ML17305A863: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/1990
| issue date = 03/31/1990
| title = Errata to Monthly Operating Rept for Mar 1990 for Palo Verde Nuclear Generating Station,Unit 2
| title = Errata to Monthly Operating Rept for Mar 1990 for Palo Verde Nuclear Generating Station,Unit 2
| author name = PORTER K F
| author name = Porter K
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC MONTHLY OPERATING REPORT~~AMENDED~~DOCKET NO.50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.2.3.4.5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 2 II"-"" Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe):~140 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): one Reasons For Restrictions, If Any: N A ll 12 13.14.15.16.17 18.19.20.21.22 23.24.This Month 44 Yr.-to-Date 2 160 1 295 0 0 0 1 295 0 61.2a Hours in Reporting Period Number of Hours Reactor Was Critical 0 0 Reactor Reserve Shutdown Hours 0 0 Hours Generator On-Line 0 0 Unit Reserve Shutdown Hours 0 0 0 0 Gross Thermal Energy Generated (MWH)0 Gross Electrical Energy Generated (MWH)0 1 712 500 Net Electrical Energy Generated (MWH)0 1 614 008 Unit Service Factor 45.0a Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N A Cumulative 30 960 20 546 1 0 0 20 042 2 0 0 3 499 053 25 682 370 23 996 820 I 63.3a 63.3a 63 5a 61 0%9 9a 25.If Shutdown At End of Report Period, Estimated Date of Start-up: June 09 1990 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~03 86 06 86~11 86 Achieved~04 18 86 05 20 86 09 19 86 9006050340 900531 PDR ADOCK 05000529 R PDC 6-0 gl I I I l i l l f}}
{{#Wiki_filter:~~       AMENDED   ~~
NRC MONTHLY OPERATING REPORT DOCKET NO.     50-529 DATE COMPLETED BY K F       Porter OPERATING STATUS 1.
2.
3.
4.
Unit Name:
II" Palo Verde Nuclear Generatin Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe):     ~140 Station    Unit  2
: 5. Design Electrical Rating (Net MWe): ~12 0
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):       1221
: 8. If Changes Occur In Capacity Ratings (Item Numbers       3 Through 7)
Since Last Report, Give Reasons:     N A
: 9. Power Level   to Which Restricted, If Any (Net     MWe):     one
: 10. Reasons For   Restrictions, If Any: N A This Month             Yr.-to-Date           Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 44                    2 160                  30 960 Was Critical                                 0 0                 1 295  0              20 546 1
: 13. Reactor Reserve Shutdown Hours               0  0                     0 0                  0 0
: 14. Hours Generator On-Line                       0 0                 1 295  0              20 042 2
: 15. Unit Reserve   Shutdown Hours                 0  0                    0 0                 0 0
: 16. Gross Thermal Energy Generated (MWH)                                 0                                       3  499 053 17  Gross Electrical Energy Generated (MWH)                                 0                 1 712 500         25 682 370
: 18. Net Electrical Energy Generated (MWH)                                 0                 1 614 008         23 996 820  I
: 19. Unit Service Factor                                                   45.0a                 63.3a
: 20. Unit Availability Factor                                                                   63.3a
: 21. Unit Capacity Factor (Using MDC Net)                                                     61.2a                63 5a 22  Unit Capacity Factor (Using   DER Net)                                                                           61 0%
: 23. Unit Forced   Outage Rate                                                                   9 9a
: 24. Shutdowns Scheduled Over Next   6 Months (Type, Date and Duration         of Each):
N A
: 25. If Shutdown At End   of Report Period, Estimated   Date   of Start-up:
June 09 1990 Forecast                Achieved INITIAL CRITICALITY                           ~03 86                   ~04 18 86 INITIAL ELECTRICITY                              06 86                05 20 86 COMMERCIAL OPERATION                          ~11 86                  09 19 86 9006050340 900531                           6-PDR     ADOCK 05000529 R                   PDC
 
0 gl I
I I
l i l l
f}}

Latest revision as of 05:00, 4 February 2020

Errata to Monthly Operating Rept for Mar 1990 for Palo Verde Nuclear Generating Station,Unit 2
ML17305A863
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/31/1990
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305A861 List:
References
NUDOCS 9006050340
Download: ML17305A863 (2)


Text

~~ AMENDED ~~

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.

2.

3.

4.

Unit Name:

II" Palo Verde Nuclear Generatin Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): ~140 Station Unit 2

5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): one
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 44 2 160 30 960 Was Critical 0 0 1 295 0 20 546 1
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 0 0 1 295 0 20 042 2
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 3 499 053 17 Gross Electrical Energy Generated (MWH) 0 1 712 500 25 682 370
18. Net Electrical Energy Generated (MWH) 0 1 614 008 23 996 820 I
19. Unit Service Factor 45.0a 63.3a
20. Unit Availability Factor 63.3a
21. Unit Capacity Factor (Using MDC Net) 61.2a 63 5a 22 Unit Capacity Factor (Using DER Net) 61 0%
23. Unit Forced Outage Rate 9 9a
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

June 09 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY 06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 9006050340 900531 6-PDR ADOCK 05000529 R PDC

0 gl I

I I

l i l l

f