Amendment No.

CRV Filtration 3.7.10

  • ACTIONS C.

CONDITION Required Action and C. 1 REQUIRED ACTION Place OPERABLE CRV COMPLETION TIME Immediately associated Completion Filtration train in Time of Condition A not emergencx mode.

met during CORE AL TERATIONS, during OR movement of irradiated fuel assemblies, or during C.2.1 Suspend CORE Immediately movement of a fuel cask in ALTERATIONS.

or over the SFP.

AND C.2.2 Suspend movement of Immediately irradiated fuel assemblies.

AND C.2.3 Suspend movement of Immediately a fuel cask in or over the SFP.

D. Two CRV Filtration trains D. 1 Suspend CORE Immediately inoperable during CORE ALTERATIONS.

AL TERATIONS, during movement of irradiated AND fuel assemblies, or during movement of a fuel cask in D.3 Suspend movement of Immediately or over the SFP. a fuel cask in or over the SFP.

E. Two CRV Filtration trains E.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or4 .

  • Palisades Nuclear Plant 3.7.10-2 Amendment No.

CRV Filtration 3.7.10

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.10.1 Operate each CRV Filtration train for :::: 1O 31 days continuous hours with associated heater (VHX-26A or VHX-268) operating.

SR 3.7.10.2 Perform required CRV Filtration filter testing in In accordance with accordance with Ventilation Filter Testing the Ventilation Filter Program. Testing Program SR 3.7.10.3 -----------------------------1\J()TE-----------------------------

Only required to be met in M()DES 1, 2, 3, and 4, and during movement of irradiated fuel assemblies in containment.

  • Verify each CRV Filtration train actuates on an actual or simulated actuation signal.

18 months SR 3.7.10.4 Verify one CRV Filtration train can maintain a 18 months positive pressure of :::: 0.125 inches water gauge, relative to the adjacent area during the emergency mode of operation, at an emergency ventilation flow rate of:::: 3040 cfm and :s:: 3520 cfm .

  • Palisades Nuclear Plant 3.7.10-3 Amendment No.

CRV Cooling 3.7.11

  • 3. 7 PLANT SYSTEMS 3.7.11 Control Room Ventilation (CRV) Cooling LCO 3. 7 .11 Two CRV Cooling trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, 4, During _CORE ALTERATIONS, During movement of irradiated fuel assemblies, During movement of a fuel cask in or over the Spent Fuel Pool (SFP).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME .

A. One CRV Cooling train A.1 Restore CRV Cooling *30 days inoperable. train to OPERABLE

  • B. Required Action and associated Completion B.1 status .

Be in MODE 3. 6_hours Time of Condition A not AND met in MODE 1, 2, 3, or 4.

B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • Palisades Nuclear Plant 3.7.11-1 Amendment No.

CRV Cooling 3.7.11

    • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Place OPERABLE CRV Immediately associated Completion Cooling train in Time of Condition A not operation.

met during CORE I

ALTERATIONS, during OR movement of irradiated fuel assemblies, or C.2.1 Suspend CORE Immediately movement of a fuel cask in AL TERATIONS.

or over the SFP.

AND C.2.2 Suspend movement of Immediately irradiated fuel assemblies.

AND I

    • C.2.3 Suspend movement of a fuel cask in or over the SFP.

Immediately D. Two CRV Cooling trains D.1 Suspend CORE Immediately inoperable during CORE ALTERATIONS.

ALTERATIONS, during movement of irradiated AND "

fuel assemblies, or movement of a fuel cask in D.2 Suspend movement of Immediately or over the SFP. irradiated fuel assemblies.

AND D.3 Suspend movement of Immediately a fuel cask in or over the SFP .

  • Palisades Nuclear Plant 3.7.11-2 Amendment No.

CRV Cooling 3.7.11

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two CRV Cooling trains E.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or4.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Verify each CRV Cooling train has the capability to 18 months remove the assumed heat load .

  • Palisades Nuclear Plant 3.7.11-3 Amendment No.

Fuel Handling Area Ventilation System 3.7.12

  • 3.7 PLANT SYSTEMS
3. 7.12 Fuel Handling Area Ventilation System LCO 3.7.12 The Fuel Handling Area Ventilation System shall be OPERABLE with one fuel handling area exhaust fan aligned to the emergency filter bank and in operation.

APPLICABILITY: During movement of irradiated fuel assemblies in the fuel handling building when irradiated fuel assemblies with < 30 days decay time are in the fuel handling building, During movement of a fuel cask in or over the SFP when irradiated fuel assemblies with < 90 days decay time are in the fuel handling building, During CORE AL TERATIONS when irradiated fuel assemblies with

< 30 days decay time are in the containment with the equipment hatch open, During movement of irradiated fuel assemblies in the containment when irradiated fuel assemblies with < 30 days decay time are in the containment with the equipment hatch open.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Fuel Handling Area A.1 Suspend movement of Immediately Ventilation System not fuel assemblies.

aligned or in operation.

AND OR A.2 Suspend CORE Immediately Fuel Handling Area AL TERATIONS.

Ventilation System inoperable. AND A.3 Suspend movement of Immediately a fuel cask in or over the SFP .

  • Palisades Nuclear Plant 3.7.12-1 Amendment No.

Fuel Handling Area Ventilation System 3.7.12

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.12.1 Perform required Fuel Handling Area Ventilation In accordance with
  • System filter testing in accordance with the the Ventilation Filter Ventilation Filter Testing Program. Testing Program SR 3.7.12.2 Verify the flow rate of the Fuel Handling Area 18 months Ventilation System, when aligned to the emergency filter bank, is ~ 5840 cfm and

~ 8760 cfm .

  • Palisades Nuclear Plant 3.7.12-2 Amendment No.

ESRV Dampers 3.7.13

  • 3. 7 PLANT SYSTEMS
3. 7.13 Engineered Safeguards Room Ventilation (ESRV) Dampers LCO 3.7.13 Two ESRV Damper trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more ESRV A.1 Initiate action to isolate Immediately Damper trains inoperable. associated ESRV Damper train(s) .

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.13.1 Verify each ESRV Damper train closes on an 31 days actual or simulated actuation signal.

  • Palisades Nuclear Plant 3.7.13-1 Amendment No.

SFP Water Level 3.7.14

  • 3. 7 PLANT SYSTEMS 3.7.14 Spent Fuel Pool (SFP) Water Level LCO 3.7.14 The SFP water level shall be~ 647 ft elevation.

NOTE------------------------------------------

S FP level may be below the 647 ft elevation to support fuel cask movement, if the displacement of water by the fuel cask wh~n submerged in the SFP, would raise SFP level to~ 647 ft elevation.


~-----------------------------------------------

APPLICABILITY: During movement of irradiated fuel assemblies in the SFP, During movement of a fuel cask in or over the SFP.

ACTIONS


N()TE-----------------------------------------------------------

LCO 3.0.3 is not applicable .

  • A.

CONDITION SFP water level not within limit.

A.1 REQUIRED ACTION Suspend movement of irradiated fuel COMPLETION TIME Immediately assemblies in SFP.

A.2 Suspend movement of Immediately fuel cask in or over the SFP.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.14.1 Verify the SFP water level is ~ 647 ft elevation. 7 days

  • Palisades Nuclear Plant 3.7.14-1 Amendment No.

SFP Boron Concentration 3.7.15

  • 3. 7 PLANT SYSTEMS
3. 7.15 Spent Fuel Pool (SFP) Boron Concentration LCO 3.7.15 The SFP boron concentration shall be ~ 1720 ppm.

APPLICABILITY: When fuel assemblies are stored in the SFP and a verification of the stored assemblies has not been performed since the last movement of fuel assemblies in the SFP.

ACTIONS


NOTE------------------------------------------------------------

LCO 3.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.15.1 Verify the SFP boron concentration is within limit. 7 days

  • Palisades Nuclear Plant 3.7.15-1 Amendment No.

Spent Fuel Assembly Storage 3.7.16

  • 3. 7 PLANT SYSTEMS 3.7.16 Spent Fuel Assembly Storage LCO 3.7.16 The combination of initial enrichment and burnup of each spent fuel assembly stored in Region II shall be within the requirements of Table 3.7.16-1.

APPLICABILITY: Whenever any fuel assembly is stored in Region II of either the spent fuel pool or the north tilt pit.

ACTIONS


1\JOTE---------------------------------------------------------

LCO 3.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the LCO A.1 Initiate action to move Immediately not met. the noncomplying fuel assembly from Region II.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.16.1 Verify by administrative means the initial Prior to storing the enrichment and burnup of the fuel assembly is in fuel assembly in accordance with Table 3.7.16-1 . Region II

  • Palisades Nuclear Plant 3.7.16-1 Amendment No.

Spent Fuel Assembly Storage 3.7.16

  • TABLE 3.7.16-1(page1of1)

Spent Fuel Burnup Requirements for Storage in Region II of the Spent Fuel Pool and North Tilt Pit Discharge Burnup Initial Enrichment in Gigawatt Days per Weight % of U235 Metric Ton 1.5 0 1.6 1.9 1.8 5.2 2.0 8.5 2.2 11.5 2.4 14.1 2.6 16.6 2.8 18.8 3.0 20.9 3.2 22.9 3.27 23.5

  • Linear interpolation between two consecutive points will yield conservative results .
  • Palisades Nuclear Plant 3.7.16-2 Amendment No.

Secondary Specific Activity 3.7.17

  • 3. 7 PLANT SYSTEMS
3. 7.17 Secondary Specific Activity LCO 3.7.17 The specific activity of the secondary coolant shall be ~ 0.1 OµCi/gm DOSE EQUIVALENT 1-131.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Specific activity not within A.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> limit.

    • A.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.17.1 Verify the specific activity of the secondary coolant is 31 days within limit.

~*

Palisades Nuclear Plant 3.7.17-1 Amendment No.

AC Sources - Operating 3.8.1

  • 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:
a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and
b. Two Diesel Generators (DGs) each capable of supplying one train of the onsite Class 1E AC Electrical Power Distribution System.
  • APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

A.1 Perform SR 3.8.1.1 (offsite source check) for OPERABLE offsite circuit.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter A.2 Restore offsite circuit to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

10 days from discovery of failure to meet LCO

  • Palisades Nuclear Plant 3.8.1-1 Amendment No.

AC Sources - Operating 3.8.1

  • ACTIONS 8.

CONDITION One DG inoperable. 8.1 REQUIRED ACTION Perform SR 3.8.1.1 COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (offsite source check) for the OPERABLE AND offsite circuit(s).

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND 8.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s) supported by discovery of the inoperable DG Condition 8 inoperable when its concurrent with redundant required inoperability of feature(s) is inoperable. redundant required feature(s)

AND 8.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (start test) for OPERABLE DG.

AND B.4 Restore DG to 7 days OPERABLE status.

AND 10 days from discovery of failure to meet LCO

  • Palisades Nuclear Plant 3.8.1-2 Amendment No.

AC Sources - Operating 3.8.1

  • ACTIONS C.

CONDITION Two offsite circuits C.1 REQUIRED ACTION Declare required COMPLETION TIME 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from inoperable. feature(s) inoperable discovery of when its redundant Condition C required feature(s) is concurrent with inoperable. inoperability of redundant required feature(s)

AND C.2 Restore one offsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> circuit to OPERABLE status.

D. One offsite circuit ------------------NOTE------------------

inoperable. Enter applicable Conditions and Required Actions of LCO 3.8.9, AND "Distribution Systems -

Operating," when Condition D is One DG inoperable. entered with no AC power source to any train.

D.1 Restore offsite circuit to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.

OR D.2 Restore DG to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status. '

E. Two DGs inoperable. E.1 Restore one DG to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OPERABLE status.

  • Palisades Nuclear Plant 3.8.1-3 Amendment No.

AC Sources - Operating 3.8.1

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. Required Action and F.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Associated Completion Time of Condition A, B, C, AND D, or E not met.

F.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> G. Three or more AC sources G.1 Enter LCO 3.0.3. Immediately inoperable.

SURVEILLANCE REQUIREMENTS .

SURVEILLANCE . FREQUENCY

  • SR .3.8.1.1 Verify correct breaker alig.nrrient and voltage for each offsite circuit.

7 days SR 3.8.1~2 Verify each DG starts from standby conditions and 31 days achieves:

a. In ~ 10 seconds, ready-to-load status; and b., Steady state voltage~ 2280 V and

.~ 2520 V, and frequency~ 59.5 Hz and

~ 61.2 Hz.

Palisades Nuclear Plant 3.8.1-4 Amendment No.

(

AC Sources - Operating 3.8.1


NOTES---------------------------

FREQUENCY

1. Momentary transients outside the load range do not invalidate this test.
2. This Surveillance shall be conducted on only one DG at a time.
3. This Surveillance shall be preceded by and immediately follow without shutdown a

Verify each DG is synchronized and loaded, and 31 days operates for ~ 60 minutes:

a. For ~ 15 minutes loaded to greater than or equal to peak accident load; and
b. For the remainder of the test at a load

~ 2300 kW and ~ 2500 kW.

SR 3.8.1.4 Verify each day tank contains~ 2500 gallons of 31 days fuel oil.

SR 3.8.1.5 Verify each DG rejects a load greater than or 18 months equal to its associated single largest post-accident load, and:

a. Following load rejection, the frequency is

~ 68 Hz;

b. Within 3 seconds following load rejection, the voltage is ~ 2280 V and ~ 2640 V; and
c. Within 3 seconds following load rejection, the frequency is~ 59.5 Hz and ~ 61.5 Hz .
  • Palisades Nuclear Plant 3.8.1-5 Amendment No.

AC Sources - Operating 3.8.1

  • SURVEILLANCE REQUIREMENTS SR 3.8.1.6 SURVEILLANCE Verify each DG, operating at a power factor ~ 0.9, FREQUENCY 18 months does not trip, and voltage is maintained ~ 4000 V during and following a load rejection of ~ 2300 kW and ~ 2500 kW.

SR 3.8.1.7 -------------------~---------N()TE-----------------------------

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify on an actual or simulated loss of offsite 18 months power signal:

a. De-energization of emergency buses;
b. Load shedding from emergency buses;
  • c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in ~ 1O seconds,
2. energizes auto-connected shutdown loads through automatic load sequencer,
3. maintains steady state voltage

~ 2280 V and ~ 2520 V,

4. maintains steady state frequency

~ 59.5 Hz and ~ 61.2 Hz, and

5. supplies permanently connected loads for~ 5 minutes .
    • Palisades Nuclear Plant 3.8.1-6 Amendment No.
  • AC Sources - Operating 3.8.1

-~---~-----------------------N()TE-----------------------------

FREQUENCY Momentary transients outside the load and power factor ranges do not invalidate this test.

Verify each DG, operating at a power factor ~ 0.9, 18 months operates for ~ 24 .hours:*

a. For ~ 100 minutes loaded ~ its peak accident loading; and
b. For the remaining hours of the test loaded

~ 2300 kW and ~ 2500 kW.

SR 3.8.1.9 -----------------------------1\J()TE----~-----------------------

This Surveillance shall not be performed in

  • MODE 1, 2, 3, or4 .

Verify each DG: 18 months

a. Synchronizes with offsite power source while supplying its associated 2400 V bus upon a simulated restoration of offsite power;
b. Transfers loads to offsite power source; and
c. Returns to ready-to-load operation .
  • Palisades Nuclear Plant 3.8.1-7 Amendment l'Jo.

AC Sources - Operating 3.8.1

  • SURVEILLANCE REQUIREMENTS SR 3.8.1.10 SURVEILLANCE

N()TE-----------------------------

FREQUENCY This Surveillance shall not be performed in MODE 1, 2, 3, or4.

Verify the time of each sequenced load is within 18 months

+/- 0.3 seconds of design timing for each automatic load sequencer.

SR 3.8.1.11 ~------------~---------------N()TE-~--~--------~--------------*

This Surveillance shall not be performed in MODE 1, 2, 3, or4.

Verify on an .actual or simulated loss of offsite 18 months power signal in conjunction with an actual or_.

simulated. safety injection signal:

a. De-energization of emergency buses; bi Load shedding from emergency buses;
c. DG auto-starts from standby condition and:
1.
  • energizes permanently connected loads in ~ 10 seconds,
2. energizes auto~connected emergency loads through its automatic load sequencer,
3. achieves steady state voltage
2280 V and ~ 2520 V,
4. achieves steady state frequency
59.5 Hz and ~ 61.2 Hz, and
5. supplies permanently connected loads for :::: 5 minutes .
  • Palisades Nuclear Plant 3.8.1-8 Amendment No.

AC Sources - Shutdown 3.8.2

  • 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources - Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:
a. One qualified circuit between the offsite transmission network and the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.10, "Distribution Systems - Shutdown"; and
b. One Diesel Generator (DG) capable of supplying one train of the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.10.

APPLICABILITY: MODES 5 and 6, During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. The required offsite circuit -----------------NOTE-------------------

inoperable. Enter applicable Conditions and Required Actions of LCO 3.8.10, with one required train de-energized as a result of Condition A.

A.1 Declare affected Immediately required feature(s) with no offsite power available inoperable.

A.2.1 Suspend CORE Immediately ALTERATIONS.

(continued)

Palisades Nuclear Plant 3.8.2-1 Amendment No.

AC Sources - Shutdown 3.8.2

  • ACTIONS A.

CONDITION (continued) A.2.2 REQUIRED ACTION Suspend movement of COMPLETION TIME Immediately irradiated fuel assemblies.

AND A.2.3 Initiate action to Immediately suspend operations involving positive reactivity additions.

AND A.2.4 Initiate action to restore Immediately required offsite power circuit to OPERABLE status .

B.1 AND Suspend CORE ALTERATIONS.

Immediately B.2 Suspend movement of Immediately irradiated fuel assemblies.

AND B.3 Initiate action to Immediately suspend operations involving positive reactivity additions.

AND B.4 Initiate action to restore Immediately required DG to OPERABLE status .

  • Palisades Nuclear Plant 3.8.2-2 Amendment No.

AC Sources - Shutdown 3.8.2

  • Palisades Nuclear Plant 3.8.2-3 Amendment No.

Diesel Fuel, Lube Oil, and Starting Air 3.8.3

  • 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel, Lube Oil, and Starting Air LCO 3.8.3 For each Diesel Generator (DG):
a. The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits, and
b. Both diesel fuel oil transfer systems shall be OPERABLE.

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each DG .

CONDITION REQUIRED ACTION COMPLETION TIME

  • A. Fuel oil inventory

< 23, 700 gallons and

> 20, 11 O gallons in storage tank.

A.1 Restore fuel oil inventory to within limits.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> B. Stored lube oil inventory B.1 . Restore stored lube oil 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />

< 200 gallons and inventory to within limits.

> 160 gallons.

I C. Fuel transfer system C. 1 Restore fuel transfer 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> (P-18A) inoperable. system to OPERABLE status .

  • Palisades Nuclear Plant 3.8.3-1 Amendment No.

I

Diesel Fuel, Lube Oil, and Starting Air 3.8.3

  • ACTIONS D.

CONDITION Fuel transfer system D. 1 REQUIRED ACTION Restore fuel transfer COMPLETION TIME 7 days (P-18B) inoperable. system to OPERABLE I status.

E..1 Restore one fuel 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> E. Both fuel transfer systems transfer system to inoperable. OPERABLE status.

F. Fuel oil properties other F.1 Restore stored fuel oil 30 days than viscosity, and water properties to within and sediment, not within limits.

limits .

  • G. Required Action and associated Compl~tion

. Time not met.

OR G.1 Declare associated DG(s) inoperable.

Immediately Stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than Condition A, B, or F.

  • Palisades Nuclear Plant 3.8.3-2 Amendment. No.

Diesel Fuel, Lube Oil, and Starting Air 3.8.3

  • SURVEILLANCE REQUIREMENTS SR 3.8.3.1 SURVEILLANCE Verify the fuel oil storage tank contains FREQUENCY 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
23, 700 gallons of fuel.

SR 3.8.3.2 Verify stored lube oil inventory is ;:: 200 gallons. 31 days SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are In accordance tested in accordance with, and maintained within the with the Fuel Oil limits of, the Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify each DG air start receiver pressure is 31 days

200 psig .
  • SR *3.8.3.5 Check for and remove excess accumulated water from the fuel oil storage tank.

92 days SR 3.8.3.6 Verify the fuel oil transfer system operates to transfer 92 days fuel oil from the fuel oil storage tank to each DG day tank and engine mounted tank .

  • Palisades Nuclear Plant 3.8.3-3 Amendment No.

DC Sources - Operating 3.8.4

/

  • 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources - Operating LCO 3.8.4 The Left Train and Right Train DC electrical power sources shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS I

- CONDITION REQUIRED ACTION COMPLETION TIME.

A. One required DC electrical A.1 Verify* functional 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power ~~urce battery cross-connected battery charger inoperable. charger is connected supplying power to the affected DC train.

AND

\ I A.2 Restore required DC 7 days electrical power source battery charger to OPERABLE status.

B. One required DC electrical B.1 Verify OPERABLE 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power source battery directly connected and inoperable. functional cross-connected battery chargers are connected supplying power to the affected DC train.

AND B.2 Restore required DC 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> electrical power source battery to OPERABLE status .

  • Palisades Nuclear Plant 3:8.4-1 Amendment No.

DC Sources - Operating 3.8.4

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is ~ 125 V on float 7 days charge .

  • SR 3.8.4.2 Verify no visible corrosion at battery terminals and connectors.

92 days Verify battery connection resistance is

~ 50 µohm for inter-cell connections, ~ 360 µohm for inter-rack connections, and ~ 360 µohm for inter-tier connections.

SR 3.8.4.3 Inspect battery cells, cell plates, and racks for 12 months visual indication of physical damage or abnormal deterioration that could degrade battery performance .

  • Palisades Nuclear Plant 3.8.4-2 Amendment No.

DC Sources - Operating 3.8.4

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.4 Remove visible terminal corrosion and verify 12 months battery cell to cell and terminal connections are coated with anti-corrosion material.

SR 3.8.4.5 Verify battery connection resistance is 12 months

~ 50 µohm for inter-cell connections, ~ 360 µohm for inter-rack connections, and ~ 360 µohm for inter-tier connections.

SR 3.8.4.6 Verify each required battery charger supplies 18 months

<: 180 amps at :<: 125 V for :<: 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> .
  • SR 3.8.4.7 -----------------------------NOTES---------------------------
1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7.
2. This Surveillance shall not be performed in MODE 1, 2, 3, or4.

Verify battery capacity is adequate to supply, and 18 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

~-

Palisades Nuclear Plant 3.8.4-3 Amendment No.

DC Sources - Operating 3.8.4

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.8 -------------------------------NOTE---------------------------

Th is 3urveillance shall not be performed in MODE 1, 2, 3, or4.

Verify battery capacity is ~ 80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.

12 months when battery shows degradation or has reached 85% of the expected life with capacity < 100% of manufacturer's rating

  • 24 months when battery has reached 85% of the expected life with capacity

~ 100% of manufacturer's rating

  • Palisades Nuclear Plant 3.8.4-4 Amendment No.

DC Sources - Shutdown 3.8.5

  • 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources - Shutdown
  • LCO 3.8.5 DC electrical power source(s) shall be OPERABLE to support the DC electrical power distribution subsystem(s) required by LCO 3.8.10, "Distribution Systems - Shutdown."

APPLICABILITY: MODES 5 and 6, During movement of irrad.iated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required DC A.1 Declare affected Immediately electrical power sources required feature(s) inoperable . inoperable.

OR A.2.1 Suspend CORE Immediately ALTERATIONS.

AND A.2.2 Suspend movement of Immediately irradiated fuel assemblies.

AND A.2.3 Initiate action to Immediately suspend operations involving positive reactivity additions.

AND (continued)

  • Palisades Nuclear Plant 3.8.5-1 Amendment No.

DC Sources - Shutdown 3.8.5

  • ACTIONS A.

CONDITION (continued) A.2.4 REQUIRED ACTION Initiate action to restore COMPLETION TIME Immediately required DC electrical power source(s) to OPERABLE status.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 For DC sources required to be OPERABLE, the *1n accordance with following SRs are applicable: applicable SRs SR 3.8.4.1 SR 3.8.4.3 SR 3.8.4.5 SR 3.8.4.2 SR 3.8.4.4 SR 3.8.4.6 .

  • Palisades Nuclear Plant 3.8.5-2 Amendment No.

Battery Cell Parameters 3.8.6

  • 3.8 ELECTRICAL POWER SYSTEMS
  • 3.8.6 Battery Cell Parameters LC0*3.8.6 Battery cell parameters for the Left Train and Right Train batteries shall be within limits.

APPLICABILITY: When associated DC electrical p*ower source(s) are required to be OPERABLE.

ACTIONS


~-----------------------N()TE----------------------------------------------------------*

Separate Condition entry is allowed for each battery.

C()NDITl()N REQU_IRED ACTION COMPLETl()N TIME

  • A. ()ne or more batteries with one or more battery cell parameters not within Category A or B limits.

A.1 Verify pilot cells electrolyte level and float voltage meet Table 3.8.6-1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Category C limits.

AND A.2 Verify battery cell 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> parameters meet Table 3.8.6-1 AND Category C limits.

()nee per 7 days thereafter AND A.3 Restore battery cell 31 days parameters to Category A and B limits of Table 3.8.6-1 .

  • Palisades Nuclear Plant 3.8.6-1 Amendment No.

Battery Cell Parameters 3.8.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and 8.1 Declare associated Immediately associated Completion battery inoperable.

Time of Condition A not met.

OR One or more batteries with average electrolyte temperature of the representative cells

< 70°F.

OR One or more batteries with one or more battery cell parameters not within Category C limits .

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.1 Verify battery cell parameters meet Table 3.8.6-1 31 days Category A limits.

SR 3.8.6.2 Verify average electrolyte temperature of 31 days representative cells is ~ ?0°F.

SR 3.8.6.3 Verify battery cell parameters meet Table 3.8.6-1 92 days Category B limits .

  • Palisades Nuclear Plant 3.8.6-2 Amendment No.

Battery Cell Parameters

. 3.8.6

  • Table 3.8.6-1 (page 1 of 1)

Battery Surveillance Requirements CATEGORY A: CATEGORY B: CATEGORYC:

NORMAL LIMITS NORMAL LIMITS ALLOWABLE FOR EACH FOR EACH LIMITS FOR EACH DESIGNATED CONNECTED CONNECTED PARAMETER PILOT CELL CELL CELL Electrolyte Level > Minimum level > Minimum level Above top of plates, indication mark, and indication mark, and and not overflowing

~ 'Y4 inch above ~* Y.a inch above maximum level maximum level indication mark(a) indication mark(a)

Float Voltage ~ 2.13 v ~ 2.13 v > 2.07 v

AND 1.200 Not more than 0.020 below average connected cells Average of connected cells AND

~ 1.205 Average of all connected cells

~ 1.195 (a) It is acceptable for the electrolyte level to temporarily increase above the specified maximum during equalizing charges provided it is not overflowing.

(b) Corrected for electrolyte temperature and level. Level correction is not required, however, when battery charging is < 2 amps when on float charge.

(c) A battery charging current of< 2 amps when on float charge is acceptable for meeting specific gravity limits .

Palisades Nuclear Plant 3.8.6-3 Amendment No.

Inverters - Operating 3.8.7

  • 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters - Operating LCO 3.8.7 Four invert.ers shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A One inverter inoperable. -----------------NOTE------------------

Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems -

Operating" with any Preferred AC bus de-energized.

A.1 Restore inverter to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correctinverter voltage, frequency, and 7 days alignment to Preferred AC buses .

  • Palisades Nuclear Plant 3.8.7-1 Amendment No.

Inverters - Shutdown 3.8.8

  • 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Inverters - Shutdown LCO *3.8.8 lnverter(s) shall be OPERABLE to support the onsite Class 1E Preferred AC bus electrical power distribution subsystem(s) required by LCO 3.8.10, "Distribution Systems - Shutdown."

APPLICABILITY: MODES 5 and 6, During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Declare affected Immediately inverters inoperable. required feature(s) inoperable.

OR A.2.1 Suspend CORE Immediately ALTERATIONS.

AND A.2.2 Suspend movement of Immediately irradiated fuel assemblies.

AND A.2.3 Initiate action to Immediately suspend operations involving positive reactivity additions.

AND A.2.4 Initiate action to restore Immediately required inverters to OPERABLE status .

  • Palisades Nuclear Plant 3.8.8-1 Amendment No.

Inverters - Shutdown 3.8.8

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct inverter voltage, frequency, and 7 days alignment to required Preferred AC buses .
  • Palisades Nuclear Plant 3.8.8-2 Amendment No.

Distribution Systems - Operating 3.8.9

  • 3.8 ELECTRICAL POWER SYSTEMS
3. 8. 9 Distribution Systems - Operating LCO 3.8.9 Left Train and Right Train AC, DC, and Preferred AC bus electrical power distribution subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

Ar.TION~

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more AC electrical A.1 Restore AC eleCtrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> power distribution power distribution subsystems in one train subsystem(s) to AND inoperable. OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to*

meet LCO B. One Preferred AC bus B.1 Restore Preferred AC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable. bus to OP~RABLE status. AND I

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO C. One or more DC electrical C.1 Restore DC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> power distribution power distribution subsystems in one train subsystem(s) to AND inoperable. OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO

  • Palisades Nuclear Plant 3.8.9-1 Amendment No.

Distribution Systems - Operating 3.8.9

  • ACTIONS D.

CONDITION Required Action and D.1 REQUIRED ACTION Be in MODE 3.

COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND D.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E. Two or more inoperable E.1 Enter LCO 3.0.3. Immediately distribution subsystems that result in a loss of function.

SURVEILLANCE REQUIREMENTS

  • SR 3.8.9.1 SURVEILLANCE Verify correct breaker alignments and voltage to required AC, DC, and Preferred AC bus electrical FREQUENCY 7 days power distribution subsystems .
  • Palisades Nuclear Plant 3.8.9-2 Amendment No.

Distribution Systems - Shutdown 3.8.10

  • 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 O Distribution Systems - Shutdown LCO 3.8.10 The necessary portion of AC, DC, and Preferred AC bus electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.

APPLICABILITY: MODES 5 and 6, .

During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required AC, A.1 Declare associated Immediately DC, or Preferred AC bus supported required electrical power distribution feature(s) inoperable.

subsystems inoperable.

OR A.2.1 Suspend CORE Immediately ALTERATIONS.

AND A.2.2 Suspend movement of ,Immediately irradiated fuel assemblies.

AND A.2.3 Initiate action to Immediately suspend operations involving positive reactivity additions.

AND (continued)

  • Palisades Nuclear Plant 3.8.10-1 Amendment No.

Distribution Systems - Shutdown 3.8.10

  • ACTIONS A

CONDITION (continued) A.2.4 REQUIRED ACTION Initiate actions to COMPLETION TIME Immediately restore required AC, DC, and Preferred AC bus electrical power distribution subsystems to OPERABLE status.

A.2.5 Declare associated Immediately required shutdown cooling train inoperable and not in operation.

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE .FREQUENCY SR 3.8.10.1 Verify correct breaker alignments and voltage to 7 days required AC, DC, and Preferred AC bus electrical power distribution subsystems .
  • Palisades Nuclear Plant 3.8.10-2 Amendment No.

Boron Concentration 3.9.1

  • 3.9 REFUELING OPERATIONS 3.9.1 Boron Concentration LCO 3.9.1 Boron concentrations of the Primary Coolant System and the refueling cavity shall be maintained at the REFUELING BORON CONCENTRATION.

APPLICABILITY: MODE 6.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

' A. Boron concentration not A.1 Suspend CORE Immediately within limit. AL TERATIONS.

AND

  • A.2 AND Suspend positive reactivity additions.

Immediately A.3 Initiate action to restore Immediately boron concentration to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.1.1 Verify boron concentration is at the REFUELING 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> BORON CONCENTRATION .

  • Palisades Nuclear Plant 3.9.1-1 Amendment No.

Nuclear Instrumentation 3.9.2

  • 3.9 REFUELING OPERATIONS 3.9.2 Nuclear Instrumentation LCO 3.9.2 Two source range channels shall be OPERABLE.

APPLICABILITY: MODE 6.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One source range channel A.1 Suspend CORE Immediately inoperable. AL TERATIONS.

AND A.2 Suspend positive Immediately reactivity ~dditions .

B. Two source range B.1 Initiate action to restore Immediately channels inoperable. one source range channel to OPERABLE status.

AND B.2 Perform SR 3.9.1.1 Once per (PCS boron 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> concentration verification) .

  • Palisades Nuclear Plant 3.9.2-1 Amendment No.

Nuclear Instrumentation 3.9.2

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.9.2.2 -----------------------------N()l"E------------------------------

Neutron detectors are excluded from the CHANNEL CALIBRA"fl()N.

Perform CHANNEL CALIBRA"fl()N . 18 months

  • Palisades Nuclear Plant 3.9.2-2 Amendment No.

Containment Penetrations 3.9.3

  • 3.9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 The containment penetrations shall be in the following status:
a. The equipment hatch closed and held in place by four bolts;

N()TE------------------------------------------

The equipment hatch is only required to be closed when the Fuel Handling Area Ventilation System is not in compliance with LCO 3. 7 .12, "Fuel Handling Area Ventilation System."

b. One door in the personnel air lock closed;

NOTE--------------------------------------------

()ne door in the personnel air lock is only required to be closed ~hen the equipment hatch is closed.

  • c.

d.

1.

One door in the emergency air lock closed; and Each penetration providing direct access from the containment atmosphere to the outside atmosphere either:

closed by a manual or automatic isolation valve, blind flange, or equivalent, or

2. capable of being closed by an OPERABLE Refueling Containment High Radiation Initiation signal.

APPLICABILITY: During CORE AL TERATIONS, During movement of irradiated fuel assemblies within containment.

  • Palisades Nuclear Plant 3.9.3-1 Amendment No.

Containment Penetrations 3.9.3

  • ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more containment A.1 Suspend CORE Immediately penetrations not iri ALTERATIONS.

required status.

A.2 Suspend movement of Immediately irradiated fuel assemblies within containment.

SURVEILLANCE REQUIREMENTS

  • SR 3.9.3.1 SURVEILLANCE Verify each required to be met containment penetration is in the required status.

FREQUENCY 7 days SR 3.9.3.2 -----------------------------NOTE-----------------------------

Only required to be met for unisolated containment penetrations.

Verify each required automatic isolation valve 18 months closes on an actual or simulated Refueling Containment High Radiation signal.

  • Palisades Nuclear Plant 3.9.3-2 Amendment No.

SOC and Coolant Circulation - High Water Level 3.9.4

  • ' )

3.9 REFUELING OPERATIONS 3.9.4 Shutdown Cooling (SOC) and Coolant Circulation - High Water Level One SOC train shall be OPERABLE and in operation.


NOTES------------------------------------------

1. The required SOC train may not be in operation for ~ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause reduction of the Primary Coolant System boron concentration.
2. The required SOC train may be made inoperable for ~ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period for testing or maintenance, provided one SOC train is in operation providing flow through the reactor core, and core outlet temperature is ~ 200°F.

APPLICABILITY: MODE 6 with the refueling cavity water level ~ 647 ft elevation.

  • =AC=-T=l=O=N=S==============::::;=====================::::;==============

CONDITION REQUIRED ACTION COMPLETION TIME A. One required SOC train A.1 Initiate action to restore Immediately inoperable or not in SOC train to operation. OPERABLE status and operation.

A.2 Suspend operations Immediately involving a reduction in primary coolant boron concentration.

(continued)

  • Palisades Nuclear Plant 3.9.4-1 Amendment No.

SOC and Coolant Circulation - High Water Level 3.9.4

  • ACTIONS CONDITION A (continued) A.3 REQUIRED ACTION Suspend loading COMPLETION TIME Immediately irradiated fuel assemblies in the core.

A.4 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment atmosphere to outside atmosphere.

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.4.1 Verify one SOC train is in operation and circulating 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> primary coolant at a flow rate of~ 1000 gpm .
  • Palisades Nuclear Plant 3.9.4-2 Amendment No.

SOC and Coolant Circulation - Low Water Level 3.9.5

APPLICABILITY: MODE 6 with the refueling cavity water level < 647 ft elevation.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SOC train inoperable. A.1 Initiate action to restore Immediately SOC train to OPERABLE status .

  • A.2 Initiate action to establish the refueling cavity water level

~ 647 ft elevation .

Immediately

  • Palisades Nuclear Plant 3.9.5-1 Amendment No.

SOC and Coolant Circulation - Low Water Level 3.9.5

  • ACTIONS B.

CONDITION No SOC train OPERABLE B.1 REQUIRED ACTION Suspend operations COMPLETION TIME Immediately or in operation. involving a reduction in primary coolant boron concentration.

AND B.2 Initiate action to restore Immediately one SOC train to OPERABLE status and to operation.

AND B.3 Initiate action to close Immediately all containment penetrations providing direct access from

  • containment atmosphere to outside atmosphere.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.5.1 Verify one SOC train is in operation and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> circulating primary coolant at a flow rate of

~ 1000 gpm.

SR 3.9.5.2 Verify correct breaker alignment and indicated 7 days power available to the required SOC pump that is not in operation .

  • Palisades Nuclear Plant 3.9.5-2 Amendment No.

Refueling Cavity Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Refueling Cavity Water Level LCO 3.9.6 Th~ refueling cavity water level shall be maintained ~ 647 ft elevation.

APPLICABILITY: During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refueling cavity water A.I Suspend CORE Immediately level not within limit. ALTERATIONS .

  • A.2 Suspend movement of irradiated fuel assemblies within containment.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify refueling cavity water level is~ 647 ft 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> elevation .

  • Palisades Nuclear Plant 3.9.6-1 Amendment No.

Design Features 4.0

  • 4.0 4.1 DESIGN FEATURES Site Location The Palisades Nuclear Plant is located on property owned by Consumers Energy 6n the eastern shore of Lake Michigan approximately four and one-half miles south of the southern city limits of South Haven, Michigan. The minimum distance to the boundary of the exclusion area as defined in 10 CFR 100.3 shall be 677 meters.

4.2 Reactor Core 4.2.1 Fuel Assemblies The reactor core shall contain 204 fuel assemblies. Each assembly shall consist of a matrix of zircaloy-4 clad fuel rods with an initial composition of depleted, natural, or slightly enriched uranium dioxide (U02) as fuel material. Limited substitutions of zirconium alloy or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used.

Fuel assemblies shall be limited to those fuel designs that have been analyzed with applicable NRC staff approved codes and methods and shown by tests or

  • analyses to comply with all fuel safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions. A core plug or plugs may be used to replace cine or more fuel assemblies subject to the analysis of the resulting power distribution.

Poison may be placed in the fuel bundles for long-term reactivity control.

4.2.2 Control Rod Assemblies The reactor core shall contain 45 control rods. Four of these control rods may consist of part-length absorbers. The control material shall be silver-indium-cadmium, as approved by the NRC.

4.3 Fuel Storage 4.3.1 Criticality 4.3.1.1 The Region I fuel storage racks (See Figure B 3.7.16-1) are designed and shall be maintained with:

a. Fuel assemblies having a maximum enrichment of 4.40 weight percent;
  • Palisades Nuclear Plant 4.0-1 Amendment No.

Design Features 4.0

  • 4.0 DESIGN FEATURES 4.3 Fuel Storage 4.3.1 Criticality (continued)
b. Kett s 0.95 if fully flooded with unborated water, which includes allowances for uncertainties as described in Section 9.11 of the FSAR.
c. A nominal 10.25 inch center to center distance between fuel assemblies with the exception of the single Type E rack which has a nominal 11.25 inch center to center distance between fuel assemblies; and
d. New or partially spent fuel assemblies. Assemblies with enrichments above 3.27 weight percent U235 must contain 216 rods which are either U0 2 , Gd 20 3-U0 2 or solid metal.

4.3.1.2 The Region 11 fuel storage racks (See Figure B 3. 7 .16-1) are designed and shall be maintained with;

  • a.

b.

Fuel assemblies having maximum enrichment of 3.27 weight percent; Kett s 0.95 if fully flooded with unborated water, which includes allowance for uncertainties as described in Section 9.11 of the FSAR.

c. A nominal 9.17 inch center to center distance between fuel assemblies; and
d. Partially spent fuel assemblies which meet the discharge burnup requirements of Table 3. 7.16-1.

4.3.1.3 The new fuel storage racks are designed and shall be maintained with:

a. Fuel assemblies having a maximum average planar U235 enrichment of 4.20 weight percent;
b. Kett s 0.95 when flooded with either full density or low density (optimum moderation) water including allowances for uncertainties as described in Section 9.11 of the FSAR.
  • Palisades Nuclear Plant 4.0-2 Amendment No.

Design Features 4.0

  • 4.0 DESIGN FEATURES 4.3 Fuel Storage 4.3.1 Criticality (continued)
c. Assemblies must contain 216 rods which are either U02 ,

Gd 20 3-U0 2 or solid metal.

d. The pitch of the new fuel storage rack lattice being~ 9.375 inches and every other position in the lattice being permanently occupied by an 8" x 8" structural steel or core plugs, resulting in a nominal 13.26 inch center to center distance between fuel assemblies placed in alternating storage locations.

4.3 Fuel Storage 4.3.2 Drainage The spent fuel storage pool cooling system suction and discharge piping is designed and shall be maintained to prevent inadvertent draining of the pool

  • 4.3.3 below elevation 644 ft 5 inches .

Capacity The spent fuel storage pool and north tilt pit are designed and shall be maintained with a storage capacity limited to no more than 892 fuel assemblies.

Palisades Nuclear Plant 4.0-3 Amendment No.

Responsibility 5.1

  • 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility 5.1.1 The plant superintendent shall be responsible for overall plant operation and shall delegate in writing the succession for this responsibility during his absence.

The plant superintendent or his designee shall approve, prior to implementation, each proposed test, experiment or modification to systems or equipment that affect nuclear safety.

5.1.2 The Shift Supervisor (SS) shall be responsible for the control room command function. During any absence of the SS from the control room while the plant is in MODE 1, 2, 3, or 4, an individual with an active Senior Reactor Operator (SRO) license shall be designated to assume the control room command function. During any absence of the SS from the control room while the plant is in MODE 5 or 6 an individual with an active SRO license or Reactor Operator (RO) license shall be designated to assume the control room command function .

Palisades Nuclear Plant 5.0-1 Amendment No.

Organization 5.2

  • 5.0 ADMINISTRATIVE CONTROLS 5.2 Organization 5.2.1 Onsite and Offsite Organizations Onsite and offsite organizations shall be established for plant operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting the safety of the Palisades plant.
a. Lines of authority, responsibility and communication shall be established and defined for the highest management levels through intermediate levels to and including all operating organization positions. These relationships shall be documented, and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key positions, or in equivalent forms of documentation. These requirements and the plant specific equivalent of those titles referred to in these Technical Specifications shall be documented in the FSAR.
b. The plant superintendent shall be responsible for overall plant safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.
  • c. A specified corporate executive shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining and providing technical support to the plant to ensure nuclear safety.
d. The individuals who train the operating staff and those who carry out .

radiation safety and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence* from operating pressures.

5.2.2 Plant Staff

a. A non-licensed operator shall be assigned when fuel is in the reactor and an additional non-licensed operator shall be assigned when the reactor is operating in MODES 1, 2, 3, or 4.
b. At least one licensed Reactor Operator (RO) shall be present in the control room when fuel is in the reactor. In addition, while the plant is in MODES 1, 2, 3, or 4, at least one licensed Senior Reactor Operator (SRO) shall be present in the control room .
  • Palisades Nuclear Plant 5.0-2 Amendment No.

Organization 5.2

  • 5.2 Organization 5.2.2 Plant Staff (continued)
c. Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i), and 5.2.2.a and 5.2.2.g for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the requirements.
d. A radiation safety technician shall be on site when fuel is in the reactor.

The position may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.

e. Administrative procedures shall be developed and implemented to limit the working hours of plant staff who perform safety-related functions (e.g., licensed SROs, licensed ROs, radiation safety personnel, auxiliary operators, and key maintenance personnel).

In the event that overtime is used, the following guidelines shall be followed:

    • 1.

2.

An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, excluding shift turnover time; An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, nor more than 24. hours in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period, all excluding shift turnover time;

3. A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time;
4. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for ttie entire staff on a shift.

Any deviations from the overtime guidelines shall be authorized in advance by the plant superintendent or his designee, in accordance with approved administrative procedures, or by higher .levels of management, in accordance with established procedures and with documentation of the basis for granting* the deviation.

Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the plant superintendent or his designee to ensure that excessive hours have not been assigned. Routine deviation from the above guidelines is not authorized.

Palisades Nuclear Plant 5.0-3 Amendment No.

Organization 5.2

  • 5.2 Organization 5.2.2 Plant Staff (continued)
f. The operations manager or an assistant operations manager shall hold an SRO license. The individual holding the SRO license shall be responsible for directing the activities of the licensed operators.
g. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Supervisor (SS) in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the plant. If either SRO on shift satisfies the Shift Engineer qualification requirements, then the STA does not need to be stationed .
  • Palisades Nuclear Plant 5.0-4 Amendment No.

Plant Staff Qualifications 5.3

  • 5.0 ADMINISTRATIVE CONTROLS 5.3 Plant Staff Qualifications 5.3.1 Each member of the plant staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions.

5.3.2 The radiation safety manager shall meet the qualifications of a Radiation Protection Manager as defined in Regulatory Guide 1.8, September 1975. For the purpose of this section, "Equivalent," as utilized in Regulatory Guide 1.8 for the bachelor's degree requirement, may be met with four years of any one or combination of the following: (a) Formal schooling in science or engineering, or (b) operational or technical experience and training in nuclear power.

5.3.3 The Shift Technical Advisor shall have a bachelor's degree or equivalent and the Shift Engineer shall have a bachelor's degree in a scientific or engineering discipline. Specific training for both the Shift Technical Advisor and the Shift Engineer shall include plant design, operations, and response and analysis of the plant for transients and accidents. The Shift Engineer shall hold a Senior Reactor Operator license .

  • 5.3.4 The plant staff who perform reviews which ensure compliance with 10 CFR 50.59 shall meet or exceed the minimum qualifications of ANS 3.1-1987, Section 4.7.1 and 4.7.2. A Senior Reactor Operator license or certification shall be considered equivalent to a bachelors degree for the purpose of this

. specification .

  • Palisades Nuclear Plant 5.0-5 Amendment No.

Procedures 5.4

  • 5.0 ADMINISTRATIVE CONTROLS 5.4 Procedures 5.4.1 Written procedures shall be established, implemented, and maintained covering the activities referenced below:
a. The applicable procedures recommended in of Regulatory Guide 1.33,

. Revision 2, February 1978.

b. The emergency operating procedures required to implement the requirements of NUREG-0737 and NUREG-0737, Supplement 1, as
c. Site Fire Protection Program implementation.
d. All programs specified in S!pecification 5.5 .
  • Palisades Nuclear Plant 5.0-6 Amendment No.

Programs and Manuals 5.5

  • 5.0 ADMINISTRATIVE CONTROLS 5.5 Programs and Manuals The following programs shall be established, implemented, and maintained:

5.5.1 Offsite Dose Calculation Manual (ODCM)

a. The ODCM shall contain the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm and trip setpoints, and in the conduct of the radiological environmental monitoring program; and
b. The ODCM shall also contain (1) the radioactive effluent controls and radiological environmental monitoring activities and (2) descriptions of the information that should be included in the Radiological Environmental Operating Report, and Radioactive Effluent Release Report required by Specification 5.6.2 and Specification 5.6.3.
c. Changes to ODCM:
1. Shall be documented and records of reviews performed shall be retained. This documentation shall contain:
a. Sufficient information to support the change together with the appropriate analyses or evaluations justifying the changes, and
b. A determination that the change will maintain the level of radioactive effluent control required by 10 CFR 20.1302, 40 CFR 190, 10 CFR 50.36a, and 10 CFR 50, Appendix I, and not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations.
2. Shall become effective after approval by the plant superintendent.
3. Shall be submitted to the NRC in the form of a complete, legible copy of the entire ODCM as a part of or concurrent with the Radioactive Effluent Release Report for the period of the report in which any change to the ODCM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (e.g., month/year) the change was implemented .
  • Palisades Nuclear Plant 5.0-7 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.2 Primary Coolant Sources Outside Containment This program provides controls to minimize leakage to the engineered safeguards rooms, from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident, to as low as practical. The systems include the Containment Spray System, the Safety Injection System, the Shutdown Cooling System, and the containment sump suction piping. This program shall include the following:
a. Provisions establishing preventive maintenance and periodic visual inspection requirements, and
b. Integrated leak test requirements for each system at a frequency not to exceed refueling cycle intervals.
c. The portion of the shutdown cooling system that is outside the containment shall be tested either by use in normal operation or hydrostatically tested at 255 psig.
d. Piping from valves CV-3029 and CV-3030 to the discharge of the safety injection pumps and containment spray pumps shall be hydrostatically tested at no less than 100 psig. *
e. The maximum allowable leakage from the recirculation heat removal systems' components (which include valve stems, flanges and pump seals) shall not exceed 0.2 gallon per minute under the normal hydrostatic head from the SIRW tank (approximately 44 psig).

5.5.3 Post Accident Sampling Program This program provides controls which will ensure the capability to accurately determine the airborne iodine concentration in vital areas and which will ensure the capability to obtain and analyze reactor coolant, radioactive gases and particulates in plant gaseous effluents, and containment atmosphere samples under accident conditions. This program shall include the following:

a. Training of personnel,
b. Procedures for sampling and analysis, and
c. Provisions for maintenance of sampling and analytic equipment.
  • Palisades Nuclear Plant 5.0-8 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.4 Radioactive Effluent Controls Program A program shall be provided conforming with 10 CFR 50.36a for the control of radioactive effluents and for maintaining the doses to members of the public from radioactive effluents as low as reasonably achievable. The program (1) shall be contained in the Offsite Dose Calculation Manual (ODCM), (2) shall be implemented by operating procedures, and (3) shall include remedial actions to be taken whenever the program limits are exceeded. The program shall include the following elements:
a. Limitations on the functional capability of radioactive liquid and gaseous monitoring instrumentation including surveillance tests and setpoint determination in accordance with the methodology in the ODCM,
b. Limitations on the concentrations of radioactive material released in liquid effluents to unrestricted areas conforming to 10 times the value in 10 CFR 20, Appendix B, Table 2, Column 2.
c. Monitoring, sampling, and analysis of radioactive liquid and gaseous effluents in accordance with 10 CFR 20.1302 and with the methodology and parameters in the ODCM,
d. Limitation on the annual and quarterly doses or dose commitment to a member of the public from radioactive materials in liquid effluents released from each plant to unrestricted areas conforming to 10 CFR 50, Appendix I,
e. Limitations on the dose rate resulting from radioactive material released in gaseous effluents to areas beyond the site boundary conforming to the doses associated with 10 times the value listed in 10 CFR 20, Appendix B, Table 2, Column 1.
f. Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary conforming to 10 CFR 50, Appendix I,
g. Limitations on the annual and quarterly doses to a member of the public from lodine-131, lodine-133, tritium and all radionuclides in particulate form with half-lives greater than 8 days in gaseous effluents released from each plant to areas beyond the site boundary conforming to 10 CFR 50, Appendix I,
h. Limitations on the annual doses or dose commitment to any member of the public due to releases of radioactivity and to radiation from uranium
  • Palisades Nuclear Plant fuel cycle sources conforming to 40 CFR 190.

5.0-9 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.5 Containment Structural Integrity Surveillance Program This program provides controls for monitoring any tendon degradation in pre-stressed concrete containments, including effectiveness of its corrosion protection mepium, to ensure containment structural integrity. The program shall include baseline measurements prior to initial operations. The Containment Structural Integrity Surveillance Program, inspection frequencies, and acceptance criteria shall be in accordance with ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWE and IWL.

If, as a result of a tendon inspection, corrective retensioning of five percent (8) or more of the total number of dome tendons is necessary to restore their liftoff forces to within the limits, a dome delamination inspection shall be performed within 90 days following such corrective retensioning. The results of this inspection shall be reported to the NRC in accordance with Specification 5.6.7, "Containment Structural Integrity Surveillance Report."

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Containment Structural Integrity Surveillance Program inspection frequencies .

  • 5.5.6 Primary Coolant Pump Flywheel Surveillance Program
a. Surveillance of the primary coolant pump flywheels shall consist of a 100% volumetric inspection of the upper flywheels each 10 years.
b. The provisions of SR 3.0.2 are not applicable to the Flywheel Testing Program .
  • Palisades Nuclear Plant 5.0-10 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.7 lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components.* The program shall include the following:
a. Testing frequencies specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda (B&PV Code) as follows:

B&PV Code terminology Required interval for inservice testing for performing inservice activities testing activities Weekly  ::; 7 days Monthly , .:> 31 days Quarterly or every 3 months . .:> 92 days Semiannually or every 6 months .:> 184 days Every 9 months .:> 276 days Yearly or annually *  ::; 366 days Biennially or every 2 years .:> 731 days

b. The provisions of SR 3.0.2 are applicable to the above required intervals for performing inservice testing activities;
c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
d. Nothing in the B&PV Code shall be construed to supersede the requirements of any Technical Specification.

5.5.8 Steam Generator Tube Surveillance Program This program provides controls for surveillance testing of the Steam Generator (SG) tubes to ensure that the structural integrity of this portion of the Primary Coolant System (PCS) is maintained. The program shall contain controls to ensure:

a. Steam Generator Tube Sample Selection and Inspection The inservice inspection may be limited to one SG on a rotating schedule encompassing 6% of the tubes if the results of previous inspections indicate that both SGs are performing in a like manner. If the operating conditions in one SG are found to be more severe than those in the other SG, the sample sequence shall be modified to inspect the most severe conditions .
  • Palisades Nuclear Plant 5.0-11 Amendment No.

Programs and Manuals 5.5.

a. Steam Generator Tube Sample Selection and Inspection (continued)

The SG tube minimum sample size, inspection result classification, and the corresponding action required shall be as specified in Table 5.5.8-1.

The tubes selected for each inservice inspection shall include at least 3%

of the total number of tubes in all SGs; the tubes selected for these inspections shall be selected on a random basis except:

1. Where experience in similar plants with similar water chemistry indicates critical areas to be inspected, then at least 50% of the tubes inspected shall be from these critical areas.
2. The first sample of tubes selected for each inservice inspec~ion of each SG shall include:

a) All nonplugged tubes that previously had detectable wall penetrations greater than 20%.

  • b) Tubes in those areas where experience has indicated
  • c) potential problems .

A tube inspection shall be performed on each selected tube. If any selected tuqe does not permit the passage of the eddy current probe for a tube inspection, this shall be recorded and an adjacent tube shall be selected and subjected to a tube inspection.

3. The tubes selected as the second and third samples (if required by Table 5.5.8-1) during each inservice inspection may be subjected to a partial tube inspection provided:

a) The tubes selected for these samples include the tubes from those areas of the tube sheet array where tubes with imperfections were previously found.

b) The inspections include those portions of the tubes where

  • imperfections were previously found .
  • Palisades Nuclear Plant 5.0-12 Amendment No.

Programs and Manuals 5.5

4. The re.suits of each sample inspection shall be classified into one of the following three categories:

Category Inspection Results*

C-1 Less than 5% of the total.tubes inspected are degraded tubes and none of the inspected tubes are defective.

C-2 One or more tubes, but not more than 1% of the total tubes inspected are defective, or between 5% and 10% of the total tubes inspected are degraded tubes.

C-3 More than 10% of the total tubes inspected are degraded tubes or more than 1% of the inspected tubes are defective.

  • NOTE: In all inspections, previously degraded tubes must exhibit significant (greater than 10%) further wall penetrations to be included in the above percentage calculations.
b. Inspection FreguenCies The above required inservice inspection of SG tubes shall be performed at the following frequencies:
1. lnservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection. If two consecutive inspections following service under Avr conditions, not including the preservice inspection, result in all inspections results falling into the C-1 category or if two consecutive inspections demonstrate that previously observed degradation has not continued and no additional degradation has occurred, the inspection interval may be extended to a maximum of once per 40 months .
  • Palisades Nuclear Plant 5.0-13 Amendment No.

Programs and Manuals 5.5

b. Inspection Frequencies (continued)
2. If the results of the inservice inspection of a SG conducted in accordance with Table 5.5.8-1 at 40 month intervals fall into Category C-3, the inspection frequency shall be increased to at least once per 20 months. The increase in inspection frequency shall apply until the subsequent inspections satisfy the criteria of Specification 5.5.8.b.1; the interval may then be extended to a maximum of once per 40 months.
3. Additional, unscheduled inservice inspections shall be performed on each SG in accordance with the first sample inspection specified in Table 5.5.8-1 during the shutdown subsequent to any of the following conditions:

a) Primary-to-secondary tube leaks (not including leaks originating from tube-to-tube sheet welds) in exce$S of the limits of LCO 3.4.13.

  • b)
  • c)

A seismic occurrence greater than the Operating Basis

A loss-of-coolant accident resulting in initiation of flow of the engineered safeguards.

d) A main steam line or main feedwater line break.

c. Acceptance Criteria
1. As used in this Specification:

a) Imperfection means an exception to the dimensions, finish or contour of a tube from that required fabrication drawings or specifications. Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections.

b) Degradation means a service-induced cracking, wastage, wear or general corrosion occ1,.1rring on either inside or outside of a tube.

c) Degraded Tube means a tube containing imperfections greater than or equal to 20% of the nominal wall thickness

  • caused by degradation .

Palisades Nuclear Plant 5.0-14 Amendment No.

Programs and Manuals 5.5

b. Inspection Frequencies (continued) d)  % Degradation means the percentage of the tube wall thickness affected or removed by degradation.

e) Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is.

defective.

f) Plugging Limit means the imperfection depth at or beyond which the tube shall be removed from service and is equal to 40% of the nominal tube wall thickness.

g) Unserviceable described the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a steam line or feedwater line break as specified in 5.5.8.b.3, above .

  • h) i)

Tube Inspection means an inspection of the SG tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg.

Preservice Inspection means an inspection of the full length of each tube in SG performed by eddy current techniques prior to service to establish a baseline condition of the tubing. This inspection shall be performed

  • after the shop hydrostatic test and prior to initial POWER OPERATION using the equipment and techniques expected to be used during subsequent inservic~

inspections.

2. The SG shall be determined OPERABLE after completing the corresponding actions (plug all tubes exceeding the plugging limit and all tubes containing through-wall cracks) required by Table 5.5.8-1.

The provisions of SR 3.0.2 are applicable to the Steam Generator Tube Surveillance Program .

  • Palisades Nuclear Plant 5.0-15 Amendment No.

Programs and Manuals 5.5

  • 1ST SAMPLE INSPECTION 1 Result Action Required Result TABLE 5.5.8-1 STEAM GENERATOR TUBE INSPECTION 2ND SAMPLE INSPECTION Action Required 3RD SAMPLE INSPECTION Result Action Required C-1 None
  • N/A N/A N/A N/A C-2 Plug defective tubes and inspect additional 2S tubes in this SG. C-1 None N/A N/A C-3 Inspect all tubes in C-2 Plug defective C-1 None this SG, plug tubes and inspect defective tubes and additional 4S tubes C-2 Plug defective inspect 2S tubes in in this SG. tubes each other SG. C-3 Perform action for C-3 result of first Sample C-3 Perform action for N/A N/A C-3 result of first Sample All None N/A N/A other SGs are C-1 Some Perform action for N/A NIA SGs C-2 result of C-2 but second sample no other SGis C-3.

Other Inspect all tubes N/A N/A SG is each SG and plug C-3 defective tubes NOTES: 1 The minimum sample size for the first sample inspection is S tubes per SG where S=(6/n)%,,where n is the number of steam generators inspected during an inspection .

  • Palisades Nuclear Plant 5.0-16 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.9 Secondary Water Chemistry Program A program shall be established, implemented and maintained for monitoring of secondary water chemistry to inhibit steam generator tube degradation and shall include:
a. Identification of a sampling schedule for the critical variables and control.

points for these variables,

b. Identification of the procedures used to measure the values of the critical variables,
c. Identification of process sampling points, which shall include monitoring the discharge of the condensate pumps for evidence of condenser in-leakage,
d. Procedures for the recording and management of data,
e. Procedures defining corrective actions for all off-control point chemistry conditions, and
  • 5.5.10
f. A procedure identifying (a) the authority responsible for the interpretation of the data, and (b) the sequence and timing of administrative events required to initiate corrective actions.

Ventilation Filter Testing Program A program shall be established to implement the following required testing of Control Room Ventilation (CRV) and Fuel Handling Area Ventilation systems at the frequencies specified in Regulatory Guide 1.52, Revision 2 (RG 1.52), and in accordance with RG 1.52 and ASME N510-1989, at the system flowrates and tolerances specified below*:

a. Demonstrate for each of the ventilation systems that an inplace test of the High Efficiency Particulate Air (HEPA) filters shows a penetration and system bypass < 0.05% for the CRV and < 1.00% for the Fuel Handling .

Area Ventilation System when tested in accordance with RG 1.52 and ASME N510-1989:

Ventilation System Flowrate (CFM)

V-BA or V-88 7300 +/- 20%

V-BA and V-88 10,000 +/- 20%

V-95 orV-96 12,500 +/- 10%

  • Palisades Nuclear Plant 5.0-17 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.10 Ventilation Filter Testing Program (continued)
b. Demonstrate for each of the ventilation systems that an inplace test of the charcoal adsorber shows a penetration and system bypass< 0.05%

for the CRV and< 1.00% for the Fuel Handling Area Ventilation System

, when tested in accordance with RG 1.52 and ASME N510-1989.

I Ventilation System Flowrate (CFM)

V-8A and V-88 10,000 +/- 20%

V-26A and V-268 3200 +10% -5%

c. Demonstrate for each of the ventilation systems that a laboratory test of a sample of the charcoal adsorber, when obtained as described in RG 1.52 shows the methyl iodide penetration less than the value specified below when tested in accordance with ASTM D3803-1989 at a temperature of

~ 30°C and equal to the relative humidity specified as follows:

Ventilation System Penetration Relative Humidity VF-66 6.00% - 95%

VFC-26A and VFC-268 0.157% 70%.

  • - d. For each of the ventilation systems, demonstrate the pressure drop across the combined HEPA filters, the prefilters, and the charcoal adsorbers is less than the value specified below when tested in accordance with RG 1.52 and ASME N510-1989:

Ventilation System Delta P (In H2Ql Flowrate (CFM)

V-8A and V-88 6.0 10,000 +/- 20%

VF-26A and VF-268 8.0 3200 +10% -5%

e. Demonstrate that the heaters for the CRV system dissipates the following specified value+/- 20% when tested in accordance with ASME N510-1989:

Ventilation System Wattage VHX-26A and VHX-268 15 kW The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Ventilation Filter Testing Program frequencies.

  • Should the 720-hour limitation on charcoal adsorber operation occur during a plant operation requiring the use of the charcoal adsorber -

such as refueling - testing may be delayed until the completion of the plant operation or up to 1,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of filter operation; whichever occurs first.

Palisades Nuclear Plant 5.0-18 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.11 Fuel Oil Testing Program A fuel oil testing program to implement required testing of both new fuel oil and stored fuel oil shall be established. The program shall include sampling requirements, testing requirements, and acceptance criteria, based on the diesel manufacturer's specifications and applicable ASTM Standards. The program shall establish the following:
a. Acceptability of new fuel oil prior to addition to the Fuel Oil Storage Tank, and acceptability of fuel oil stored in the Fuel Oil Storage Tank, by determining that the fuel oil has the following properties within limits:
1. API gravity or an absolute specific gravity, 2.. Kinematic viscosity, and
3. Water and sediment content.
b. Other properties of fuel oil stored in the Fuel Oil Storage Tank, specified by the diesel manufacturers or specified for grade 20 fuel oil in ASTM D 975, are within limits .

The provisions of SR 3 ..0.2 and SR 3.0.3 are applicable to the Fuel Oil Testing Program.

5.5.12 Technical Specifications '(TS) Bases Control Program This. program provides a means for processing changes to the Bases of these.

Technical Specifications.

a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
b. Licensees may make changes to Bases without prior NRC approval .

provided the changes do not involve either of the following:

1. A change in the TS incorporated in the license; or
2. A change to the updated FSAR or Bases that involves an unreviewed safety question as defined in 10 CFR 50.59 .
  • Palisades Nuclear Plant 5.0-19 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.12 Technical Specifications (TS) Bases Control Program (continued)
c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR.
d. Proposed changes that meet the criteria of Specification 5.5.12.b. above shall be reviewed and approved by the NRC prior to implementation.

Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e).

5.5.13 Safety Functions Determination Program (SFDP)

This program ensures loss of safety function is detected and appropriate actions taken. Upon entry into LCO 3.0.6, an evaluation shall be made to determine. if loss of safety function exists. Additionally, other appropriate limitations and remedial or compensatory actions may be identified to be taken as a result of the support system inoperability and corresponding exception to entering supported system Condition and Required Actions. This program implements the requirements of LCO 3.0.6. The SFDP shall contain the following:

  • a.

b.

Provisions for cross train checks to ensure a loss of the capability to perform the safety function assumed in the accident analysis does not go undetected; Provisions for ensuring the plant is maintained in a safe condition if a loss of function condition exists;

c.
  • Provisio.ns to ensure that an inoperable supported system's Completion Time is not inappropriately extended as a result of multiple support system inoperabilities; and
d. Other appropriate limitations and remedial or compensatory actions.

A loss of safety function exists when, assuming no concurrent single failure, a safety function assumed in the accident analysis cannot be performed. For the purpose of this program, a loss of safety function may exist when a support system is inoperable, and:

a. A required system redundant to system(s) supported by the inoperable support system is also inoperable; or
b. A required system redundant to system(s) in turn supported by the inoperable supported system is also inoperable; or Palisades Nuclear Plant 5.0-20 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.13 Safety Functions Determination Program (SFDP) (continued)
c. A required system redundant to support system(s) for the supported systems (a) and (b) above is also inoperable.

The SFDP identifies where a loss of safety function exists. If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

5.5.14 Containment Leak Rate Testing Program Programs shall be established to implement the leak rate testing of the containment as required by 10 CFR 50.54(0) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. The Type A test program shall meet the requirements of 10 CFR 50, Appendix J, Option B and shall be in accordance with the guidelines of Regulatory Guide 1.163~ "Performance-Based Containment Leakage-Test Program, dated September 1995."

The Type B and Type C test .

program shall meet the requirements of 10 CFR 50,'

Appendix J, Option A, as modified by the exemption from certain requirements of 10 CFR 50 Appendix J which was granted in an NRC letter to Consumers Power Company dated December 6, *1989.

The peak calculated containment internal pressure for the design basis loss of coolant accident, par is 52.64 psig.

The maximum allowable containment leak rate, L3 , at Pa* shall be 0.1 % of.

containment air weight per day.

Local leak rate tests, other than Personnel Airlock doors between the seals tests, shall be performed at ~ 55 psig.

Local leak rate tests for checking airlock doors seals within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of each door opening shall be performed as follows:

a.. A between the seals test shall be performed on the Personnel Airlock at

~ 10 psig.

b. A full pressure test shall be performed on the Emergency Escape Airlock at ~ 5~ psig. A seal contact check shall be performed on the Emergency Escape Airlock following each full pressure test. Emergency Escape Airlock door opening, solely for the purpose of strongback removal and performance of the seal contact check, does not necessitate additional pressure testing.

Palisades Nuclear Plant 5.0-21 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.14 Containment Leak Rate Testing Program (continued)

Leak rate acceptance criteria are:

a. Containment leak rate acceptance criteria is ::; 1.0 La. During the first plant startup following testing in accordance with this program, the leak rate acceptance criteria are ::; 0.60 La for the Type B and Type C tests and ::; 0. 75 La for Type A tests;
b. The leakage for a Personnel Airlock door seal test shall not exceed 0.023 La.
c. An acceptable Emergency Escape Airlock door seal contact check consists of a verification of co.ntinuous contact between the seals and the sealing surfaces.

Containment OPERABILITY is equivalent to "Containment Integrity" for the purposes of the air lock testing requirements in 10 CFR 50, Appendix J.

The provisions of SR 3.0.2 are not applicable to the Containment Leak Rate Testing Program requirements .

  • 5.5.15 The provisions of SR 3.0.3 are applicable to the Containment Leak Rate Testing Program requirements.

Process Control Program

a. The Process Control Program shall contain the current formula, sampling, analyses, tests, and determinations to be made to ensure that the processing and packaging of solid radioactive wastes based on demonstrated processing of actual or simulated wet solid wastes will be accomplished in such a way as to *assure compliance with 10 CFR 20, 10 CFR 71, Federal and State regulations, and other requirements governing the disposal of the radioactive waste.
b. Changes to the Process Control Program:
1. Shall be documented and records of reviews performed shall be retained as required by the Quality Program, CPC-2A. This documentation shall contain:

a) Sufficient information to support the change together with the appropriate analyses or evaluation justifying the change(s) and Palisades Nuclear Plant 5.0-22 Amendment No.

Programs and Manuals 5.5

  • 5.5 Programs and Manuals 5.5.15 Process Control Program (continued) b) A determination that the change will maintain the overall conformance of the solidified waste product to existing requirements of Federal, State, or other applicable regulations.
2. Shall become effective after approval by the plant superintendent.
  • Palisades Nuclear Plant 5.0-23 Amendment No.

Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS

. 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4 ..

5.6.1 Occupational Radiation Exposure Report This report shall include a tabulation on an annual basis of the number of stations, utility and other personnel (including contractors), for whom monitoring was performed, receiving an annual deep dose equivalent greater than 100 mrem and the associated deep dose equivalent (reported in person-rem) according to work and job functions (e.g., reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance [describe maintenance], waste processing and refueling). This tabulation supplements the requirements of 10 CFR 20.2206. The dose assignments to various duty functions may be estimated based OM pocket ionization chamber, electronic dosimeter, TLD, or film badge measurements. Small exposures totaling less

  • than 20% of the individual total dose need not be accounted for. In the aggregate, at least 80% of the total deep dose equivalent external sources should be assigned to specific major work functions. The report covering the previous calendar year shall be submitted by April 30 of each year.
  • 5.6.2 Radiological Environmental Operating Report
  • The Radiological Environmental Operating Report covering the operation of the plant during the previous calendar year shall be submitted before May 15 of each year. The report shall include summaries, interpretations, and analysis of trends of the results of the radiological environmental monitoring program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual and in 10 CFR 50, Appendix I, Sections IV.8.2, IV.8.3, and IV.C.

5.6.3 Radioactive Effluent Release Report The Radioactive Effluent Release Report covering operation of the plant in the previous year shall be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the plant.

The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual and Process Control Program, and shall be in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.8.1 .

  • Palisades Nuclear Plant 5.0-24 Amendment No.

Reporting Requirements 5.6

  • . 5.6 Reporting Requirements 5.6.4 Monthly Operating Report Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the NRC no later than the fifteenth of each month following the calendar month covered by the report.

5.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to 'any remaining portion of a reload cycle, and shall be documented in the COLR for the following:

3.1.1 Shutdown Margin 3.1.6 Regulating Rod Group Position Limits 3.2.1 Linear Heat Rate Limits 3.2.2 Radial Peaking Factor Limits 3.2.4 ASI Limits .

b. The analytical methods used to determine the core operating limits shall be those approved by the NRC, specifically those described in the latest approved revision of the following documents:
1. XN-75-27(A), "Exxon Nuclear Neutronics Design Methods for Pressurized Water Reactors," and Supplements 1(A), 2(A),

3(P)(A), 4(P)(A), and 5(P)(A); Exxon Nuclear Company.

(LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4)

2. ANF-84-73(P)(A), "Advanced Nuclear Fuels Methodology for Pressurized Water Reactors: Analysis of Chapter 15 Events," and Appendix B(P)(A) and Supplements 1(P)(A), 2(P)(A); Advanced Nuclear Fuels Corporation.

(LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4)

3. XN-NF-82-21 (P)(A), "Application of Exxon Nuclear Company PWR Thermal Margin Methodology to Mixed Core Configurations," Exxon Nuclear Company.

(LCOs 3.2.1, 3.2.2, & 3.2.4)

4. ANF-84-093(P)(A), "Steamline Break Methodology for PWRs,"

and Supplement 1(P)(A); Advanced Nuclear Fuels Corporation.

(LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4) .

  • Palisades Nuclear Plant 5.0-25 Amendment No.

Reporting Requirements 5.6

  • 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
5. XN-75-32(P)(A), "Computational Procedure for Evaluating Fuel Rod Bowing," and Supplements 1(P)(A), 2(P)(A), 3(P)(A), and 4(P)(A); Exxon Nuclear Company.

(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)

6. EXEM PWR Large Break LOCA Model as defined by:

(LCOs 3.1.6, 3.2.1, & 3.2.2) a) XN-NF-82-20(A), "Exxon Nuclear Company Evaluation Model EXEM/PWR ECCS Model Updates," and Supplements 1(P)(A), 2(P)(A), 3(P)(A), and 4(P)(A); Exxon Nuclear Company.

  • b) XN-NF-82-0?(P)(A), "Exxon Nuclear Company ECCS Cladding Swelling and Rupture Model," Exxon Nuclear Company.

c) XN-NF-81-58(A), "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," and Supplements.1(P)(A),

2(P)(A), 3(P)(A), and 4(P)(A); Exxon Nuclear Company.

d) XN-NF-85-16(A), "PWR 17x17 Fuel Cooling Tests Program," Volume 1 and Supplements 1(P)(A), 2(P)(A),

and 3(P)(A), and Volume 2 and Supplement 1(P)(A);

Exxon Nuclear Company.

e) XN-NF-85-105(A), "Scaling of FCTF Based Reflood Heat Transfer Correlation for other Bundle Designs," and Supplement 1(P)(A); Exxon Nuclear Company.

7. XN-NF-78-44(A), "A Generic Analysis of the Control Rod Ejection Transient for Pressurized Water Reactors," Exxon Nuclear Company. (LCOs 3.1.6, 3.2.1, & 3:2.2)
8. ANF-1224(P)(A), "Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel," and Supplement 1(P)(A);

Advanced Nuclear Fuels Corporation.

(LCOs 3.2.1, 3.2.2, & 3.2.4)

9. ANF-89-151 (P)(A), "ANF-RELAP Methodology for Pressurized Water Reactors: Analysis of Non-LOCA Chapter 15 Events,"

Advanced Nuclear Fuels Corporation.

  • Palisades Nuclear Plant (LCOs 3.1.(3, 3.2.1, 3.2.2, & 3.2.4) 5.0-26 Amendment No.

Reporting Requirements 5.6

  • 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
10. EMF-92-153(P)(A), "HTP: Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel," Siemens Power Corporation. (LCOs 3.2.1, 3.2.2, & 3.2.4)
c. The core operating limits shall be determined such that all applicable
d. The COLR, including any mid cycle revisions or supplements, shall be provided, upon issuance for each reload cycle, to the NRC.

5.6.6 Post Accident Monitoring Report When a report is required .by LCO 3.3.7, "Post Accident Monitoring Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels to OPERABLE statu~.

5.6.7 Containment Structural Integrity Surveillance Report Reports shall be submitted to the NRC covering Prestressing, Anchorage, and Dome Delamination tests within 90 days after completion of the tests.

5.6.8 Steam Generator Tube Surveillance Report The following reports shall be submitted to the Commission following each inservice inspection of steam generator tubes:

  • a. The number of tubes plugged in each steam generator shall be reported to the Commission within 15 days following the completion of each inspection, and
    • Palisades Nuclear Plant 5.0-27 Amendment No.

Reporting Requirements 5:6

  • 5.6 Reporting Requirements 5.6.8 Steam Generator Tube Surveillance Report (continued)
b. The complete results of the steam generator tube inservice inspection shall be reported to the Commission within 12 months following completion of the inspection. This report shalt include:
1. Number and extent of tubes inspected.
2. Location and percent of wall-thickness penetration for each indication of an imperfection.
3. Identification of tubes plugged.
c. Results of steam generator t4be inspections that fall into Category C-3 shall require 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> verbal notification to the NRC prior to resumption of plant operation. A written followup within the next 30 days shall provide a description of investigations and corrective measures taken to prevent recurrence .
  • Palisades Nuclear Plant 5.0-28 Amendment No.

High Radiation Area 5.7

  • 5.0 ADMINISTRATIVE CONTROLS
5. 7 High Radiation Area
5. 7.1 Pursuant to 10 CFR 20, paragraph 20.1601(c), in lieu of the requirements of 10 CFR 20.1601, each high radiation area, as defined in 10 CFR 20, in which the intensity of radiation is > 100 mrem/hr but < 1000 mrem/hr, shall be barricaded and conspicuously posted as a high radiation area arid entrance thereto shall be controlled by requiring issuance of a Radiation Work Permit (RWP). Individuals qualified in radiation protection procedures (e.g., radiation safety technicians) or personnel continuously escorted by such individuals may be exempt from the RWP issuance requirement during the performance of their assigned duties in high radiation areas with exposure rates < 1000 mrem/hr, provided they are otherwise following plant radiation protection procedures for entry into such high radiation areas.

Any individual or group of individuals permitted to enter such areas shall be provided with or accompanied by one or more of the following:

a. A radiation monitoring device that continuously indicates the radiation dose rate in the area.
b. A radiation monitoring device that continuously integrates the radiation dose rate in the area and alarms when a preset integrated dose is received. Entry into such areas with this monitoring device may be made after the dose rate levels in the area have been established and personnel are aware of them.
c. An individual qualified in radiation protection procedures with a radiation dose rate monitoring device, who is responsible for providing positive
  • control over the activities within the area and shall perform periodic radiation surveillance at the frequency specified by the Radiation Work Request.

5.7.2 In addition to the requirements of Specification 5.7.1, except as allowed by 5.7.3, areas with radiation levels ~ 1000 mrem/hr shall be provided with locked or continuously guarded doors to prevent unauthorized entry and the keys shall be maintained under the administrative control of the Shift Supervisor on duty or radiation safety supervision. Doors shall remain lo.eked except during periods of access by personnel under an approved RWP that shall specify the dose rate levels in the immediate work areas and the maximum allowable stay times for individuals in those areas. In lieu of the stay time specification of the RWP, direct or remote (such as closed circuit TV cameras) continuous surveillance

  • may be made by personnel qualified in radiation protection procedures to provide positive exposure control over the activities being performed within the area .
  • Palisades Nuclear Plant 5.0-29 . Amendment No.

L____ _

High Radiation Area

. . 5_j

.* 5. 7 High Radiation Area 5.7.3 For individual high radiation areas with radiation levels of~ 1000 mrem/hr, accessible to personnel, that are located within large areas 'Such as" re~ctor containment, where no enclosure exists for purposes of lockirig, or that cannot be continuously guarded, and where no. enclosure.can be.reasonably constructed around the individual area, that iridividu~I area shaJI be barricaded and conspicuously posted, and a flashing light shall be activated as ~ warning device. * *

  • Palisades Nuclear Plant 5.0-30 Amen~rnent No.