| issue date = 09/30/1981
| issue date = 09/30/1981
| title = Requests Clarification to Implement Interim Actions for NUREG-0612 Re Control of Heavy Loads,Per NRC 810701 Ltr. Interim Actions Will Become Effective at Next Refueling Outage
| title = Requests Clarification to Implement Interim Actions for NUREG-0612 Re Control of Heavy Loads,Per NRC 810701 Ltr. Interim Actions Will Become Effective at Next Refueling Outage
| author name = LEASBURG R H
| author name = Leasburg R
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name = DENTON H R, EISENHUT D G
| addressee name = Denton H, Eisenhut D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000280, 05000281, 05000338, 05000339
| docket = 05000280, 05000281, 05000338, 05000339
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:* VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND.,, VIRGINIA 23261 R.H.LEASBURO VICE PRESIDEN:I" NucLEAJ< 0:l'ERA:rioNs September 30, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
{{#Wiki_filter:*
NUREG-0612 CONTROL OF HEAVY LOADS Serial No. 388A NO/DJF:jmjJl Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 NORTH ANNA AND SURRY POWER STATIONS Clarification is required for our July 1, 1981 letter to you concerning NUREG 0612, Control of Heavy Loads. We requested that the requirement to implement interim actions be delayed for each unit until the respective unit commences its next refueling outage or is required to move a load that qualifies as a heavy load, whichever is earlier. We are continuing with the implementation of your request and will have the interim actions in affect for each unit when the respective*
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND.,, VIRGINIA 23261 R.H.LEASBURO                           September 30, 1981 VICE PRESIDEN:I" NucLEAJ< 0:l'ERA:rioNs Mr. Harold R. Denton, Director                               Serial No. 388A I
unit commences its next refueling outage. In the interim, when it is required to move a load that qualifies as a heavy load, we will implement procedures covering the requirements of the interim actions as stated by you for movements of heavy loads as they arise in the course of maintenance.
Office of Nuclear Reactor Regulation                       NO/DJF:jmjJl Attn: Darrell G. Eisenhut, Director                         Docket Nos. 50-280 Division of Licensing                                       50-281 U.S. Nuclear Regulatory Commission                                       50-338 Washington, D.C. 20555                                                   50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:
Please contact us if you have any questions. .r"" 8110050243 810930 '\ 1 PDR ADOCK 05000280' p PDR Very truly yours, ;/1/i.4/ R. H. Leasburg I}}
NUREG-0612 CONTROL OF HEAVY LOADS NORTH ANNA AND SURRY POWER STATIONS Clarification is required for our July 1, 1981 letter to you concerning NUREG 0612, Control of Heavy Loads. We requested that the requirement to implement interim actions be delayed for each unit until the respective unit commences its next refueling outage or is required to move a load that qualifies as a heavy load, whichever is earlier.
We are continuing with the implementation of your request and will have the interim actions in affect for each unit when the respective* unit commences its next refueling outage.         In the interim, when it is required to move a load that qualifies as a heavy load, we will implement procedures covering the requirements of the interim actions as stated by you for movements of heavy loads as they arise in the course of maintenance.
Please contact us if you have any questions.
Very truly yours,
                                                                            ;/1/i.4/
R. H. Leasburg
.r"" 8110050243 810930 '\
1 PDR ADOCK 05000280' p                        PDR}}

Latest revision as of 03:08, 21 October 2019

Requests Clarification to Implement Interim Actions for NUREG-0612 Re Control of Heavy Loads,Per NRC 810701 Ltr. Interim Actions Will Become Effective at Next Refueling Outage
ML18139B551
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 09/30/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Eisenhut D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR 388A, NUDOCS 8110050243
Download: ML18139B551 (1)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND.,, VIRGINIA 23261 R.H.LEASBURO September 30, 1981 VICE PRESIDEN:I" NucLEAJ< 0:l'ERA:rioNs Mr. Harold R. Denton, Director Serial No. 388A I

Office of Nuclear Reactor Regulation NO/DJF:jmjJl Attn: Darrell G. Eisenhut, Director Docket Nos. 50-280 Division of Licensing 50-281 U.S. Nuclear Regulatory Commission 50-338 Washington, D.C. 20555 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:

NUREG-0612 CONTROL OF HEAVY LOADS NORTH ANNA AND SURRY POWER STATIONS Clarification is required for our July 1, 1981 letter to you concerning NUREG 0612, Control of Heavy Loads. We requested that the requirement to implement interim actions be delayed for each unit until the respective unit commences its next refueling outage or is required to move a load that qualifies as a heavy load, whichever is earlier.

We are continuing with the implementation of your request and will have the interim actions in affect for each unit when the respective* unit commences its next refueling outage. In the interim, when it is required to move a load that qualifies as a heavy load, we will implement procedures covering the requirements of the interim actions as stated by you for movements of heavy loads as they arise in the course of maintenance.

Please contact us if you have any questions.

Very truly yours,

/1/i.4/

R. H. Leasburg

.r"" 8110050243 810930 '\

1 PDR ADOCK 05000280' p PDR