2019 Perry Retake ES-401-4 Rejected KAs
ML22144A344
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/03/2019
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Baker R
Shared Package
ML19220A197 List:
References
Download: ML22144A344 (1)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Tier / Group Randomly Reason for Rejection Selected K/A 2/1 RO 263000 K5.01 Was unable to write an operationally valid RO level question for selected K/A (Knowledge of the operational implications of the following concepts as they apply to D.C. ELECTRICAL DISTRIBUTION: Hydrogen generation during battery charging). Perry does not have any documents that identify hydrogen generation as a hazard during battery charging. It is implied in training, but not overtly stated.

Randomly selected K/A 218000 K5.01 2/2/ RO 204000 K4.05 Was unable to write an operationally valid RO level question for selected K/A (Knowledge of REACTOR WATER CLEANUP SYSTEM design feature(s) and/or interlocks which provide for the following: Double valve isolation from the reactor). Perry does not have any documents that identify any requirement to have double valve isolation from the reactor.

Randomly selected K/A 201003 K4.02 Page 1 of 1 FENOC Facimile (Rev. 11)