{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 21, 2012 | |||
Mr. Vito Kaminskas Site Vice President, Nuclear | |||
FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097 | |||
==SUBJECT:== | |||
REQUALIFICATION PROGRAM INSPECTION | |||
==Dear Mr. Kaminskas:== | |||
In a telephone conversation on August 17, 2012, Mr. R. Torres, Operations Training, and Mr. M. Bielby, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Perry Nuclear Power Plant. The inspection is planned for the week of December 3, 2012, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by week of November 19, 2012. Mr. Torres has been advised of this request and provided with the name and address of the NRC lead inspecto r assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. | |||
V. Kaminskas | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707. | |||
Sincerely, | |||
/RA/ Hironori Peterson, Chief | |||
Operations Branch Division of Reactor Safety | |||
Docket No. 50-440 License No. NPF-58 | |||
cc: Distribution via ListServŽ | |||
V. Kaminskas | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707. | |||
Sincerely, | |||
/RA/ Hironori Peterson, Chief | |||
Operations Branch Division of Reactor Safety | |||
Docket No. 50-440 License No. NPF-58 | |||
cc: Distribution via ListServŽ DISTRIBUTION | |||
: Silas Kennedy RidsNrrPMPerry Resource | |||
RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck | |||
Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak | |||
John McHale, NRR | |||
Janet Kweiser, DRS | |||
DOCUMENT NAME: Ltr 082112 Perry Requalification Program Inspection.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII RIII RIII NAME MBielby:cs HPeterson DATE 08/21/12 08/21/12 OFFICIAL RECORD COPY}} |
Revision as of 21:56, 1 August 2018
ML12234A664 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 08/21/2012 |
From: | Hironori Peterson Operations Branch III |
To: | Kaminskas V FirstEnergy Nuclear Operating Co |
References | |
Download: ML12234A664 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 21, 2012
Mr. Vito Kaminskas Site Vice President, Nuclear
FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Kaminskas:
In a telephone conversation on August 17, 2012, Mr. R. Torres, Operations Training, and Mr. M. Bielby, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Perry Nuclear Power Plant. The inspection is planned for the week of December 3, 2012, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by week of November 19, 2012. Mr. Torres has been advised of this request and provided with the name and address of the NRC lead inspecto r assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
V. Kaminskas
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707.
Sincerely,
/RA/ Hironori Peterson, Chief
Operations Branch Division of Reactor Safety
Docket No. 50-440 License No. NPF-58
cc: Distribution via ListServŽ
V. Kaminskas
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707.
Sincerely,
/RA/ Hironori Peterson, Chief
Operations Branch Division of Reactor Safety
Docket No. 50-440 License No. NPF-58
cc: Distribution via ListServŽ DISTRIBUTION
- Silas Kennedy RidsNrrPMPerry Resource
RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck
Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak
John McHale, NRR
Janet Kweiser, DRS
DOCUMENT NAME: Ltr 082112 Perry Requalification Program Inspection.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII RIII RIII NAME MBielby:cs HPeterson DATE 08/21/12 08/21/12 OFFICIAL RECORD COPY