{{#Wiki_filter:Pennsylvania Power8LightCompanyTwoNorthNinthStreet~Allentown, PA18101~215/770-5151HaroldW.Keiser'ice President-Nuclear Operations 215/770-7502 OCT33i986DirectorofNuclearReactorRegulation Attention:
{{#Wiki_filter:Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215/770-5151 Harold W.Keiser'ice President-Nuclear Operations 21 5/770-7502 OCT 3 3 i986 Director of Nuclear Reactor Regulation Attention:
Ms.E.Adensam,ProjectDirectorBWRProjectDirectorate No.3DivisionofLicensing U.S.NuclearRegulatory Commission Washington, D.C.20555SUSQUEHANNA STEAMELECTRICSTATIONAPPENDIXR-ADDITIONAL INFORMATION ONDEVIATION REQUESTNO.6NON-FIREPROOF STRUCTURAL STEELPLA-2749FILEP5-1,A17-15DocketNo.50-387and50-388
Ms.E.Adensam, Project Director BWR Project Directorate No.3 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION APPENDIX R-ADDITIONAL INFORMATION ON DEVIATION REQUEST NO.6 NON-FIREPROOF STRUCTURAL STEEL PLA-2749 FILE P5-1, A17-15 Docket No.50-387 and 50-388  


==DearMs.Adensam:==
==Dear Ms.Adensam:==
EnclosedisourrevisiontoDeviation RequestNumber6whichaddresses Non-Fireproofing ofStructural Steelincluding issuesandconcernsraisedbyyourstaffduringtheirmeetingwithusonJuly30,1986.Inordertoadequately addresstheissuesandconcernsraisedbyyourstaff,anextensive reanalysis oftheUnit1andUnit2ReactorBuildings wasperformed.
Enclosed is our revision to Deviation Request Number 6 which addresses Non-Fireproofing of Structural Steel including issues and concerns raised by your staff during their meeting with us on July 30, 1986.In order to adequately address the issues and concerns raised by your staff, an extensive reanalysis of the Unit 1 and Unit 2 Reactor Buildings was performed.
Thiseffortrequiredadetailedstructural analysisinparallelwithafireprotection evaluation inordertoexamineallareasofeachbuildingonafloor-by-floor, area-by-area, andcase-by-case basis.Becauseoftheshearmagnitude ofthiseffort,asubstantial amountoftimewasrequiredtocompleteit.Yourstaffexpressed concernwithouruseofaveragecombustible loadingsinourpreviousanalysis.
This effort required a detailed structural analysis in parallel with a fire protection evaluation in order to examine all areas of each building on a floor-by-floor, area-by-area, and case-by-case basis.Because of the shear magnitude of this effort, a substantial amount of time was required to complete it.Your staff expressed concern with our use of average combustible loadings in our previous analysis.Our reanalysis is based on fire test data (referenced in the attached summary report)and existing plant configurations.
Ourreanalysis isbasedonfiretestdata(referenced intheattachedsummaryreport)andexistingplantconfigurations.
If you have any questions regarding this submittal, please contact us.Very truly yours, qx H.W.Keiser Vice President-Nuclear Operations cc: M.C.Thadani-NRC L.R.Plisco-'RC 8611060158-861031 PDR'DOCK 05000387':-F PDR APPENDIX R DEVIATION RE UEST E-NON FIREPROOFED STRUCTURAL STEEL Deviation Request No.6 Revised October'986
Ifyouhaveanyquestions regarding thissubmittal, pleasecontactus.Verytrulyyours,qxH.W.KeiserVicePresident-Nuclear Operations cc:M.C.Thadani-NRCL.R.Plisco-'RC8611060158-861031PDR'DOCK05000387':-FPDR APPENDIXRDEVIATION REUESTE-NONFIREPROOFED STRUCTURAL STEELDeviation RequestNo.6RevisedOctober'986
'age 1 of 3 EIIATIOE EEIEII Exposed structural steel supporting the fire area barriers ident'ified below are acceptable and do not require fireproofing.
'age1of3EIIATIOEEEIEIIExposedstructural steelsupporting thefireareabarriersident'ified belowareacceptable anddonotrequirefireproofing.
FIRE ZONES AFFECTED:<'C-i Table 1.0 provides a list of the affected fire zones.This table,als'o.=reefs to a series of drawings associated with each fire rated floor',slab'o s6o'w'tfie extent of the required fire protection.
FIREZONESAFFECTED:
REASON FOR DEVIATION RE UEST: I Within the Unit 1 and 2 Reactor Buildings and Control Structure, cert'ain floor/ceiling assemb'lies are to be upgraded to a 3 hour fire rating,',<t'o'eparate redundant safe shutdown equipment.
<'C-iTable1.0providesalistoftheaffectedfirezones.Thistable,als'o.=reefs toaseriesofdrawingsassociated witheachfireratedfloor',slab'o s6o'w'tfie extentoftherequiredfireprotection.
The structural steel supporting these floors is not protected.
REASONFORDEVIATION REUEST:IWithintheUnit1and2ReactorBuildings andControlStructure, cert'ainfloor/ceiling assemb'lies aretobeupgradedtoa3hourfirerating,',<t'o'eparate redundant safeshutdownequipment.
Thestructural steelsupporting thesefloorsisnotprotected.
JUSTIFICATION:
JUSTIFICATION:
UNIT&#xb9;IAND&#xb9;2REACTORBUILDINGS:
UNIT&#xb9;I AND&#xb9;2 REACTOR BUILDINGS:
Structural steel'associated witheachoftheUnit&#xb9;Iand&#xb9;2ReactorBuildingfirebarriersrequiredtobeupgradedwasexaminedandtheevaluation criteriaappliedtodemonstrate thatfireproofingofthisstructural steelisnotrequiredwasdeveloped inthe"SummaryReportforStructural SteelEvaluation" documented asEngineering StudySEA-CE-003.
Structural steel'associated with each of the Unit&#xb9;I and&#xb9;2 Reactor Building fire barriers required to be upgraded was examined and the evaluation criteria applied to demonstrate that fire proofing of this structural steel is not required was developed in the"Summary Report for Structural Steel Evaluation" documented as Engineering Study SEA-CE-003.
Toclearlydemonstrate
To clearly demonstrate.the applicabi 1ity of this criteria to the fire area barriers in question:, a'rawing of each area, corresponding
.theapplicabi 1ityofthiscriteriatothefireareabarriersinquestion:,
'to the Fire Zones listed in.Tabl'e 1'.0, is attached to this deviation request along with an area unique justification for each drawing.These drawings show the barrier area in question, the structural steel members supporting the barrier and the primary combustibles relevant to each area.Each drawing s corresponding unique justification references the section of the Summary Report for Structural Steel Evaluation that provides the basis for that justification.
a'rawingofeacharea,corresponding
je l1 n~II Jlg g<'f>'s yf+'ll.ill*h (),'i'<)I I'I II;)(e t~'f i C P 1 C,g p f'lW)F ii)(>l'pj' Deviation Request No.6 Revised October 1986'age 2 of 3 CONTROL STRUCTURE:
'totheFireZoneslistedin.Tabl'e1'.0,isattachedtothisdeviation requestalongwithanareauniquejustification foreachdrawing.Thesedrawingsshowthebarrierareainquestion, thestructural steelmemberssupporting thebarrierandtheprimarycombustibles relevanttoeacharea.Eachdrawingscorresponding uniquejustification references thesectionoftheSummaryReportforStructural SteelEvaluation thatprovidesthebasisforthatjustification.
Automatic detection and protection is provided below the exposed structural steel.The majority of the combustibles in the area below the exposed structural steel are cables.The majority of the cables are located either below the raised (computer type)floor in the Control Room or in 2 hour fire rated cable chases on the north and south walls of the control structure where only one structural member is effected.There is-approximately 20 feet between the raised computer floor and the exposed structural steel supporting
jel1n~IIJlgg<'f>'syf+'ll.ill*h(),'i'<)II'III;)(et~'fiCP1C,gpf'lW)Fii)(>l'pj
.elevation 754'-0.Finally, the Control Room comprises the majority of the area beneath this steel and it is continually staffed.dk/d205i:mg jp I\~bW I~J l~~I*
'
TABLE 1.0 Deviation Request No.6 Revised October 1986 Page 3 oE 3 FIRE ZONE BENEATH RATED FLOOR SLAB Unit 1 Reactor Buil 1-1F 1-1E 1-3A 1-3B-W 1-3B-W 1-4A-W 1-4A-W 1-4A-N 1-4A-W 1"4A-S 1-4A-W 1-4A-N 1-4G 1-5A-S TOP OF SLAB ELEVATION 683'"0" 683'" 719'1" 719'"1 719'"1 749'-ln 749&#x17d;1" 749'-1 749&#x17d;1" 761'-3.0" 779'-1 NFPA 13 SPRINKLER PROTECTION PROVIDED No No Partial Yes Yes Yes Yes Yes Yes Yes DRAWING REFERENCE C-206006 Sht.1 C-206006 Sht.2 C-206007-Shts.
Deviation RequestNo.6RevisedOctober1986'age2of3CONTROLSTRUCTURE:
1&2 C-206021 Sht.1 C-206021 Sht.2 C-206008 Shts.1&3 C-206008 Sht.2 C-206008 Sht.4 C-206008 Sht.5 C-206009 Shts.1&2 C-206010 Shts.162 Unit 2 Reactor Build 2"1F 2-lE 2"3B-N 2-3B-W 2-3B-W 2-4A-S 2-4A-W 2-4A-W 2-4A-W 2-4A-S 2-4A-W 2-4A-N 2-4G 2-5C 2-5A-S 2-5B 2-6A 683'-00 683'-0" 719'-1" 719'-1" 719<-l" 749)"1u 749'-1" 749&#x17d;1" ,749&#x17d;1" 761'"10" 779 1 Ill 799'-1" No No Yes Yes Yes Yes.Yes Yes Yes No No C-206011 Sht.1 C-206011 Sht.2 C-206012 Shts.1&2 C-206022 Sht.1 C"206022 Sht.2 C-206013 Sht.1 C-206013 Shts.2&3 C-206013 Sht.4 C-206013 SIlt.5 C-206014 Shts.1&2 C-206015 Shts.l,2&3 C-206016 Sht.1 Control Structure 0-26A)E-N)P)R 754'-0" Partial N/A dk/d205ai:mg}}
Automatic detection andprotection isprovidedbelowtheexposedstructural steel.Themajorityofthecombustibles intheareabelowtheexposedstructural steelarecables.Themajorityofthecablesarelocatedeitherbelowtheraised(computer type)floorintheControlRoomorin2hourfireratedcablechasesonthenorthandsouthwallsofthecontrolstructure whereonlyonestructural memberiseffected.
Thereis-approximately 20feetbetweentheraisedcomputerfloorandtheexposedstructural steelsupporting
.elevation 754'-0.Finally,theControlRoomcomprises themajorityoftheareabeneaththissteelanditiscontinually staffed.dk/d205i:mg jpI\~bWI~Jl~~I*
TABLE1.0Deviation RequestNo.6RevisedOctober1986Page3oE3FIREZONEBENEATHRATEDFLOORSLABUnit1ReactorBuil1-1F1-1E1-3A1-3B-W1-3B-W1-4A-W1-4A-W1-4A-N1-4A-W1"4A-S1-4A-W1-4A-N1-4G1-5A-STOPOFSLABELEVATION 683'"0"683'"719'1"719'"1719'"1749'-ln749&#x17d;1"749'-1749&#x17d;1"761'-3.0" 779'-1NFPA13SPRINKLER PROTECTION PROVIDEDNoNoPartialYesYesYesYesYesYesYesDRAWINGREFERENCE C-206006Sht.1C-206006Sht.2C-206007-Shts.
1&2C-206021Sht.1C-206021Sht.2C-206008Shts.1&3C-206008Sht.2C-206008Sht.4C-206008Sht.5C-206009Shts.1&2C-206010Shts.162Unit2ReactorBuild2"1F2-lE2"3B-N2-3B-W2-3B-W2-4A-S2-4A-W2-4A-W2-4A-W2-4A-S2-4A-W2-4A-N2-4G2-5C2-5A-S2-5B2-6A683'-00683'-0"719'-1"719'-1"719<-l"749)"1u749'-1"749&#x17d;1",749&#x17d;1"761'"10"7791Ill799'-1"NoNoYesYesYesYes.YesYesYesNoNoC-206011Sht.1C-206011Sht.2C-206012Shts.1&2C-206022Sht.1C"206022Sht.2C-206013Sht.1C-206013Shts.2&3C-206013Sht.4C-206013SIlt.5C-206014Shts.1&2C-206015Shts.l,2&3 C-206016Sht.1ControlStructure 0-26A)E-N)P)R754'-0"PartialN/Adk/d205ai:mg}}

Revision as of 02:11, 6 July 2018

Forwards Rev to Deviation Request 6,addressing App R Re Nonfireproofing of Structural Steel,Including Issues & Concerns Raised by NRC During 860730 meeting.Thirty-two Oversize Drawings Encl
ML18040A816
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/31/1986
From: KEISER H W
PENNSYLVANIA POWER & LIGHT CO.
To: ADENSAM E
Office of Nuclear Reactor Regulation
Shared Package
ML17146A596 List:
References
PLA-2749, NUDOCS 8611060158
Download: ML18040A816 (6)


Text

Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215/770-5151 Harold W.Keiser'ice President-Nuclear Operations 21 5/770-7502 OCT 3 3 i986 Director of Nuclear Reactor Regulation Attention:

Ms.E.Adensam, Project Director BWR Project Directorate No.3 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 SUSQUEHANNA STEAM ELECTRIC STATION APPENDIX R-ADDITIONAL INFORMATION ON DEVIATION REQUEST NO.6 NON-FIREPROOF STRUCTURAL STEEL PLA-2749 FILE P5-1, A17-15 Docket No.50-387 and 50-388

Dear Ms.Adensam:

Enclosed is our revision to Deviation Request Number 6 which addresses Non-Fireproofing of Structural Steel including issues and concerns raised by your staff during their meeting with us on July 30, 1986.In order to adequately address the issues and concerns raised by your staff, an extensive reanalysis of the Unit 1 and Unit 2 Reactor Buildings was performed.

This effort required a detailed structural analysis in parallel with a fire protection evaluation in order to examine all areas of each building on a floor-by-floor, area-by-area, and case-by-case basis.Because of the shear magnitude of this effort, a substantial amount of time was required to complete it.Your staff expressed concern with our use of average combustible loadings in our previous analysis.Our reanalysis is based on fire test data (referenced in the attached summary report)and existing plant configurations.

If you have any questions regarding this submittal, please contact us.Very truly yours, qx H.W.Keiser Vice President-Nuclear Operations cc: M.C.Thadani-NRC L.R.Plisco-'RC 8611060158-861031 PDR'DOCK 05000387':-F PDR APPENDIX R DEVIATION RE UEST E-NON FIREPROOFED STRUCTURAL STEEL Deviation Request No.6 Revised October'986

'age 1 of 3 EIIATIOE EEIEII Exposed structural steel supporting the fire area barriers ident'ified below are acceptable and do not require fireproofing.

FIRE ZONES AFFECTED:<'C-i Table 1.0 provides a list of the affected fire zones.This table,als'o.=reefs to a series of drawings associated with each fire rated floor',slab'o s6o'w'tfie extent of the required fire protection.

REASON FOR DEVIATION RE UEST: I Within the Unit 1 and 2 Reactor Buildings and Control Structure, cert'ain floor/ceiling assemb'lies are to be upgraded to a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire rating,',<t'o'eparate redundant safe shutdown equipment.

The structural steel supporting these floors is not protected.

JUSTIFICATION:

UNIT¹I AND¹2 REACTOR BUILDINGS:

Structural steel'associated with each of the Unit¹I and¹2 Reactor Building fire barriers required to be upgraded was examined and the evaluation criteria applied to demonstrate that fire proofing of this structural steel is not required was developed in the"Summary Report for Structural Steel Evaluation" documented as Engineering Study SEA-CE-003.

To clearly demonstrate.the applicabi 1ity of this criteria to the fire area barriers in question:, a'rawing of each area, corresponding

'to the Fire Zones listed in.Tabl'e 1'.0, is attached to this deviation request along with an area unique justification for each drawing.These drawings show the barrier area in question, the structural steel members supporting the barrier and the primary combustibles relevant to each area.Each drawing s corresponding unique justification references the section of the Summary Report for Structural Steel Evaluation that provides the basis for that justification.

je l1 n~II Jlg g<'f>'s yf+'ll.ill*h (),'i'<)I I'I II;)(e t~'f i C P 1 C,g p f'lW)F ii)(>l'pj' Deviation Request No.6 Revised October 1986'age 2 of 3 CONTROL STRUCTURE:

Automatic detection and protection is provided below the exposed structural steel.The majority of the combustibles in the area below the exposed structural steel are cables.The majority of the cables are located either below the raised (computer type)floor in the Control Room or in 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> fire rated cable chases on the north and south walls of the control structure where only one structural member is effected.There is-approximately 20 feet between the raised computer floor and the exposed structural steel supporting

.elevation 754'-0.Finally, the Control Room comprises the majority of the area beneath this steel and it is continually staffed.dk/d205i:mg jp I\~bW I~J l~~I*

TABLE 1.0 Deviation Request No.6 Revised October 1986 Page 3 oE 3 FIRE ZONE BENEATH RATED FLOOR SLAB Unit 1 Reactor Buil 1-1F 1-1E 1-3A 1-3B-W 1-3B-W 1-4A-W 1-4A-W 1-4A-N 1-4A-W 1"4A-S 1-4A-W 1-4A-N 1-4G 1-5A-S TOP OF SLAB ELEVATION 683'"0" 683'" 719'1" 719'"1 719'"1 749'-ln 749Ž1" 749'-1 749Ž1" 761'-3.0" 779'-1 NFPA 13 SPRINKLER PROTECTION PROVIDED No No Partial Yes Yes Yes Yes Yes Yes Yes DRAWING REFERENCE C-206006 Sht.1 C-206006 Sht.2 C-206007-Shts.

1&2 C-206021 Sht.1 C-206021 Sht.2 C-206008 Shts.1&3 C-206008 Sht.2 C-206008 Sht.4 C-206008 Sht.5 C-206009 Shts.1&2 C-206010 Shts.162 Unit 2 Reactor Build 2"1F 2-lE 2"3B-N 2-3B-W 2-3B-W 2-4A-S 2-4A-W 2-4A-W 2-4A-W 2-4A-S 2-4A-W 2-4A-N 2-4G 2-5C 2-5A-S 2-5B 2-6A 683'-00 683'-0" 719'-1" 719'-1" 719<-l" 749)"1u 749'-1" 749Ž1" ,749Ž1" 761'"10" 779 1 Ill 799'-1" No No Yes Yes Yes Yes.Yes Yes Yes No No C-206011 Sht.1 C-206011 Sht.2 C-206012 Shts.1&2 C-206022 Sht.1 C"206022 Sht.2 C-206013 Sht.1 C-206013 Shts.2&3 C-206013 Sht.4 C-206013 SIlt.5 C-206014 Shts.1&2 C-206015 Shts.l,2&3 C-206016 Sht.1 Control Structure 0-26A)E-N)P)R 754'-0" Partial N/A dk/d205ai:mg