| issue date = 04/30/1997
| issue date = 04/30/1997
| title = Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant.W/970514 Ltr
| title = Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant.W/970514 Ltr
| author name = ROBINSON W R, ROGERS S
| author name = Robinson W, Rogers S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULRTC@INPORMATION DISTRIBUTION
{{#Wiki_filter:CATEGORY 1 REGULRTC@ INPORMATION DISTRIBUTION %STEM (RIDE)
%STEM (RIDE)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,'S.
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                   05000400 AUTH. NAME           AUTHOR AFFILIATION ROGERS,'S.           Carolina Power   &   Light Co.
Carolina Power&Light Co.ROBINSON,W.R.
ROBINSON,W.R.       Carolina Power   6   Light Co.
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept r 1997 for Shearon Harris Nuclear Power Plant.970514 1 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR 1 ENCL!SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000400 E RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: Ol OC/DBA PAD EXTERNAL: LITCO BRYCEIJ H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ROONEYPV AEOD/SPD/RRAB
Monthly operating rept             r 1997   for   Shearon   Harris Nuclear Power Plant. 970514 1 r.
.NRR/DRPM/PECB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: IE24D       COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech 1
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL.1'1 1 , CP?QE Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris NUclear Plant MAY 1 4>997 United States Nuclear Regulatory Commission ATTENTION:
Specs)
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT Serial: HNP-97-107
ENCL    !  SIZE:
NOTES:Application for permit renewal         filed.                               05000400 E RECIPIENT           COPIES            RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME           LTTR ENCL PD2-1 PD                 1     1       ROONEYPV                  1   1 INTERNAL:                            1     1       AEOD/SPD/RRAB       . 1    1 Ol      1    1      NRR/DRPM/PECB             1    1 OC/DBA PAD              1     1       RGN2                      1   1 EXTERNAL: LITCO BRYCEIJ H            1     1       NOAC                      1   1 NRC PDR                  1     1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             11   ENCL     .1'1
 
1
  , CP?QE Carolina Power & Light Company                                                           William R. Robinson PO Box 165                                                                               Vice President New Hill NC 27562                                                                       Harris NUclear Plant MAY   1 4 >997 United States Nuclear Regulatory Commission                                                 Serial: HNP-97-107 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power 8c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of April 1997 is provided.Sincerely, MV Enclosure Mr.J.B.Brady-NRC Senior Resident Inspector Mr.L.A.Reyes-NRC Regional Administrator Mr.N.B.Le-NRC Project Manager 97052202bl 970430 PDR ADQCK 05000400 R PDR'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095 United States Nuclear Regu atory Commission HNP-97-107
 
/Page 2 bc: Mr.T.C.Bell Mr.B.H.Clark Mr.G.W.Davis Ms.S.F.Flynn Mr.W.J.Hindman Ms.W.C.Langston (PE&RAS File)Mr.R.D.Martin Mr.W.S.Orser Mr.W.R.Robinson Mr.W.G.Wendland Nuclear Records File: HI/A-2D Enclosure to Serial HNP-97-107 Sheet 1 of 4 CP&L CO.RUN DATE 05/05/97 RUN TIME 19:04:56 DOCKET NO.050"400 COMPLETED BY: SHEILA ROGERS TELEPHONE (919)362-2573 OPERATING STATUS PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRXS UNIT 1 PAGE 1 RPD36-000 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: APRIL 97 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LXNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNXT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 719.00 98.45.00 98.37.00 266067.00 89258.00 75947.00 13.68 13.68 12.28 11.74.00 (TYPE, DATE, 87648.00 73489.90.00 72767.79.00 194984120.70 64917818.00 60544526.00 83.02 83.02 80.32 76.75 3.29 2879.00 2223.79.00 2210.13.00 6099787.44 2050566.00 1919787.00 76.77 76.77 77.54 74.09 2.14 AND DURATION OF EACH): Unit started Refueling Outage 7 on 4/5/97, with an estimated duration of 40 days.25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: May 29, 1997 26.UNITS XN TEST STATUS (PRXOR TO COMMERCIAL OPERATION):
In accordance with Carolina Power 8c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of April 1997 is provided.
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 Enclosure to Serial: HNP-97-107 Sheet 2 of 4 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 05/05/97 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 19:04:56 HARRIS UNIT 1 PAGE 1 RPD39-000 APRIL 1997 DAY AVG.DAILY POWER LEVEL (MWE-NET)875 878 878 DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)17 18 19 850-17-30-26 20 21 22 23-12 10 12 13 15 16"15-10-10-12-12-12 25 26 27 28 29 30 0'I Enclosure to Serial: HNP-97-107
Sincerely, MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. N. B. Le       - NRC Project Manager
~,Sheet 3of<UNIT NAME: Harris DATE: 03/05/97 COMPLETED BY: S.G.Rogers TELEPHONE:
                                                    'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 97052202bl 970430 PDR   ADQCK 05000400 R                       PDR State Road 1134 New Hill NC     Tel 919362-2502         Fax 919362-2095
(919)362-2573 REPORT MONTH UNIT SHUTDOWNS AND POWER REDUCTION NUMBER DATE TYPE I DURATION (HOURS)REASON 2 METHOD OF SHU1TING DOWN REACTOR 3 LICENSEE EVENT REPORT g SYSTEM CODE 4 COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 97-002 970404 0.0 N/A Unit commenced turbine load reduction at 2223 on 4/4/97 in preparation for refueling outage 7.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)8-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training&License Examination F-Administrative G-Operational Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4<ontinued 5-Reduced Load 643thcr 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4)161) 5 Exhibit I-Same Source  
 
/II P J~~i t UNIT SHUTDOWNS AND POWER REDUCTION r Enclosure<o, Serial: HNP-97-107.,Sheet 4 of@UNIT NAME: Hams DATE: 03/05/97 COMPLETED BY: S.G.Rogers TELEPHONE:
United States Nuclear Regu atory Commission HNP-97-107 / Page 2 bc:   Mr. T. C. Bell Mr. B. H. Clark Mr. G. W. Davis Ms. S. F. Flynn Mr. W. J. Hindman Ms. W. C. Langston (PE&RAS File)
(919)362-2573 REPORT MONTH NUMBER DATE TYPE I DURATION (HOURS)REASON 2 METHOD OF SHUITING DOWN REACTOR 3 LICENSEE EVENT REPORT II SYSTEM CODE4 COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 97403 970405 620.63 N/A ZZZZZZ Unit shutdown and taken olf-line at 0222 on 4/5/97 for refueling outage 7.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4Mntinued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4161) 5 Exhibit I-Same Source}}
Mr. R. D. Martin Mr. W. S. Orser Mr. W. R. Robinson Mr. W. G. Wendland Nuclear Records File: HI/A-2D
 
Enclosure to Serial HNP-97-107 Sheet 1 of 4 CP&L CO.                     PLANT PERFORMANCE DATA SYSTEM                PAGE      1 RUN DATE 05/05/97               OPERATING DATA REPORT                  RPD36-000 RUN TIME 19:04:56                 HARRXS UNIT 1 DOCKET NO. 050"400 COMPLETED BY: SHEILA ROGERS TELEPHONE (919)362-2573 OPERATING STATUS
: 1. UNIT NAME:             HARRIS UNIT 1
: 2. REPORTING PERIOD:       APRIL 97
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE): 950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
: 7. MAX DEPENDABLE CAPACITY (NET MWE):     860.0
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,       GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS           YR TO                 CUMUL MONTH            DATE                 ATIVE
: 11. HOURS IN REPORTING PERIOD                   719.00          2879.00              87648.00
: 12. NUMBER OF HOURS REACTOR CRITICAL             98.45          2223.79              73489.90
: 13. REACTOR RESERVE SHUTDOWN HRS                     .00              .00                    .00
: 14. HOURS GENERATOR ON LXNE                       98.37          2210.13              72767.79
: 15. UNIT RESERVE SHUTDOWN HOURS                     .00              .00                    .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)         266067.00        6099787.44        194984120.70
: 17. GROSS ELEC. ENERGY GEN (MWH)               89258.00      2050566.00          64917818.00
: 18. NET ELEC. ENERGY GENERATED (MWH)           75947.00      1919787.00          60544526.00
: 19. UNXT SERVICE FACTOR                           13.68            76.77                  83.02
: 20. UNIT AVAILABILITYFACTOR                      13.68            76.77                  83.02
: 21. UNIT CAP. FACTOR (USING MDC NET)             12.28            77.54                  80.32
: 22. UNIT CAP. FACTOR (USING DER NET)             11.74            74.09                  76.75
: 23. UNIT FORCED OUTAGE RATE                         .00            2.14                  3.29
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Unit started Refueling Outage   7 on 4/5/97, with an estimated duration of       40 days.
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: May 29, 1997
: 26. UNITS XN TEST STATUS (PRXOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
 
Enclosure to Serial: HNP-97-107 Sheet 2 of 4 CP&L CO.                   PLANT PERFORMANCE DATA SYSTEM                 PAGE      1 RUN DATE 05/05/97     APPENDIX B - AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TIME 19:04:56                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 APRIL          1997 DAY  AVG. DAILY POWER LEVEL            DAY   AVG. DAILY POWER LEVEL (MWE-NET)                                 (MWE-NET) 875                    17 878                    18 878                    19 850                   20                -12
                  -17                   21
                  -30                   22
                  -26                   23 "15                   25 10                -10                   26 27 12                -10                   28 13                                        29
                  -12                   30 15                -12 16                -12
 
0
  'I
 
Enclosure to Serial: HNP-97-107   ~
                                                                                                                                                                ,Sheet 3of<
UNIT SHUTDOWNS AND POWER REDUCTION UNITNAME:       Harris DATE:         03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE:     (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF      LICENSEE                                    ACTION TO DURATION                    SHU1TING DOWN      EVENT        SYSTEM COMPONENT      PREVENT RECURRENCE NUMBER       DATE         TYPE   I       (HOURS)         REASON 2     REACTOR 3       REPORT g     CODE 4   CODE 5 97-002     970404                         0.0                                         N/A                             Unit   commenced   turbine load reduction at 2223 on 4/4/97 in preparation for refueling outage 7.
I                           2                                                          3                            4 F: Forced                     Reason:                                                    Method:                      Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Explain)                               I-Manual                    for Preparation of Data 8-Maintenance or Test                                       2-Manual Scram              Entry Sheets for Licensee Event C-Refueling                                                 3-Automatic Scram            Report (LER) File D-Regulatory Restriction                                   4<ontinued                  (NUREG4)161)
E&perator Training & License Examination                   5-Reduced Load F-Administrative                                           643thcr                      5 G-Operational Error (Explain)                                                           Exhibit I - Same Source Hither (Explain)
 
/
II P J
    ~
      ~
i t
 
r Enclosure <o, Serial: HNP-97-107.
                                                                                                                                                              ,Sheet 4 of@
UNITSHUTDOWNS AND POWER REDUCTION UNITNAME:       Hams DATE:         03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE:     (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF      LICENSEE                                    ACTION TO DURATION                    SHUITING DOWN    EVENT        SYSTEM COMPONENT      PREVENT RECURRENCE NUMBER       DATE         TYPE   I       (HOURS)         REASON 2     REACTOR 3     REPORT II     CODE4   CODE 5 97403       970405                       620.63                                         N/A                 ZZZZZZ     Unit shutdown and taken olf-line at 0222 on 4/5/97 for refueling outage 7.
I                           2                                                          3                            4 F: Forced                     Reason:                                                    Method:                      Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Explain)                               I-Manual                    for Preparation of Data B-Maintenance or Test                                       2-Manual Scram              Entry Sheets for Licensee Event C-Refueling                                                 3-Automatic Scram            Report (LER) File D-Regulatory Restriction                                   4Mntinued                    (NUREG4161)
E-Operator Training & License Examination                   5-Reduced Load F-Administrative                                            6-Other                     5 G-Operational Error (Explain)                                                           Exhibit I - Same Source Hither (Explain)}}

Latest revision as of 05:52, 22 October 2019

Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant.W/970514 Ltr
ML18012A782
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1997
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-97-107, NUDOCS 9705220261
Download: ML18012A782 (9)


Text

CATEGORY 1 REGULRTC@ INPORMATION DISTRIBUTION %STEM (RIDE)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,'S. Carolina Power & Light Co.

ROBINSON,W.R. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept r 1997 for Shearon Harris Nuclear Power Plant. 970514 1 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech 1

Specs)

ENCL  ! SIZE:

NOTES:Application for permit renewal filed. 05000400 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 ROONEYPV 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB . 1 1 Ol 1 1 NRR/DRPM/PECB 1 1 OC/DBA PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEIJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL .1'1

1

, CP?QE Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris NUclear Plant MAY 1 4 >997 United States Nuclear Regulatory Commission Serial: HNP-97-107 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power 8c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of April 1997 is provided.

Sincerely, MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. L. A. Reyes - NRC Regional Administrator Mr. N. B. Le - NRC Project Manager

'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 97052202bl 970430 PDR ADQCK 05000400 R PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095

United States Nuclear Regu atory Commission HNP-97-107 / Page 2 bc: Mr. T. C. Bell Mr. B. H. Clark Mr. G. W. Davis Ms. S. F. Flynn Mr. W. J. Hindman Ms. W. C. Langston (PE&RAS File)

Mr. R. D. Martin Mr. W. S. Orser Mr. W. R. Robinson Mr. W. G. Wendland Nuclear Records File: HI/A-2D

Enclosure to Serial HNP-97-107 Sheet 1 of 4 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/97 OPERATING DATA REPORT RPD36-000 RUN TIME 19:04:56 HARRXS UNIT 1 DOCKET NO. 050"400 COMPLETED BY: SHEILA ROGERS TELEPHONE (919)362-2573 OPERATING STATUS

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: APRIL 97
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 719.00 2879.00 87648.00
12. NUMBER OF HOURS REACTOR CRITICAL 98.45 2223.79 73489.90
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LXNE 98.37 2210.13 72767.79
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 266067.00 6099787.44 194984120.70
17. GROSS ELEC. ENERGY GEN (MWH) 89258.00 2050566.00 64917818.00
18. NET ELEC. ENERGY GENERATED (MWH) 75947.00 1919787.00 60544526.00
19. UNXT SERVICE FACTOR 13.68 76.77 83.02
20. UNIT AVAILABILITYFACTOR 13.68 76.77 83.02
21. UNIT CAP. FACTOR (USING MDC NET) 12.28 77.54 80.32
22. UNIT CAP. FACTOR (USING DER NET) 11.74 74.09 76.75
23. UNIT FORCED OUTAGE RATE .00 2.14 3.29
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Unit started Refueling Outage 7 on 4/5/97, with an estimated duration of 40 days.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: May 29, 1997
26. UNITS XN TEST STATUS (PRXOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

Enclosure to Serial: HNP-97-107 Sheet 2 of 4 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 19:04:56 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 APRIL 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 875 17 878 18 878 19 850 20 -12

-17 21

-30 22

-26 23 "15 25 10 -10 26 27 12 -10 28 13 29

-12 30 15 -12 16 -12

0

'I

Enclosure to Serial: HNP-97-107 ~

,Sheet 3of<

UNIT SHUTDOWNS AND POWER REDUCTION UNITNAME: Harris DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHU1TING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT g CODE 4 CODE 5 97-002 970404 0.0 N/A Unit commenced turbine load reduction at 2223 on 4/4/97 in preparation for refueling outage 7.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4<ontinued (NUREG4)161)

E&perator Training & License Examination 5-Reduced Load F-Administrative 643thcr 5 G-Operational Error (Explain) Exhibit I - Same Source Hither (Explain)

/

II P J

~

~

i t

r Enclosure <o, Serial: HNP-97-107.

,Sheet 4 of@

UNITSHUTDOWNS AND POWER REDUCTION UNITNAME: Hams DATE: 03/05/97 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUITING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT II CODE4 CODE 5 97403 970405 620.63 N/A ZZZZZZ Unit shutdown and taken olf-line at 0222 on 4/5/97 for refueling outage 7.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4Mntinued (NUREG4161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source Hither (Explain)