Category:Meeting Notice
MONTHYEARPMNS20231317, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE)2023-11-21021 November 2023 Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE) PMNS20230561, Annual Assessment Meeting2023-04-26026 April 2023 Annual Assessment Meeting PMNS20230395, Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE)2023-04-13013 April 2023 Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE) PMNS20230392, Annual Assessment Meeting2023-04-0707 April 2023 Annual Assessment Meeting PMNS20220537, Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-1912022-06-0202 June 2022 Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-191 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220350, Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting2022-04-0404 April 2022 Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting PMNS20210385, and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting2021-04-12012 April 2021 and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting ML21041A4822021-02-10010 February 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed License Amendment Request to Adopt TSTF-505 ML21022A2292021-01-22022 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed Standby Liquid Control System License Amendment Request ML21011A1472021-01-11011 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Inservice Testing of Safety Relief Valves Relief Request ML21007A1942021-01-0707 January 2021 Closed Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Underground Service Water Pipe Coating Relief Valves Relief Request PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes2020-10-22022 October 2020 Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML14106A2902014-04-16016 April 2014 Notice of Category 1 Public Meeting Regarding Shearon Harris Nuclear Plant to Discuss NRC Reactor Oversight Process Annual Assessment of 2013 Performance ML14106A2622014-04-16016 April 2014 Notice of Category 3 Public Meeting Regarding Brunswick Steam Electric Plant to Discuss NRC Reactor Oversight Process Annual Assessment ML14087A0802014-03-28028 March 2014 Notice of Forthcoming Meeting with Duke Energy ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13221A5122013-08-12012 August 2013 8/20/2013 - Closed Notice of Forthcoming Meeting with Duke Energy Regarding Mella Brunswick Steam Electric Plant, Units 1 and 2 ML13162A2962013-06-11011 June 2013 7/9/2013 - Notice of Forthcoming Meeting with Duke Energy, Inc. Re. a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request ML13151A0622013-05-31031 May 2013 Notice of Category 3 Public Meeting to Discuss the NRC Special Inspection on the Reactor Vessel Head Nozzle Repair of Shearon Harris Nuclear Plant, Unit 1 ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13094A2602013-04-0404 April 2013 Notice of Meeting with Carolina Power & Light Company to Discuss NRC Reactor Oversight Process Annual Assessment of Shearon Harris Nuclear Plant, Unit 1 ML13093A2202013-04-0303 April 2013 Meeting Announcement - Category 3 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML12346A2842012-12-18018 December 2012 Forthcoming Public Conference Call Meeting with Duke Energy Carolinas Re Mellla+ for Brunswick Steam Electric Plant, Units 1 and 2, to Discuss the Maximum Extended Load Limit Analysis Plus (Mellla+) Implementation ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12261A0992012-09-17017 September 2012 10/2/12 - Notice of Forthcoming Public Conference Call with Duke Energy Carolinas Regarding Shearon Harris Nuclear Plant, Unit 1 ML12249A1702012-09-0606 September 2012 Notice of Forthcoming Conference Call Public Meeting with Duke Energy Regarding the Non Conservative Technical Specifications License Amendment Requests for Shearon Harris Nuclear Plant Unit 1 ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12213A5172012-07-31031 July 2012 8/24/2012 Harris Meeting Announcement - Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference ML12160A5732012-06-11011 June 2012 Meeting Notice - Forthcoming Pre-Application Conference Call with Carolina Power and Light Company Regarding National Fire Protection Association Standard 805 for Brunswick Steam Electric Plant, Units 1 and 2 ML12153A1592012-06-0101 June 2012 Notice of Category 1 Public Meeting - Annual Assessment of Brunswick ML12144A2802012-05-23023 May 2012 Notice of Forthcoming Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12128A3462012-05-10010 May 2012 Meeting Notice - Forthcoming Notice of Pre-application Meeting with Carolina Power & Light Company Regarding NFPA805 ML1207201932012-03-12012 March 2012 Meeting Announcement - Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML11336A1592011-12-0202 December 2011 Notice of Closed Meeting with Carolina Power & Light Company Regarding Shearon Harris Nuclear Plant, Unit 1 (TAC ME6999), the Purpose of the Meeting Is to Discuss the August 22, 2011, Large Break Loss of Coolant Accident Submittal ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1112200802011-05-0202 May 2011 Notice of Category 1 Public Meeting to Discuss Nrc'S Reactor Oversight Process Annual Assessment of Brunswick Steam Electric Plant ML1108902092011-03-30030 March 2011 Notice of Meeting with Shearon Harris Nuclear Plant to Discuss Human Improvement Plan and to Introduce New Site Management Team ML1108406312011-03-29029 March 2011 Notice of Forthcoming Pre-Application Meeting with Carolina Power & Light Co. and Florida Power Corp., Brunswick Units 1 & 2, Crystal River Unit 3, and H.B. Robinson Unit 2, to Discuss Transition to the Requirements of National Fire.. ML1108004872011-03-21021 March 2011 Notice of Meeting with Carolina Power & Light Co. to Discuss NRC Reactor Oversight Process Annual Assessment of the Shearon Harris Nuclear Plant ML1103804972011-02-0808 February 2011 Notice of Forthcoming Preapplication Meeting with Carolina Power & Light Company and Representatives Regarding Shearon Harris Nuclear Plant, Unit 1 ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1014400462010-05-21021 May 2010 Notice of Public Meeting to Discuss Fire Protection Screening Criteria Identified at Browns Ferry and Their Implications to Brunswick Steam Electric Plant - Docket Nos. 05000325 and 05000324 2023-04-07
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20231317, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE)2023-11-21021 November 2023 Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE) PMNS20230561, Annual Assessment Meeting2023-04-26026 April 2023 Annual Assessment Meeting PMNS20230395, Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE)2023-04-13013 April 2023 Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE) PMNS20230392, Annual Assessment Meeting2023-04-0707 April 2023 Annual Assessment Meeting PMNS20220537, Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-1912022-06-0202 June 2022 Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-191 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220350, Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting2022-04-0404 April 2022 Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting PMNS20210385, and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting2021-04-12012 April 2021 and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting ML21041A4532021-02-17017 February 2021 Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation ML21041A4822021-02-10010 February 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed License Amendment Request to Adopt TSTF-505 ML21022A2292021-01-22022 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Proposed Standby Liquid Control System License Amendment Request ML21011A1472021-01-11011 January 2021 Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Inservice Testing of Safety Relief Valves Relief Request ML21007A1942021-01-0707 January 2021 Closed Pre-Submittal Teleconference with Duke Energy Progress, LLC Regarding Brunswick Steam Electric Plant, Units 1 and 2 - Underground Service Water Pipe Coating Relief Valves Relief Request ML20329A3812020-12-0707 December 2020 Regulatory Audit Summary Regarding License Amendment Request to Adopt Risk Informed Completion Times Technical Specification Task Force-505, Rev. 2, Provide Risk-Informed Completion Times (EPID L-2019-LLA-0218 PMNS20201240, Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes2020-10-22022 October 2020 Closed Meeting with Duke Energy to Update the U.S. Nuclear Regulatory Commission Staff Security Plan Changes ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML18130A6942018-05-10010 May 2018 Agenda - Power Uprates Subcommittee Meeting - May 16, 2018 ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML14140A2912014-05-20020 May 2014 EA-14-048 Public Meeting Summary - Regulatory Conference and Predecision Enforcement Conference for Brunswick Steam Electric Plant ML14106A2902014-04-16016 April 2014 Notice of Category 1 Public Meeting Regarding Shearon Harris Nuclear Plant to Discuss NRC Reactor Oversight Process Annual Assessment of 2013 Performance ML14106A2622014-04-16016 April 2014 Notice of Category 3 Public Meeting Regarding Brunswick Steam Electric Plant to Discuss NRC Reactor Oversight Process Annual Assessment ML14087A0802014-03-28028 March 2014 Notice of Forthcoming Meeting with Duke Energy ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13221A5122013-08-12012 August 2013 8/20/2013 - Closed Notice of Forthcoming Meeting with Duke Energy Regarding Mella Brunswick Steam Electric Plant, Units 1 and 2 ML13162A2962013-06-11011 June 2013 7/9/2013 - Notice of Forthcoming Meeting with Duke Energy, Inc. Re. a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request ML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML12346A2842012-12-18018 December 2012 Forthcoming Public Conference Call Meeting with Duke Energy Carolinas Re Mellla+ for Brunswick Steam Electric Plant, Units 1 and 2, to Discuss the Maximum Extended Load Limit Analysis Plus (Mellla+) Implementation ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12261A0992012-09-17017 September 2012 10/2/12 - Notice of Forthcoming Public Conference Call with Duke Energy Carolinas Regarding Shearon Harris Nuclear Plant, Unit 1 ML12249A1702012-09-0606 September 2012 Notice of Forthcoming Conference Call Public Meeting with Duke Energy Regarding the Non Conservative Technical Specifications License Amendment Requests for Shearon Harris Nuclear Plant Unit 1 ML12160A5732012-06-11011 June 2012 Meeting Notice - Forthcoming Pre-Application Conference Call with Carolina Power and Light Company Regarding National Fire Protection Association Standard 805 for Brunswick Steam Electric Plant, Units 1 and 2 ML12144A2802012-05-23023 May 2012 Notice of Forthcoming Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12128A3462012-05-10010 May 2012 Meeting Notice - Forthcoming Notice of Pre-application Meeting with Carolina Power & Light Company Regarding NFPA805 ML12076A1422012-01-11011 January 2012 Meeting Topics - Suggested Discussion Items Regarding Large Break Loss-of-Coolant Accident Submittal - Shearon Harris Nuclear Power Plant, Unit 1 ML11336A1592011-12-0202 December 2011 Notice of Closed Meeting with Carolina Power & Light Company Regarding Shearon Harris Nuclear Plant, Unit 1 (TAC ME6999), the Purpose of the Meeting Is to Discuss the August 22, 2011, Large Break Loss of Coolant Accident Submittal ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1108406312011-03-29029 March 2011 Notice of Forthcoming Pre-Application Meeting with Carolina Power & Light Co. and Florida Power Corp., Brunswick Units 1 & 2, Crystal River Unit 3, and H.B. Robinson Unit 2, to Discuss Transition to the Requirements of National Fire.. ML1108004872011-03-21021 March 2011 Notice of Meeting with Carolina Power & Light Co. to Discuss NRC Reactor Oversight Process Annual Assessment of the Shearon Harris Nuclear Plant ML1103804972011-02-0808 February 2011 Notice of Forthcoming Preapplication Meeting with Carolina Power & Light Company and Representatives Regarding Shearon Harris Nuclear Plant, Unit 1 ML1005702002010-02-26026 February 2010 Notice of Closed Meeting with Progress Energy to Observe a Live Test Fire of Mackenzie River Partner'S Remotely Operated Weapon System at the Shearon Harris Nuclear Plant ML0936406952010-01-0707 January 2010 Notice of Meeting with Carolina Power & Light Company to Discuss Requests for Additional Information Associated with Generic Letter 2004-02 ML0929201872009-10-19019 October 2009 Enclosure 1 - Scheduling Note: Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting) ML0927402342009-09-30030 September 2009 Draft Agenda for Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting) ML0921609632009-08-0404 August 2009 Meeting Summary - Public Meeting Category 1 - Preliminary White Finding - Brunswick Steam Electric Plant ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit 2023-04-07
[Table view] |