ML18017A154
ML18017A154 | |
Person / Time | |
---|---|
Site: | Susquehanna, North Anna ![]() |
Issue date: | 04/28/1980 |
From: | Susan Cooper TRANSPORTATION, DEPT. OF |
To: | Sells D Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8005070522 | |
Download: ML18017A154 (3) | |
Similar Documents at Susquehanna, North Anna | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999
[Table view]Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML20207C9851999-05-28028 May 1999 Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999
[Table view]Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML20207C9851999-05-28028 May 1999 Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206H0221999-05-0303 May 1999 Informs That Licensee Changes Bases for TS 3/4.6.1.2, Containment Leakage. Changes Allow Use of Other NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing.Ts Bases Page,Encl ML20206G9481999-05-0303 May 1999 Informs NRC That Insp of 58 Accessible safety-related Pipe Supports Completed in Response to NOV from Insp Rept 50-338/98-05 & 50-339/98-05.Commitments Made Include Plans to Perform Assessment of Welding & Welding Insp ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed ML20205T1181999-04-16016 April 1999 Requests NRC Approval Prior to Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit.Nrc Concurrence with Irradiation Program Requested by End of June 1999 ML20205P1891999-04-0808 April 1999 Forwards ISI Program for Third ten-yr ISI Interval for North Anna Unit 1 for Class 1,2 & 3 Components & Component Support.Third ten-yr Insp Interval for North Anna Unit 1 Begins on 990501.Page 2-26 of Encl Not Included ML20205K3631999-04-0505 April 1999 Requests That Relief Request IWE-3 Be Removed from 980804 Relief Requests Submitted to Nrc.Subject Relief Request Was Inadvertently Retained in Attachment 1 for Unit 1 1999-09-08 Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC MONTHYEARML18040B2701990-01-12012 January 1990
[Table view]Forwards Radiological Emergency Preparedness Exercise Evaluation Rept:Susquehanna Steam Electric Station, for Exercise on 890222.Several Areas Requiring Corrective Action & Deficiency Noted ML20245A0371989-03-20020 March 1989 Forwards Final Exercise Rept for 880628,exercise of Offsite Radiological Emergency Preparedness Plans.No Deficiencies Identified But Several Areas Require Corrective Actions ML18040A8611987-12-29029 December 1987 Forwards 870429 Final Exercise Rept for Exercise of Offsite Radiological Emergency Preparedness Plans site-specific to Facility.No Deficiencies Identified.Outstanding Deficiency Identified at Last Exercise Corrected ML20236S4061987-11-19019 November 1987 Concurs W/Nrc Determination That Operation & Maint Activities of Plant Would Not Affect Archeological Sites SES-3,6,8 & 11,considered Eligible for Inclusion in Natl Register of Historic Places ML20235K5561987-09-0202 September 1987 Forwards, North Anna Power Station Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification, Confirming Adequacy of Applicable Criteria from Rev 1 to NUREG-0654/FEMA-REP-1 & FEMA-REP-10 ML20212B2611986-12-16016 December 1986 Forwards Exercise Rept for 860618 Exercise of Offsite Radiological Emergency Preparedness Plans.No Deficiencies Noted.Areas Requiring Corrective Action Noted in Rept.Plans Adequate ML20214M6511986-08-15015 August 1986 Forwards Susquehanna Steam Electric Station Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification, Satisfying Requirements of Rev 1 to NUREG-0654/FEMA-REP-1 & FEMA-43 ML20153D7481986-02-18018 February 1986 Responds to 860130 Request Re Status of Deficiencies Identified at 850501 Offsite Radiological Emergency Preparedness Exercise.Listed Deficiencies Remain Uncorrected.Postponed Remedial Exercise Not Rescheduled ML20116K3951985-05-0101 May 1985 Forwards FEMA Region III Exercise Evaluation Rept of 841115 Exercise of Offsite Radiological Emergency Preparedness Plans.Corrective Actions Schedule Submitted by Commonwealth of VA Also Encl ML20087J8521984-03-15015 March 1984 Notifies That State of PA Eligible for Biennial Frequency for Participation in Radiological Emergency Preparedness Exercise.Change from Annual Exercise Requirement Would Be Supported If Requested by Util ML20079E7271984-01-0909 January 1984 Forwards Exercise Rept of 830618 Joint Exercise of Offsite Radiological Emergency Preparedness Plans for Facilities ML20076L4201983-06-13013 June 1983 Forwards Evaluation Rept of Radiological Emergency Exercise Conducted on 830323.Deficiencies Cited in Four Areas That Will Require Schedule of Corrective Actions.Extension Until End of June to Furnish Schedule Granted ML20072M2431983-02-23023 February 1983 Approves State of VA & Local Emergency Plans,Subj to FEMA Verification of Adequacy of Alerting & Notification Sys,Per NUREG-0654,Rev 1.Plans Adequate to Protect Public Health & Safety ML20063P4651982-10-0404 October 1982 Responds to Inquiry Re Supplemental Interim Findings on Adequacy of Offsite Emergency Preparedness for Facility. State & Local Emergency Plans Adequate.Conditions Should Be Imposed to Assure Completion of Corrective Actions ML20063L2461982-08-31031 August 1982 Forwards Interim Findings on Offsite Emergency Preparedness at Facility.All Deficiencies Noted in Plan Review & Exercise Evaluation Have Been Corrected,Completed or Scheduled for Completion by Early Jan 1983 ML20054M2301982-06-30030 June 1982 Informs That Written School Plans & Detailed Transportation Plans from Surrounding Municipalities,Submitted in Response to Deficiencies Identified by Susquehanna Aslb,Found to Be Adequate ML18030A4971981-07-0101 July 1981 Verifies Official Filing of EIS (NUREG-0564) for Facilities. Fr Notice of Availability Scheduled to Be Published on 810702.Public Review Period Will Terminate on 810803 ML18030A3021981-06-0808 June 1981 Comments on Des.Insufficient Info Provided Re Flood Plains & Hazards.Fes Should Provide Info Re 25,50 & 100-yr Flood Elevations ML18030A2951981-05-28028 May 1981 Provides Comments on Suppl to Des Re Operation of Facilities.Fes Should Include All Risks from Moderate Frequency Accidents,Infrequent Accidents,Limiting Faults & Severe Core Melt Accidents ML18030A5461981-05-27027 May 1981 Ack 810522 Request for Extension Until 810529 for Submittal of Comments on Des ML18030A5451981-05-18018 May 1981 Comments on 810331 Suppl 2 to Des.Final Suppl Should Assess Potential Impacts to Fish & Wildlife Resources from Nuclear Accident.Active Sand & Gravel Pit & Processing Plant within 3-mile Radius of Low Population Zone Should Be Mentioned ML18030A2881981-05-15015 May 1981 Comments on Des Per 810331 Request.Review Consists of EIS Prepared by Other Agencies in Areas of Electric Power, Natural Gas & Oil Pipeline Industries.No Significant Impacts Exist If Action Undertaken ML18026A3561981-05-14014 May 1981 Comments on Des Per 810508 Request.Review Consisted of EIS Prepared by Other Agencies in Areas of Electric Power, Natural Gas & Oil Pipeline Industries.No Significant Impacts Exist If Action Undertaken ML18030A4831981-04-0808 April 1981 Verifies Official Filing of NRC EIS Draft Suppl 2 (NUREG-0564) for Facility.Fr Notice of Availability Scheduled to Be Published on 810410.Public Review Period Will Terminate on 810525 ML18030A1141980-06-10010 June 1980 Responds to NRC Requests for Comments Re Draft Suppl to Draft Eis.Review Indicates Use of Cowanesque Project Currently Under Const Would Provide Better Water Storage than Building New Reservoir ML19326D5741980-06-0606 June 1980 Forwards Hb Mcdonald Ltr Expressing Concerns Re Continued Operation of Facilities ML18030A0051980-05-30030 May 1980 Forwards Comments on Draft Suppl to Draft EIS Re Operation of Facilities,Specifically Pond Hill Creek Reservoir ML18030A1091980-05-29029 May 1980 Comments on Draft Suppl to EIS Re Facility Operation. Provided That Util Implements Mgt Plans in Consultation W/Pa Fish & Game Commissions,No Objections Offered to Const as Proposed ML18030A4991980-05-27027 May 1980 Submits Comments Re Draft EIS Suppl.Statement Displays Good Environ Assessment & Adequately Addresses Areas within Usda Expertise ML18030A1081980-05-27027 May 1980 Submits Comments Re Des Draft Suppl Review.Clean Water Act Conditions & Mgt Practices Re Proposed Dam Encl.Document Should Address Flood Hazard of Spillway Overtopping ML18030A4351980-05-20020 May 1980 Notifies That Bureau of Radiological Health,Fda,Has Reviewed Draft Suppl to DES,NUREG-0564.No Applicable Comments ML18017A1691980-05-13013 May 1980 Forwards NOAA 800429 Comment Re Des.Geodetic Control Survey Monuments May Be Located in Proposed Project Area.Funding for Project Should Include Cost of Any Relocation Required for Monuments ML18017A1551980-04-30030 April 1980 Comments on NUREG-0564, Draft Suppl to Des: Applicant Should More Fully Investigate Water Quality Problems Associated W/Releases & Present Procedures for Ameliorating Them ML18017A1541980-04-28028 April 1980 Notifies That Draft Suppl to Des Re Proposed Const of Pond Hill Creek Storage Reservoir Adequately Addresses Probable Impacts to Highway Facilities.Requests Evidence of Coordination W/State of PA Dept of Transportation ML20064K0301980-04-17017 April 1980 Requests Info Re NRC Involvement in Archeological Data Recovery Activities for FY79 & Forwards Questionnaire ML19290E6031980-01-25025 January 1980 Forwards White House 791203 Ltr Transmitting Jg Owens 791128 Ltr to President Carter Urging Decision Re Licensing of Facility.Requests Comment ML19320D0401980-01-21021 January 1980 Forwards Misdirected 791203 Ltr Re Licensing of New Nuclear Power Plants ML19309E2341980-01-14014 January 1980 Forwards,For NRC Response,L Brusso 791219 Ltr Requesting Approval of Facility for Operation ML19305D1411979-12-26026 December 1979 Forwards for NRC Response,North Anna Environ Coalition 791201 Ltr to President Carter Protesting Pressure Being Exerted by Governor Dalton & VA Atty Gen Coleman for Licensing of Facility ML19305D2091979-12-26026 December 1979 Forwards for NRC Response,Bm Scott Ltr to President Carter Expressing Concern Re Pressure Being Exerted by VA Govt Officials for Licensing of Facility ML19260D5011979-12-19019 December 1979 Forwards Hanover County (VA) Board of Supervisors 791128 Resolution Supporting Licensing of Facility.Requests Comments ML19211A6331979-11-23023 November 1979 Requests That NRC Expedite Licensing of Facility.Delay Results in Unjustifiable Financial Burden on Citizens of VA ML18031A2591979-09-10010 September 1979 Submits Detailed Comments on Des ML18031A2541979-08-30030 August 1979 Comments on Des.Suggests Effect of Consumptive Withdrawal on Aquatic Habitat During Prolonged Periods of Low Flow Be Addressed & That Monitoring Program Include Plant Intake & Discharge Flows ML18031A2451979-08-20020 August 1979 Comments on Draft Eis.Sediment & Erosion Control Should Be Discussed Re Certain PA State Regulations & Impact on Farm & Agricultural Land Should Be Displayed ML18031A2411979-08-17017 August 1979 Forwards Comments on Des.Document & Proposal Have Been Classified as Environ Rept 2.DES Contains Insufficient Info to Fully Assess Environ Impact ML18031A2391979-08-14014 August 1979 Discusses Des Re Use of 2,4,5-T Weed Control Agent in rights-of-way.Study of Coal & U Fuel Cycles Should Include Indirect Effect of Mining on Landscape ML18031A2321979-08-0909 August 1979 Submits Comments Re Draft Rept.Rept Did Not Discuss Impact on Existing Highways Re Traffic Traveling to & from Plant ML18031A2091979-07-31031 July 1979 Advises That Evaluation of Des Has Been Completed.Offers No Substantive Comments ML19248D2871979-07-12012 July 1979 Forwards FOIA Request from J Allen Re Investigation of Alleged Withholding of Info by VEPCO 1990-01-12 |
Text
puff REGULA TOit INFORMATION DISTRIBUTION STK l (RIDS)
ACCESSION NBR:8005070522 OOC ~ DATF: 80/04/28 NOTARIZED: NO DOCKET ¹ FACIL:Se~~uscuenanna Steam Electric Staticn0 Unit i0 Pennsylva OS000307 388 sque h anna Steam Electric S t a t i on Unit 2 i Pennsy l v a P 0 5 0 0 0 388 AU T AUTHOR AFFILIATION COOPERpS ~ HE TransportationiDept,of REC IP ~ NARK RECIPIENT AFFILIATION SELLSgD ~ ED Environmental Projects Branch 2 SUBJECT; Notifies that draft suppl to DFS re proposed const of Pond Hill Creek storage reservoir adequately addresses probable impacts to high"ay facilities'equests evidence of coordination ~/State o,f PA Dept of COOK: C002S COPIES RECEIVED:LTR Transportation'ISTRIOUTIOiN FNCL ~ SIZE: /
TITLE: Environs Comments'=
NOTES'-M~A me i'm RECIPIENT COPIES REC IP IEiQT COP IF.S ACTION ~ 05 PM 18
~~~~~
IO CODE/NAIE LAl ~~~~
LTTR ENCL 1
1 1
1 ID CODE/NA9E 17SC AD I~KNW LTTR ENCL f 1 0
INTERNAI: 0 EGAL 1 1 02 NRC PDR 07 IY 2 2 09 ENVN SPEC BR 10 CST SNFT'ANL 1 1 12 GEOSCIEN BR 13 HYDRO METEOR 1 1 ACDFNT ANAl Y 15 KFLT TRT SYS 1 1 16 RAD ASST BR 19 DIR DSE 1 AD ENVIRON TECH AD SITE ANALY 1 0 OKLD EXTERNAL: 03 LPDR 1 1 04 NSIC 1 1 ZO NATL LAB ~~ ~ 5 5 ACRS 0
'9 S~R I
+- 19'< ~ai<QT l,'IPj7 9 'Iggt>
TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL 22
800 5 07 9z z DEPARTMENT OF TRANGPORTATlON REGIONAL REPRESENTATIVE OF THE SECRETARY 434 WALNUT STREET PHILADELPHIA, PENNSYLVANIA 19I06 April 28, 1980 REGION III Donald E. Sells Acting Branch Chief Environmental Projects Branch 2 Divison of Site Safety tI Environmental Analysis U.S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: Draft Supplement to the DEIS related to the operation, of the Susquehanna Steam Electric Station, Units 1 g 2 Docket Nos.: 50-387 and 50-388 The draft supplement to the DEIS covering the proposed con-struction of the Pond Hill Creek storage reservoir for the Sus-quehanna Steam Electric Station has adequately addressed the probable impacts to highway facilities.. However, the supplement still lacks evidence of coordination with the Pennsylvania Department of Transportation. 'Since the pump station construction will affect Route 239 (pg. 4-12) and an access road will be added for the reservoir construction, we repeat our comment of August 9, 1979, recommending coordination with PA DOT.
Sally H. Cooper Regional Representative of the Secretary g~'V SPCCO 55 It's 0 Iew we Cen liVe With.