ES-401 Record of Rejected K/As Form ES-401-4 Page 1 of 1 FENOC Facimile (Rev. 11)
Tier / Group Randomly Selected K/A Reason for Rejection 2/1 RO 263000 K5.01 Was unable to write an operationally valid RO level question for selected K/A (Knowledge of the operational implications of the following concepts as they apply to D.C. ELECTRICAL DISTRIBUTION: Hydrogen generation during battery charging). Perry does not have any documents that identify hydrogen generation as a hazard during battery charging. It is implied in training, but not overtly stated.
Randomly selected K/A 218000 K5.01 2/2/ RO 204000 K4.05 Was unable to write an operationally valid RO level question for selected K/A (Knowledge of REACTOR WATER CLEANUP SYSTEM design feature(s) and/or interlocks which provide for the following: Double valve isolation from the reactor). Perry does not have any documents that identify any requirement to have double valve isolation from the reactor.
Randomly selected K/A 201003 K4.02