{{#Wiki_filter:January15,1SS9LD-99-002 U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555
{{#Wiki_filter:January 15, 1SS9 LD-99-002 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555  


==Subject:==
==Subject:==
ReportofaOefectPursuantto1QCFR21Concerning Incorrect ModelingofaBWRLowerPlenumVolumeinBISONThepurposeofthisletteris'tonotifytheNuclearRegulatory Commission ofadefectunder10CFR21,"Reporting ofDefectsandNoncompliance."
Report of a Oefect Pursuant to 1Q CFR 21 Concerning Incorrect Modeling of a BWR Lower Plenum Volume in BISON The purpose of this letter is'to notify the Nuclear Regulatory Commission of a defect under 10 CFR 21,"Reporting of Defects and Noncompliance." The defect concerns the Operating Limit for the Minimum Critical Power Ratio (MCPR)in Boiling Water Reactors (BWRs)analyzed using the BISON fast transient analysis code.Specifically, the defect involves incorrect modeling of the reactor vessel lower plenum volume in the BISON code, which could lead to the establishment of non-conservative MCPR Operating Limits in plant technical specifications.
ThedefectconcernstheOperating LimitfortheMinimumCriticalPowerRatio(MCPR)inBoilingWaterReactors(BWRs)analyzedusingtheBISONfasttransient analysiscode.Specifically, thedefectinvolvesincorrect modelingofthereactorvessellowerplenumvolumeintheBISONcode,whichcouldleadtotheestablishment ofnon-conservative MCPROperating Limitsinplanttechnical specifications.
The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE).If you have any questions, please feel free to contact me or Virgil Paggen of my staff at (860)2854700, Very truly yours, COMBUSTION ENGINEERING, INC.lan.ickard, Director uclear Licensing
TheEnclosure summarizes theevaluation performed byABBCombustion Engineering (ABB-CE).
Ifyouhaveanyquestions, pleasefeelfreetocontactmeorVirgilPaggenofmystaffat(860)2854700,Verytrulyyours,COMBUSTION ENGINEERING, INC.lan.ickard,DirectoruclearLicensing


==Enclosure:==
==Enclosure:==


Asstatedcc:M.A.Barnoski(ABB-CE)~(,.t~ABBCombustion Engineering NuclearPowerComhusion Engineer(ng, Inc.P.O.Box5002000DayHihRd.Windsor,CT0609&0500 Te(ephone (880)888-1911Fax(880)285-5203  
As stated cc: M.A.Barnoski (ABB-CE)~(,.t~ABB Combustion Engineering Nuclear Power Comhusion Engineer(ng, Inc.P.O.Box 500 2000 Day Hih Rd.Windsor, CT 0609&0500 Te(ephone (880)888-1911 Fax (880)285-5203  


Enclosure toLD-99-002 Page2of2(vi)Inthecaseofabasiccomponent whichcontainsadefectorfailstocomply,thenumberandlocationofallsuchcomponents inuseat,suppliedfor,orbeingsuppliedforoneormorefacilities oractivities subjecttotheregulations inthispart:TheBISONcomputercodeisaproprietary ABBAtomABprogramusedbyABB-CEforperforming BWRsafetyanalysesforU.S.customers.
Enclosure to LD-99-002 Page2of2 (vi)In the case of a basic component which contains a defect orfails to comply, the number and location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subj ect to the regulations in this part: The BISON computer code is a proprietary ABB Atom AB program used by ABB-CE for performing BWR safety analyses for U.S.customers.
Thedefectappliesonlytoreloadfuelassemblies currently inoperation atWNP-2.(vii)Thecorrective actionwhichhasbeen,isbeing,orwillbetaken;thenameoftheindividual ororganization responsible fortheaction;andthelengthoftimethathasbeenorwillbetakentocompletetheactiontAnevaluation ofthedefecthasbeenperformed byABB-CE.Theresultsofthatevaluation showthatthereisnosafetyproblematWNP-2foroperation ofthepreviousCycles12and13anditscurrentCycle14operating state(NormalScramSpeed,Recirculation PumpTripoperable, andTurbineBypassoperable) priorto5,000MWd/MTU.Thatis,theestablished MCPROperating Limitscurrently intheplanttechnical specifications forthisoperating stateprovideadequateprotection.
The defect applies only to reload fuel assemblies currently in operation at WNP-2.(vii)The corrective action which has been, is being, or will be taken;the name of theindividual or organization responsible for the action;and the length of time that has been or will be taken to complete the actiont An evaluation of the defect has been performed by ABB-CE.The results of that evaluation show that there is no safety problem at WNP-2 for operation of the previous Cycles 12 and 13 and its current Cycle 14 operating state (Normal Scram Speed, Recirculation Pump Trip operable, and Turbine Bypass operable)prior to 5,000 MWd/MTU.That is, the established MCPR Operating Limits currently in the plant technical specifications for this operating state provide adequate protection.
However,certainMCPROperating Limitsforotheroperating statespriorto5,000MWd/MTUandalloperating statesafter5,000MWd/MTUforWNP-2Cycle14mustbeincreased toaccommodate thedefect.Theutilitycurrently projectsthatWNP-2willreach5.000MWd/MTUinearly1999.ABB-CEhasnotifiedtheWashington PublicPowerSupplySystemofthenecessary changestotheWNP-2MCPROperating Limits.TheBISONcodemodelforWNP-2hasbeenrevisedtocorrecttheerror.AllABB-CEBWRfuelusershavebeennotifiedofthiscondition.
However, certain MCPR Operating Limits for other operating states prior to 5,000 MWd/MTU and all operating states after 5,000 MWd/MTU for WNP-2 Cycle 14 must be increased to accommodate the defect.The utility currently projects that WNP-2 will reach 5.000 MWd/MTU in early 1999.ABB-CE has notified the Washington Public Power Supply System of the necessary changes to the WNP-2 MCPR Operating Limits.The BISON code model for WNP-2 has been revised to correct the error.All ABB-CE BWR fuel users have been notified of this condition.(viii)Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees:
(viii)Anyadvicerelatedtothedefectorfailuretocomplyaboutthefacility,
The Washington Public Power Supply System has been notified of the defect and has been provided with revised MCPR Operating Limits for WNP-2.TOTAL P.84 Enclosure to LD-99<02 Pageos of 2 ABB Combustion Engineering Nuclear Power 10 CFR 21 Re ort of a Defect or Failure to Com I The following information is provided pursuant to the requirements set forth in 10 CFR 21.21(c)(4): (l)liame and address of the individuals informing the Commiss1on:
: activity, orbasiccomponent thathasbeen,isbeing,orwillbegiventopurchasers orlicensees:
lan C.Rickard, Director Nuclear Licensing Combustion Engineering, Inc.2000 Day Hill Road.Windsor, CT 06095-0500 (ii)Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect: The activity for which this report is being filed is the establishment of non-conservative MCPR Operating Limits for the Washington Public Power Supply System Nuclear Project Unit 2 (WNP-2)nuclear power plant during Cycles 12, 13, and 14 operation..(iii)Identification of the fir constructing the facility or supplying the basic component which fails to comply or contains a defect: Combustion Engineering, Inc.2000 Day Hill Road Windsor, CT 06095-0500 (iv)iVature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply: The defect identified involves the incorrect modeling of the reactor vessel lower plenum volume in the BISON code.The defect caused the BISON code model to have a lower plenum volume approximately twice its proper size.This incorrect modeling has the potential to lead to calculation of non-conservative MCPR Operating Limits in some situations.(v)The date on which the information of such defect or failure to comply was obtained: ABB-CE determined that a defect in the BISON code existed on January 14.1999.
TheWashington PublicPowerSupplySystemhasbeennotifiedofthedefectandhasbeenprovidedwithrevisedMCPROperating LimitsforWNP-2.TOTALP.84 Enclosure toLD-99<02Pageosof2ABBCombustion Engineering NuclearPower10CFR21ReortofaDefectorFailuretoComIThefollowing information isprovidedpursuanttotherequirements setforthin10CFR21.21(c)(4):
02/16/1999 X/U,S.Nuc/egu/atory Commission Operations Center Report General Information or Other (PAR)P~ae I Event&#xb9;35271 Rep Org: ABB COMBUSTION ENGINEERING Supplier: ABB COMBUSTION ENGINEERING Region: 1 City: WINDSOR County: State: CT Notification Date/Time: 01/15/1999 14:15 (EST)Event Date/Time: 01/15/1999 14:15 (EST)Last llodiflcation:
(l)liameandaddressoftheindividuals informing theCommiss1on:
01/15/1999 Docket&#xb9;: Agreement State: No License&#xb9;: UNSPECIFIED PARAGRAPH NRC Notified by: IAN RICKARD MQ Ops Officer: DOUG WEAVER Emergency Class: NON EMERGENCY 10 CFR Section: 21.21 Notifications:
lanC.Rickard,DirectorNuclearLicensing Combustion Engineering, Inc.2000DayHillRoad.Windsor,CT06095-0500 (ii)Identification ofthefacility, theactivity, orthebasiccomponent suppliedforsuchfacilityorsuchactivitywithintheUnitedStateswhichfailstocomplyorcontainsadefect:Theactivityforwhichthisreportisbeingfiledistheestablishment ofnon-conservative MCPROperating LimitsfortheWashington PublicPowerSupplySystemNuclearProjectUnit2(WNP-2)nuclearpowerplantduringCycles12,13,and14operation..
BLAIR SPITZBERG VERN HODGE R4 NRR PART 21 NOTIFICATION RELATED TO MINIMUM CRITICAL POWER RATIO (MCPR)"The purpose of this letter is to notify the Nuclear Regulatory Commission of a defect under 10 CFR 21,'Reporting of Defects and Noncompliance.'he defect concerns the Operating Limit for the Minimum Critical Power Ratio (MCPR)in Boiling Water Reactors (BWRs)analyzed using the BISON fast transient analysis code.Specifically, the defect involves incorrect modeling of the reactor vessel tower plenum volume in the BISON code, which could lead to the establishment of non-conservative MCPR Operating Limits in plant technical specifications."The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE).If you have any questions, please feel free to contact me[Ian C.RickardJ or Virgil Paggen of my staff."'I This event effects WNP-2 current operating cycle (Cycle 14).I i**i I i i i*I i i*i*I i i I i i i i I I i i i*I i I I I I****i**i i*i*I**i*I I i i I i i I i i i I 11 I i I*i i lII i i I i**i i i i I I I I I I i*I I i i I I*I l1 I I I I i I I i I I*I i i II i I i i******i I I i~i i*
(iii)Identification ofthefirconstructing thefacilityorsupplying thebasiccomponent whichfailstocomplyorcontainsadefect:Combustion Engineering, Inc.2000DayHillRoadWindsor,CT06095-0500 (iv)iVatureofthedefectorfailuretocomplyandthesafetyhazardwhichiscreatedorcouldbecreatedbysuchdefectorfailuretocomply:Thedefectidentified involvestheincorrect modelingofthereactorvessellowerplenumvolumeintheBISONcode.ThedefectcausedtheBISONcodemodeltohavealowerplenumvolumeapproximately twiceitspropersize.Thisincorrect modelinghasthepotential toleadtocalculation ofnon-conservative MCPROperating Limitsinsomesituations.
CATEGORY j.REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBRP9901220123 DOC.DATE: 99/01/15 NOTARIZED:
(v)Thedateonwhichtheinformation ofsuchdefectorfailuretocomplywasobtained:
NO DOCKET&#xb9;FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION RICKARD,I.C.
ABB-CEdetermined thatadefectintheBISONcodeexistedonJanuary14.1999.
ABB Combustion Engineering Nuclear'uel (formerly Combustio RICHARD,I.C.
02/16/1999 X/U,S.Nuc/egu/atory Commission Operations CenterReportGeneralInformation orOther(PAR)P~aeIEvent&#xb9;35271RepOrg:ABBCOMBUSTION ENGINEERING Supplier:
ABB Atom, Inc.(formerly ASEA Atom, Inc.)RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
ABBCOMBUSTION ENGINEERING Region:1City:WINDSORCounty:State:CTNotification Date/Time:01/15/1999 14:15(EST)EventDate/Time:01/15/1999 14:15(EST)Lastllodiflcation:
01/15/1999 Docket&#xb9;:Agreement State:NoLicense&#xb9;:UNSPECIFIED PARAGRAPH NRCNotifiedby:IANRICKARDMQOpsOfficer:DOUGWEAVEREmergency Class:NONEMERGENCY 10CFRSection:21.21Notifications:
BLAIRSPITZBERG VERNHODGER4NRRPART21NOTIFICATION RELATEDTOMINIMUMCRITICALPOWERRATIO(MCPR)"ThepurposeofthisletteristonotifytheNuclearRegulatory Commission ofadefectunder10CFR21,'Reporting ofDefectsandNoncompliance.'he defectconcernstheOperating LimitfortheMinimumCriticalPowerRatio(MCPR)inBoilingWaterReactors(BWRs)analyzedusingtheBISONfasttransient analysiscode.Specifically, thedefectinvolvesincorrect modelingofthereactorvesseltowerplenumvolumeintheBISONcode,whichcouldleadtotheestablishment ofnon-conservative MCPROperating Limitsinplanttechnical specifications.
"TheEnclosure summarizes theevaluation performed byABBCombustion Engineering (ABB-CE).
Ifyouhaveanyquestions, pleasefeelfreetocontactme[IanC.RickardJorVirgilPaggenofmystaff."'IThiseventeffectsWNP-2currentoperating cycle(Cycle14).Ii**iIiii*Iii*i*IiiIiiiiIIiii*IiIIII****i**ii*i*I**i*IIiiIiiIiiiI11IiI*iilIIiiIi**iiiiIIIIIIi*IIiiII*Il1IIIIiIIiII*IiiIIiIii******iIIi~ii*
CATEGORYj.REGULAYINFORMATION DISTRIBUTIO SYSTEM(RIDS)ACCESSION NBRP9901220123 DOC.DATE:
99/01/15NOTARIZED:
NODOCKET&#xb9;FACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAMEAUTHORAFFILIATION RICKARD,I.C.
ABBCombustion Engineering Nuclear'uel (formerly Combustio RICHARD,I.C.
ABBAtom,Inc.(formerly ASEAAtom,Inc.)RECIP.NAME RECIPIENT AFFILIATION RecordsManagement Branch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
Part21reptreincorrect modelingofBWRlowerplenumvolinBISON.Decfect appliesonlytoreloadfuelassemblies currently inoperation atWNP-2.BISON codemodelforWNP-2hasbeenrevisedtocorrecterror.DISTRIBUTION CODE:IE19TCOPIESRECEIVED:LTR ENCLSIZE:TITLE:Part21Rept(50DKT)NOTES:INTERNARECIPIENT IDCODE/NAME PD4-2PDRES/DET/EIB RGN2RGN4COPIESLTTRENCL111111111111RECIPIENT IDCODE/NAME POSLUSNY,C NRR/DRPM/PECB PDRWARD,M.RGNlRGN3COPIESLTTRENCL1111111111EXTERNAL:
Part 21 rept re incorrect modeling of BWR lower plenum vol in BISON.Decfect applies only to reload fuel assemblies currently in operation at WNP-2.BISON code model for WNP-2 has been revised to correct error.DISTRIBUTION CODE: IE19T COPIES RECEIVED:LTR ENCL SIZE: TITLE: Part 21 Rept (50 DKT)NOTES: INTERNA RECIPIENT ID CODE/NAME PD4-2 PD RES/DET/EIB RGN2 RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME POSLUSNY,C NRR/DRPM/PECB PDR WARD, M.RGNl RGN3 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 EXTERNAL: INPO RECORD CTR NRC PDR 1 1 1 1 NOAC SILVER,E NUDOCS FULL TXT 1.1 1 1 , VHS GCu~emr HAS SKOSH~0 NOTE TO ALL nRIDSn RECIPIENTS PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15 r>"5,~fit+~~>
INPORECORDCTRNRCPDR1111NOACSILVER,ENUDOCSFULLTXT1.111,VHSGCu~emrHASSKOSH~0NOTETOALLnRIDSnRECIPIENTS PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
~'~".~l llew, O LFQO January 15, 1999 LD-99-002 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555  
LTTR15ENCL15 r>"5,~fit+~~>
~'~".~l llew,OLFQOJanuary15,1999LD-99-002 U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555


==Subject:==
==Subject:==
ReportofaDefectPursuantto10CFR21Concerning Incorrect ModelingofaBWRLowerPlenumVolumeinBISONThepurposeofthisletteristonotifytheNuclearRegulatory Commission ofadefectunder10CFR21,"Reporting ofDefectsandNoncompliance."
Report of a Defect Pursuant to 10 CFR 21 Concerning Incorrect Modeling of a BWR Lower Plenum Volume in BISON The purpose of this letter is to notify the Nuclear Regulatory Commission of a defect under 10 CFR 21,"Reporting of Defects and Noncompliance." The defect concerns the Operating Limit for the Minimum Critical Power Ratio (MCPR)in Boiling Water Reactors (BWRs)analyzed using the BISON fast transient analysis code.Specifically, the defect involves incorrect modeling of the reactor vessel lower plenum volume in the BISON code, which could lead to the establishment of non-conservative MCPR Operating Limits in plant technical specifications.
ThedefectconcernstheOperating LimitfortheMinimumCriticalPowerRatio(MCPR)inBoilingWaterReactors(BWRs)analyzedusingtheBISONfasttransient analysiscode.Specifically, thedefectinvolvesincorrect modelingofthereactorvessellowerplenumvolumeintheBISONcode,whichcouldleadtotheestablishment ofnon-conservative MCPROperating Limitsinplanttechnical specifications.
The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE).If you have any questions, please feel free to contact me or Virgil Paggen of my staff at (860)285<700.Very truly yours, COMBUSTION ENGINEERING, INC.lan.ickard, Director uclear Licensing
TheEnclosure summarizes theevaluation performed byABBCombustion Engineering (ABB-CE).
Ifyouhaveanyquestions, pleasefeelfreetocontactmeorVirgilPaggenofmystaffat(860)285<700.Verytrulyyours,COMBUSTION ENGINEERING, INC.lan.ickard,DirectoruclearLicensing


==Enclosure:==
==Enclosure:==


Asstatedcc:M.A.Barnoski(ABB-CE)'VABBCombustion Engineering NuclearPowerCornbusdon Engineering, Inc.P.O.Box5002000DayHillRd.Mrindsor, CT060954500 Telephone (860)688-1911Fax(860)285-5203'7901220123 990115PDRADQCK05000397S,PDR Enclosure toLD-99-002 Page1of2ABBCombustion Engineering NuclearPower10CFR21ReortofaDefectorFailuretoComIThefollowing information isprovidedpursuanttotherequirements setforthin10CFR21.21(c)(4):
As stated cc: M.A.Barnoski (ABB-CE)'V ABB Combustion Engineering Nuclear Power Cornbusdon Engineering, Inc.P.O.Box 500 2000 Day Hill Rd.Mrindsor, CT 060954500 Telephone (860)688-1911 Fax(860)285-5203'7901220123 990115 PDR ADQCK 05000397 S , PDR Enclosure to LD-99-002 Page 1 of 2 ABB Combustion Engineering Nuclear Power 10 CFR21 Re ortof a Defector Failure to Com I The following information is provided pursuant to the requirements set forth in 10 CFR 21.21(c)(4): (i)Name and address of the individuals informing the Commission:
(i)Nameandaddressoftheindividuals informing theCommission:
lan C.Rickard, Director Nuclear Licensing Combustion Engineering, Inc.2000 Day Hill Road Windsor, CT 06095-0500 (ii)Identification of the facility, the activity, or the basic component supplied for suclt facility or suclt activity within the United States which fails to comply or contains a defect: The activity for which this report is being filed is the establishment of non-conservative MCPR Operating Limits for the Washington Public Power Supply System Nuclear Project Unit 2 (WNP-2)nuclear power plant during Cycles 12, 13, and 14 operation.(iii)Identification of tlte firm constructing the facility or supplying the basic component which fails to comply or contains a defect: Combustion Engineering, Inc.2000 Day Hill Road Windsor, CT 06095-0500 (iv)Nature of the defect or failure to comply and tlte safety hazard whiclt is created or could be created by such defect or failure to comply: The defect identified involves the incorrect modeling of the reactor vessel lower plenum volume in the BISON code.The defect caused the BISON code model to have a lower plenum volume approximately twice its proper size.This incorrect modeling has the potential to lead to calculation of non-conservative MCPR Operating Limits in some situations.(v)The date on which tlteinformation of such defect or failure to comply was obtained: ABB-CE determined that a defect in the BISON code existed on January 14, 1999.
lanC.Rickard,DirectorNuclearLicensing Combustion Engineering, Inc.2000DayHillRoadWindsor,CT06095-0500 (ii)Identification ofthefacility, theactivity, orthebasiccomponent suppliedforsucltfacilityorsucltactivitywithintheUnitedStateswhichfailstocomplyorcontainsadefect:Theactivityforwhichthisreportisbeingfiledistheestablishment ofnon-conservative MCPROperating LimitsfortheWashington PublicPowerSupplySystemNuclearProjectUnit2(WNP-2)nuclearpowerplantduringCycles12,13,and14operation.
Enclosure to LD-99-002 Page2of2 (vi), In the case of a basic component wltich contains a defect or fails to comply, the number and location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subject to the regulations in this part: The BISON computer code is a proprietary ABB Atom AB program used by ABB-CE for performing BWR safety analyses for U.S.customers.
(iii)Identification oftltefirmconstructing thefacilityorsupplying thebasiccomponent whichfailstocomplyorcontainsadefect:Combustion Engineering, Inc.2000DayHillRoadWindsor,CT06095-0500 (iv)Natureofthedefectorfailuretocomplyandtltesafetyhazardwhicltiscreatedorcouldbecreatedbysuchdefectorfailuretocomply:Thedefectidentified involvestheincorrect modelingofthereactorvessellowerplenumvolumeintheBISONcode.ThedefectcausedtheBISONcodemodeltohavealowerplenumvolumeapproximately twiceitspropersize.Thisincorrect modelinghasthepotential toleadtocalculation ofnon-conservative MCPROperating Limitsinsomesituations.
The defect applies only to reload fuel assemblies currently in operation at WNP-2.(vii)The corrective action wlticlt has been, is being, or will be taken;the name of the individual or organization responsible for the action;and the length of time tltat has been or will be taken to complete the action: An evaluation of the defect has been performed by ABB-CE.The results of that evaluation show that there is no safety problem at WNP-2 for operation of the previous Cycles 12 and 13 and its current Cycle 14 operating state (Normal Scram Speed, Recirculation Pump Trip operable, and Turbine Bypass operable)prior to 5,000 MWd/MTU.That is, the established MCPR Operating Limits currently in the plant technical specifications for this operating state provide adequate protection.
(v)Thedateonwhichtlteinformation ofsuchdefectorfailuretocomplywasobtained:
However, certain MCPR Operating Limits for other operating states prior to 5,000 MWd/MTU and all operating states after 5,000 MWd/MTU for WNP-2 Cycle 14 must be increased to accommodate the defect.The utility currently projects that WNP-2 will reach 5,000 MWd/MTU in early 1999.ABB-CE has notified the Washington Public Power Supply System of the necessary changes to the WNP-2 MCPR Operating Limits.The BISON code model for WNP-2 has been revised to correct the error.All ABB-CE BWR fuel users have been notified of this condition.(viii)Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees:
ABB-CEdetermined thatadefectintheBISONcodeexistedonJanuary14,1999.
The Washington Public Power Supply System has been notified of the defect and has been provided with revised MCPR Operating Limits for WNP-2.
Enclosure toLD-99-002 Page2of2(vi),Inthecaseofabasiccomponent wltichcontainsadefectorfailstocomply,thenumberandlocationofallsuchcomponents inuseat,suppliedfor,orbeingsuppliedforoneormorefacilities oractivities subjecttotheregulations inthispart:TheBISONcomputercodeisaproprietary ABBAtomABprogramusedbyABB-CEforperforming BWRsafetyanalysesforU.S.customers.
Distribution Sheet Distri84.txt Priority: Normal From: Patricia Exum Action Recipients:
Thedefectappliesonlytoreloadfuelassemblies currently inoperation atWNP-2.(vii)Thecorrective actionwlticlthasbeen,isbeing,orwillbetaken;thenameoftheindividual ororganization responsible fortheaction;andthelengthoftimetltathasbeenorwillbetakentocompletetheaction:Anevaluation ofthedefecthasbeenperformed byABB-CE.Theresultsofthatevaluation showthatthereisnosafetyproblematWNP-2foroperation ofthepreviousCycles12and13anditscurrentCycle14operating state(NormalScramSpeed,Recirculation PumpTripoperable, andTurbineBypassoperable) priorto5,000MWd/MTU.Thatis,theestablished MCPROperating Limitscurrently intheplanttechnical specifications forthisoperating stateprovideadequateprotection.
In erne Remii.ents.
However,certainMCPROperating Limitsforotheroperating statespriorto5,000MWd/MTUandalloperating statesafter5,000MWd/MTUforWNP-2Cycle14mustbeincreased toaccommodate thedefect.Theutilitycurrently projectsthatWNP-2willreach5,000MWd/MTUinearly1999.ABB-CEhasnotifiedtheWashington PublicPowerSupplySystemofthenecessary changestotheWNP-2MCPROperating Limits.TheBISONcodemodelforWNP-2hasbeenrevisedtocorrecttheerror.AllABB-CEBWRfuelusershavebeennotifiedofthiscondition.
FILE CENTER 01 Copies: Paper Copy External Recipients:
(viii)Anyadvicerelatedtothedefectorfailuretocomplyaboutthefacility,
NOAC Paper Copy Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID: 003686666'1
: activity, orbasiccomponent thathasbeen,isbeing,orwillbegiventopurchasers orlicensees:
TheWashington PublicPowerSupplySystemhasbeennotifiedofthedefectandhasbeenprovidedwithrevisedMCPROperating LimitsforWNP-2.
Distribution SheetDistri84.txt Priority:
NormalFrom:PatriciaExumActionRecipients:
InerneRemii.ents.
FILECENTER01Copies:PaperCopyExternalRecipients:
NOACPaperCopyTotalCopies:Item:ADAMSDocumentLibrary:MLADAMS"HQNTAD01ID:003686666'1


==Subject:==
==Subject:==
SUMMARYOFJANUARY27,2000MEETINGWITHENERGYNORTHWEST REGARDING THEPROPOSEDSECONDARY CONTAINMENT/STANDBY GASTREATMENT SUBMITTAL.Body:ADAMSDISTRIBUTION NOTIFICATION.
 
Electronic Recipients canRIGHTCLICKandOPENthefirstAttachment toViewtheDocumentinADAMS.TheDocumentmayalsobeviewedbysearching forAccession NumberML003686666.
==SUMMARY==
DF01-DirectFlowDistribution:
OF JANUARY 27, 2000 MEETING WITH ENERGY NORTHWEST REGARDING THE PROPOSED SECONDARY CONTAINMENT/STANDBY GAS TREATMENT SUBMITTA L.Body: ADAMS DISTRIBUTION NOTIFICATION.
50Docket(PDRAvail)Docket:05000397Page1 ti+g0'Nr*y+~4$'y14******lt't><<fi/Jll]litgOgenre'ICENSEE:
Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS.The Document may also be viewed by searching for Accession Number ML003686666.
EnergyNorthwest UNITEDSTATESNUCLEARREGULATORY COMMISSION WASHiNGTON,O.C.20555-0001 February15,2000/~~gPg-iIIkcurn+n~gebe<conn~(in4P,dc(en''Rle.~~FACILITY:
DF01-Direct Flow Distribution:
WNP-2
50 Docket (PDR Avail)Docket: 05000397 Page 1 ti+g 0'Nr*y+~4$'y1 4******lt't><<fi/Jll]lit gO genre'ICENSEE:
Energy Northwest UNITED STATES NUCLEAR REGULATORY COMMISSION WASH iNGTON, O.C.20555-0001 February 15, 2000/~~gP g-i II k curn+n~g e be<conn~(in 4 P,d c(en''Rle.~~FACILITY: WNP-2  


==SUBJECT:==
==SUBJECT:==
SUMMARYOFMEETINGWITHENERGYNORTHWEST REGARDING THEPROPOSEDSECONDARY CONTAINMENT/STANDBY GASTREATMENT SUBMITTAL OnJanuary27,2000,theNuclearRegulatory Commission (NRC)staffmetwithrepresentatives ofEnergyNorthwest todiscusstheupcomingsecondary containment/standby gastreatment licenseamendment submittal.
 
Theproposedchangeswouldrevisethefollowing:
==SUMMARY==
SR3.6.1.3.10 increases thesecondary containment bypassleakagefrom.74standardcubicfeetperhour(scfh)to.028percent/day approximately 9.4scfh.SR3.6.4.1.1 changetherequirement toverifysecondary containment pressureislessthan.25inchvacuumwatergagetolessthan0inchvacuumwatergage.SR3.6.4.1.4 increasethesecondary containment drawdowntimefrom2minutesto20minutes.TS5.5.7increasethestandbygastreatment systemflowrateto5000cubicfeetperminute(cfm).EnergyNorthwest withdrewasimilaramendment requestinJuly1999,whenthestaffidentified acalculation errorindetermining containment releaseconcentration.
OF MEETING WITH ENERGY NORTHWEST REGARDING THE PROPOSED SECONDARY CONTAINMENT/STANDBY GAS TREATMENT SUBMITTAL On January 27, 2000, the Nuclear Regulatory Commission (NRC)staff met with representatives of Energy Northwest to discuss the upcoming secondary containment/standby gas treatment license amendment submittal.
Duetotheextensive reviewrequiredoftheprevioussubmittal, boththestaffandthelicenseefeltthatameetingtodiscusstheupcomingsubmittal wouldbebeneficial inshortening thereviewandavoidingunnecessary requestsforadditional information.
The proposed changes would revise the following:
Inordertoimproveefficiency thesameNRCstaffmemberswhowereinvolvedinthefinalreviewforthefirstsubmittal wereatthemeetingandwillreviewthesecondsubmittal.
SR 3.6.1.3.10 increases the secondary containment bypass leakage from.74 standard cubic feet per hour (scfh)to.028 percent/day approximately 9.4 scfh.SR 3.6.4.1.1 change the requirement to verify secondary containment pressure is less than.25 inch vacuum water gage to less than 0 inch vacuum water gage.SR 3.6.4.1.4 increase the secondary containment drawdown time from 2 minutes to 20 minutes.TS 5.5.7 increase the standby gas treatment system flow rate to 5000 cubic feet per minute (cfm).Energy Northwest withdrew a similar amendment request in July 1999, when the staff identified a calculation error in determining containment release concentration.
Enclosure 1isalistofthemeetingparticipants.
Due to the extensive review required of the previous submittal, both the staff and the licensee felt that a meeting to discuss the upcoming submittal would be beneficial in shortening the review and avoiding unnecessary requests for additional information.
Enclosure 2isacopyoftheslidespresented byEnergyNorthwest.
In order to improve efficiency the same NRC staff members who were involved in the final review for the first submittal were at the meeting and will review the second submittal. is a list of the meeting participants. is a copy of the slides presented by Energy Northwest.
Attheoutsetofthemeeting,Mr.JohnArbuckleofEnergyNorthwest presented anoverviewofthesubmittal.
At the outset of the meeting, Mr.John Arbuckle of Energy Northwest presented an overview of the submittal.
Theemphasiswasonhowthissubmittal haschangedfromtheprevioussubmittal.
The emphasis was on how this submittal has changed from the previous submittal.
Thissubmittal includesmeteorological dataandatmospheric dispersion calculations (X/Qcalculations).
This submittal includes meteorological data and atmospheric dispersion calculations (X/Q calculations).
LetaBrown,oftheNRCstaff,suggested thatitwouldbeusefuliftheX/Qcalculations andanelectronic versionofthemeteorological datawereprovidedforstaffreview.Mr.DavidStudleyofScientech discussed theX/Qcalculations including thefourreleasepointsandthecontrolroomintakes.Thediscussion alsocoveredtheapplication ofARGON96Codeandtheassumptions thatweremade.Thedescription ofthesiteconfiguration andoftheOo@~~It"~48KFiXgfjP"~88C8<ggg  
Leta Brown, of the NRC staff, suggested that it would be useful if the X/Q calculations and an electronic version of the meteorological data were provided for staff review.Mr.David Studley of Scientech discussed the X/Q calculations including the four release points and the control room intakes.The discussion also covered the application of ARGON 96 Code and the assumptions that were made.The description of the site configuration and of the Oo@~~It"~48KFiX gfjP"~88C8<ggg  
/'  ~.~controlroomintakeswereusefultothestaffinunderstanding theassumptions thatweremade.Thestaffexpressed aconcernwiththeventoptionusedintheARCON96Codethatwasusedtocalculate someofthecontrolroomatmospheric dispersion factors.Itwassuggested thatanacceptable solutionwouldbetorecalculate theventruncasesasagroundreleaseoptionusingARGON96.'r.BruceBoyumofEnergyNorthwest discussed theaccidents thatwereanalyzedspecifically, mainsteamlinebreakaccident, fuelhandlingaccident, controlroddropaccidentandloss-of-coolant accident(LOCA).Mr.BoyumstatedthattheLOCAwastheboundingaccident.
/'  ~.~control room intakes were useful to the staff in understanding the assumptions that were made.The staff expressed a concern with the vent option used in the ARCON 96 Code that was used to calculate some of the control room atmospheric dispersion factors.It was suggested that an acceptable solution would be to recalculate the vent run cases as a ground release option using ARGON 96.'r.Bruce Boyum of Energy Northwest discussed the accidents that were analyzed specifically, main steam line break accident, fuel handling accident, control rod drop accident and loss-of-coolant accident (LOCA).Mr.Boyum stated that the LOCA was the bounding accident.Mr.Mark Blumberg,'of the NRC staff, stated that it would be useful to include the calculations for the LOCA analysis and include sufficient informatiori on other accidents so that it can be determined that the LOCA is the bounding accident.Mr.Studley described the Axident Code, which is the dose analysis code used in the submittal.
Mr.MarkBlumberg,'of theNRCstaff,statedthatitwouldbeusefultoincludethecalculations fortheLOCAanalysisandincludesufficient informatiori onotheraccidents sothatitcanbedetermined thattheLOCAistheboundingaccident.
The Axident Code models the transport of radioactivity to the environment and to the control room.The major assumptions and the reasons for them were discussed.
Mr.Studleydescribed theAxidentCode,whichisthedoseanalysiscodeusedinthesubmittal.
Mr.Boyum also discussed the release pathways including the use of the Gothic Code to justify the 40 percent mixing assumed in secondary containment.
TheAxidentCodemodelsthetransport ofradioactivity totheenvironment andtothecontrolroom.Themajorassumptions andthereasonsforthemwerediscussed.
Mr.Richard Lobel, of the NRC staff, said the proposed submittal should include a description of the derivation and use of the flow equation which is the basis for Figure 4 of Attachment 2 to the licensee's October 15, 1996, submittal.
Mr.Boyumalsodiscussed thereleasepathwaysincluding theuseoftheGothicCodetojustifythe40percentmixingassumedinsecondary containment.
In addition, the staff may request input used in reactor building pressure drawdown calculations so that the staff may perform independent calculations.
Mr.RichardLobel,oftheNRCstaff,saidtheproposedsubmittal shouldincludeadescription ofthederivation anduseoftheflowequationwhichisthebasisforFigure4ofAttachment 2tothelicensee's October15,1996,submittal.
A final decision has not been made.Mr.Boyum then discussed control room air flows and unfiltered control room in-leakage.
Inaddition, thestaffmayrequestinputusedinreactorbuildingpressuredrawdowncalculations sothatthestaffmayperformindependent calculations.
Mr.Blumberg stated that licensees have had to verify their unfiltered in-leakage assumptions.
Afinaldecisionhasnotbeenmade.Mr.Boyumthendiscussed controlroomairflowsandunfiltered controlroomin-leakage.
The ASTM E741,"Standard Test Methods for Determining Air Change in a Single Zone by Means of a Tracer Gas Dilution," test method is acceptable to the staff as a verification test for unfiltered in-leakage.
Mr.Blumbergstatedthatlicensees havehadtoverifytheirunfiltered in-leakage assumptions.
The licensee could describe their design and propose an alternative test method that would have to be reviewed and approved by the staff.The NRC staff felt that Energy Northwest did a good job explaining their submittal and that they were receptive to suggestions from the staff.Docket No.50-397  
TheASTME741,"Standard TestMethodsforDetermining AirChangeinaSingleZonebyMeansofaTracerGasDilution,"
testmethodisacceptable tothestaffasaverification testforunfiltered in-leakage.
Thelicenseecoulddescribetheirdesignandproposeanalternative testmethodthatwouldhavetobereviewedandapprovedbythestaff.TheNRCstafffeltthatEnergyNorthwest didagoodjobexplaining theirsubmittal andthattheywerereceptive tosuggestions fromthestaff.DocketNo.50-397


==Enclosures:==
==Enclosures:==


1~ListofMeetingParticipants 2.EnergyNothwestSlidesccw/encls:SeenextpageE-MailJZwolinski/SBlack SRichardsDLange,EDOEPeytonRLobelMBlumberg LBrownLSmith,RIVJackGushing,ProjectManager,Section2ProjectDirectorate IV8Decomissioning DivisionofLicensing ProjectManagement OfficeofNuclearReactorRegulation DISTRIBUTION:
1~List of Meeting Participants 2.Energy Nothwest Slides cc w/encls: See next page E-Mail JZwolinski/SBlack S Richards DLange, EDO E Peyton RLobel MBlumberg LBrown LSmith, RIV Jack Gushing, Project Manager, Section 2 Project Directorate IV 8 Decomissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation DISTRIBUTION:
'HardCoCentralFilePUBLICPDIV-2R/FJCushingOGCACRSOFFICEPDIV-2/PM CPDIV-2/LA NAMEDATEJcushing:Icc EPeytoncBII"ffOoFFICIALRECORDCOPYDOCUMENTNAME:GAPDIV-2EWNP2iMTS12700.
'Hard Co Central File PUBLIC PDIV-2 R/F JCushing OGC ACRS OFFICE PDIV-2/PM C PDIV-2/LA NAME DATE Jcushing:Icc EPeyton cB I I"f fOo FFICIAL RECORD COPY DOCUMENT NAME: GAPDIV-2EWNP2iMTS12700.
rcewecIU(e,IIuxPDIV-2/SC SDembe"f~=/t//r.'/'=~
r cewe c I U(e, I I u x PDIV-2/SC SDembe"f~=/t//r.'/'=~
'/~6hzQg~
'/~6hz Qg~
controlroomintakeswereusefultothestaffinunderstanding theassumptions thatweremade.Thestaffexpressed aconcernwiththeventoptionusedintheARCON96Codethatwasusedtocalculate someofthecontrolroomatmospheric dispersion factors.Itwassuggested thatanacceptable solutionwouldbetorecalculate theventruncasesasagroundreleaseoptionusingARGON96.Mr.BruceBoyumofEnergyNorthwest discussed theaccidents thatwereanalyzedspecifically, mainsteamlinebreakaccident, fuelhandlingaccident, controlroddropaccidentandloss-of-coolant accident(LOCA).Mr.BoyumstatedthattheLOCAwastheboundingaccident.
control room intakes were useful to the staff in understanding the assumptions that were made.The staff expressed a concern with the vent option used in the ARCON 96 Code that was used to calculate some of the control room atmospheric dispersion factors.It was suggested that an acceptable solution would be to recalculate the vent run cases as a ground release option using ARGON 96.Mr.Bruce Boyum of Energy Northwest discussed the accidents that were analyzed specifically, main steam line break accident, fuel handling accident, control rod drop accident and loss-of-coolant accident (LOCA).Mr.Boyum stated that the LOCA was the bounding accident.Mr.Mark Blumberg, of the NRC staff, stated that it, would be useful to include the calculations for the LOCA analysis and include sufficient information on other accidents so that it can be determined that the LOCA is the bounding accident.Mr.Studley described the Axident Code, which is the dose analysis code used in the submittal.
Mr.MarkBlumberg, oftheNRCstaff,statedthatit,wouldbeusefultoincludethecalculations fortheLOCAanalysisandincludesufficient information onotheraccidents sothatitcanbedetermined thattheLOCAistheboundingaccident.
The Axident Code models the transport of radioactivity to the environment and to the control room.The major assumptions and the reasons for them were discussed.
Mr.Studleydescribed theAxidentCode,whichisthedoseanalysiscodeusedinthesubmittal.
Mr.Boyum also discussed the release pathways including the use of the Gothic Code to justify the 40 percent mixing assumed in secondary containment.
TheAxidentCodemodelsthetransport ofradioactivity totheenvironment andtothecontrolroom.Themajorassumptions andthereasonsforthemwerediscussed.
Mr.Richard Lobel, of the NRC staff, said the proposed submittal should include a description of the derivation and use of the flow equation which is the basis for Figure 4 of Attachment 2 to the licensee's October 15, 1996, submittal.
Mr.Boyumalsodiscussed thereleasepathwaysincluding theuseoftheGothicCodetojustifythe40percentmixingassumedinsecondary containment.
In addition, the staff may request input used in reactor building pressure drawdown calculations so that the staff may perform independent calculations.
Mr.RichardLobel,oftheNRCstaff,saidtheproposedsubmittal shouldincludeadescription ofthederivation anduseoftheflowequationwhichisthebasisforFigure4ofAttachment 2tothelicensee's October15,1996,submittal.
A final decision has not been made.Mr.Boyum then discussed control room air flows and unfiltered control room in-leakage.
Inaddition, thestaffmayrequestinputusedinreactorbuildingpressuredrawdowncalculations sothatthestaffmayperformindependent calculations.
Mr.Blumberg stated that licensees have had to verify their unfiltered in-leakage assumptions.
Afinaldecisionhasnotbeenmade.Mr.Boyumthendiscussed controlroomairflowsandunfiltered controlroomin-leakage.
The ASTM E741,"Standard Test Methods for Determining Air Change in a Single Zone by Means of a Tracer Gas Dilution," test method is acceptable to the staff as a verification test for unfiltered in-leakage.
Mr.Blumbergstatedthatlicensees havehadtoverifytheirunfiltered in-leakage assumptions.
The licensee could describe their design and propose an alternative test method that would have to be reviewed and approved by the staff.The NRC staff felt that Energy Northwest did a good job explaining their submittal and that they were receptive to suggestions from the staff.Jack Gushing, Project Manager, Section 2 Project Directorate IV 8 Decomissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No.50-397  
TheASTME741,"Standard TestMethodsforDetermining AirChangeinaSingleZonebyMeansofaTracerGasDilution,"
testmethodisacceptable tothestaffasaverification testforunfiltered in-leakage.
Thelicenseecoulddescribetheirdesignandproposeanalternative testmethodthatwouldhavetobereviewedandapprovedbythestaff.TheNRCstafffeltthatEnergyNorthwest didagoodjobexplaining theirsubmittal andthattheywerereceptive tosuggestions fromthestaff.JackGushing,ProjectManager,Section2ProjectDirectorate IV8Decomissioning DivisionofLicensing ProjectManagement OfficeofNuclearReactorRegulation DocketNo.50-397


==Enclosures:==
==Enclosures:==


1.ListofMeetingParticipants 2.Licensee's Slidesccw/encls:Seenextpage ylC WNP-2CC:Mr.GregO.Smith(MailDrop927M)VicePresident, Generation EnergyNorthwest P.O.Box968Richland, Washington 99352-0968 Mr.AlbertE.Mouncer(MailDrop1396)ChiefCounselEnergyNorthwest P.O.Box968Richland, Washington 99352-0968 Ms.DeborahJ.Ross,ChairmanEnergyFacilitySiteEvaluation CouncilP.'.Box43172Olympia,Washington 98504-3172 Mr.D.W.Coleman(MailDropPE20)Manager,Regulatory AffairsEnergyNorthwest P.O.Box968Richland, Washington 99352-0968 Mr.PaulInserra(MailDropPE20)Manager,Licensing EnergyNorthwest P.O.Box968Richland, Washington 99352-0968 RegionalAdministrator, RegionIVU.S.NuclearRegulatory Commission
1.List of Meeting Participants 2.Licensee's Slides cc w/encls: See next page y l C WNP-2 CC: Mr.Greg O.Smith (Mail Drop 927M)Vice President, Generation Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Mr.Albert E.Mouncer (Mail Drop 1396)Chief Counsel Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Ms.Deborah J.Ross, Chairman Energy Facility Site Evaluation Council P.'.Box 43172 Olympia, Washington 98504-3172 Mr.D.W.Coleman (Mail Drop PE20)Manager, Regulatory Affairs Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Mr.Paul Inserra (Mail Drop PE20)Manager, Licensing Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Regional Administrator, Region IV U.S.Nuclear Regulatory Commission
,HarrisTower8Pavilion611RyanPlazaDrive,Suite400Arlington, Texas76011-8064 ChairmanBentonCountyBoardofCommissioners P.O.Box69Prosser,Washington 99350-0190 SeniorResidentInspector U.S.NuclearRegulatory Commission P.O.Box69Richland, Washington 99352-0069 Mr.RodneyL.Webring(MailDropPE08)VicePresident, Operations Support/PIO EnergyNorthwest P.O.Box968Richland, Washington 99352-0968 ThomasC.Poindexter, Esq.Winston&Strawn1400LStreet,N.W.Washington, DC20005-3502 Mr.BobNicholsExecutive PolicyDivisionOfficeoftheGovernorP.O.Box43113Olympia,Washington 98504-3113 Mr.J.V.ParrishChiefExecutive OfficerEnergyNorthwest P.O.Box968(MailDrop1023)Richland, WA99352-0968 ENERGYNORTHWEST MEETINGPARTICIPANTS JANUARY272000ENERGYNORTHWEST DouglasColemanBruceBoyumJohnBekahaziLindaWoolsleyJohnArbuckleSCIENTECH-NUS DavidStudleyNRCJackGushingSteveDembekMarkBlumbergRichardLobelLetaBrownEnclosure 1
, Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.Box 69 Prosser, Washington 99350-0190 Senior Resident Inspector U.S.Nuclear Regulatory Commission P.O.Box 69 Richland, Washington 99352-0069 Mr.Rodney L.Webring (Mail Drop PE08)Vice President, Operations Support/PIO Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Thomas C.Poindexter, Esq.Winston&Strawn 1400 L Street, N.W.Washington, DC 20005-3502 Mr.Bob Nichols Executive Policy Division Office of the Governor P.O.Box 43113 Olympia, Washington 98504-3113 Mr.J.V.Parrish Chief Executive Officer Energy Northwest P.O.Box 968 (Mail Drop 1023)Richland, WA 99352-0968 ENERGY NORTHWEST MEETING PARTICIPANTS JANUARY 27 2000 ENERGY NORTHWEST Douglas Coleman Bruce Boyum John Bekahazi Linda Woolsley John Arbuckle SCIENTECH-NUS David Studley NRC Jack Gushing Steve Dembek Mark Blumberg Richard Lobel Leta Brown Enclosure 1 ENERGY NORTHWEST Secondary Containment/SGT Submittal Presentation A Introduction (John Arbuckle)Meteorological Data And X/Q Calculations (John Arbuckle and Dave Studley)Dose Analysis And Results (Bruce Boyum and Dave Studley)Summary (Bruce Boyum)Enclosure 2 INTRODUCTION Initial Problem Submittal History Analysis Problem/TS Retraction/JCO-FAO Impact Comparison of Key SGT Parameters Technical Specification Changes Submittal Content INITIAL PROBLEM Under Certain Post-Accident Meteorological Conditions, WNP-2 could not Develop 0.25-inch Negative Differential Pressure Within 120 Seconds Therefore, a Revised Design Basis and Dose Analysis was Provided.JCO (FAO)Prepared and Submitted to Staff.
ENERGYNORTHWEST Secondary Containment/SGT Submittal Presentation AIntroduction (JohnArbuckle)
SU BMITTAL HISTORY~October 1996 Technical Specification.
Meteorological DataAndX/QCalculations (JohnArbuckleandDaveStudley)DoseAnalysisAndResults(BruceBoyumandDaveStudley)Summary(BruceBoyum)Enclosure 2
Amendment Request December 1997-June 1999 Formally Responded to Three RAls
INTRODUCTION InitialProblemSubmittal HistoryAnalysisProblem/TS Retraction/JCO-FAO ImpactComparison ofKeySGTParameters Technical Specification ChangesSubmittal Content INITIALPROBLEMUnderCertainPost-Accident Meteorological Conditions, WNP-2couldnotDevelop0.25-inch NegativeDifferential PressureWithin120SecondsTherefore, aRevisedDesignBasisandDoseAnalysiswasProvided.
 
JCO(FAO)PreparedandSubmitted toStaff.
ANALYSIS PROBLEM Analysis Problem/TS Retraction/JCO-FAO Impact Jul 1999 Withdrew Technical Amendment Request-Discovery of a Nonconservative Error in Determining Containment Release Concentration During Resolution of Proposed RAI 4 No Impact on JCO-FAO, Current Design Basis, Technical Specifications or Recent Analyses COMPARISON OF KEY SGT PARAMETERS 2 minutes 2240 cfm 4457 cfm Original Ke Parameter Desi n Drawdown Time SC Leakage SGT Flow Current Desi n JCO-FAO 10 minutes 1475 cfm 5385-5850 cfm Proposed Desi n 20 minutes 2240 cfm 5000 cfm l ,1 TECHNICAL SP ECIF ICATIONS Proposed Technical Specification Changes SR 3.6.1.3.10 SR 3.6.4.1.1 SR 3.6.4.1 4 Increase Secondary Containment Bypass Leakage from 0.74 scfh to(0.028%/day)
SUBMITTALHISTORY~October1996Technical Specification.
<~<''9.4 scfh)Change the Surveillance Requirement to Verify Every 24 Hours that the Pressure Within Secondary Containment is (0 inch (vs 0.25 inch)c~-'-',, of Vacuum Water Gauge Increase Secondary Containment Drawdown Time from 120 seconds to 20 minutes 5.5.7.2.A Increase Standby Gas Treatment System Flow Rate from 4457 cfm to 5000 cfm SU BMITTAL CONTENT Detailed History-Supersedes Previous Submiitals Responses to RAls Incorporated Design Basis Meteorology and X/Q Valuey>,,rii."'it''Accidents Analyzed-LOCA in Detail, FHA, MSLB and CRDA GOTHIC Model and Benchmarking Efforts Discussion of Standby Gas Treatment System Evaluation of Significant Hazards Environmental Considerations Evaluation
Amendment RequestDecember1997-June1999FormallyResponded toThreeRAls
~-Marked-Up and Typed Technical Specifications Marked-Up Technical Specification Bases-For Info Only I
METEOROLOGICAL DATA AND XlQ CALCULATIONS Description of Met Tower, Terrain, and Instrumentation Data Used (6yrs)ARCON96 1.Description of Release Points and Control Room lntakes 2.Application of ARCON96 at WNP-2 3.Comparison With JCO-FAO and Power Uprate DESCRIPTION OF MET TOWER, TERRAIN, AND INSTRUMENTATION Meteorological Tower Consists of a 240-ft Structure with a 5-ft Extension Mast The Tower is Triangular in Shape and of Open Lattice Construction to Minimize Tower Interference with Meteorological Measurements Wind Speed and Direction is Monitored by Separate Channels at the 33-ft and 245-ft Elevations A Single Channel Provides Air Temperature Difference Between 33-ft and 245-ft Elevations


ANALYSISPROBLEMAnalysisProblem/TS Retraction/JCO-FAO ImpactJul1999WithdrewTechnical Amendment Request-Discovery ofaNonconservative ErrorinDetermining Containment ReleaseConcentration DuringResolution ofProposedRAI4NoImpactonJCO-FAO,CurrentDesignBasis,Technical Specifications orRecentAnalyses COMPARISON OFKEYSGTPARAMETERS 2minutes2240cfm4457cfmOriginalKeParameter DesinDrawdownTimeSCLeakageSGTFlowCurrentDesinJCO-FAO10minutes1475cfm5385-5850cfmProposedDesin20minutes2240cfm5000cfm l,1 TECHNICAL SPECIFICATIONSProposedTechnical Specification ChangesSR3.6.1.3.10 SR3.6.4.1.1 SR3.6.4.14IncreaseSecondary Containment BypassLeakagefrom0.74scfhto(0.028%/day)
DESCRIPTION OF MET TOWER, TERRAIN, AND INSTRUMENTATION Siting of Instrumentation with Respect to Meteorological Tower and Surrounding Vegetation is Very Good The Base of the Tower Maintained as Natural Vegetation Area Around the Tower is Open Terrain with no Natural or Man-Made Obstructions to Impact Data Being Collected
<~<''9.4scfh)ChangetheSurveillance Requirement toVerifyEvery24HoursthatthePressureWithinSecondary Containment is(0inch(vs0.25inch)c~-'-',,ofVacuumWaterGaugeIncreaseSecondary Containment DrawdownTimefrom120secondsto20minutes5.5.7.2.A IncreaseStandbyGasTreatment SystemFlowRatefrom4457cfmto5000cfm SUBMITTALCONTENTDetailedHistory-Supersedes PreviousSubmiitals Responses toRAlsIncorporated DesignBasisMeteorology andX/QValuey>,,rii."'it''Accidents Analyzed-LOCAinDetail,FHA,MSLBandCRDAGOTHICModelandBenchmarking EffortsDiscussion ofStandbyGasTreatment SystemEvaluation ofSignificant HazardsEnvironmental Considerations Evaluation
~-Marked-Up andTypedTechnical Specifications Marked-Up Technical Specification Bases-ForInfoOnly I
METEOROLOGICAL DATAANDXlQCALCULATIONS Description ofMetTower,Terrain,andInstrumentation DataUsed(6yrs)ARCON961.Description ofReleasePointsandControlRoomlntakes2.Application ofARCON96atWNP-23.Comparison WithJCO-FAOandPowerUprate DESCRIPTION OFMETTOWER,TERRAIN,ANDINSTRUMENTATION Meteorological TowerConsistsofa240-ftStructure witha5-ftExtension MastTheTowerisTriangular inShapeandofOpenLatticeConstruction toMinimizeTowerInterference withMeteorological Measurements WindSpeedandDirection isMonitored bySeparateChannelsatthe33-ftand245-ftElevations ASingleChannelProvidesAirTemperature Difference Between33-ftand245-ftElevations


DESCRIPTION OFMETTOWER,TERRAIN,ANDINSTRUMENTATION SitingofInstrumentation withRespecttoMeteorological TowerandSurrounding Vegetation isVeryGoodTheBaseoftheTowerMaintained asNaturalVegetation AreaAroundtheTowerisOpenTerrainwithnoNaturalorMan-MadeObstructions toImpactDataBeingCollected
DATA USED (6YRS)Site-specific Meteorological (Temperature 8 Wind Speed)Data were used for a Six-year Span from January 1, 1984, to January 1, 1990 A Corresponding Calculation Was Performed and a Curve was Generated which Encompasses a Minimum of 96.1 Percent of all WNP-2 Weather Conditions Data Checked for Reasonableness The Curve Excludes Approximately Four Percent as a Conservative Approximation of 95'/0/5'/o l l F DATA USED (6YRS)Winter Cases Yielded Longer Drawdown Times than Summer Cases Limiting Case Very Conservative
-Atmospheric Temperature of 0'F, no Wind, Standby Service Water System Spray Pond Temperature 77'F, Division 2 Electrical Power (i.e., Division 1 Not in Operation), One Train of Standby Gas Treatment System in Operation, and 50%Room Cooler Efficiency Case Resulted in a Drawdown Time of 711 Seconds (11.85 Minutes)
J C, DATA USED (6YRS)Zero Wind Speed and Zero Degrees Temperature.
used Because Temperature Impact on Differential Pressure is Prominent Factor, due to the Higher Differential Temperature Between Inside and Outside Temperatures (9
X/Q CALCULATIONS.r V y4waa ARCON96 1.Description of Release Points and Control Room intakes 2.Application of ARCON96 at WNP-2 3.Comparison with JCO-FAO and Power Uprate X/Q CALCULATIONS ARCON96 ARCQN96 used to Determine X/Q values for Three Control Room lntakes and Four Release Points Utilized the Same Time Period/plant Specific Data as Used in the Drawdown Analysis CR Intakes-Local and Two Remote Intakes
'~I'~l::.-~NQ CALCULATIONS e Release Points Considered
.Turbine Building Walls-Release from Turbine Building Walls to be Used with Events such as CRDAs Reactor Building Walls-Release from Reactor Building Walls to be Used During Drawdown Period and Secondary Bypass Leakage Reactor Building Roof line (Stack)Release-Vent Release from Reactor Building Roof Used for SGTS Releases Reactor Building (King Kong)Doors-Release from Reactor Building Grade Area X/Q CALCULATIONS
-ARCON96-SITE CONFIGURATION SEE NEXT SLIDE X/Q Calculations
-ARCON96-Site Configuration Intake&#xb9;1 1589W, 12294 42 fl MSL Reactor Bldg Roofline 1243.5W, 11918N 671 ft MSL KK Doors 1176W, 11778N 441ft MSL Tttto North Sito North 12300 ftN 12200 Turbine Bldg Wall Sources CRIntake 1467W, 11883N 528 ft MSL Roof Elevation 457 MS L 57S MSL , Turbine Bldg, 545 tSL 66ShtSL Reactor Bldg.506 542 MSL ht L 12100 12000 11900 11800 Reactor Bldg Wall Sources Intake&#xb9;2 1025W, 11565 442 ft MSL 1600 1500 1400 474 MSL Ptaat Grado.441 MSL 1300 200 1100 11700 11600 11500 1000ft W X/Q CALCULATIONS Application of ARGON96 Analyzed each of the four Release Paths for each of the Three Intakes (i.e., 12 Scenarios)
Analyzed all 12 Scenarios for all 6 Years The Maximum Value of the 6 Years was Chosen for each Time Period (i.e., not just the Maximum Year but the Maximum Value each Time Step)Local Intake not Used for LOCA due to the Presence of an Automatic Isolation Signal X/Q CALCULATIONS A.Application of ARCON96 Between 0 to 3 Hours, no Credit for Operator Action-psed Average of the two Remote lntakes~>--"~" From 3 Hours to the 30 Days, Credit for Operator Action-Used the.Lower of the two X/Qs Calculated for the Remote Intakes~@',z-q", Very Conservative Treatment-With the Presence of two Remote'"""c" Intakes, the Plant will be able to Switch to the Upwind Intake and in Effect Preclude the Introduction of Activity During the Accident X/Q CALCULATIONS SEE NEXT SLIDE I 1 NQ Calculations ARCON96 Results and Comparison with Original CR NQs for UFSAR Time Period Ground Release NQ Calculated with ARGON 96 s/m'Q Used for UFSAR Analysis Ratio of ARGON 96 Value s/m'o UFSAR Value 0-2hr 2-3hr 3-8hr 8-24 hr 1-4da s 4-30da s SGTS Release 0-2 hr 2-3 hr 3-8 hr 8-24 hr 1-4da s 4-30da s 9.94E-5 9.91E-5 7.16E-5 4.37E-5 2.35E-5~1.56E-5 2.54E-4'j.70E-4 8.15E-5 3.20E-5 2.26E-5 1.90E-5 2.17E-4 5.43E-5 4.49E-5 3.55E-5 1.67E-5 1.67E-5 3.77E-4 9.43E-5 7.80E-5 6.17E-5 2.90E-5 2.90E-5 45.81%182.50%159.47%123.10%140.72%93 41 67.37%180.28%104.49%51.86%77 93%65.52%
DOSE ANALYSIS AND RESULTS Accidents Analyzed for Radiological Consequences AXIDENT Code 1.How Applied 2.Where used Before Summary of LOCA Major Assumptions Changes from Original Design and Previous Submittal LOCA Results ACCIDENTS ANALYZED Main Steam Line Break (MSLB)Fuel Handling Accident (FHA)Control Rod Drop Accident (CRDA)Loss Of Coolant Accident (LOCA) 1 1 AXIDENT CODE~f Dose Analysis Code-Radiological Consequences of the Spectrum of Design Basis Accidents were Analyzed using the SCIENTECH-NUS AXIDENT Code Code Description
-AXIDENT Models the Transport of Radioactivity to the Environment and to the Control Room.This.Code Includes the time Dependent Effects of Containment Sprays, Recirculation, Purge and Intake Filters, Atmospheric Dispersion, Natural Decay, etc.The Code is Based on the Explicit Solution of the Integrated Activity in a Receptor Volume.
AXIDENT CODE Industry Experience/Usage of the AXIDENT Code-Developed in the early 70's to Support the Licensing and Licensing Reviews of both U.S.and international Commercial Nuclear Power Plants.Developed to fill the Void in Codes Available to Assess the Emerging Issue at the time-Control Room Habitability.
General lndust Usa e~Used to Support Licensing Submittals in the 70's Used for a Number of Plants in Support of the Post-TMI Action Item~Used Throughout the 80's and 90's to Resolve Control Room Habitability and Accident Analyses Issues


DATAUSED(6YRS)Site-specific Meteorological (Temperature 8WindSpeed)DatawereusedforaSix-yearSpanfromJanuary1,1984,toJanuary1,1990ACorresponding Calculation WasPerformed andaCurvewasGenerated whichEncompasses aMinimumof96.1PercentofallWNP-2WeatherConditions DataCheckedforReasonableness TheCurveExcludesApproximately FourPercentasaConservative Approximation of95'/0/5'/o llF DATAUSED(6YRS)WinterCasesYieldedLongerDrawdownTimesthanSummerCasesLimitingCaseVeryConservative
AXIDENT CODE SCIENTECH Experience Successfully Benchmarked the Previous Results Generated by other Codes which Compute the Integrated/exact Solution (i.e., Bechtel's LOCADOSE and S&L's PostDBA)Over the Years, Thousands of Cases have been run on the AXIDENT Code.In all Cases, the Results have Trended as Expected.The Results have also Consistently been in Close Agreement with the Steady State Murphy/Campe Equations.
-Atmospheric Temperature of0'F,noWind,StandbyServiceWaterSystemSprayPondTemperature 77'F,Division2Electrical Power(i.e.,Division1NotinOperation),
S I AXIDENT CODE Recent Calculations Submitted to the NRC Include: Control Room and Offsite Dose Calculations to Support the FPC Crystal River Restart CRDA and MSLB Analyses for the CPLL Brunswick Station's Power U prate Effort Reanalysis Effort for the Cooper Station-Pending Review I I I<<e~I~i~'~~~I I'Y/////I I I~~~~I r~I e C
OneTrainofStandbyGasTreatment SysteminOperation, and50%RoomCoolerEfficiency CaseResultedinaDrawdownTimeof711Seconds(11.85Minutes)
CONTROL ROOM AIR FLOWS Air intake 1100 cfm Filter Unit: 95%eff Elemental and Organic 99%eff.Particulate Control Room (CR)CR Total Volume, 2.0E5 ft'xit Flow.~1110.55 cfm Unfiltered Infiltration 8c in~ass/egress 10.55 c6n MAJOR ASSUMPTIONS
JC, DATAUSED(6YRS)ZeroWindSpeedandZeroDegreesTemperature.
)~AXIDENT Code used for Dose Analysis Source Term Release Per TID-14844 (102%Power Level)100/0 Noble Gases-25%Halogens (50%ESF Leakage)91%Elemental 5%Particulate 4%Organic Dose Conversion Factors in Accordance with ICRP 30 MAJOR ASSUMPTIONS Instantaneous Mixing in Primary Containment Release from Containment of.5'/oiday Total.32/o/day Containment Leakage-.18'/o/day MSIV Leakage No Suppression Pool Scrubbing Credited MAJOR ASSUMPTIONS SGT Filter Efficiency
usedBecauseTemperature ImpactonDifferential PressureisProminent Factor,duetotheHigherDifferential Temperature BetweenInsideandOutsideTemperatures (9
--99%Efficient for Halogens 0%Efficient for Noble Gases.SGT.Flow: 5000 cfm Single Train 50 cfm Bypass Leakage Control Room Filter Efficiency 95%Efficient for Elemental and Organic iodine 99%Efficient for Particulate iodine 7 I MAJOR ASSUMPTIONS Secondary Containment Drawdown Time of 20 Minutes During Drawdown Time:-No SGT Filtration Credited-Secondary Containment Leakage at a Rate of 1 Volume/day 40%Mixing in Secondary Containment for Entire Scenario MAJOR ASSUMPTIONS gl~P ESF Leakage Into Secondary Containment:
X/QCALCULATIONS
--1 gpm-10%Flashing Fraction-50%Core Iodine Source Term Control Room Unfiltered Inleakage:
.rVy4waaARCON961.Description ofReleasePointsandControlRoomintakes2.Application ofARCON96atWNP-23.Comparison withJCO-FAOandPowerUprate X/QCALCULATIONS ARCON96ARCQN96usedtoDetermine X/QvaluesforThreeControlRoomlntakesandFourReleasePointsUtilizedtheSameTimePeriod/plant SpecificDataasUsedintheDrawdownAnalysisCRIntakes-LocalandTwoRemoteIntakes
10 scfm Ingress/egress
'~I'~l::.-~NQCALCULATIONS eReleasePointsConsidered
.55 scfm Infiltration Secondary Containment Bypass Leakage of.028%/day (9.4 scfh)New X/Q Values DOSE ANALYSIS METHODOLOGY MAJOR CHANGES'~ITEM Drawdown Time Sec.Ctmt Mixing ESF Leakage SGT Filter Bypass Bypass Leakage (%Day)CURRENT DESIGN 5 Min None 14 cfm.00209 PREVIOUS SUBMITTAL 20 Min 40%Vol.None 14 cfm 054*'cj~PROPOSED DESIGN 20 Min 40%Vol.1 GPM.50 cfm.028 r4, LOCA ANALYSIS RESULTS CR Whole Body GR Thyroid GR Beta CALC.~REM 0.4 28.1 6.8.LlMIT~REM 5 30 30 EAB Whole Body EAB Thyroid 3.7 56.6 25 300 LPZ Whole Body LPZ Thyroid 3.4 131 25 300 4
.TurbineBuildingWalls-ReleasefromTurbineBuildingWallstobeUsedwithEventssuchasCRDAsReactorBuildingWalls-ReleasefromReactorBuildingWallstobeUsedDuringDrawdownPeriodandSecondary BypassLeakageReactorBuildingRoofline(Stack)Release-VentReleasefromReactorBuildingRoofUsedforSGTSReleasesReactorBuilding(KingKong)Doors-ReleasefromReactorBuildingGradeArea X/QCALCULATIONS
E LOCA DOSE BY PATH E RELEASE PATH CONTROL ROOM LPZ THYROID W.BODY THYROID W.BODY Sec.Ctmt Bypass Sec.Ctmt Leakage 21.02.02 8E-5 1Q1 0.2 0.5 4E-3 Sec.Ctmt SGT Rel.4.2 ESF.Leakage Sec.Ctmt 0.3.16 1E-5 1.2 1.2 2E-3 MSIV Leakage TOTAL 3.0 28.1.18 04 13 131 1.7 34 CONTAINMENT RELEASE IMPACT (.04%1day Sec Ctmt Bypass Leakage)RELEASE PATH CR THYROID DOSE (REM).32'/o/DAY
-ARCON96-SITECONFIGURATION SEENEXTSLIDE X/QCalculations
.5'/o/DAY Sec Ctmt Bypass Sec Ctmt Leakage Sec Ctmt SGT Rel.ESF Leak (Sec Ctmt)MSIV Leakage TOTAL.02 4.2 0.3 3.0 36.9.03 0.3 3.0 39.2 t~4 I ,0 0~I EFFECT OF RELEASE ELEVATION DESCRIPTION Ground Release=100%Roof line Release=0/0 Ground Release=60'/0 Roofline Release=40'/0 Ground Release=50'/0 Roof line Release=50'/0 DOSE REM 39.2 39.6 39.7 Ground Release=0'/0 Roof line Release=100%39.2 Based on Thyroid Dose in Control Room Assuming.5'/0/day Containment Leakage and.04%/day Secondary Containment Bypass EFFECT OF SGT FLOWRATE DESCRIPTION 4K cfm for 30 Days DOSE (REM)THYROID W.BODY 37.3.357 5K cfm for 30 Days 10K cfm for 30 Days (20 Min Drawdn)10K cfm for 30 Days (10 Min Drawdn)10K cfm for 1 Hr Then 4K 36.9 37.3.369 A09.409.362 cfm 30 Days Based On.32%/day Ctmt Leakage and.04%/day Sec Ctmt Bypass Leakage
-ARCON96-SiteConfiguration Intake&#xb9;11589W,1229442flMSLReactorBldgRoofline1243.5W,11918N671ftMSLKKDoors1176W,11778N441ftMSLTtttoNorthSitoNorth12300ftN12200TurbineBldgWallSourcesCRIntake1467W,11883N528ftMSLRoofElevation 457MSL57SMSL,TurbineBldg,545tSL66ShtSLReactorBldg.506542MSLhtL12100120001190011800ReactorBldgWallSourcesIntake&#xb9;21025W,11565442ftMSL160015001400474MSLPtaatGrado.441MSL130020011001170011600115001000ftW X/QCALCULATIONS Application ofARGON96AnalyzedeachofthefourReleasePathsforeachoftheThreeIntakes(i.e.,12Scenarios)
Analyzedall12Scenarios forall6YearsTheMaximumValueofthe6YearswasChosenforeachTimePeriod(i.e.,notjusttheMaximumYearbuttheMaximumValueeachTimeStep)LocalIntakenotUsedforLOCAduetothePresenceofanAutomatic Isolation Signal X/QCALCULATIONS A.Application ofARCON96Between0to3Hours,noCreditforOperatorAction-psedAverageofthetwoRemotelntakes~>--"~"From3Hourstothe30Days,CreditforOperatorAction-Usedthe.LowerofthetwoX/QsCalculated fortheRemoteIntakes~@',z
-q",VeryConservative Treatment
-WiththePresenceoftwoRemote'"""c"Intakes,thePlantwillbeabletoSwitchtotheUpwindIntakeandinEffectPrecludetheIntroduction ofActivityDuringtheAccident X/QCALCULATIONS SEENEXTSLIDE I1 NQCalculations ARCON96ResultsandComparison withOriginalCRNQsforUFSARTimePeriodGroundReleaseNQCalculated withARGON96s/m'QUsedforUFSARAnalysisRatioofARGON96Values/m'oUFSARValue0-2hr2-3hr3-8hr8-24hr1-4das4-30dasSGTSRelease0-2hr2-3hr3-8hr8-24hr1-4das4-30das9.94E-59.91E-57.16E-54.37E-52.35E-5~1.56E-52.54E-4'j.70E-48.15E-53.20E-52.26E-51.90E-52.17E-45.43E-54.49E-53.55E-51.67E-51.67E-53.77E-49.43E-57.80E-56.17E-52.90E-52.90E-545.81%182.50%159.47%123.10%140.72%934167.37%180.28%104.49%51.86%7793%65.52%
DOSEANALYSISANDRESULTSAccidents AnalyzedforRadiological Consequences AXIDENTCode1.HowApplied2.WhereusedBeforeSummaryofLOCAMajorAssumptions ChangesfromOriginalDesignandPreviousSubmittal LOCAResults ACCIDENTS ANALYZEDMainSteamLineBreak(MSLB)FuelHandlingAccident(FHA)ControlRodDropAccident(CRDA)LossOfCoolantAccident(LOCA) 11 AXIDENTCODE~fDoseAnalysisCode-Radiological Consequences oftheSpectrumofDesignBasisAccidents wereAnalyzedusingtheSCIENTECH-NUS AXIDENTCodeCodeDescription
-AXIDENTModelstheTransport ofRadioactivity totheEnvironment andtotheControlRoom.This.CodeIncludesthetimeDependent EffectsofContainment Sprays,Recirculation, PurgeandIntakeFilters,Atmospheric Dispersion, NaturalDecay,etc.TheCodeisBasedontheExplicitSolutionoftheIntegrated ActivityinaReceptorVolume.
AXIDENTCODEIndustryExperience/Usage oftheAXIDENTCode-Developed intheearly70'stoSupporttheLicensing andLicensing ReviewsofbothU.S.andinternational Commercial NuclearPowerPlants.Developed tofilltheVoidinCodesAvailable toAssesstheEmergingIssueatthetime-ControlRoomHabitability.
GenerallndustUsae~UsedtoSupportLicensing Submittals inthe70'sUsedforaNumberofPlantsinSupportofthePost-TMIActionItem~UsedThroughout the80'sand90'stoResolveControlRoomHabitability andAccidentAnalysesIssues


AXIDENTCODESCIENTECH Experience Successfully Benchmarked thePreviousResultsGenerated byotherCodeswhichComputetheIntegrated/exact Solution(i.e.,Bechtel's LOCADOSEandS&L'sPostDBA)OvertheYears,Thousands ofCaseshavebeenrunontheAXIDENTCode.InallCases,theResultshaveTrendedasExpected.
==SUMMARY==
TheResultshavealsoConsistently beeninCloseAgreement withtheSteadyStateMurphy/Campe Equations.
Dose Analysis Meets 10CFR50 and 10CFR100 Limits No Hardware Changes Necessary Beyond Those Completed in-Support of the JCO-FAO Tech Spec Submittal to be Made.in February FSAR Changes will be Implemented Following Approval of Tech Spec Submittal FSAR Changes Include:-.Accident Analysis and Doses Control Room Habitability Analysis~Secondary Containment Description
SI AXIDENTCODERecentCalculations Submitted totheNRCInclude:ControlRoomandOffsiteDoseCalculations toSupporttheFPCCrystalRiverRestartCRDAandMSLBAnalysesfortheCPLLBrunswick Station's PowerUprateEffortReanalysis EffortfortheCooperStation-PendingReview III<<e~I~i~'~~~II'Y/////III~~~~Ir~Ie C
-Description of SGTS and REA JCO-FAO will be Closed Following Approval of Tech Spec Submittal le'g.
CONTROLROOMAIRFLOWSAirintake1100cfmFilterUnit:95%effElemental andOrganic99%eff.Particulate ControlRoom(CR)CRTotalVolume,2.0E5ft'xitFlow.~1110.55cfmUnfiltered Infiltration 8cin~ass/egress 10.55c6n MAJORASSUMPTIONS
q RC~O C~+4 Cy 4V 0 0 Cy+n~O UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 NOV l 5 I999 Mr.J.V.Parrish (Mail Drop 1023)Chief Executive Officer Energy Northwest P.O.Box 968 Richland, Washington 99352-0968
)~AXIDENTCodeusedforDoseAnalysisSourceTermReleasePerTID-14844 (102%PowerLevel)100/0NobleGases-25%Halogens(50%ESFLeakage)91%Elemental 5%Particulate 4%OrganicDoseConversion FactorsinAccordance withICRP30 MAJORASSUMPTIONS Instantaneous MixinginPrimaryContainment ReleasefromContainment of.5'/oiday Total.32/o/day Containment Leakage-.18'/o/day MSIVLeakageNoSuppression PoolScrubbing Credited MAJORASSUMPTIONS SGTFilterEfficiency
--99%Efficient forHalogens0%Efficient forNobleGases.SGT.Flow:5000cfmSingleTrain50cfmBypassLeakageControlRoomFilterEfficiency 95%Efficient forElemental andOrganiciodine99%Efficient forParticulate iodine 7I MAJORASSUMPTIONS Secondary Containment DrawdownTimeof20MinutesDuringDrawdownTime:-NoSGTFiltration Credited-Secondary Containment LeakageataRateof1Volume/day 40%MixinginSecondary Containment forEntireScenario MAJORASSUMPTIONS gl~PESFLeakageIntoSecondary Containment:
--1gpm-10%FlashingFraction-50%CoreIodineSourceTermControlRoomUnfiltered Inleakage:
10scfmIngress/egress
.55scfmInfiltration Secondary Containment BypassLeakageof.028%/day (9.4scfh)NewX/QValues DOSEANALYSISMETHODOLOGY MAJORCHANGES'~ITEMDrawdownTimeSec.CtmtMixingESFLeakageSGTFilterBypassBypassLeakage(%Day)CURRENTDESIGN5MinNone14cfm.00209PREVIOUSSUBMITTAL 20Min40%Vol.None14cfm054*'cj~PROPOSEDDESIGN20Min40%Vol.1GPM.50cfm.028r4, LOCAANALYSISRESULTSCRWholeBodyGRThyroidGRBetaCALC.~REM0.428.16.8.LlMIT~REM53030EABWholeBodyEABThyroid3.756.625300LPZWholeBodyLPZThyroid3.413125300 4
ELOCADOSEBYPATHERELEASEPATHCONTROLROOMLPZTHYROIDW.BODYTHYROIDW.BODYSec.CtmtBypassSec.CtmtLeakage21.02.028E-51Q10.20.54E-3Sec.CtmtSGTRel.4.2ESF.Leakage Sec.Ctmt0.3.161E-51.21.22E-3MSIVLeakageTOTAL3.028.1.1804131311.734 CONTAINMENT RELEASEIMPACT(.04%1day SecCtmtBypassLeakage)RELEASEPATHCRTHYROIDDOSE(REM).32'/o/DAY
.5'/o/DAY SecCtmtBypassSecCtmtLeakageSecCtmtSGTRel.ESFLeak(SecCtmt)MSIVLeakageTOTAL.024.20.33.036.9.030.33.039.2 t~4I,00~I EFFECTOFRELEASEELEVATION DESCRIPTION GroundRelease=100%RooflineRelease=0/0GroundRelease=60'/0RooflineRelease=40'/0GroundRelease=50'/0RooflineRelease=50'/0DOSEREM39.239.639.7GroundRelease=0'/0RooflineRelease=100%39.2BasedonThyroidDoseinControlRoomAssuming.5'/0/day Containment Leakageand.04%/daySecondary Containment Bypass EFFECTOFSGTFLOWRATEDESCRIPTION 4Kcfmfor30DaysDOSE(REM)THYROIDW.BODY37.3.3575Kcfmfor30Days10Kcfmfor30Days(20MinDrawdn)10Kcfmfor30Days(10MinDrawdn)10Kcfmfor1HrThen4K36.937.3.369A09.409.362cfm30DaysBasedOn.32%/dayCtmtLeakageand.04%/daySecCtmtBypassLeakage SUMMARYDoseAnalysisMeets10CFR50and10CFR100LimitsNoHardwareChangesNecessary BeyondThoseCompleted in-SupportoftheJCO-FAOTechSpecSubmittal tobeMade.inFebruaryFSARChangeswillbeImplemented Following ApprovalofTechSpecSubmittal FSARChangesInclude:-.AccidentAnalysisandDosesControlRoomHabitability Analysis~Secondary Containment Description
-Description ofSGTSandREAJCO-FAOwillbeClosedFollowing ApprovalofTechSpecSubmittal le'g.
qRC~OC~+4Cy4V00Cy+n~OUNITEDSTATESNUCLEARREGULATORY COMMISSION REGIONIV611RYANPLAZADRIVE,SUITE400ARLINGTON, TEXAS76011-8064 NOVl5I999Mr.J.V.Parrish(MailDrop1023)ChiefExecutive OfficerEnergyNorthwest P.O.Box968Richland, Washington 99352-0968


==SUBJECT:==
==SUBJECT:==
INVITATION TODISCUSSION OFPILOTPROGRAMRESULTS
INVITATION TO DISCUSSION OF PILOT PROGRAM RESULTS


==DearMr.Parrtsh:==
==Dear Mr.Parrtsh:==
OnMay30,1999,weinitiated apilotoftherisk-informed baselineinspection programatCooperNuclearStationandFortCalhounStation.Thepilotprogramisscheduled toendNovember27.OnDecember1,1999,theNRCwillmeetwithOmahaPublicPowerDistrictandNebraskaPublicPowerDistricttodiscusstheirperceptions andlessonslearnedgatheredduringthepilotprogram.Youwillfindthedetailsofthemeetingdocumented intheenclosedmeetingnotice.AlthoughthemeetingisbetweentheNRCandmembersofthepilotplantstaffs,wewillbediscussing topicsthatmaybeofinteresttoyourorganization.
On May 30, 1999, we initiated a pilot of the risk-informed baseline inspection program at Cooper Nuclear Station and Fort Calhoun Station.The pilot program is scheduled to end November 27.On December 1, 1999, the NRC will meet with Omaha Public Power District and Nebraska Public Power District to discuss their perceptions and lessons learned gathered during the pilot program.You will find the details of the meeting documented in the enclosed meeting notice.Although the meeting is between the NRC and members of the pilot plant staffs, we will be discussing topics that may be of interest to your organization.
Thismeetingwillbeopentopublicobservation.
This meeting will be open to public observation.
Following themeeting,thediscussion willbeopenedforcommentsandquestions fromobservers.
Following the meeting, the discussion will be opened for comments and questions from observers.
Wewouldentertain andwelcomeyourparticipation atthattime.Shouldyouhaveanyquestions onthisinspection plan,pleasecontactCharlesMarschall at~(817)860-8185orDavidLovelessat(817)860-8161.Sincerely, gals'@zPdK CharlesS.Marschall, ChiefProject'Branch CDivisionofReactorProjectsDocketNo.:50-397LicenseNo.:NPF-21
We would entertain and welcome your participation at that time.Should you have any questions on this inspection plan, please contact Charles Marschall at~(817)860-8185 or David Loveless at (817)860-81 61.Sincerely, gals'@zPdK Charles S.Marschall, Chief Project'Branch C Division of Reactor Projects Docket No.: 50-397 License No.: NPF-21  


==Enclosure:==
==Enclosure:==


AsStated
As Stated


EnergyNorthwest ccw/enclosure:
Energy Northwest cc w/enclosure:
ChairmanEnergyFacilitySiteEvaluation CouncilP.O.Box43172Olympia,Washington 98504-3172 RodneyL.Webring(MailDropPE08)VicePresident, Operations Support/PIO EnergyNorthwest P.O.Box968Richland, Washington 99352-0968 GregO.Smith(MailDrop927M)VicePresident, Generation EnergyNorthwest P.O.Box968Richland, Washington 99352-0968 D.W.Coleman(MailDropPE20)Manager,Regulatory AffairsEnergyNorthwest P.O.Box968Richland, Washington 99352-0968 AlbertE.Mouncer(MailDrop1396)GeneralCounselEnergyNorthwest P.O.Box968Richland, Washington 99352-0968 PaulInserra(MailDropPE20)Manager,Licensing
Chairman Energy Facility Site Evaluation Council P.O.Box 43172 Olympia, Washington 98504-3172 Rodney L.Webring (Mail Drop PE08)Vice President, Operations Support/PIO Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Greg O.Smith (Mail Drop 927M)Vice President, Generation Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 D.W.Coleman (Mail Drop PE20)Manager, Regulatory Affairs Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Albert E.Mouncer (Mail Drop 1396)General Counsel Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Paul Inserra (Mail Drop PE20)Manager, Licensing.Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Perry D.Robinson, Esq.Winston 8 Strawn 1400 L Street, N.W.Washington, D.C.20005-3502 Bob Nichols State Liaison Officer Executive Policy Division Office of the Governor P.O.Box 43113 Olympia, Washington 98504-3113 Energy Northwest bcc to DCD (IE45)-3-bcc distrib.by RIV w enclosure:
.EnergyNorthwest P.O.Box968Richland, Washington 99352-0968 PerryD.Robinson, Esq.Winston8Strawn1400LStreet,N.W.Washington, D.C.20005-3502 BobNicholsStateLiaisonOfficerExecutive PolicyDivisionOfficeoftheGovernorP.O.Box43113Olympia,Washington 98504-3113 EnergyNorthwest bcctoDCD(IE45)-3-bccdistrib.byRIVwenclosure:
Branch Chief (DRP/E)Project Engineer (DRP/E)bcc distrib.w/o enclosure:
BranchChief(DRP/E)ProjectEngineer(DRP/E)bccdistrib.w/oenclosure:
Regional Administrator DRP Director DRS Director-Branch Chief (DRP/TSS)Resident Inspector RIV File RITS Coordinator DOCUMENT NAME: R:QWN2>mn12-1.wpd Torecelvecopyofdocurnent, Indicateinbox:"C"=Cop withoutenclosures"E"=Cop withenclosures"N"~Nocopy RIV'C:DRP/C CSMarschall;vlh 11/1 5/99 OFFICIAL RECORD COPY
RegionalAdministrator DRPDirectorDRSDirector-BranchChief(DRP/TSS)
%+8 Recu C~+~~o Cy A A 0 c Ol Cy+gO~>>*++UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 November 15, 1999 NOTICE OF LICENSEE MEETING Name of Licensee: Name of Facility: Docket: Date and Time of Meeting: Location of Meeting: Purpose of Meeting: NRC Attendees:
ResidentInspector RIVFileRITSCoordinator DOCUMENTNAME:R:QWN2>mn12-1.wpd Torecelvecopyofdocurnent, Indicateinbox:"C"
Licensee Attendees:
=Copwithoutenclosures "E"=Copwithenclosures "N"~NocopyRIV'C:DRP/C CSMarschall;vlh 11/15/99OFFICIALRECORDCOPY
Nebraska Public Power District Omaha Public Power District Cooper Nuclear Station Fort Calhoun Station 50-285 50-298 December 1, 1999 1-3 p.m.(CDT)Fort Calhoun Station Auditorium Hwy.75-North of Fort Calhoun Fort Calhoun, Nebraska Discussion of the licensee's perceptions and lessons learned from the pilot inspection program K.Brockman, Director, Division of Reactor Projects C.Marschall, Chief, Branch C, Division of Reactor Projects A.Madison, Transition Task Force Leader, Office of Nuclear Reactor'Regulation W.Jones', Senior Reactor Analyst, Division of Reactor Safety L.Wharton, FCS Project Manager, Office of Nuclear Reactor Regulation L.Burkhart, CNS Project Manager, Office of Nuclear Reactor Regulation D.Loveless, Senior Project Engineer, Branch C, Division of Reactor Projects W.Gary Gates, Vice President, Fort Calhoun Station S.Gambhir, Division Manager, Nuclear Operations J.Chase,.Division Manager, Nuclear Assessments M.Tesar, Division, Manager, Nuclear Support Services R.Phelps, Division Manager, Nuclear Engineering J.Solymossy, Manager, Fort Calhoun Station M.Frans, Manager, Nuclear Licensing R.Jaworski, Manager, Revised Reactor Oversight Project B.Hansher, Supervisor, Station, Licensing Nebraska Public Power District Omaha Public Power District-2-H.Hackerott, Supervisor, Systems Analysis J.McDonatd, Plant Manager, Cooper Nuclear Station P.Caudill, General Manager, Technical Services G.Smith, Nuclear Projects Manager J.Sumpter, Licensing Supervisor D.Robinson, QA Assessment Manager R.Wachowiak, Risk Management Supervisor NOTE: (1)This meeting is open to attendance by members of the general public.(2)NRC personnel, not listed above, that desire to attend this meeting should notify C.S.Marschall at 817/860-8185 by COB on November 19, 1999.(3)A comment session will be conducted at the end of the meeting for participation of all Region IV operating reactor licensees.
%+8RecuC~+~~oCyAA0cOlCy+gO~>>*++UNITEDSTATESNUCLEARREGULATORY COMMISSION REGIONIV611RYANPLAZADRIVE,SUITE400ARLINGTON, TEXAS76011-8064 November15,1999NOTICEOFLICENSEEMEETINGNameofLicensee:
~n Approved By: Charles S~Marschall, Chief Project Branch C Division of Reactor Projects CC: G.R.Horn, Senior Vice President of Energy Supply Nebraska Public Power District 1414 15th Street Columbus, Nebraska 68601 John R.McPhail, General Counsel Nebraska Public Power District P.O.Box 499 Columbus, Nebraska 68602-0499 B.L.Houston, Nuclear Licensing and Safety Manager Nebraska Public Power District P.O.Box 98 Brownville, Nebraska 68321 Nebraska Public Power District Omaha Public Power District-3-Dr.William D.Leech Manager-Nuclear MidAmerican Energy-907 Walnut Street P.O.Box 657 Des Moines, Iowa 50303-0657 Ron Stoddard Lincoln Electric System 1040 0 Street P.O.Box 80869 Lincoln, Nebraska 68501-0869 Michael J.Linder, Director Nebraska Department of Environmental Quality P.O.Box 98922 Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305 Cheryl K.Rogers, Program Manager Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301, Centennial Mall, South P.O.Box 95007 Lincoln, Nebraska 68509-5007 Ronald A.Kucera, Director of Intergovernmental Cooperation Department of Natural Resources P.O.Box 176 Jefferson City, Missouri 65102 Jerry Uhlmann, Director State Emergency Management Agency P:O.Box 116 Jefferson City, Missouri 65101 Nebraska Public Power District.Omaha Public Power District-4-Vick L.Cooper, Chief Radiation Control Program, RCP Kansas Department of Health and Environment Bureau of Air and Radiation Forbes Field Building 283 Topeka, Kansas 66620 Mark T.Frans, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.~P.O.Box 399 Hwy.75-North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W.Chase, Division Manager Nuclear Assessments Fort Calhoun Station P.O.Box 399 Fort Calhoun, Nebraska 68023 J.M.Solymossy, Manager-Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O.Box 399 Hwy.75-North of Fort Calhoun Fort Calhoun, Nebraska 68023 Perry D.Robinson, Esq.Winston 8 Strawn 1400 L.Street, N.W.Washington, D.C.20005-3502 Chairman Washington County Board of Supervisors Washington County Courthouse P.O.Box 466 Blair, Nebraska 68008 Cheryl K.Rogers, Program Manager Nebraska Health and-Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O.Box 95007 Lincoln, Nebraska 68509-5007 0 C Nebraska Public Power District Omaha Public Power District-5-bcc: DMB (IE45)OEDO RIV Coordinator (16E15)ORA File RIV File E-Mail To: ()PMNS PAB FJM BWS BAB2 LJB LRW OEMAIL WCW JAC CAH GFS BWH'AC1, CJG LAT, DLF,LJB1 CLG, LMB, NLH CMS, JAK,NSL PDP LPL NRC Attendees Mtg Announcement Coordinator DEDR A/D/NRR Acting, ADT/NRR Acting ADP/NRR L.Burkhart, Project Manager, NRR R.Wharton, Project Manager, NRR D/OE W.Walker, Senior Resident Inspector J.Clark, Senior Resident Inspector C.Hackney, RSLO G.Sanborn, EO B.Henderson, PAO RA Secretaries DRP Division DRS Division DNMS Division Dean Papa P.Longdo DOCUMENT NAME: R:QCNS<CN12-1'MN.DRP and R:QFCS>FC12-1 MN.DRP To receive co of document, Indicate In box: "C"=Co without enclosures"E"=Co with enclosures N"=No co RI V:DR P/C C CSMarsch all:vlh 11/1 5/99 RSLO PAO C CAHackne 11/1 5/99 BWHenderson 11/15/99 OFFICIAL RECORD COPY Distri89.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients:
NameofFacility:
NRR/DLPM/LPD4-2 NRR/DLPM/LPD4-1 L R Wharton L Burkhart J Cushing Internal Recipients:
Docket:DateandTimeofMeeting:LocationofMeeting:PurposeofMeeting:NRCAttendees:
RidsEdoMailCenter RGN 4.FILE 01 RES/DET/ERAB OGC/ROED NRR/DIPM IOLB NTE EDRO External Recipients:
LicenseeAttendees:
NRC PDR NOAC Copies: 1 1 1 1, 1 1'1 1 1 1 1 1 Not Found Not Found Not Found Not Found Not Found OK Not Found Not Found Not Found Not Found Not Found Not Found Not Found Not Found Total Copies: Item: ADAMS Package Library: ML ADAMS"HQNTAD01 ID: 993280276 14  
NebraskaPublicPowerDistrictOmahaPublicPowerDistrictCooperNuclearStationFortCalhounStation50-28550-298December1,19991-3p.m.(CDT)FortCalhounStationAuditorium Hwy.75-NorthofFortCalhounFortCalhoun,NebraskaDiscussion ofthelicensee's perceptions andlessonslearnedfromthepilotinspection programK.Brockman,
: Director, DivisionofReactorProjectsC.Marschall, Chief,BranchC,DivisionofReactorProjectsA.Madison,Transition TaskForceLeader,OfficeofNuclearReactor'Regulation W.Jones',SeniorReactorAnalyst,DivisionofReactorSafetyL.Wharton,FCSProjectManager,OfficeofNuclearReactorRegulation L.Burkhart, CNSProjectManager,OfficeofNuclearReactorRegulation D.Loveless, SeniorProjectEngineer, BranchC,DivisionofReactorProjectsW.GaryGates,VicePresident, FortCalhounStationS.Gambhir,DivisionManager,NuclearOperations J.Chase,.Division Manager,NuclearAssessments M.Tesar,Division, Manager,NuclearSupportServicesR.Phelps,DivisionManager,NuclearEngineering J.Solymossy, Manager,FortCalhounStationM.Frans,Manager,NuclearLicensing R.Jaworski, Manager,RevisedReactorOversight ProjectB.Hansher,Supervisor, Station,Licensing NebraskaPublicPowerDistrictOmahaPublicPowerDistrict-2-H.Hackerott, Supervisor, SystemsAnalysisJ.McDonatd, PlantManager,CooperNuclearStationP.Caudill,GeneralManager,Technical ServicesG.Smith,NuclearProjectsManagerJ.Sumpter,Licensing Supervisor D.Robinson, QAAssessment ManagerR.Wachowiak, RiskManagement Supervisor NOTE:(1)Thismeetingisopentoattendance bymembersofthegeneralpublic.(2)NRCpersonnel, notlistedabove,thatdesiretoattendthismeetingshouldnotifyC.S.Marschall at817/860-8185 byCOBonNovember19,1999.(3)Acommentsessionwillbeconducted attheendofthemeetingforparticipation ofallRegionIVoperating reactorlicensees.
~nApprovedBy:CharlesS~Marschall, ChiefProjectBranchCDivisionofReactorProjectsCC:G.R.Horn,SeniorVicePresident ofEnergySupplyNebraskaPublicPowerDistrict141415thStreetColumbus, Nebraska68601JohnR.McPhail,GeneralCounselNebraskaPublicPowerDistrictP.O.Box499Columbus, Nebraska68602-0499 B.L.Houston,NuclearLicensing andSafetyManagerNebraskaPublicPowerDistrictP.O.Box98Brownville, Nebraska68321 NebraskaPublicPowerDistrictOmahaPublicPowerDistrict-3-Dr.WilliamD.LeechManager-NuclearMidAmerican Energy-907WalnutStreetP.O.Box657DesMoines,Iowa50303-0657 RonStoddardLincolnElectricSystem10400StreetP.O.Box80869Lincoln,Nebraska68501-0869 MichaelJ.Linder,DirectorNebraskaDepartment ofEnvironmental QualityP.O.Box98922Lincoln,Nebraska68509-8922 ChairmanNemahaCountyBoardofCommissioners NemahaCountyCourthouse 1824NStreetAuburn,Nebraska68305CherylK.Rogers,ProgramManagerNebraskaHealthandHumanServicesSystemDivisionofPublicHealthAssurance ConsumerServicesSection301,Centennial Mall,SouthP.O.Box95007Lincoln,Nebraska68509-5007 RonaldA.Kucera,DirectorofIntergovernmental Cooperation Department ofNaturalResources P.O.Box176Jefferson City,Missouri65102JerryUhlmann,DirectorStateEmergency Management AgencyP:O.Box116Jefferson City,Missouri65101 NebraskaPublicPowerDistrict.OmahaPublicPowerDistrict-4-VickL.Cooper,ChiefRadiation ControlProgram,RCPKansasDepartment ofHealthandEnvironment BureauofAirandRadiation ForbesFieldBuilding283Topeka,Kansas66620MarkT.Frans,ManagerNuclearLicensing OmahaPublicPowerDistrictFortCalhounStationFC-2-4Adm.~P.O.Box399Hwy.75-NorthofFortCalhounFortCalhoun,Nebraska68023-0399 JamesW.Chase,DivisionManagerNuclearAssessments FortCalhounStationP.O.Box399FortCalhoun,Nebraska68023J.M.Solymossy, Manager-FortCalhounStationOmahaPublicPowerDistrictFortCalhounStationFC-1-1PlantP.O.Box399Hwy.75-NorthofFortCalhounFortCalhoun,Nebraska68023PerryD.Robinson, Esq.Winston8Strawn1400L.Street,N.W.Washington, D.C.20005-3502 ChairmanWashington CountyBoardofSupervisors Washington CountyCourthouse P.O.Box466Blair,Nebraska68008CherylK.Rogers,ProgramManagerNebraskaHealthand-Human ServicesSystemDivisionofPublicHealthAssurance ConsumerServicesSection301Centennial Mall,SouthP.O.Box95007Lincoln,Nebraska68509-5007 0C NebraskaPublicPowerDistrictOmahaPublicPowerDistrict-5-bcc:DMB(IE45)OEDORIVCoordinator (16E15)ORAFileRIVFileE-MailTo:()PMNSPABFJMBWSBAB2LJBLRWOEMAILWCWJACCAHGFSBWH'AC1,CJGLAT,DLF,LJB1CLG,LMB,NLHCMS,JAK,NSLPDPLPLNRCAttendees MtgAnnouncement Coordinator DEDRA/D/NRRActing,ADT/NRRActingADP/NRRL.Burkhart, ProjectManager,NRRR.Wharton,ProjectManager,NRRD/OEW.Walker,SeniorResidentInspector J.Clark,SeniorResidentInspector C.Hackney,RSLOG.Sanborn,EOB.Henderson, PAORASecretaries DRPDivisionDRSDivisionDNMSDivisionDeanPapaP.LongdoDOCUMENTNAME:R:QCNS<CN12-1'MN.DRP andR:QFCS>FC12-1 MN.DRPToreceivecoofdocument, IndicateInbox:"C"=Cowithoutenclosures "E"=Cowithenclosures N"=NocoRIV:DRP/CCCSMarschall:vlh11/15/99RSLOPAOCCAHackne11/15/99BWHenderson 11/15/99OFFICIALRECORDCOPY Distri89.txt Distribution SheetPriority:
NormalFrom:Esperanza LomosbogActionRecipients:
NRR/DLPM/LPD4-2 NRR/DLPM/LPD4-1 LRWhartonLBurkhartJCushingInternalRecipients:
RidsEdoMailCenter RGN4.FILE01RES/DET/ERAB OGC/ROEDNRR/DIPMIOLBNTEEDROExternalRecipients:
NRCPDRNOACCopies:1111,11'111111NotFoundNotFoundNotFoundNotFoundNotFoundOKNotFoundNotFoundNotFoundNotFoundNotFoundNotFoundNotFoundNotFoundTotalCopies:Item:ADAMSPackageLibrary:MLADAMS"HQNTAD01 ID:993280276 14


==Subject:==
==Subject:==
SummaryofSignificant MeetingwithLicensee(Part50)Body:PDRADOCK05000397PDocket:05000285, Notes:N/ADocket:05000298, Notes:N/ADocket:05000397, Notes:N/APage1}}
Summary of Significant Meeting with Licensee (Part 50)Body: PDR ADOCK 05000397 P Docket: 05000285, Notes: N/A Docket: 05000298, Notes: N/A Docket: 05000397, Notes: N/A Page 1}}

Revision as of 11:54, 6 July 2018

Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error
ML17292B534
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/15/1999
From: RICHARD I C, RICKARD I C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-99 LD-99-002, LD-99-2, NUDOCS 9901220123
Download: ML17292B534 (89)


Text

January 15, 1SS9 LD-99-002 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555

Subject:

Report of a Oefect Pursuant to 1Q CFR 21 Concerning Incorrect Modeling of a BWR Lower Plenum Volume in BISON The purpose of this letter is'to notify the Nuclear Regulatory Commission of a defect under 10 CFR 21,"Reporting of Defects and Noncompliance." The defect concerns the Operating Limit for the Minimum Critical Power Ratio (MCPR)in Boiling Water Reactors (BWRs)analyzed using the BISON fast transient analysis code.Specifically, the defect involves incorrect modeling of the reactor vessel lower plenum volume in the BISON code, which could lead to the establishment of non-conservative MCPR Operating Limits in plant technical specifications.

The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE).If you have any questions, please feel free to contact me or Virgil Paggen of my staff at (860)2854700, Very truly yours, COMBUSTION ENGINEERING, INC.lan.ickard, Director uclear Licensing

Enclosure:

As stated cc: M.A.Barnoski (ABB-CE)~(,.t~ABB Combustion Engineering Nuclear Power Comhusion Engineer(ng, Inc.P.O.Box 500 2000 Day Hih Rd.Windsor, CT 0609&0500 Te(ephone (880)888-1911 Fax (880)285-5203

Enclosure to LD-99-002 Page2of2 (vi)In the case of a basic component which contains a defect orfails to comply, the number and location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subj ect to the regulations in this part: The BISON computer code is a proprietary ABB Atom AB program used by ABB-CE for performing BWR safety analyses for U.S.customers.

The defect applies only to reload fuel assemblies currently in operation at WNP-2.(vii)The corrective action which has been, is being, or will be taken;the name of theindividual or organization responsible for the action;and the length of time that has been or will be taken to complete the actiont An evaluation of the defect has been performed by ABB-CE.The results of that evaluation show that there is no safety problem at WNP-2 for operation of the previous Cycles 12 and 13 and its current Cycle 14 operating state (Normal Scram Speed, Recirculation Pump Trip operable, and Turbine Bypass operable)prior to 5,000 MWd/MTU.That is, the established MCPR Operating Limits currently in the plant technical specifications for this operating state provide adequate protection.

However, certain MCPR Operating Limits for other operating states prior to 5,000 MWd/MTU and all operating states after 5,000 MWd/MTU for WNP-2 Cycle 14 must be increased to accommodate the defect.The utility currently projects that WNP-2 will reach 5.000 MWd/MTU in early 1999.ABB-CE has notified the Washington Public Power Supply System of the necessary changes to the WNP-2 MCPR Operating Limits.The BISON code model for WNP-2 has been revised to correct the error.All ABB-CE BWR fuel users have been notified of this condition.(viii)Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees:

The Washington Public Power Supply System has been notified of the defect and has been provided with revised MCPR Operating Limits for WNP-2.TOTAL P.84 Enclosure to LD-99<02 Pageos of 2 ABB Combustion Engineering Nuclear Power 10 CFR 21 Re ort of a Defect or Failure to Com I The following information is provided pursuant to the requirements set forth in 10 CFR 21.21(c)(4): (l)liame and address of the individuals informing the Commiss1on:

lan C.Rickard, Director Nuclear Licensing Combustion Engineering, Inc.2000 Day Hill Road.Windsor, CT 06095-0500 (ii)Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect: The activity for which this report is being filed is the establishment of non-conservative MCPR Operating Limits for the Washington Public Power Supply System Nuclear Project Unit 2 (WNP-2)nuclear power plant during Cycles 12, 13, and 14 operation..(iii)Identification of the fir constructing the facility or supplying the basic component which fails to comply or contains a defect: Combustion Engineering, Inc.2000 Day Hill Road Windsor, CT 06095-0500 (iv)iVature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply: The defect identified involves the incorrect modeling of the reactor vessel lower plenum volume in the BISON code.The defect caused the BISON code model to have a lower plenum volume approximately twice its proper size.This incorrect modeling has the potential to lead to calculation of non-conservative MCPR Operating Limits in some situations.(v)The date on which the information of such defect or failure to comply was obtained: ABB-CE determined that a defect in the BISON code existed on January 14.1999.

02/16/1999 X/U,S.Nuc/egu/atory Commission Operations Center Report General Information or Other (PAR)P~ae I Event¹35271 Rep Org: ABB COMBUSTION ENGINEERING Supplier: ABB COMBUSTION ENGINEERING Region: 1 City: WINDSOR County: State: CT Notification Date/Time: 01/15/1999 14:15 (EST)Event Date/Time: 01/15/1999 14:15 (EST)Last llodiflcation:

01/15/1999 Docket¹: Agreement State: No License¹: UNSPECIFIED PARAGRAPH NRC Notified by: IAN RICKARD MQ Ops Officer: DOUG WEAVER Emergency Class: NON EMERGENCY 10 CFR Section: 21.21 Notifications:

BLAIR SPITZBERG VERN HODGE R4 NRR PART 21 NOTIFICATION RELATED TO MINIMUM CRITICAL POWER RATIO (MCPR)"The purpose of this letter is to notify the Nuclear Regulatory Commission of a defect under 10 CFR 21,'Reporting of Defects and Noncompliance.'he defect concerns the Operating Limit for the Minimum Critical Power Ratio (MCPR)in Boiling Water Reactors (BWRs)analyzed using the BISON fast transient analysis code.Specifically, the defect involves incorrect modeling of the reactor vessel tower plenum volume in the BISON code, which could lead to the establishment of non-conservative MCPR Operating Limits in plant technical specifications."The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE).If you have any questions, please feel free to contact me[Ian C.RickardJ or Virgil Paggen of my staff."'I This event effects WNP-2 current operating cycle (Cycle 14).I i**i I i i i*I i i*i*I i i I i i i i I I i i i*I i I I I I****i**i i*i*I**i*I I i i I i i I i i i I 11 I i I*i i lII i i I i**i i i i I I I I I I i*I I i i I I*I l1 I I I I i I I i I I*I i i II i I i i******i I I i~i i*

CATEGORY j.REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBRP9901220123 DOC.DATE: 99/01/15 NOTARIZED:

NO DOCKET¹FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION RICKARD,I.C.

ABB Combustion Engineering Nuclear'uel (formerly Combustio RICHARD,I.C.

ABB Atom, Inc.(formerly ASEA Atom, Inc.)RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Part 21 rept re incorrect modeling of BWR lower plenum vol in BISON.Decfect applies only to reload fuel assemblies currently in operation at WNP-2.BISON code model for WNP-2 has been revised to correct error.DISTRIBUTION CODE: IE19T COPIES RECEIVED:LTR ENCL SIZE: TITLE: Part 21 Rept (50 DKT)NOTES: INTERNA RECIPIENT ID CODE/NAME PD4-2 PD RES/DET/EIB RGN2 RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME POSLUSNY,C NRR/DRPM/PECB PDR WARD, M.RGNl RGN3 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 EXTERNAL: INPO RECORD CTR NRC PDR 1 1 1 1 NOAC SILVER,E NUDOCS FULL TXT 1.1 1 1 , VHS GCu~emr HAS SKOSH~0 NOTE TO ALL nRIDSn RECIPIENTS PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15 r>"5,~fit+~~>

~'~".~l llew, O LFQO January 15, 1999 LD-99-002 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555

Subject:

Report of a Defect Pursuant to 10 CFR 21 Concerning Incorrect Modeling of a BWR Lower Plenum Volume in BISON The purpose of this letter is to notify the Nuclear Regulatory Commission of a defect under 10 CFR 21,"Reporting of Defects and Noncompliance." The defect concerns the Operating Limit for the Minimum Critical Power Ratio (MCPR)in Boiling Water Reactors (BWRs)analyzed using the BISON fast transient analysis code.Specifically, the defect involves incorrect modeling of the reactor vessel lower plenum volume in the BISON code, which could lead to the establishment of non-conservative MCPR Operating Limits in plant technical specifications.

The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE).If you have any questions, please feel free to contact me or Virgil Paggen of my staff at (860)285<700.Very truly yours, COMBUSTION ENGINEERING, INC.lan.ickard, Director uclear Licensing

Enclosure:

As stated cc: M.A.Barnoski (ABB-CE)'V ABB Combustion Engineering Nuclear Power Cornbusdon Engineering, Inc.P.O.Box 500 2000 Day Hill Rd.Mrindsor, CT 060954500 Telephone (860)688-1911 Fax(860)285-5203'7901220123 990115 PDR ADQCK 05000397 S , PDR Enclosure to LD-99-002 Page 1 of 2 ABB Combustion Engineering Nuclear Power 10 CFR21 Re ortof a Defector Failure to Com I The following information is provided pursuant to the requirements set forth in 10 CFR 21.21(c)(4): (i)Name and address of the individuals informing the Commission:

lan C.Rickard, Director Nuclear Licensing Combustion Engineering, Inc.2000 Day Hill Road Windsor, CT 06095-0500 (ii)Identification of the facility, the activity, or the basic component supplied for suclt facility or suclt activity within the United States which fails to comply or contains a defect: The activity for which this report is being filed is the establishment of non-conservative MCPR Operating Limits for the Washington Public Power Supply System Nuclear Project Unit 2 (WNP-2)nuclear power plant during Cycles 12, 13, and 14 operation.(iii)Identification of tlte firm constructing the facility or supplying the basic component which fails to comply or contains a defect: Combustion Engineering, Inc.2000 Day Hill Road Windsor, CT 06095-0500 (iv)Nature of the defect or failure to comply and tlte safety hazard whiclt is created or could be created by such defect or failure to comply: The defect identified involves the incorrect modeling of the reactor vessel lower plenum volume in the BISON code.The defect caused the BISON code model to have a lower plenum volume approximately twice its proper size.This incorrect modeling has the potential to lead to calculation of non-conservative MCPR Operating Limits in some situations.(v)The date on which tlteinformation of such defect or failure to comply was obtained: ABB-CE determined that a defect in the BISON code existed on January 14, 1999.

Enclosure to LD-99-002 Page2of2 (vi), In the case of a basic component wltich contains a defect or fails to comply, the number and location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subject to the regulations in this part: The BISON computer code is a proprietary ABB Atom AB program used by ABB-CE for performing BWR safety analyses for U.S.customers.

The defect applies only to reload fuel assemblies currently in operation at WNP-2.(vii)The corrective action wlticlt has been, is being, or will be taken;the name of the individual or organization responsible for the action;and the length of time tltat has been or will be taken to complete the action: An evaluation of the defect has been performed by ABB-CE.The results of that evaluation show that there is no safety problem at WNP-2 for operation of the previous Cycles 12 and 13 and its current Cycle 14 operating state (Normal Scram Speed, Recirculation Pump Trip operable, and Turbine Bypass operable)prior to 5,000 MWd/MTU.That is, the established MCPR Operating Limits currently in the plant technical specifications for this operating state provide adequate protection.

However, certain MCPR Operating Limits for other operating states prior to 5,000 MWd/MTU and all operating states after 5,000 MWd/MTU for WNP-2 Cycle 14 must be increased to accommodate the defect.The utility currently projects that WNP-2 will reach 5,000 MWd/MTU in early 1999.ABB-CE has notified the Washington Public Power Supply System of the necessary changes to the WNP-2 MCPR Operating Limits.The BISON code model for WNP-2 has been revised to correct the error.All ABB-CE BWR fuel users have been notified of this condition.(viii)Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees:

The Washington Public Power Supply System has been notified of the defect and has been provided with revised MCPR Operating Limits for WNP-2.

Distribution Sheet Distri84.txt Priority: Normal From: Patricia Exum Action Recipients:

In erne Remii.ents.

FILE CENTER 01 Copies: Paper Copy External Recipients:

NOAC Paper Copy Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID: 003686666'1

Subject:

SUMMARY

OF JANUARY 27, 2000 MEETING WITH ENERGY NORTHWEST REGARDING THE PROPOSED SECONDARY CONTAINMENT/STANDBY GAS TREATMENT SUBMITTA L.Body: ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS.The Document may also be viewed by searching for Accession Number ML003686666.

DF01-Direct Flow Distribution:

50 Docket (PDR Avail)Docket: 05000397 Page 1 ti+g 0'Nr*y+~4$'y1 4******lt't><<fi/Jll]lit gO genre'ICENSEE:

Energy Northwest UNITED STATES NUCLEAR REGULATORY COMMISSION WASH iNGTON, O.C.20555-0001 February 15, 2000/~~gP g-i II k curn+n~g e be<conn~(in 4 P,d c(enRle.~~FACILITY: WNP-2

SUBJECT:

SUMMARY

OF MEETING WITH ENERGY NORTHWEST REGARDING THE PROPOSED SECONDARY CONTAINMENT/STANDBY GAS TREATMENT SUBMITTAL On January 27, 2000, the Nuclear Regulatory Commission (NRC)staff met with representatives of Energy Northwest to discuss the upcoming secondary containment/standby gas treatment license amendment submittal.

The proposed changes would revise the following:

SR 3.6.1.3.10 increases the secondary containment bypass leakage from.74 standard cubic feet per hour (scfh)to.028 percent/day approximately 9.4 scfh.SR 3.6.4.1.1 change the requirement to verify secondary containment pressure is less than.25 inch vacuum water gage to less than 0 inch vacuum water gage.SR 3.6.4.1.4 increase the secondary containment drawdown time from 2 minutes to 20 minutes.TS 5.5.7 increase the standby gas treatment system flow rate to 5000 cubic feet per minute (cfm).Energy Northwest withdrew a similar amendment request in July 1999, when the staff identified a calculation error in determining containment release concentration.

Due to the extensive review required of the previous submittal, both the staff and the licensee felt that a meeting to discuss the upcoming submittal would be beneficial in shortening the review and avoiding unnecessary requests for additional information.

In order to improve efficiency the same NRC staff members who were involved in the final review for the first submittal were at the meeting and will review the second submittal. is a list of the meeting participants. is a copy of the slides presented by Energy Northwest.

At the outset of the meeting, Mr.John Arbuckle of Energy Northwest presented an overview of the submittal.

The emphasis was on how this submittal has changed from the previous submittal.

This submittal includes meteorological data and atmospheric dispersion calculations (X/Q calculations).

Leta Brown, of the NRC staff, suggested that it would be useful if the X/Q calculations and an electronic version of the meteorological data were provided for staff review.Mr.David Studley of Scientech discussed the X/Q calculations including the four release points and the control room intakes.The discussion also covered the application of ARGON 96 Code and the assumptions that were made.The description of the site configuration and of the Oo@~~It"~48KFiX gfjP"~88C8<ggg

/' ~.~control room intakes were useful to the staff in understanding the assumptions that were made.The staff expressed a concern with the vent option used in the ARCON 96 Code that was used to calculate some of the control room atmospheric dispersion factors.It was suggested that an acceptable solution would be to recalculate the vent run cases as a ground release option using ARGON 96.'r.Bruce Boyum of Energy Northwest discussed the accidents that were analyzed specifically, main steam line break accident, fuel handling accident, control rod drop accident and loss-of-coolant accident (LOCA).Mr.Boyum stated that the LOCA was the bounding accident.Mr.Mark Blumberg,'of the NRC staff, stated that it would be useful to include the calculations for the LOCA analysis and include sufficient informatiori on other accidents so that it can be determined that the LOCA is the bounding accident.Mr.Studley described the Axident Code, which is the dose analysis code used in the submittal.

The Axident Code models the transport of radioactivity to the environment and to the control room.The major assumptions and the reasons for them were discussed.

Mr.Boyum also discussed the release pathways including the use of the Gothic Code to justify the 40 percent mixing assumed in secondary containment.

Mr.Richard Lobel, of the NRC staff, said the proposed submittal should include a description of the derivation and use of the flow equation which is the basis for Figure 4 of Attachment 2 to the licensee's October 15, 1996, submittal.

In addition, the staff may request input used in reactor building pressure drawdown calculations so that the staff may perform independent calculations.

A final decision has not been made.Mr.Boyum then discussed control room air flows and unfiltered control room in-leakage.

Mr.Blumberg stated that licensees have had to verify their unfiltered in-leakage assumptions.

The ASTM E741,"Standard Test Methods for Determining Air Change in a Single Zone by Means of a Tracer Gas Dilution," test method is acceptable to the staff as a verification test for unfiltered in-leakage.

The licensee could describe their design and propose an alternative test method that would have to be reviewed and approved by the staff.The NRC staff felt that Energy Northwest did a good job explaining their submittal and that they were receptive to suggestions from the staff.Docket No.50-397

Enclosures:

1~List of Meeting Participants 2.Energy Nothwest Slides cc w/encls: See next page E-Mail JZwolinski/SBlack S Richards DLange, EDO E Peyton RLobel MBlumberg LBrown LSmith, RIV Jack Gushing, Project Manager, Section 2 Project Directorate IV 8 Decomissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation DISTRIBUTION:

'Hard Co Central File PUBLIC PDIV-2 R/F JCushing OGC ACRS OFFICE PDIV-2/PM C PDIV-2/LA NAME DATE Jcushing:Icc EPeyton cB I I"f fOo FFICIAL RECORD COPY DOCUMENT NAME: GAPDIV-2EWNP2iMTS12700.

r cewe c I U(e, I I u x PDIV-2/SC SDembe"f~=/t//r.'/'=~

'/~6hz Qg~

0 control room intakes were useful to the staff in understanding the assumptions that were made.The staff expressed a concern with the vent option used in the ARCON 96 Code that was used to calculate some of the control room atmospheric dispersion factors.It was suggested that an acceptable solution would be to recalculate the vent run cases as a ground release option using ARGON 96.Mr.Bruce Boyum of Energy Northwest discussed the accidents that were analyzed specifically, main steam line break accident, fuel handling accident, control rod drop accident and loss-of-coolant accident (LOCA).Mr.Boyum stated that the LOCA was the bounding accident.Mr.Mark Blumberg, of the NRC staff, stated that it, would be useful to include the calculations for the LOCA analysis and include sufficient information on other accidents so that it can be determined that the LOCA is the bounding accident.Mr.Studley described the Axident Code, which is the dose analysis code used in the submittal.

The Axident Code models the transport of radioactivity to the environment and to the control room.The major assumptions and the reasons for them were discussed.

Mr.Boyum also discussed the release pathways including the use of the Gothic Code to justify the 40 percent mixing assumed in secondary containment.

Mr.Richard Lobel, of the NRC staff, said the proposed submittal should include a description of the derivation and use of the flow equation which is the basis for Figure 4 of Attachment 2 to the licensee's October 15, 1996, submittal.

In addition, the staff may request input used in reactor building pressure drawdown calculations so that the staff may perform independent calculations.

A final decision has not been made.Mr.Boyum then discussed control room air flows and unfiltered control room in-leakage.

Mr.Blumberg stated that licensees have had to verify their unfiltered in-leakage assumptions.

The ASTM E741,"Standard Test Methods for Determining Air Change in a Single Zone by Means of a Tracer Gas Dilution," test method is acceptable to the staff as a verification test for unfiltered in-leakage.

The licensee could describe their design and propose an alternative test method that would have to be reviewed and approved by the staff.The NRC staff felt that Energy Northwest did a good job explaining their submittal and that they were receptive to suggestions from the staff.Jack Gushing, Project Manager, Section 2 Project Directorate IV 8 Decomissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No.50-397

Enclosures:

1.List of Meeting Participants 2.Licensee's Slides cc w/encls: See next page y l C WNP-2 CC: Mr.Greg O.Smith (Mail Drop 927M)Vice President, Generation Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Mr.Albert E.Mouncer (Mail Drop 1396)Chief Counsel Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Ms.Deborah J.Ross, Chairman Energy Facility Site Evaluation Council P.'.Box 43172 Olympia, Washington 98504-3172 Mr.D.W.Coleman (Mail Drop PE20)Manager, Regulatory Affairs Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Mr.Paul Inserra (Mail Drop PE20)Manager, Licensing Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Regional Administrator, Region IV U.S.Nuclear Regulatory Commission

, Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.Box 69 Prosser, Washington 99350-0190 Senior Resident Inspector U.S.Nuclear Regulatory Commission P.O.Box 69 Richland, Washington 99352-0069 Mr.Rodney L.Webring (Mail Drop PE08)Vice President, Operations Support/PIO Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Thomas C.Poindexter, Esq.Winston&Strawn 1400 L Street, N.W.Washington, DC 20005-3502 Mr.Bob Nichols Executive Policy Division Office of the Governor P.O.Box 43113 Olympia, Washington 98504-3113 Mr.J.V.Parrish Chief Executive Officer Energy Northwest P.O.Box 968 (Mail Drop 1023)Richland, WA 99352-0968 ENERGY NORTHWEST MEETING PARTICIPANTS JANUARY 27 2000 ENERGY NORTHWEST Douglas Coleman Bruce Boyum John Bekahazi Linda Woolsley John Arbuckle SCIENTECH-NUS David Studley NRC Jack Gushing Steve Dembek Mark Blumberg Richard Lobel Leta Brown Enclosure 1 ENERGY NORTHWEST Secondary Containment/SGT Submittal Presentation A Introduction (John Arbuckle)Meteorological Data And X/Q Calculations (John Arbuckle and Dave Studley)Dose Analysis And Results (Bruce Boyum and Dave Studley)Summary (Bruce Boyum)Enclosure 2 INTRODUCTION Initial Problem Submittal History Analysis Problem/TS Retraction/JCO-FAO Impact Comparison of Key SGT Parameters Technical Specification Changes Submittal Content INITIAL PROBLEM Under Certain Post-Accident Meteorological Conditions, WNP-2 could not Develop 0.25-inch Negative Differential Pressure Within 120 Seconds Therefore, a Revised Design Basis and Dose Analysis was Provided.JCO (FAO)Prepared and Submitted to Staff.

SU BMITTAL HISTORY~October 1996 Technical Specification.

Amendment Request December 1997-June 1999 Formally Responded to Three RAls

ANALYSIS PROBLEM Analysis Problem/TS Retraction/JCO-FAO Impact Jul 1999 Withdrew Technical Amendment Request-Discovery of a Nonconservative Error in Determining Containment Release Concentration During Resolution of Proposed RAI 4 No Impact on JCO-FAO, Current Design Basis, Technical Specifications or Recent Analyses COMPARISON OF KEY SGT PARAMETERS 2 minutes 2240 cfm 4457 cfm Original Ke Parameter Desi n Drawdown Time SC Leakage SGT Flow Current Desi n JCO-FAO 10 minutes 1475 cfm 5385-5850 cfm Proposed Desi n 20 minutes 2240 cfm 5000 cfm l ,1 TECHNICAL SP ECIF ICATIONS Proposed Technical Specification Changes SR 3.6.1.3.10 SR 3.6.4.1.1 SR 3.6.4.1 4 Increase Secondary Containment Bypass Leakage from 0.74 scfh to(0.028%/day)

<~<9.4 scfh)Change the Surveillance Requirement to Verify Every 24 Hours that the Pressure Within Secondary Containment is (0 inch (vs 0.25 inch)c~-'-',, of Vacuum Water Gauge Increase Secondary Containment Drawdown Time from 120 seconds to 20 minutes 5.5.7.2.A Increase Standby Gas Treatment System Flow Rate from 4457 cfm to 5000 cfm SU BMITTAL CONTENT Detailed History-Supersedes Previous Submiitals Responses to RAls Incorporated Design Basis Meteorology and X/Q Valuey>,,rii."'itAccidents Analyzed-LOCA in Detail, FHA, MSLB and CRDA GOTHIC Model and Benchmarking Efforts Discussion of Standby Gas Treatment System Evaluation of Significant Hazards Environmental Considerations Evaluation

~-Marked-Up and Typed Technical Specifications Marked-Up Technical Specification Bases-For Info Only I

METEOROLOGICAL DATA AND XlQ CALCULATIONS Description of Met Tower, Terrain, and Instrumentation Data Used (6yrs)ARCON96 1.Description of Release Points and Control Room lntakes 2.Application of ARCON96 at WNP-2 3.Comparison With JCO-FAO and Power Uprate DESCRIPTION OF MET TOWER, TERRAIN, AND INSTRUMENTATION Meteorological Tower Consists of a 240-ft Structure with a 5-ft Extension Mast The Tower is Triangular in Shape and of Open Lattice Construction to Minimize Tower Interference with Meteorological Measurements Wind Speed and Direction is Monitored by Separate Channels at the 33-ft and 245-ft Elevations A Single Channel Provides Air Temperature Difference Between 33-ft and 245-ft Elevations

DESCRIPTION OF MET TOWER, TERRAIN, AND INSTRUMENTATION Siting of Instrumentation with Respect to Meteorological Tower and Surrounding Vegetation is Very Good The Base of the Tower Maintained as Natural Vegetation Area Around the Tower is Open Terrain with no Natural or Man-Made Obstructions to Impact Data Being Collected

DATA USED (6YRS)Site-specific Meteorological (Temperature 8 Wind Speed)Data were used for a Six-year Span from January 1, 1984, to January 1, 1990 A Corresponding Calculation Was Performed and a Curve was Generated which Encompasses a Minimum of 96.1 Percent of all WNP-2 Weather Conditions Data Checked for Reasonableness The Curve Excludes Approximately Four Percent as a Conservative Approximation of 95'/0/5'/o l l F DATA USED (6YRS)Winter Cases Yielded Longer Drawdown Times than Summer Cases Limiting Case Very Conservative

-Atmospheric Temperature of 0'F, no Wind, Standby Service Water System Spray Pond Temperature 77'F, Division 2 Electrical Power (i.e., Division 1 Not in Operation), One Train of Standby Gas Treatment System in Operation, and 50%Room Cooler Efficiency Case Resulted in a Drawdown Time of 711 Seconds (11.85 Minutes)

J C, DATA USED (6YRS)Zero Wind Speed and Zero Degrees Temperature.

used Because Temperature Impact on Differential Pressure is Prominent Factor, due to the Higher Differential Temperature Between Inside and Outside Temperatures (9

X/Q CALCULATIONS.r V y4waa ARCON96 1.Description of Release Points and Control Room intakes 2.Application of ARCON96 at WNP-2 3.Comparison with JCO-FAO and Power Uprate X/Q CALCULATIONS ARCON96 ARCQN96 used to Determine X/Q values for Three Control Room lntakes and Four Release Points Utilized the Same Time Period/plant Specific Data as Used in the Drawdown Analysis CR Intakes-Local and Two Remote Intakes

'~I'~l::.-~NQ CALCULATIONS e Release Points Considered

.Turbine Building Walls-Release from Turbine Building Walls to be Used with Events such as CRDAs Reactor Building Walls-Release from Reactor Building Walls to be Used During Drawdown Period and Secondary Bypass Leakage Reactor Building Roof line (Stack)Release-Vent Release from Reactor Building Roof Used for SGTS Releases Reactor Building (King Kong)Doors-Release from Reactor Building Grade Area X/Q CALCULATIONS

-ARCON96-SITE CONFIGURATION SEE NEXT SLIDE X/Q Calculations

-ARCON96-Site Configuration Intake¹1 1589W, 12294 42 fl MSL Reactor Bldg Roofline 1243.5W, 11918N 671 ft MSL KK Doors 1176W, 11778N 441ft MSL Tttto North Sito North 12300 ftN 12200 Turbine Bldg Wall Sources CRIntake 1467W, 11883N 528 ft MSL Roof Elevation 457 MS L 57S MSL , Turbine Bldg, 545 tSL 66ShtSL Reactor Bldg.506 542 MSL ht L 12100 12000 11900 11800 Reactor Bldg Wall Sources Intake¹2 1025W, 11565 442 ft MSL 1600 1500 1400 474 MSL Ptaat Grado.441 MSL 1300 200 1100 11700 11600 11500 1000ft W X/Q CALCULATIONS Application of ARGON96 Analyzed each of the four Release Paths for each of the Three Intakes (i.e., 12 Scenarios)

Analyzed all 12 Scenarios for all 6 Years The Maximum Value of the 6 Years was Chosen for each Time Period (i.e., not just the Maximum Year but the Maximum Value each Time Step)Local Intake not Used for LOCA due to the Presence of an Automatic Isolation Signal X/Q CALCULATIONS A.Application of ARCON96 Between 0 to 3 Hours, no Credit for Operator Action-psed Average of the two Remote lntakes~>--"~" From 3 Hours to the 30 Days, Credit for Operator Action-Used the.Lower of the two X/Qs Calculated for the Remote Intakes~@',z-q", Very Conservative Treatment-With the Presence of two Remote'"""c" Intakes, the Plant will be able to Switch to the Upwind Intake and in Effect Preclude the Introduction of Activity During the Accident X/Q CALCULATIONS SEE NEXT SLIDE I 1 NQ Calculations ARCON96 Results and Comparison with Original CR NQs for UFSAR Time Period Ground Release NQ Calculated with ARGON 96 s/m'Q Used for UFSAR Analysis Ratio of ARGON 96 Value s/m'o UFSAR Value 0-2hr 2-3hr 3-8hr 8-24 hr 1-4da s 4-30da s SGTS Release 0-2 hr 2-3 hr 3-8 hr 8-24 hr 1-4da s 4-30da s 9.94E-5 9.91E-5 7.16E-5 4.37E-5 2.35E-5~1.56E-5 2.54E-4'j.70E-4 8.15E-5 3.20E-5 2.26E-5 1.90E-5 2.17E-4 5.43E-5 4.49E-5 3.55E-5 1.67E-5 1.67E-5 3.77E-4 9.43E-5 7.80E-5 6.17E-5 2.90E-5 2.90E-5 45.81%182.50%159.47%123.10%140.72%93 41 67.37%180.28%104.49%51.86%77 93%65.52%

DOSE ANALYSIS AND RESULTS Accidents Analyzed for Radiological Consequences AXIDENT Code 1.How Applied 2.Where used Before Summary of LOCA Major Assumptions Changes from Original Design and Previous Submittal LOCA Results ACCIDENTS ANALYZED Main Steam Line Break (MSLB)Fuel Handling Accident (FHA)Control Rod Drop Accident (CRDA)Loss Of Coolant Accident (LOCA) 1 1 AXIDENT CODE~f Dose Analysis Code-Radiological Consequences of the Spectrum of Design Basis Accidents were Analyzed using the SCIENTECH-NUS AXIDENT Code Code Description

-AXIDENT Models the Transport of Radioactivity to the Environment and to the Control Room.This.Code Includes the time Dependent Effects of Containment Sprays, Recirculation, Purge and Intake Filters, Atmospheric Dispersion, Natural Decay, etc.The Code is Based on the Explicit Solution of the Integrated Activity in a Receptor Volume.

AXIDENT CODE Industry Experience/Usage of the AXIDENT Code-Developed in the early 70's to Support the Licensing and Licensing Reviews of both U.S.and international Commercial Nuclear Power Plants.Developed to fill the Void in Codes Available to Assess the Emerging Issue at the time-Control Room Habitability.

General lndust Usa e~Used to Support Licensing Submittals in the 70's Used for a Number of Plants in Support of the Post-TMI Action Item~Used Throughout the 80's and 90's to Resolve Control Room Habitability and Accident Analyses Issues

AXIDENT CODE SCIENTECH Experience Successfully Benchmarked the Previous Results Generated by other Codes which Compute the Integrated/exact Solution (i.e., Bechtel's LOCADOSE and S&L's PostDBA)Over the Years, Thousands of Cases have been run on the AXIDENT Code.In all Cases, the Results have Trended as Expected.The Results have also Consistently been in Close Agreement with the Steady State Murphy/Campe Equations.

S I AXIDENT CODE Recent Calculations Submitted to the NRC Include: Control Room and Offsite Dose Calculations to Support the FPC Crystal River Restart CRDA and MSLB Analyses for the CPLL Brunswick Station's Power U prate Effort Reanalysis Effort for the Cooper Station-Pending Review I I I<<e~I~i~'~~~I I'Y/////I I I~~~~I r~I e C

CONTROL ROOM AIR FLOWS Air intake 1100 cfm Filter Unit: 95%eff Elemental and Organic 99%eff.Particulate Control Room (CR)CR Total Volume, 2.0E5 ft'xit Flow.~1110.55 cfm Unfiltered Infiltration 8c in~ass/egress 10.55 c6n MAJOR ASSUMPTIONS

)~AXIDENT Code used for Dose Analysis Source Term Release Per TID-14844 (102%Power Level)100/0 Noble Gases-25%Halogens (50%ESF Leakage)91%Elemental 5%Particulate 4%Organic Dose Conversion Factors in Accordance with ICRP 30 MAJOR ASSUMPTIONS Instantaneous Mixing in Primary Containment Release from Containment of.5'/oiday Total.32/o/day Containment Leakage-.18'/o/day MSIV Leakage No Suppression Pool Scrubbing Credited MAJOR ASSUMPTIONS SGT Filter Efficiency

--99%Efficient for Halogens 0%Efficient for Noble Gases.SGT.Flow: 5000 cfm Single Train 50 cfm Bypass Leakage Control Room Filter Efficiency 95%Efficient for Elemental and Organic iodine 99%Efficient for Particulate iodine 7 I MAJOR ASSUMPTIONS Secondary Containment Drawdown Time of 20 Minutes During Drawdown Time:-No SGT Filtration Credited-Secondary Containment Leakage at a Rate of 1 Volume/day 40%Mixing in Secondary Containment for Entire Scenario MAJOR ASSUMPTIONS gl~P ESF Leakage Into Secondary Containment:

--1 gpm-10%Flashing Fraction-50%Core Iodine Source Term Control Room Unfiltered Inleakage:

10 scfm Ingress/egress

.55 scfm Infiltration Secondary Containment Bypass Leakage of.028%/day (9.4 scfh)New X/Q Values DOSE ANALYSIS METHODOLOGY MAJOR CHANGES'~ITEM Drawdown Time Sec.Ctmt Mixing ESF Leakage SGT Filter Bypass Bypass Leakage (%Day)CURRENT DESIGN 5 Min None 14 cfm.00209 PREVIOUS SUBMITTAL 20 Min 40%Vol.None 14 cfm 054*'cj~PROPOSED DESIGN 20 Min 40%Vol.1 GPM.50 cfm.028 r4, LOCA ANALYSIS RESULTS CR Whole Body GR Thyroid GR Beta CALC.~REM 0.4 28.1 6.8.LlMIT~REM 5 30 30 EAB Whole Body EAB Thyroid 3.7 56.6 25 300 LPZ Whole Body LPZ Thyroid 3.4 131 25 300 4

E LOCA DOSE BY PATH E RELEASE PATH CONTROL ROOM LPZ THYROID W.BODY THYROID W.BODY Sec.Ctmt Bypass Sec.Ctmt Leakage 21.02.02 8E-5 1Q1 0.2 0.5 4E-3 Sec.Ctmt SGT Rel.4.2 ESF.Leakage Sec.Ctmt 0.3.16 1E-5 1.2 1.2 2E-3 MSIV Leakage TOTAL 3.0 28.1.18 04 13 131 1.7 34 CONTAINMENT RELEASE IMPACT (.04%1day Sec Ctmt Bypass Leakage)RELEASE PATH CR THYROID DOSE (REM).32'/o/DAY

.5'/o/DAY Sec Ctmt Bypass Sec Ctmt Leakage Sec Ctmt SGT Rel.ESF Leak (Sec Ctmt)MSIV Leakage TOTAL.02 4.2 0.3 3.0 36.9.03 0.3 3.0 39.2 t~4 I ,0 0~I EFFECT OF RELEASE ELEVATION DESCRIPTION Ground Release=100%Roof line Release=0/0 Ground Release=60'/0 Roofline Release=40'/0 Ground Release=50'/0 Roof line Release=50'/0 DOSE REM 39.2 39.6 39.7 Ground Release=0'/0 Roof line Release=100%39.2 Based on Thyroid Dose in Control Room Assuming.5'/0/day Containment Leakage and.04%/day Secondary Containment Bypass EFFECT OF SGT FLOWRATE DESCRIPTION 4K cfm for 30 Days DOSE (REM)THYROID W.BODY 37.3.357 5K cfm for 30 Days 10K cfm for 30 Days (20 Min Drawdn)10K cfm for 30 Days (10 Min Drawdn)10K cfm for 1 Hr Then 4K 36.9 37.3.369 A09.409.362 cfm 30 Days Based On.32%/day Ctmt Leakage and.04%/day Sec Ctmt Bypass Leakage

SUMMARY

Dose Analysis Meets 10CFR50 and 10CFR100 Limits No Hardware Changes Necessary Beyond Those Completed in-Support of the JCO-FAO Tech Spec Submittal to be Made.in February FSAR Changes will be Implemented Following Approval of Tech Spec Submittal FSAR Changes Include:-.Accident Analysis and Doses Control Room Habitability Analysis~Secondary Containment Description

-Description of SGTS and REA JCO-FAO will be Closed Following Approval of Tech Spec Submittal le'g.

q RC~O C~+4 Cy 4V 0 0 Cy+n~O UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 NOV l 5 I999 Mr.J.V.Parrish (Mail Drop 1023)Chief Executive Officer Energy Northwest P.O.Box 968 Richland, Washington 99352-0968

SUBJECT:

INVITATION TO DISCUSSION OF PILOT PROGRAM RESULTS

Dear Mr.Parrtsh:

On May 30, 1999, we initiated a pilot of the risk-informed baseline inspection program at Cooper Nuclear Station and Fort Calhoun Station.The pilot program is scheduled to end November 27.On December 1, 1999, the NRC will meet with Omaha Public Power District and Nebraska Public Power District to discuss their perceptions and lessons learned gathered during the pilot program.You will find the details of the meeting documented in the enclosed meeting notice.Although the meeting is between the NRC and members of the pilot plant staffs, we will be discussing topics that may be of interest to your organization.

This meeting will be open to public observation.

Following the meeting, the discussion will be opened for comments and questions from observers.

We would entertain and welcome your participation at that time.Should you have any questions on this inspection plan, please contact Charles Marschall at~(817)860-8185 or David Loveless at (817)860-81 61.Sincerely, gals'@zPdK Charles S.Marschall, Chief Project'Branch C Division of Reactor Projects Docket No.: 50-397 License No.: NPF-21

Enclosure:

As Stated

Energy Northwest cc w/enclosure:

Chairman Energy Facility Site Evaluation Council P.O.Box 43172 Olympia, Washington 98504-3172 Rodney L.Webring (Mail Drop PE08)Vice President, Operations Support/PIO Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Greg O.Smith (Mail Drop 927M)Vice President, Generation Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 D.W.Coleman (Mail Drop PE20)Manager, Regulatory Affairs Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Albert E.Mouncer (Mail Drop 1396)General Counsel Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Paul Inserra (Mail Drop PE20)Manager, Licensing.Energy Northwest P.O.Box 968 Richland, Washington 99352-0968 Perry D.Robinson, Esq.Winston 8 Strawn 1400 L Street, N.W.Washington, D.C.20005-3502 Bob Nichols State Liaison Officer Executive Policy Division Office of the Governor P.O.Box 43113 Olympia, Washington 98504-3113 Energy Northwest bcc to DCD (IE45)-3-bcc distrib.by RIV w enclosure:

Branch Chief (DRP/E)Project Engineer (DRP/E)bcc distrib.w/o enclosure:

Regional Administrator DRP Director DRS Director-Branch Chief (DRP/TSS)Resident Inspector RIV File RITS Coordinator DOCUMENT NAME: R:QWN2>mn12-1.wpd Torecelvecopyofdocurnent, Indicateinbox:"C"=Cop withoutenclosures"E"=Cop withenclosures"N"~Nocopy RIV'C:DRP/C CSMarschall;vlh 11/1 5/99 OFFICIAL RECORD COPY

%+8 Recu C~+~~o Cy A A 0 c Ol Cy+gO~>>*++UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-8064 November 15, 1999 NOTICE OF LICENSEE MEETING Name of Licensee: Name of Facility: Docket: Date and Time of Meeting: Location of Meeting: Purpose of Meeting: NRC Attendees:

Licensee Attendees:

Nebraska Public Power District Omaha Public Power District Cooper Nuclear Station Fort Calhoun Station 50-285 50-298 December 1, 1999 1-3 p.m.(CDT)Fort Calhoun Station Auditorium Hwy.75-North of Fort Calhoun Fort Calhoun, Nebraska Discussion of the licensee's perceptions and lessons learned from the pilot inspection program K.Brockman, Director, Division of Reactor Projects C.Marschall, Chief, Branch C, Division of Reactor Projects A.Madison, Transition Task Force Leader, Office of Nuclear Reactor'Regulation W.Jones', Senior Reactor Analyst, Division of Reactor Safety L.Wharton, FCS Project Manager, Office of Nuclear Reactor Regulation L.Burkhart, CNS Project Manager, Office of Nuclear Reactor Regulation D.Loveless, Senior Project Engineer, Branch C, Division of Reactor Projects W.Gary Gates, Vice President, Fort Calhoun Station S.Gambhir, Division Manager, Nuclear Operations J.Chase,.Division Manager, Nuclear Assessments M.Tesar, Division, Manager, Nuclear Support Services R.Phelps, Division Manager, Nuclear Engineering J.Solymossy, Manager, Fort Calhoun Station M.Frans, Manager, Nuclear Licensing R.Jaworski, Manager, Revised Reactor Oversight Project B.Hansher, Supervisor, Station, Licensing Nebraska Public Power District Omaha Public Power District-2-H.Hackerott, Supervisor, Systems Analysis J.McDonatd, Plant Manager, Cooper Nuclear Station P.Caudill, General Manager, Technical Services G.Smith, Nuclear Projects Manager J.Sumpter, Licensing Supervisor D.Robinson, QA Assessment Manager R.Wachowiak, Risk Management Supervisor NOTE: (1)This meeting is open to attendance by members of the general public.(2)NRC personnel, not listed above, that desire to attend this meeting should notify C.S.Marschall at 817/860-8185 by COB on November 19, 1999.(3)A comment session will be conducted at the end of the meeting for participation of all Region IV operating reactor licensees.

~n Approved By: Charles S~Marschall, Chief Project Branch C Division of Reactor Projects CC: G.R.Horn, Senior Vice President of Energy Supply Nebraska Public Power District 1414 15th Street Columbus, Nebraska 68601 John R.McPhail, General Counsel Nebraska Public Power District P.O.Box 499 Columbus, Nebraska 68602-0499 B.L.Houston, Nuclear Licensing and Safety Manager Nebraska Public Power District P.O.Box 98 Brownville, Nebraska 68321 Nebraska Public Power District Omaha Public Power District-3-Dr.William D.Leech Manager-Nuclear MidAmerican Energy-907 Walnut Street P.O.Box 657 Des Moines, Iowa 50303-0657 Ron Stoddard Lincoln Electric System 1040 0 Street P.O.Box 80869 Lincoln, Nebraska 68501-0869 Michael J.Linder, Director Nebraska Department of Environmental Quality P.O.Box 98922 Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305 Cheryl K.Rogers, Program Manager Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301, Centennial Mall, South P.O.Box 95007 Lincoln, Nebraska 68509-5007 Ronald A.Kucera, Director of Intergovernmental Cooperation Department of Natural Resources P.O.Box 176 Jefferson City, Missouri 65102 Jerry Uhlmann, Director State Emergency Management Agency P:O.Box 116 Jefferson City, Missouri 65101 Nebraska Public Power District.Omaha Public Power District-4-Vick L.Cooper, Chief Radiation Control Program, RCP Kansas Department of Health and Environment Bureau of Air and Radiation Forbes Field Building 283 Topeka, Kansas 66620 Mark T.Frans, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.~P.O.Box 399 Hwy.75-North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W.Chase, Division Manager Nuclear Assessments Fort Calhoun Station P.O.Box 399 Fort Calhoun, Nebraska 68023 J.M.Solymossy, Manager-Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O.Box 399 Hwy.75-North of Fort Calhoun Fort Calhoun, Nebraska 68023 Perry D.Robinson, Esq.Winston 8 Strawn 1400 L.Street, N.W.Washington, D.C.20005-3502 Chairman Washington County Board of Supervisors Washington County Courthouse P.O.Box 466 Blair, Nebraska 68008 Cheryl K.Rogers, Program Manager Nebraska Health and-Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O.Box 95007 Lincoln, Nebraska 68509-5007 0 C Nebraska Public Power District Omaha Public Power District-5-bcc: DMB (IE45)OEDO RIV Coordinator (16E15)ORA File RIV File E-Mail To: ()PMNS PAB FJM BWS BAB2 LJB LRW OEMAIL WCW JAC CAH GFS BWH'AC1, CJG LAT, DLF,LJB1 CLG, LMB, NLH CMS, JAK,NSL PDP LPL NRC Attendees Mtg Announcement Coordinator DEDR A/D/NRR Acting, ADT/NRR Acting ADP/NRR L.Burkhart, Project Manager, NRR R.Wharton, Project Manager, NRR D/OE W.Walker, Senior Resident Inspector J.Clark, Senior Resident Inspector C.Hackney, RSLO G.Sanborn, EO B.Henderson, PAO RA Secretaries DRP Division DRS Division DNMS Division Dean Papa P.Longdo DOCUMENT NAME: R:QCNS<CN12-1'MN.DRP and R:QFCS>FC12-1 MN.DRP To receive co of document, Indicate In box: "C"=Co without enclosures"E"=Co with enclosures N"=No co RI V:DR P/C C CSMarsch all:vlh 11/1 5/99 RSLO PAO C CAHackne 11/1 5/99 BWHenderson 11/15/99 OFFICIAL RECORD COPY Distri89.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients:

NRR/DLPM/LPD4-2 NRR/DLPM/LPD4-1 L R Wharton L Burkhart J Cushing Internal Recipients:

RidsEdoMailCenter RGN 4.FILE 01 RES/DET/ERAB OGC/ROED NRR/DIPM IOLB NTE EDRO External Recipients:

NRC PDR NOAC Copies: 1 1 1 1, 1 1'1 1 1 1 1 1 Not Found Not Found Not Found Not Found Not Found OK Not Found Not Found Not Found Not Found Not Found Not Found Not Found Not Found Total Copies: Item: ADAMS Package Library: ML ADAMS"HQNTAD01 ID: 993280276 14

Subject: