ML18030A302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY 1NFORMATION DISTRIBUTION SYSTK'H(RIDS)ACCESSION NBR:8106090718 OOC~DATE!81/06/08NOTARIZED:.
{{#Wiki_filter:REGULATORY 1NFORMATION DISTRIBUTION SYSTK'H (RIDS)ACCESSION NBR: 8106090718 OOC~DATE!81/06/08 NOTARIZED:.
NOFACIL!50387Susquehanna SteamElectricStationEUnit1EPennsylva 50388Susquehanna SteamElectricStationiUnit2EPennsylva AUTHINANEAUTHuRAFFILIATION TRIKSCHHANi W~E.ArmyFDept~ofRECIP~NAMERECIPIENT-AFFILIATION YOUNGBLOODEB
NO FACIL!50 387 Susquehanna Steam Electric StationE Unit 1E Pennsylva 50 388 Susquehanna Steam Electric Stationi Unit 2E Pennsylva AUTH INANE AUTHuR AFFILIATION TRIKSCHHANi W~E.Ar my F Dept~of RECIP~NAME RECIPIENT-AFFILIATION YOUNGBLOODEB
~J~Licensing Branch1SUBJECTSCommentsonOKS~Insufficient infoprovidedrefloodolains4hazards,FES shoulaprovideinfore25E508100yi'loodelements, DOCKET¹0509938-000DISTRIBUTION CODE:CODESCOPIESRECEIVED:LTR
~J~Licensing Branch 1 SUBJECTS Comments on OKS~Insufficient info provided re flood olains 4 hazards,FES shoula provide info re 25E50 8 100 yi'lood elements, DOCKET¹05 09938-000 DISTRIBUTION CODE: CODES COPIES RECEIVED:LTR
+ENCLSIZE:TITLE:Environ~Comments.
+ENCL SIZE: TITLE: Environ~Comments.NOTES:Send ISE 3 conies FSAR 8, all amends, 1 cy.BWR-LRG PM(LIBRIS) 05000387 Send I8E 3 copies FSAR 8 all amends, 1 cy:BWR LRG PH(L.RIB)05000388 RECIPIENT IO COOK/NARK ACTION!LIC BR¹2 BC 17 INTERNAl.:
NOTES:Send ISE3coniesFSAR8,allamends,1cy.BWR-LRG PM(LIBRIS) 05000387SendI8E3copiesFSAR8allamends,1cy:BWRLRGPH(L.RIB) 05000388RECIPIENT IOCOOK/NARK ACTION!LICBR¹2BC17INTERNAl.:
ACC IDNT KVAL BR ENV KNG BR 09 HYDRO GKO BR NRC PDR 02 RAD ASSESSHT BR SIT ANAL BR 10 COP IKS I.TTR ENCL RECIPIENT ID COOK/NAME STARKERS 05 KF TREAT SYS BR HYD/GEO BR ILE 07 0 KG FI 01'TTL AI ANCE BR COPIES LTTR ENCL EXTERNAL;ACRS NATL LAB 20 LPOR NSIC 03 04 pe 12%81 TOTAL NUABER OF COPIES REQUIREDI LTTR.W ENCL DEPARTMENT OF THE ARMY BALTIMORE DISTRICT.CORPS OF ENOINEERS P.O.BOX I 715 BAI TIMORE.MARYLAND EIEO3 REPLY TO ATTKHTIOII OS<NABPL-E Mr.B.J.Youngblood Chief Licensing Branch No.1 Division of Licensing United States Nuclear Regulatory Commission Washington, D.C.20555  
ACCIDNTKVALBRENVKNGBR09HYDROGKOBRNRCPDR02RADASSESSHTBRSITANALBR10COPIKSI.TTRENCLRECIPIENT IDCOOK/NAME STARKERS05KFTREATSYSBRHYD/GEOBRILE070KGFI01'TTLAIANCEBRCOPIESLTTRENCLEXTERNAL; ACRSNATLLAB20LPORNSIC0304pe12%81TOTALNUABEROFCOPIESREQUIREDI LTTR.WENCL DEPARTMENT OFTHEARMYBALTIMORE DISTRICT.
CORPSOFENOINEERS P.O.BOXI715BAITIMORE.MARYLANDEIEO3REPLYTOATTKHTIOII OS<NABPL-EMr.B.J.Youngblood ChiefLicensing BranchNo.1DivisionofLicensing UnitedStatesNuclearRegulatory Commission Washington, D.C.20555


==DearMr.Youngblood:==
==Dear Mr.Youngblood:==


ThisletterisinresponsetoyourDraftEnvironmental ImpactStatement (DEIS)relatedtotheoperation oftheSusquehanna SteamElectricStationDocketNos.50-387-50>>388.
This letter is in response to your Draft Environmental Impact Statement (DEIS)related to the operation of the Susquehanna Steam Electric Station Docket Nos.50-387-50>>388.
CommentshavebeenprovidedinregardstotheCorps'reas ofconcernastheyrelatetotheproposedproject.Thisagency'sareasofconcernarefloodcontrolhazardpotential, permitrequire-mentsunderSection404oftheCleanWaterAct,andotherdirectandindirectimpactsonCorpsofEngineers'xisting and/orproposedprojects.
Comments have been provided in regards to the Corps'reas of concern as they relate to the proposed project.This agency's areas of concern are flood control hazard potential, permit require-ments under Section 404 of the Clean Water Act, and other direct and indirect impacts on Corps of Engineers'xisting and/or proposed projects.Insufficient information has been provided in order for comments to be made with regards to flood plain hazards.It is suggested that the Final Environmental Impact Statement provide information with regards to the 25, 50, and 100-year flood elevations.
Insufficient information hasbeenprovidedinorderforcommentstobemadewithregardstofloodplainhazards.Itissuggested thattheFinalEnvironmental ImpactStatement provideinformation withregardstothe25,50,and100-yearfloodelevations.
Any crossings of these flood plains should be extensively explained and mapped.The physical plant should have flood protection up to the probable maximum flood (PMF)level.A determination has been made that a Department of the Army Section 404 permit will not be required for the proposed construction.
Anycrossings ofthesefloodplainsshouldbeextensively explained andmapped.Thephysicalplantshouldhavefloodprotection uptotheprobablemaximumflood(PMF)level.Adetermination hasbeenmadethataDepartment oftheArmySection404permitwillnotberequiredfortheproposedconstruction.
It has also been determined that no impacts are anticipated to any existing and/or proposed Corps of EngineersI projects due to the proposed construction.
Ithasalsobeendetermined thatnoimpactsareanticipated toanyexistingand/orproposedCorpsofEngineersI projectsduetotheproposedconstruction.
The Baltimore District appreciates the opportunity to comment on your DEIS and if we can be of further assistance, please do not hesitate to contact us.Sincerely, s y0609'"'3 i'L, Q WIL IAM.ESC Chief, Planning Division QQQQ 5 Ilo}}
TheBaltimore Districtappreciates theopportunity tocommentonyourDEISandifwecanbeoffurtherassistance, pleasedonothesitatetocontactus.Sincerely, sy0609'"'3i'L,QWILIAM.ESCChief,PlanningDivisionQQQQ5Ilo}}

Revision as of 04:21, 6 July 2018

Comments on Des.Insufficient Info Provided Re Flood Plains & Hazards.Fes Should Provide Info Re 25,50 & 100-yr Flood Elevations
ML18030A302
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/08/1981
From: TRIESCHMAN W E
ARMY, DEPT. OF
To: YOUNGBLOOD B J
Office of Nuclear Reactor Regulation
References
NABPL-E, NUDOCS 8106090718
Download: ML18030A302 (2)


Text

REGULATORY 1NFORMATION DISTRIBUTION SYSTK'H (RIDS)ACCESSION NBR: 8106090718 OOC~DATE!81/06/08 NOTARIZED:.

NO FACIL!50 387 Susquehanna Steam Electric StationE Unit 1E Pennsylva 50 388 Susquehanna Steam Electric Stationi Unit 2E Pennsylva AUTH INANE AUTHuR AFFILIATION TRIKSCHHANi W~E.Ar my F Dept~of RECIP~NAME RECIPIENT-AFFILIATION YOUNGBLOODEB

~J~Licensing Branch 1 SUBJECTS Comments on OKS~Insufficient info provided re flood olains 4 hazards,FES shoula provide info re 25E50 8 100 yi'lood elements, DOCKET¹05 09938-000 DISTRIBUTION CODE: CODES COPIES RECEIVED:LTR

+ENCL SIZE: TITLE: Environ~Comments.NOTES:Send ISE 3 conies FSAR 8, all amends, 1 cy.BWR-LRG PM(LIBRIS) 05000387 Send I8E 3 copies FSAR 8 all amends, 1 cy:BWR LRG PH(L.RIB)05000388 RECIPIENT IO COOK/NARK ACTION!LIC BR¹2 BC 17 INTERNAl.:

ACC IDNT KVAL BR ENV KNG BR 09 HYDRO GKO BR NRC PDR 02 RAD ASSESSHT BR SIT ANAL BR 10 COP IKS I.TTR ENCL RECIPIENT ID COOK/NAME STARKERS 05 KF TREAT SYS BR HYD/GEO BR ILE 07 0 KG FI 01'TTL AI ANCE BR COPIES LTTR ENCL EXTERNAL;ACRS NATL LAB 20 LPOR NSIC 03 04 pe 12%81 TOTAL NUABER OF COPIES REQUIREDI LTTR.W ENCL DEPARTMENT OF THE ARMY BALTIMORE DISTRICT.CORPS OF ENOINEERS P.O.BOX I 715 BAI TIMORE.MARYLAND EIEO3 REPLY TO ATTKHTIOII OS<NABPL-E Mr.B.J.Youngblood Chief Licensing Branch No.1 Division of Licensing United States Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Youngblood:

This letter is in response to your Draft Environmental Impact Statement (DEIS)related to the operation of the Susquehanna Steam Electric Station Docket Nos.50-387-50>>388.

Comments have been provided in regards to the Corps'reas of concern as they relate to the proposed project.This agency's areas of concern are flood control hazard potential, permit require-ments under Section 404 of the Clean Water Act, and other direct and indirect impacts on Corps of Engineers'xisting and/or proposed projects.Insufficient information has been provided in order for comments to be made with regards to flood plain hazards.It is suggested that the Final Environmental Impact Statement provide information with regards to the 25, 50, and 100-year flood elevations.

Any crossings of these flood plains should be extensively explained and mapped.The physical plant should have flood protection up to the probable maximum flood (PMF)level.A determination has been made that a Department of the Army Section 404 permit will not be required for the proposed construction.

It has also been determined that no impacts are anticipated to any existing and/or proposed Corps of EngineersI projects due to the proposed construction.

The Baltimore District appreciates the opportunity to comment on your DEIS and if we can be of further assistance, please do not hesitate to contact us.Sincerely, s y0609'"'3 i'L, Q WIL IAM.ESC Chief, Planning Division QQQQ 5 Ilo