ML072970690: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML072970690 | | number = ML072970690 | ||
| issue date = 10/24/2007 | | issue date = 10/24/2007 | ||
| title = | | title = Notice of Meeting with Duke Energy and Progress Energy Regarding Pilot Plant Transition to the National Fire Protection Association Standard, National Fire Protection Association 805 | ||
| author name = Lain P | | author name = Lain P | ||
| author affiliation = NRC/NRR/DRA | | author affiliation = NRC/NRR/DRA | ||
| addressee name = Klein A | | addressee name = Klein A | ||
| addressee affiliation = NRC/NRR/ADRA/DRA/AFPB | | addressee affiliation = NRC/NRR/ADRA/DRA/AFPB | ||
| docket = 05000269, 05000270, 05000287, 05000400 | | docket = 05000269, 05000270, 05000287, 05000400 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:October 24, 2007 | {{#Wiki_filter:October 24, 2007 MEMORANDUM TO: Alexander R. Klein, Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM: Paul Lain, Senior Fire Protection Engineer /RA/ | ||
Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation | |||
MEMORANDUM TO: Alexander R. Klein, Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM: | |||
==SUBJECT:== | ==SUBJECT:== | ||
PILOT OBSERVATION VISIT WITH DUKE ENERGY AND PROGRESS ENERGY REGARDING PILOT PLANT TRANSITION TO THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD, NATIONAL FIRE PROTECTION ASSOCIATION 805 | PILOT OBSERVATION VISIT WITH DUKE ENERGY AND PROGRESS ENERGY REGARDING PILOT PLANT TRANSITION TO THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD, NATIONAL FIRE PROTECTION ASSOCIATION 805 DATE & TIME: Thursday November 8, 2007 See enclosed agenda for times. | ||
LOCATION: U.S. Nuclear Regulatory Commission (NRC) Region II Sam Nunn Atlanta Federal Center Room 24T20 61 Forsyth Street, SW Atlanta, GA 30303-3415 PURPOSE: To discuss the topics associated with Duke Energys and Progress Energys Pilot Programs to transition Oconee Nuclear Power Station and Shearon Harris Nuclear Power Plant to the risk-informed, performance-based fire protection regulation in Title 10 of the Code of Federal Regulations, Part 50.48(c), the National Fire Protection Association (NFPA) 805 Rule. | |||
DATE & TIME: Thursday November 8, 2007 See enclosed agenda for times. | CATEGORY*: This is a Category 2 meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda. | ||
CONTACTS: Paul J. Fillion, RII Paul W. Lain, NRR 404-562-4623 301-415-2346 pjf@nrc.gov pwl@nrc.gov | |||
LOCATION: | |||
PURPOSE: | |||
CATEGORY*: | |||
CONTACTS: | |||
* Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings,@ | * Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings,@ | ||
PARTICIPANTS: Participants for the NRC include Staff from of the Office of Nuclear Reactor Regulation (NRR) and Region II (RII). | A. Klein 2 (67 FR 36920) May 28, 2002 PARTICIPANTS: Participants for the NRC include Staff from of the Office of Nuclear Reactor Regulation (NRR) and Region II (RII). | ||
NRC National Laboratories Stakeholders C. Payne S. Nowlen (SNL) Progress Energy A. Klein T. Blackburn (PNNL) Duke Power P. Fillion M. Zentner (PNNL) Public P. Lain Nuclear Energy Institute R. Gallucci Industry Representatives H. Barrett Consultants to the Industry W. Rogers | |||
NRC | |||
==Enclosure:== | ==Enclosure:== | ||
: 1. Agenda | : 1. Agenda | ||
NRC | A. Klein 2 PARTICIPANTS: Participants for the NRC include Staff from of the Office of Nuclear Reactor Regulation (NRR) and Region II (RII). | ||
NRC National Laboratories Stakeholders C. Payne S. Nowlen (SNL) Progress Energy A. Klein T. Blackburn (PNNL) Duke Power P. Fillion M. Zentner (PNNL) Public P. Lain Nuclear Energy Institute R. Gallucci Industry Representatives H. Barrett Consultants to the Industry W. Rogers | |||
==Enclosure:== | ==Enclosure:== | ||
: 1. Agenda | : 1. Agenda DISTRIBUTION: | ||
DRA R/F PUBLIC AFPB PDII Reading NRR/ADPT Secy M. Franovich M. Salley C. Payne T. Boyce R. Musser J. Circle J. Hyslop S. Walker S. Laur P. Fillion A. Klein C. Moulton P. Lain Adams Accession: ML NRC-001 OFFICE AFPB/FPE AFPB/BC NAME PLain AKlein DATE 10 / 23 /07 10 / 24 /07 OFFICIAL RECORD COPY | |||
DISTRIBUTION | |||
Adams Accession: | |||
1130 Adjourn}} | AGENDA NFPA 805 Pilot Observation Visit Public Meeting November 8, 2007 US NRC Region II Sam Nunn Atlanta Federal Center Room 24T20 61 Forsyth Street, SW Atlanta, GA 30303-3415 0830 Welcome from Region II Management 0835 Status of NFPA 805 Transition Pilot Program 0840 Multiple Spurious Operation Risk-Informed Methodology 0900 HRAs & Manual Operator Action Reconciliation Process 0920 Fire Scenario Development - Zone of Influence/Fire Origin Placement 0940 Break 0950 Treatment of Non-Power Operations 1000 License Amendment Request Template & FSAR Content Outline 1015 Existing Engineering Equivalency Evaluations 1035 Monitoring/Configuration Management 1055 Review of Outstanding and New Parking Lot Issues 1115 Questions 1130 Adjourn ENCLOSURE}} |
Latest revision as of 09:47, 7 December 2019
ML072970690 | |
Person / Time | |
---|---|
Site: | Oconee, Harris |
Issue date: | 10/24/2007 |
From: | Lain P NRC/NRR/DRA |
To: | Klein A NRC/NRR/ADRA/DRA/AFPB |
Lain Paul, 415-2346 | |
References | |
Download: ML072970690 (3) | |
Text
October 24, 2007 MEMORANDUM TO: Alexander R. Klein, Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM: Paul Lain, Senior Fire Protection Engineer /RA/
Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
SUBJECT:
PILOT OBSERVATION VISIT WITH DUKE ENERGY AND PROGRESS ENERGY REGARDING PILOT PLANT TRANSITION TO THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD, NATIONAL FIRE PROTECTION ASSOCIATION 805 DATE & TIME: Thursday November 8, 2007 See enclosed agenda for times.
LOCATION: U.S. Nuclear Regulatory Commission (NRC) Region II Sam Nunn Atlanta Federal Center Room 24T20 61 Forsyth Street, SW Atlanta, GA 30303-3415 PURPOSE: To discuss the topics associated with Duke Energys and Progress Energys Pilot Programs to transition Oconee Nuclear Power Station and Shearon Harris Nuclear Power Plant to the risk-informed, performance-based fire protection regulation in Title 10 of the Code of Federal Regulations, Part 50.48(c), the National Fire Protection Association (NFPA) 805 Rule.
CATEGORY*: This is a Category 2 meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
CONTACTS: Paul J. Fillion, RII Paul W. Lain, NRR 404-562-4623 301-415-2346 pjf@nrc.gov pwl@nrc.gov
- Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings,@
A. Klein 2 (67 FR 36920) May 28, 2002 PARTICIPANTS: Participants for the NRC include Staff from of the Office of Nuclear Reactor Regulation (NRR) and Region II (RII).
NRC National Laboratories Stakeholders C. Payne S. Nowlen (SNL) Progress Energy A. Klein T. Blackburn (PNNL) Duke Power P. Fillion M. Zentner (PNNL) Public P. Lain Nuclear Energy Institute R. Gallucci Industry Representatives H. Barrett Consultants to the Industry W. Rogers
Enclosure:
- 1. Agenda
A. Klein 2 PARTICIPANTS: Participants for the NRC include Staff from of the Office of Nuclear Reactor Regulation (NRR) and Region II (RII).
NRC National Laboratories Stakeholders C. Payne S. Nowlen (SNL) Progress Energy A. Klein T. Blackburn (PNNL) Duke Power P. Fillion M. Zentner (PNNL) Public P. Lain Nuclear Energy Institute R. Gallucci Industry Representatives H. Barrett Consultants to the Industry W. Rogers
Enclosure:
- 1. Agenda DISTRIBUTION:
DRA R/F PUBLIC AFPB PDII Reading NRR/ADPT Secy M. Franovich M. Salley C. Payne T. Boyce R. Musser J. Circle J. Hyslop S. Walker S. Laur P. Fillion A. Klein C. Moulton P. Lain Adams Accession: ML NRC-001 OFFICE AFPB/FPE AFPB/BC NAME PLain AKlein DATE 10 / 23 /07 10 / 24 /07 OFFICIAL RECORD COPY
AGENDA NFPA 805 Pilot Observation Visit Public Meeting November 8, 2007 US NRC Region II Sam Nunn Atlanta Federal Center Room 24T20 61 Forsyth Street, SW Atlanta, GA 30303-3415 0830 Welcome from Region II Management 0835 Status of NFPA 805 Transition Pilot Program 0840 Multiple Spurious Operation Risk-Informed Methodology 0900 HRAs & Manual Operator Action Reconciliation Process 0920 Fire Scenario Development - Zone of Influence/Fire Origin Placement 0940 Break 0950 Treatment of Non-Power Operations 1000 License Amendment Request Template & FSAR Content Outline 1015 Existing Engineering Equivalency Evaluations 1035 Monitoring/Configuration Management 1055 Review of Outstanding and New Parking Lot Issues 1115 Questions 1130 Adjourn ENCLOSURE