r.o 1 Federal Emergency Management Agency avy[i
- aen, n zek
' g f
Washington, D.C. 20472 J
GCunningham Grace AUG i 51986 Mr. Victor Stello, Jr.
Executive Director for Operations U.S. Nuclear Regulatory Ccrimission Washington, D.C.
20555 Dear Mr. Stello The Federal Emergency Management Agency (FEMA) has coupleted an analysis of the pronpt alert and notification system for the Susquehanna Steam Electric Station in Salem Township, Pennsylvania. Eis review has been conpleted pursuant to FEMA Rule 44 CFR 350; selected evaluative criteria and Appendix 3 in NUREG-0654/
FEMA-REP-1, Rev.1; and FEMA-43, the " Standard Guide for the Evaluation of Alert and Notification Systems for Nuclear Power Plants" (now published as FEMA-REP-10).
The enclosed report entitled "Susquehanna Steam Electric Station Site-Specific Offsite Radiological Emergency Preparedness Alert and Notification System Ouality Assurance Verification" sunmarizes the engineering design review, incorporates the results of the telephone survey of the public conducted in.aediately following activation of the alert and notification system on April 10, 1985, and confirms the adequacy of the applicable evaluative criteria from NUREG-0654/FENA-REP-1, Pev. 1, and FEMA-43.
Based on the engineering design review and the results of the telephone survey, FEMA has determined that the alert and notification system installed around the Susquehanna Steam Electric Station satisfies the requirements of NUREG-0654/ FEMA-REP-1, Rev.1, and FEMA-43. Werefore, there is reasonable assurance that the system is adequate to promptly alert and notify the public in the event of a radiological emergency at the site. A full review of the offsite radiological emergency preparedness plans site-specific to the Susquehanna Steam Electric Station will be conpleted by FEMA in accordance with FEMA Rule 44 CFR 350 at a later date.
Sincerely, SF?
Samuel W. Speck Associate Director l
State and Incal Programs and Support l