ML18016A910: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/1999
| issue date = 03/31/1999
| title = Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr
| title = Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr
| author name = ALEXANDER D B, ROGERS S
| author name = Alexander D, Rogers S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY j.REGULATORY INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESQXVh~NBR:9904190252 DOC.DAT.OTARIZED: NO FACIL:5'0-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NICE.I AUTHOR AFFILIATION ROGERS,S.Carolina Power&Light Co.ALEXANDER,D.B.
{{#Wiki_filter:CATEGORY j.
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000400
REGULATORY INFORMATION DISTRIBUTIO             SYSTEM (RIDS)
ACCESQXVh~NBR:9904190252           DOC.DAT .                   OTARIZED: NO             DOCKET  ¹ FACIL:5'0-400 Shearon     Harris Nuclear Power Plant, Unit 1, Carolina                 05000400 AUTH.NICE .I         AUTHOR AFFILIATION ROGERS,S.             Carolina Power & Light Co.
ALEXANDER,D.B.       Carolina Power & Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating re t or Shearon Harris Nuclear Power Pla.With 990413 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR i ENCL)SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.0500040(P RECIPIENT ID CODE/NAME LPD2-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME LAUFER,R.COPIES LTTR ENCL 1 1 R INTERNAL: ACRS CENTER 1 1 1 1 1 1 AEOD/SPD/RRAB OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating re t                           or Shearon Harris Nuclear Power Pla .With 990413             ltr.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Carolina Power&Light Company Harris Nuclear Plant P.O.Box 165 New Hill NC 27562 APR 18"999 United States Nuclear Regulatory Commission ATTENTION:
DISTRIBUTION CODE: IE24D         COPIES RECEIVED: LTR       i ENCL   )   SIZE:
Document Control Desk Washington, DC 20555 Serial: HNP-99-066 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT  
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application     for permit renewal filed.                                         0500040(P RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL          ID  CODE/NAME        LTTR ENCL LPD2-2   PD               1     1       LAUFER,R.                 1     1 R
INTERNAL: ACRS                       1     1       AEOD/SPD/RRAB             1      1 CENTER              1      1      OC/DBA/PAD               1     1 1     1 EXTERNAL: LMITCO MARSHALL             1      1      NOAC NRC PDR                   1     1 D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
Carolina Power & Light Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 APR 18 "999 United States Nuclear Regulatory Commission                                         Serial: HNP-99-066 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power&Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1999 is provided.Sincerely, ,@z~..B.Alexande Manager, Regulatory Affairs Harris Plant SGR Enclosure 1 C"t i~I~+)Q c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.R.J.Laufer-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC 9904i'70252
'si9033i PDR AMCK OS000400 R PDR P
Enclosure to Serial HNP-99-066 Shcct 1 of 4 cprcL co.RUN DATE 04/07/99 RUN TIME 19:38:13 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTXNG PERXOD: MARCH 99 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR XN CAPACITY RATINGS (XTEMS 3 THRU 7)SiNCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED ZF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERXOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNXT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNXT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 744.00 606.92.00 551.68.00 1436029.20 478486.00 441262.00 74.15 74.15 68.96 65.90 25.85 (TYPE, DATE, 104449.00 88224.21.00 87309.72.00 234569728.80 78068495.00 72846018.00 83.59 83.59 81.10 77.49 3.29 2160.00 1998.60.00 1924.11.00 5150004.84 1724458.00 1609146.00 89.08 89.08 86.63 82.78 10.92 AND DURATXON OF EACH): 25.ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS ZN TEST STATUS (PRZOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRZTZCALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9


Enclosure to Serial: HNP-99-066 Sheet 2 of 4 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 04/07/99 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 19:38:12 HARRIS UNIT 1 PAGE 1 RPD39-000 MARCH 1999 DAY AVG.DAILY POWER LEVEL (M('rE-NET)
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1999 is provided.
DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 15 878 877 871 878 881 872 207 120 763 875 878 219-35-35-36-37 17 18 19 20 21 22 23 25 26 27 28 29 30 31-36-38 707 834 865 868 864 868 873 873 871 871 873 870 t~)I)F Cy Ca'j C;f~i lq 1 f-A ,t gt (I'I f I'f(r~C A J r>>',~P.".V r.~
Sincerely,
E Enclosure to Serial: HNP-99-066
                                                                    ,@z~.
-'.Sheq>3 of 4 UNIT NAME: Hams DATE: 04/0l/99 COMPLETED BY: S.G.Rogers TELEPHONE:
                                                                  . B. Alexande Manager, Regulatory Affairs Harris Plant SGR  C"t i~ I +) Q
(9I9)362-2573 REPORT MONTH: March l999 UNIT SHUTDOWNS AND POPOVER REDUCf ION NUMBER DATE 03/07/99 TYPE I DURATION (HOURS)18.25 REASON 2 MErHOD OF SHUITING DOWN REACTOR 3 LICENSEE EVENT REPORT¹NA SYSTEM CODE 4 Hl COMPONENT CODE 5 VALVEX CAUSE AND CORRECTIVE ACrlON TO PREVENT RECURRENCE Phnt reduced power and came off line 3/7/99 due to loss of Steam Generator blowdown flow fmm B Steam Generator caused by failure of I BD-20.Repairs were made and phnt was returned to l00%power on 3/9/99 I l2:00 I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B.Maintenance or Test C.Refueling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Exphin)H-Other (Explain)3 Method: I-Manual 2.Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER)File (NUREG-OI6 I)5 Exhibit I-Same Source J
                                    ~
UNIT SHUTDOWNS AND POWER REDUCfION Enclosure to-Serial: HNP-99-066
c:        Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road  New Hill NC 9904i'70252 'si9033i PDR      AMCK OS000400 R                        PDR
~Shee@4 of 4 UNIT NAME: Harris DATE: 04/01/99 COMPLETED BY: S.G.Rogers TELEPHONE:
 
(919)362-2573 REPORT MONTH: March 1999 NUMBER 99-004 DATE TYPE I 03/12/99 DURATION (HOURS)174.07 REASON 2 MEI'HOD OF SHUTTING DOWN REACTOR 3 LICENSEE EVENT REPORT¹99-004 SYSTEM CODE 4 CH COMPONENT CODE 5 INSTRU CAUSE AND CORRECTIVE ACfION TO PREVENT RECURRENCE Phnt received auto turbine/reac(or trip from high steam generator level in"C'team generator.
P Enclosure to Serial HNP-99-066 Shcct 1 of 4 cprcL  co.                    PLANT PERFORMANCE DATA SYSTEM                PAGE      1 RUN DATE    04/07/99                OPERATING DATA REPORT                  RPD36-000 RUN TIME    19:38:13                  HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS                                        TELEPHONE (919)362-2573
Repairs were made and phnt was returned to 100%power 3/22/99 8 05:00.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Exphin)B-Maintenance or Test C-Refueling D-Reguhtory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source fC>>r, gs.I 4*I I i}}
: 1. UNIT NAME:    HARRIS UNIT 1
: 2. REPORTXNG PERXOD: MARCH        99
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE): 950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
: 7. MAX DEPENDABLE CAPACITY (NET MWE):      860.0
: 8. IF CHANGES OCCUR XN CAPACITY RATINGS (XTEMS 3 THRU 7) SiNCE LAST REPORT, GIVE REASONS:
: 9. POWER  LEVEL TO WHICH RESTRICTED ZF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION  IF ANY:
THIS            YR TO                CUMUL MONTH              DATE                ATIVE
: 11. HOURS IN REPORTING PERXOD                      744.00          2160.00            104449.00
: 12. NUMBER OF HOURS REACTOR CRITICAL              606.92          1998.60              88224.21
: 13. REACTOR RESERVE SHUTDOWN HRS                      .00              .00                  .00
: 14. HOURS GENERATOR ON LINE                        551.68          1924.11              87309.72
: 15. UNIT RESERVE SHUTDOWN HOURS                        .00              .00                  .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)          1436029.20        5150004.84        234569728.80
: 17. GROSS ELEC. ENERGY GEN (MWH)              478486.00        1724458.00          78068495.00
: 18. NET ELEC. ENERGY GENERATED (MWH)          441262.00        1609146.00          72846018.00
: 19. UNIT SERVICE FACTOR                            74.15            89.08                83.59
: 20. UNIT AVAILABILITYFACTOR                        74.15            89.08                83.59
: 21. UNXT CAP. FACTOR (USING MDC NET)                68.96            86.63                81. 10
: 22. UNIT CAP. FACTOR (USING DER NET)                65.90            82.78                77.49
: 23. UNXT FORCED OUTAGE RATE                        25.85            10.92                  3.29
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATXON OF EACH):
: 25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS ZN TEST STATUS (PRZOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRZTZCALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16  - 9
 
Enclosure to Serial: HNP-99-066 Sheet 2 of 4 CP&L CO.                   PLANT PERFORMANCE DATA SYSTEM                 PAGE      1 RUN DATE 04/07/99       APPENDIX B - AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TIME 19:38:12                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 MARCH          1999 DAY  AVG. DAILY POWER LEVEL              DAY   AVG. DAILY POWER LEVEL (M('rE-NET)                                (MWE-NET) 878                   17                -36 877                   18                -38 871                   19 878                   20                707 881                   21                834 872                   22                865 207                   23                868 120                                       864 763                   25                868 10                  875                   26                873 878                   27                873 12                  219                   28                871 13                  -35                   29                871
                    -35                   30                873 15                  -36                   31                870
                    -37
 
lq 1
Cy      f        -A Ca
        'j   C;f ~ i               ,t
  ~)
  )
IF t
gt                           (
                            'I I f
I               'f(
r~
J r>> ',~
P r.~
A
                                      .". V C
 
E Enclosure to Serial: HNP-99-066   -'.
Sheq> 3 of 4 UNIT SHUTDOWNS AND POPOVER REDUCfION UNIT NAME:     Hams DATE:         04/0l/99 COMPLETED BY: S. G. Rogers TELEPHONE:     (9I9) 362-2573 REPORT MONTH: March l999 CAUSE AND CORRECTIVE MErHOD OF      LICENSEE                                    ACrlONTO DURATION                      SHUITING DOWN      EVENT        SYSTEM  COMPONENT      PREVENT RECURRENCE NUMBER       DATE         TYPE I         (HOURS)         REASON 2       REACTOR 3       REPORT ¹       CODE 4   CODE 5 Phnt reduced power and 03/07/99                        18.25                                        NA              Hl    VALVEX      came off line 3/7/99 due to loss of Steam Generator blowdown flow fmm B Steam Generator caused by failure of I BD-20. Repairs were made and phnt was 3/9/99  I returned to l00% power on l2:00 I                             2                                                            3                            4 F: Forced                     Reason:                                                      Method:                      Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Explain)                                 I-Manual                      for Preparation of Data B.Maintenance or Test                                         2.Manual Scram                Entry Sheets for Licensee Event Rcport C.Refueling                                                   3-Automatic Scram            (LER) File D-Regulatory Restriction                                     4-Continued                  (NUREG-OI6 I)
E-Operator Training 8c License Examination                   5-Reduced Load F-Administrative                                             6-Other                      5 G-Operational Error (Exphin)                                                               Exhibit I - Same Source H-Other (Explain)
 
J Enclosure to-Serial: HNP-99-066 ~
Shee@4 of 4 UNITSHUTDOWNS AND POWER REDUCfION UNIT NAME:     Harris DATE:         04/01/99 COMPLETED BY: S. G. Rogers TELEPHONE:     (919) 362-2573 REPORT MONTH: March 1999 MEI'HOD OF      LICENSEE                                    CAUSE AND DURATION                      SHUTTING DOWN      EVENT        SYSTEM  COMPONENT            CORRECTIVE NUMBER       DATE       TYPE I         (HOURS)         REASON 2       REACTOR 3       REPORT   ¹     CODE 4   CODE 5               ACfIONTO PREVENT RECURRENCE Phnt       received       auto 99-004  03/12/99                        174.07                                        99-004        CH    INSTRU      turbine/reac(or trip from high steam generator level in "C'team generator. Repairs were made and phnt was returned   to 100% power 3/22/99 8 05:00.
I                             2                                                            3                            4 F: Forced                     Reason:                                                      Method:                      Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Exphin)                                 I-Manual                      for Preparation of Data B-Maintenance or Test                                         2-Manual Scram                Entry Sheets for Licensee Event Report C-Refueling                                                   3-Automatic Scram            (LER) File D-Reguhtory Restriction                                       4-Continued                  (NUREG-0161)
E-Operator Training 8c License Examination                   5-Reduced Load F-Administrative                                             6-Other                      5 G-Operational Error (Explain)                                                               Exhibit I - Same Source H-Other (Explain)
 
fC>> r, gs.
I 4*
I I i}}

Latest revision as of 03:01, 16 November 2019

Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr
ML18016A910
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-066, HNP-99-66, NUDOCS 9904190252
Download: ML18016A910 (11)


Text

CATEGORY j.

REGULATORY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESQXVh~NBR:9904190252 DOC.DAT . OTARIZED: NO DOCKET ¹ FACIL:5'0-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NICE .I AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co.

ALEXANDER,D.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating re t or Shearon Harris Nuclear Power Pla .With 990413 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR i ENCL ) SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 0500040(P RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 PD 1 1 LAUFER,R. 1 1 R

INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Carolina Power & Light Company Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 APR 18 "999 United States Nuclear Regulatory Commission Serial: HNP-99-066 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1999 is provided.

Sincerely,

,@z~.

. B. Alexande Manager, Regulatory Affairs Harris Plant SGR C"t i~ I +) Q

~

c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC 9904i'70252 'si9033i PDR AMCK OS000400 R PDR

P Enclosure to Serial HNP-99-066 Shcct 1 of 4 cprcL co. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/07/99 OPERATING DATA REPORT RPD36-000 RUN TIME 19:38:13 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTXNG PERXOD: MARCH 99
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR XN CAPACITY RATINGS (XTEMS 3 THRU 7) SiNCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED ZF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERXOD 744.00 2160.00 104449.00
12. NUMBER OF HOURS REACTOR CRITICAL 606.92 1998.60 88224.21
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 551.68 1924.11 87309.72
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1436029.20 5150004.84 234569728.80
17. GROSS ELEC. ENERGY GEN (MWH) 478486.00 1724458.00 78068495.00
18. NET ELEC. ENERGY GENERATED (MWH) 441262.00 1609146.00 72846018.00
19. UNIT SERVICE FACTOR 74.15 89.08 83.59
20. UNIT AVAILABILITYFACTOR 74.15 89.08 83.59
21. UNXT CAP. FACTOR (USING MDC NET) 68.96 86.63 81. 10
22. UNIT CAP. FACTOR (USING DER NET) 65.90 82.78 77.49
23. UNXT FORCED OUTAGE RATE 25.85 10.92 3.29
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATXON OF EACH):
25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS ZN TEST STATUS (PRZOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRZTZCALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

Enclosure to Serial: HNP-99-066 Sheet 2 of 4 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/07/99 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 19:38:12 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 MARCH 1999 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (M('rE-NET) (MWE-NET) 878 17 -36 877 18 -38 871 19 878 20 707 881 21 834 872 22 865 207 23 868 120 864 763 25 868 10 875 26 873 878 27 873 12 219 28 871 13 -35 29 871

-35 30 873 15 -36 31 870

-37

lq 1

Cy f -A Ca

'j C;f ~ i ,t

~)

)

IF t

gt (

'I I f

I 'f(

r~

J r>> ',~

P r.~

A

.". V C

E Enclosure to Serial: HNP-99-066 -'.

Sheq> 3 of 4 UNIT SHUTDOWNS AND POPOVER REDUCfION UNIT NAME: Hams DATE: 04/0l/99 COMPLETED BY: S. G. Rogers TELEPHONE: (9I9) 362-2573 REPORT MONTH: March l999 CAUSE AND CORRECTIVE MErHOD OF LICENSEE ACrlONTO DURATION SHUITING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT ¹ CODE 4 CODE 5 Phnt reduced power and 03/07/99 18.25 NA Hl VALVEX came off line 3/7/99 due to loss of Steam Generator blowdown flow fmm B Steam Generator caused by failure of I BD-20. Repairs were made and phnt was 3/9/99 I returned to l00% power on l2:00 I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance or Test 2.Manual Scram Entry Sheets for Licensee Event Rcport C.Refueling 3-Automatic Scram (LER) File D-Regulatory Restriction 4-Continued (NUREG-OI6 I)

E-Operator Training 8c License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Exphin) Exhibit I - Same Source H-Other (Explain)

J Enclosure to-Serial: HNP-99-066 ~

Shee@4 of 4 UNITSHUTDOWNS AND POWER REDUCfION UNIT NAME: Harris DATE: 04/01/99 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: March 1999 MEI'HOD OF LICENSEE CAUSE AND DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CORRECTIVE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT ¹ CODE 4 CODE 5 ACfIONTO PREVENT RECURRENCE Phnt received auto 99-004 03/12/99 174.07 99-004 CH INSTRU turbine/reac(or trip from high steam generator level in "C'team generator. Repairs were made and phnt was returned to 100% power 3/22/99 8 05:00.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Exphin) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event Report C-Refueling 3-Automatic Scram (LER) File D-Reguhtory Restriction 4-Continued (NUREG-0161)

E-Operator Training 8c License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

fC>> r, gs.

I 4*

I I i