ATTACHMENT 2 CONSUMERS ENERGY COMPANY PALISADES PLANT DOCKET 50-255 LICENSE DPR-20 TECHNICAL SPECIFICATIONS CHANGE REQUEST PRIMARY COOLANT PUMP FLYWHEEL INSPECTIONS Proposed Page 1 Page
~--
. -9ii0080299 971001 PDR ADOCK 05000255 p
6.0 6.. 5.5 6.5.6 6.5.7 ADMINISTRA~E CONTROLS Reserved Primary Coolant Pump Flywheel Surveillance Program
- a.
Surveillance of the primary coolant pump flywheels shall consist of a 100% volumetric inspection of the upper flywheels each 10 years.
- b.
The provisions of Surveillance Requirement 4.0.2 are applicable to the Flywheel Testing Program.
Inservice Inspection and Testing Program This program provides controls for inservice inspection and testing of ASME Code Class 1, 2, and 3 components including applicable supports.
The program shall include the following:
- a.
Testing frequencies specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda {B&PV Code) as follows:
B&PV Code terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required interval for performing inservice testing activities s
7 days s 31 days s 92 days s 184 days s 276 days s 366 days s 731 days
- b.
The provisions of Surveillance Requirement 4.0.2 are applicable to the above required intervals for performing inservice testing activities;
- c.
The provisions of Surveillance Requirement 4.0.3 are applicable to inservice testing activities; and
- d.
Nothing in the B&PV Code shall be construed to supersede the requirements of any Technical Specification.
6-8 Amendment No. +-74, -7-S,
ATTACHMENT 3 CONSUMERS ENERGY COMPANY PALISADES PLANT DOCKET 50-255 LICENSE DPR-20 TECHNICAL SPECIFICATIONS CHANGE REQUEST PRIMARY COOLANT PUMP FLYWHEEL INSPECTIONS Current Page Marked to Show Changes 1 Page
6.0 6.5.5 6.5.6 6.5.7 ADMINISTRATIVE CONTROLS Reserved Primary Coolant Pump Flywheel Surveillance Program i!@:::::t:::::::surveillance of the primary coolant pump flywheels shall consist of
- a 1003 vo 1 um~t..r..i..c:.
...i.f1.~.Pect ion of the upper fl ywhee 1 s each refuel i Ag.* :~:~:::::¥~:ir§j:f:::
Inservice Inspection and Testing Program This program provides controls for inservice inspection and testing of ASME Code Class 1, 2, and 3 components including applicable supports.
The program shall include the following:
- a.
Testing frequencies specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda {B&PV Code) as follows:
B&PV Code terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required interval for performing inservice testing activities s
7 days s 31 days s 92 days s 184 days s 276 days s 366 days s 731 days
- b.
The provisions of Surveillance Requirement 4.0.2 are applicable to the above required intervals for performing inservice testing activities;
- c.
The provisions of Surveillance Requirement 4.0.3 are applicable to inservice testing activities; and
- d.
Nothing in the B&PV Code shall be construed to supersede the requirements of any Technical Specification.
Tl=ie volumetric examiRati OR of the upper primary cool aRt pump flywheels is Rot required duriRg the refueliRg outage at the eRd of cycle 12.
6-8 Amendment No. +-74, -7.§.